Built Within · Hands-On Hospitality
Project Estimate
Division-based construction estimate worksheet
Estimate
Division-based construction estimate worksheet
⌕
35 divisions · 317 sections
| ID | Division / Section | Qty | Unit | Unit Cost | Total | Section Total | Division Total |
|---|---|---|---|---|---|---|---|
| DIV 00 | Procurement and Contracting Requirements13 | $0 | |||||
| Section-00-001 | Bid / Proposal Submitted | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-002 | Contract Executed | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-003 | Bonds Received | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-004 | Insurance Received | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-005 | Notice to Proceed | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-006 | Permit Status | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| Section-00-007 | Schedule of Values | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-008 | Pay Applications | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-009 | RFIs / Clarifications | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-010 | Change Orders | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-011 | Substantial Completion | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-012 | Final Closeout | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-013 | Warranties | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 01 | General Requirements15 | $0 | |||||
| Section-01-001 | Project Summary / Scope | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| └Scope 76 | $0 | ||||||
| └Scope 77 | $0 | ||||||
| └Scope 78 | $0 | ||||||
| └Scope 79 | $0 | ||||||
| └Scope 80 | $0 | ||||||
| └Scope 81 | $0 | ||||||
| └Scope 82 | $0 | ||||||
| └Scope 83 | $0 | ||||||
| └Scope 84 | $0 | ||||||
| └Scope 85 | $0 | ||||||
| └Scope 86 | $0 | ||||||
| └Scope 87 | $0 | ||||||
| └Scope 88 | $0 | ||||||
| └Scope 89 | $0 | ||||||
| └Scope 90 | $0 | ||||||
| └Scope 91 | $0 | ||||||
| └Scope 92 | $0 | ||||||
| └Scope 93 | $0 | ||||||
| └Scope 94 | $0 | ||||||
| └Scope 95 | $0 | ||||||
| └Scope 96 | $0 | ||||||
| └Scope 97 | $0 | ||||||
| └Scope 98 | $0 | ||||||
| └Scope 99 | $0 | ||||||
| └Scope 100 | $0 | ||||||
| └Scope 101 | $0 | ||||||
| └Scope 102 | $0 | ||||||
| └Scope 103 | $0 | ||||||
| └Scope 104 | $0 | ||||||
| └Scope 105 | $0 | ||||||
| └Scope 106 | $0 | ||||||
| └Scope 107 | $0 | ||||||
| └Scope 108 | $0 | ||||||
| └Scope 109 | $0 | ||||||
| └Scope 110 | $0 | ||||||
| └Scope 111 | $0 | ||||||
| └Scope 112 | $0 | ||||||
| └Scope 113 | $0 | ||||||
| └Scope 114 | $0 | ||||||
| └Scope 115 | $0 | ||||||
| └Scope 116 | $0 | ||||||
| └Scope 117 | $0 | ||||||
| └Scope 118 | $0 | ||||||
| └Scope 119 | $0 | ||||||
| └Scope 120 | $0 | ||||||
| └Scope 121 | $0 | ||||||
| └Scope 122 | $0 | ||||||
| └Scope 123 | $0 | ||||||
| └Scope 124 | $0 | ||||||
| └Scope 125 | $0 | ||||||
| └Scope 126 | $0 | ||||||
| └Scope 127 | $0 | ||||||
| └Scope 128 | $0 | ||||||
| └Scope 129 | $0 | ||||||
| └Scope 130 | $0 | ||||||
| └Scope 131 | $0 | ||||||
| └Scope 132 | $0 | ||||||
| └Scope 133 | $0 | ||||||
| └Scope 134 | $0 | ||||||
| └Scope 135 | $0 | ||||||
| └Scope 136 | $0 | ||||||
| └Scope 137 | $0 | ||||||
| └Scope 138 | $0 | ||||||
| └Scope 139 | $0 | ||||||
| └Scope 140 | $0 | ||||||
| └Scope 141 | $0 | ||||||
| └Scope 142 | $0 | ||||||
| └Scope 143 | $0 | ||||||
| └Scope 144 | $0 | ||||||
| └Scope 145 | $0 | ||||||
| └Scope 146 | $0 | ||||||
| └Scope 147 | $0 | ||||||
| └Scope 148 | $0 | ||||||
| └Scope 149 | $0 | ||||||
| └Scope 150 | $0 | ||||||
| └Scope 151 | $0 | ||||||
| └Scope 152 | $0 | ||||||
| └Scope 153 | $0 | ||||||
| └Scope 154 | $0 | ||||||
| └Scope 155 | $0 | ||||||
| └Scope 156 | $0 | ||||||
| └Scope 157 | $0 | ||||||
| └Scope 158 | $0 | ||||||
| └Scope 159 | $0 | ||||||
| └Scope 160 | $0 | ||||||
| └Scope 161 | $0 | ||||||
| └Scope 162 | $0 | ||||||
| └Scope 163 | $0 | ||||||
| └Scope 164 | $0 | ||||||
| └Scope 165 | $0 | ||||||
| └Scope 166 | $0 | ||||||
| └Scope 167 | $0 | ||||||
| └Scope 168 | $0 | ||||||
| └Scope 169 | $0 | ||||||
| └Scope 170 | $0 | ||||||
| └Scope 171 | $0 | ||||||
| └Scope 172 | $0 | ||||||
| └Scope 173 | $0 | ||||||
| └Scope 174 | $0 | ||||||
| └Scope 175 | $0 | ||||||
| └Scope 176 | $0 | ||||||
| └Scope 177 | $0 | ||||||
| └Scope 178 | $0 | ||||||
| └Scope 179 | $0 | ||||||
| └Scope 180 | $0 | ||||||
| └Scope 181 | $0 | ||||||
| └Scope 182 | $0 | ||||||
| └Scope 183 | $0 | ||||||
| └Scope 184 | $0 | ||||||
| └Scope 185 | $0 | ||||||
| └Scope 186 | $0 | ||||||
| └Scope 187 | $0 | ||||||
| └Scope 188 | $0 | ||||||
| └Scope 189 | $0 | ||||||
| └Scope 190 | $0 | ||||||
| └Scope 191 | $0 | ||||||
| └Scope 192 | $0 | ||||||
| └Scope 193 | $0 | ||||||
| └Scope 194 | $0 | ||||||
| └Scope 195 | $0 | ||||||
| └Scope 196 | $0 | ||||||
| └Scope 197 | $0 | ||||||
| └Scope 198 | $0 | ||||||
| └Scope 199 | $0 | ||||||
| └Scope 200 | $0 | ||||||
| └Scope 201 | $0 | ||||||
| └Scope 202 | $0 | ||||||
| └Scope 203 | $0 | ||||||
| └Scope 204 | $0 | ||||||
| └Scope 205 | $0 | ||||||
| └Scope 206 | $0 | ||||||
| └Scope 207 | $0 | ||||||
| └Scope 208 | $0 | ||||||
| └Scope 209 | $0 | ||||||
| └Scope 210 | $0 | ||||||
| └Scope 211 | $0 | ||||||
| └Scope 212 | $0 | ||||||
| └Scope 213 | $0 | ||||||
| └Scope 214 | $0 | ||||||
| └Scope 215 | $0 | ||||||
| └Scope 216 | $0 | ||||||
| └Scope 217 | $0 | ||||||
| └Scope 218 | $0 | ||||||
| └Scope 219 | $0 | ||||||
| └Scope 220 | $0 | ||||||
| └Scope 221 | $0 | ||||||
| └Scope 222 | $0 | ||||||
| └Scope 223 | $0 | ||||||
| └Scope 224 | $0 | ||||||
| └Scope 225 | $0 | ||||||
| └Scope 226 | $0 | ||||||
| └Scope 227 | $0 | ||||||
| └Scope 228 | $0 | ||||||
| └Scope 229 | $0 | ||||||
| └Scope 230 | $0 | ||||||
| └Scope 231 | $0 | ||||||
| └Scope 232 | $0 | ||||||
| └Scope 233 | $0 | ||||||
| └Scope 234 | $0 | ||||||
| └Scope 235 | $0 | ||||||
| └Scope 236 | $0 | ||||||
| └Scope 237 | $0 | ||||||
| └Scope 238 | $0 | ||||||
| └Scope 239 | $0 | ||||||
| └Scope 240 | $0 | ||||||
| └Scope 241 | $0 | ||||||
| └Scope 242 | $0 | ||||||
| └Scope 243 | $0 | ||||||
| └Scope 244 | $0 | ||||||
| └Scope 245 | $0 | ||||||
| └Scope 246 | $0 | ||||||
| └Scope 247 | $0 | ||||||
| └Scope 248 | $0 | ||||||
| └Scope 249 | $0 | ||||||
| └Scope 250 | $0 | ||||||
| └Scope 251 | $0 | ||||||
| └Scope 252 | $0 | ||||||
| └Scope 253 | $0 | ||||||
| └Scope 254 | $0 | ||||||
| └Scope 255 | $0 | ||||||
| └Scope 256 | $0 | ||||||
| └Scope 257 | $0 | ||||||
| └Scope 258 | $0 | ||||||
| └Scope 259 | $0 | ||||||
| └Scope 260 | $0 | ||||||
| └Scope 261 | $0 | ||||||
| └Scope 262 | $0 | ||||||
| └Scope 263 | $0 | ||||||
| └Scope 264 | $0 | ||||||
| └Scope 265 | $0 | ||||||
| └Scope 266 | $0 | ||||||
| └Scope 267 | $0 | ||||||
| └Scope 268 | $0 | ||||||
| └Scope 269 | $0 | ||||||
| └Scope 270 | $0 | ||||||
| └Scope 271 | $0 | ||||||
| └Scope 272 | $0 | ||||||
| └Scope 273 | $0 | ||||||
| └Scope 274 | $0 | ||||||
| └Scope 275 | $0 | ||||||
| └Scope 276 | $0 | ||||||
| └Scope 277 | $0 | ||||||
| └Scope 278 | $0 | ||||||
| └Scope 279 | $0 | ||||||
| └Scope 280 | $0 | ||||||
| └Scope 281 | $0 | ||||||
| └Scope 282 | $0 | ||||||
| └Scope 283 | $0 | ||||||
| └Scope 284 | $0 | ||||||
| └Scope 285 | $0 | ||||||
| └Scope 286 | $0 | ||||||
| └Scope 287 | $0 | ||||||
| └Scope 288 | $0 | ||||||
| └Scope 289 | $0 | ||||||
| └Scope 290 | $0 | ||||||
| └Scope 291 | $0 | ||||||
| └Scope 292 | $0 | ||||||
| └Scope 293 | $0 | ||||||
| └Scope 294 | $0 | ||||||
| └Scope 295 | $0 | ||||||
| └Scope 296 | $0 | ||||||
| └Scope 297 | $0 | ||||||
| └Scope 298 | $0 | ||||||
| └Scope 299 | $0 | ||||||
| └Scope 300 | $0 | ||||||
| └Scope 301 | $0 | ||||||
| └Scope 302 | $0 | ||||||
| └Scope 303 | $0 | ||||||
| └Scope 304 | $0 | ||||||
| └Scope 305 | $0 | ||||||
| └Scope 306 | $0 | ||||||
| └Scope 307 | $0 | ||||||
| └Scope 308 | $0 | ||||||
| └Scope 309 | $0 | ||||||
| └Scope 310 | $0 | ||||||
| └Scope 311 | $0 | ||||||
| └Scope 312 | $0 | ||||||
| └Scope 313 | $0 | ||||||
| └Scope 314 | $0 | ||||||
| └Scope 315 | $0 | ||||||
| └Scope 316 | $0 | ||||||
| └Scope 317 | $0 | ||||||
| └Scope 318 | $0 | ||||||
| └Scope 319 | $0 | ||||||
| └Scope 320 | $0 | ||||||
| └Scope 321 | $0 | ||||||
| └Scope 322 | $0 | ||||||
| └Scope 323 | $0 | ||||||
| └Scope 324 | $0 | ||||||
| └Scope 325 | $0 | ||||||
| └Scope 326 | $0 | ||||||
| └Scope 327 | $0 | ||||||
| └Scope 328 | $0 | ||||||
| └Scope 329 | $0 | ||||||
| └Scope 330 | $0 | ||||||
| └Scope 331 | $0 | ||||||
| └Scope 332 | $0 | ||||||
| └Scope 333 | $0 | ||||||
| Section-01-002 | Work Restrictions / Site Rules | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-003 | Project Meetings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-004 | Construction Schedule | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-005 | Progress Photos / Documentation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-006 | Submittals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| Section-01-007 | Quality Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| └Scope 76 | $0 | ||||||
| └Scope 77 | $0 | ||||||
| └Scope 78 | $0 | ||||||
| └Scope 79 | $0 | ||||||
| └Scope 80 | $0 | ||||||
| └Scope 81 | $0 | ||||||
| └Scope 82 | $0 | ||||||
| └Scope 83 | $0 | ||||||
| └Scope 84 | $0 | ||||||
| Section-01-008 | Temporary Facilities / Utilities | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-009 | Temporary Controls / Safety / Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| └Scope 76 | $0 | ||||||
| └Scope 77 | $0 | ||||||
| └Scope 78 | $0 | ||||||
| └Scope 79 | $0 | ||||||
| └Scope 80 | $0 | ||||||
| └Scope 81 | $0 | ||||||
| └Scope 82 | $0 | ||||||
| └Scope 83 | $0 | ||||||
| └Scope 84 | $0 | ||||||
| └Scope 85 | $0 | ||||||
| └Scope 86 | $0 | ||||||
| └Scope 87 | $0 | ||||||
| └Scope 88 | $0 | ||||||
| └Scope 89 | $0 | ||||||
| └Scope 90 | $0 | ||||||
| └Scope 91 | $0 | ||||||
| └Scope 92 | $0 | ||||||
| └Scope 93 | $0 | ||||||
| └Scope 94 | $0 | ||||||
| └Scope 95 | $0 | ||||||
| └Scope 96 | $0 | ||||||
| └Scope 97 | $0 | ||||||
| └Scope 98 | $0 | ||||||
| └Scope 99 | $0 | ||||||
| └Scope 100 | $0 | ||||||
| └Scope 101 | $0 | ||||||
| └Scope 102 | $0 | ||||||
| └Scope 103 | $0 | ||||||
| └Scope 104 | $0 | ||||||
| └Scope 105 | $0 | ||||||
| └Scope 106 | $0 | ||||||
| └Scope 107 | $0 | ||||||
| └Scope 108 | $0 | ||||||
| └Scope 109 | $0 | ||||||
| └Scope 110 | $0 | ||||||
| └Scope 111 | $0 | ||||||
| └Scope 112 | $0 | ||||||
| └Scope 113 | $0 | ||||||
| └Scope 114 | $0 | ||||||
| └Scope 115 | $0 | ||||||
| └Scope 116 | $0 | ||||||
| └Scope 117 | $0 | ||||||
| └Scope 118 | $0 | ||||||
| └Scope 119 | $0 | ||||||
| └Scope 120 | $0 | ||||||
| └Scope 121 | $0 | ||||||
| └Scope 122 | $0 | ||||||
| └Scope 123 | $0 | ||||||
| └Scope 124 | $0 | ||||||
| └Scope 125 | $0 | ||||||
| └Scope 126 | $0 | ||||||
| └Scope 127 | $0 | ||||||
| └Scope 128 | $0 | ||||||
| └Scope 129 | $0 | ||||||
| └Scope 130 | $0 | ||||||
| └Scope 131 | $0 | ||||||
| └Scope 132 | $0 | ||||||
| └Scope 133 | $0 | ||||||
| └Scope 134 | $0 | ||||||
| └Scope 135 | $0 | ||||||
| └Scope 136 | $0 | ||||||
| └Scope 137 | $0 | ||||||
| └Scope 138 | $0 | ||||||
| └Scope 139 | $0 | ||||||
| └Scope 140 | $0 | ||||||
| └Scope 141 | $0 | ||||||
| └Scope 142 | $0 | ||||||
| └Scope 143 | $0 | ||||||
| └Scope 144 | $0 | ||||||
| └Scope 145 | $0 | ||||||
| └Scope 146 | $0 | ||||||
| └Scope 147 | $0 | ||||||
| └Scope 148 | $0 | ||||||
| └Scope 149 | $0 | ||||||
| └Scope 150 | $0 | ||||||
| └Scope 151 | $0 | ||||||
| └Scope 152 | $0 | ||||||
| └Scope 153 | $0 | ||||||
| └Scope 154 | $0 | ||||||
| └Scope 155 | $0 | ||||||
| └Scope 156 | $0 | ||||||
| └Scope 157 | $0 | ||||||
| └Scope 158 | $0 | ||||||
| └Scope 159 | $0 | ||||||
| └Scope 160 | $0 | ||||||
| └Scope 161 | $0 | ||||||
| └Scope 162 | $0 | ||||||
| └Scope 163 | $0 | ||||||
| └Scope 164 | $0 | ||||||
| └Scope 165 | $0 | ||||||
| └Scope 166 | $0 | ||||||
| └Scope 167 | $0 | ||||||
| └Scope 168 | $0 | ||||||
| └Scope 169 | $0 | ||||||
| └Scope 170 | $0 | ||||||
| └Scope 171 | $0 | ||||||
| └Scope 172 | $0 | ||||||
| └Scope 173 | $0 | ||||||
| └Scope 174 | $0 | ||||||
| └Scope 175 | $0 | ||||||
| └Scope 176 | $0 | ||||||
| └Scope 177 | $0 | ||||||
| └Scope 178 | $0 | ||||||
| └Scope 179 | $0 | ||||||
| └Scope 180 | $0 | ||||||
| └Scope 181 | $0 | ||||||
| └Scope 182 | $0 | ||||||
| └Scope 183 | $0 | ||||||
| └Scope 184 | $0 | ||||||
| └Scope 185 | $0 | ||||||
| └Scope 186 | $0 | ||||||
| └Scope 187 | $0 | ||||||
| └Scope 188 | $0 | ||||||
| └Scope 189 | $0 | ||||||
| └Scope 190 | $0 | ||||||
| └Scope 191 | $0 | ||||||
| └Scope 192 | $0 | ||||||
| └Scope 193 | $0 | ||||||
| └Scope 194 | $0 | ||||||
| └Scope 195 | $0 | ||||||
| └Scope 196 | $0 | ||||||
| └Scope 197 | $0 | ||||||
| └Scope 198 | $0 | ||||||
| └Scope 199 | $0 | ||||||
| └Scope 200 | $0 | ||||||
| └Scope 201 | $0 | ||||||
| └Scope 202 | $0 | ||||||
| └Scope 203 | $0 | ||||||
| └Scope 204 | $0 | ||||||
| └Scope 205 | $0 | ||||||
| └Scope 206 | $0 | ||||||
| └Scope 207 | $0 | ||||||
| └Scope 208 | $0 | ||||||
| └Scope 209 | $0 | ||||||
| └Scope 210 | $0 | ||||||
| └Scope 211 | $0 | ||||||
| └Scope 212 | $0 | ||||||
| └Scope 213 | $0 | ||||||
| └Scope 214 | $0 | ||||||
| └Scope 215 | $0 | ||||||
| └Scope 216 | $0 | ||||||
| └Scope 217 | $0 | ||||||
| └Scope 218 | $0 | ||||||
| └Scope 219 | $0 | ||||||
| └Scope 220 | $0 | ||||||
| └Scope 221 | $0 | ||||||
| └Scope 222 | $0 | ||||||
| └Scope 223 | $0 | ||||||
| └Scope 224 | $0 | ||||||
| └Scope 225 | $0 | ||||||
| └Scope 226 | $0 | ||||||
| └Scope 227 | $0 | ||||||
| └Scope 228 | $0 | ||||||
| └Scope 229 | $0 | ||||||
| └Scope 230 | $0 | ||||||
| └Scope 231 | $0 | ||||||
| └Scope 232 | $0 | ||||||
| └Scope 233 | $0 | ||||||
| └Scope 234 | $0 | ||||||
| └Scope 235 | $0 | ||||||
| └Scope 236 | $0 | ||||||
| └Scope 237 | $0 | ||||||
| Section-01-010 | Product Delivery / Storage / Handling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-011 | Execution / Cutting / Patching | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-012 | Cleaning / Waste Management | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-013 | Closeout Procedures | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-014 | O&M Manuals / Record Docs | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-015 | Demonstration / Training | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 02 | Existing Conditions10 | $0 | |||||
| Section-02-001 | Existing Conditions Assessment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-002 | Surveys / Documentation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| Section-02-003 | Selective Demolition | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-02-004 | Site Demolition | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-005 | Structure Demolition | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-006 | Hazardous Material Testing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-007 | Hazardous Material Abatement | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-008 | Asbestos / Lead / Mold Remediation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-009 | Facility Remediation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-010 | Existing Utility Locate / Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 03 | Concrete14 | $0 | |||||
| Section-03-001 | Concrete Submittals / Mix Designs | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-002 | Concrete Forming | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-003 | Concrete Reinforcing / Rebar | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| Section-03-004 | Embeds / Anchor Bolts / Accessories | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-005 | Vapor Retarder / Slab Prep | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-006 | Cast-In-Place Concrete | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| Section-03-007 | Concrete Placement | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-008 | Concrete Finishing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-009 | Curing / Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-010 | Concrete Joints / Sawcutting | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-011 | Testing / Field Quality Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-012 | Precast Concrete | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| Section-03-013 | Grouting | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| Section-03-014 | Concrete Cutting / Core Drilling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 04 | Masonry14 | $0 | |||||
| Section-04-001 | Masonry Submittals / Samples | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-002 | Mortar / Grout | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-04-003 | Masonry Reinforcing / Anchors | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-004 | Masonry Accessories | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-005 | CMU / Concrete Unit Masonry | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| Section-04-006 | Brick / Clay Unit Masonry | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-007 | Masonry Veneer | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-008 | Flashing / Weeps / Drainage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-009 | Lintels / Bond Beams | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-010 | Control / Expansion Joints | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-011 | Stone Assemblies | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-012 | Cast Stone / Manufactured Stone | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-013 | Masonry Cleaning / Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-014 | Masonry Restoration / Repair | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 05 | Metals10 | $0 | |||||
| Section-05-001 | Structural Steel | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| Section-05-002 | Steel Joists | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-003 | Metal Decking | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-004 | Cold-Formed Metal Framing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| Section-05-005 | Metal Fabrications | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| Section-05-006 | Metal Stairs | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| Section-05-007 | Pipe / Tube Railings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| Section-05-008 | Gratings / Floor Plates | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-009 | Decorative Metal | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-010 | Steel Erection / Field Welding | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 06 | Wood, Plastics, and Composites10 | $0 | |||||
| Section-06-001 | Rough Carpentry | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-002 | Wood Framing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-003 | Sheathing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-004 | Blocking / Backing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| └Scope 76 | $0 | ||||||
| └Scope 77 | $0 | ||||||
| └Scope 78 | $0 | ||||||
| └Scope 79 | $0 | ||||||
| └Scope 80 | $0 | ||||||
| └Scope 81 | $0 | ||||||
| └Scope 82 | $0 | ||||||
| └Scope 83 | $0 | ||||||
| └Scope 84 | $0 | ||||||
| └Scope 85 | $0 | ||||||
| └Scope 86 | $0 | ||||||
| └Scope 87 | $0 | ||||||
| └Scope 88 | $0 | ||||||
| └Scope 89 | $0 | ||||||
| └Scope 90 | $0 | ||||||
| └Scope 91 | $0 | ||||||
| └Scope 92 | $0 | ||||||
| └Scope 93 | $0 | ||||||
| └Scope 94 | $0 | ||||||
| └Scope 95 | $0 | ||||||
| └Scope 96 | $0 | ||||||
| └Scope 97 | $0 | ||||||
| └Scope 98 | $0 | ||||||
| └Scope 99 | $0 | ||||||
| └Scope 100 | $0 | ||||||
| └Scope 101 | $0 | ||||||
| └Scope 102 | $0 | ||||||
| └Scope 103 | $0 | ||||||
| └Scope 104 | $0 | ||||||
| └Scope 105 | $0 | ||||||
| └Scope 106 | $0 | ||||||
| └Scope 107 | $0 | ||||||
| └Scope 108 | $0 | ||||||
| └Scope 109 | $0 | ||||||
| └Scope 110 | $0 | ||||||
| └Scope 111 | $0 | ||||||
| └Scope 112 | $0 | ||||||
| └Scope 113 | $0 | ||||||
| └Scope 114 | $0 | ||||||
| └Scope 115 | $0 | ||||||
| └Scope 116 | $0 | ||||||
| └Scope 117 | $0 | ||||||
| └Scope 118 | $0 | ||||||
| └Scope 119 | $0 | ||||||
| └Scope 120 | $0 | ||||||
| └Scope 121 | $0 | ||||||
| └Scope 122 | $0 | ||||||
| └Scope 123 | $0 | ||||||
| └Scope 124 | $0 | ||||||
| └Scope 125 | $0 | ||||||
| └Scope 126 | $0 | ||||||
| └Scope 127 | $0 | ||||||
| Section-06-005 | Finish Carpentry | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-006 | Millwork | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| └Scope 76 | $0 | ||||||
| └Scope 77 | $0 | ||||||
| └Scope 78 | $0 | ||||||
| └Scope 79 | $0 | ||||||
| └Scope 80 | $0 | ||||||
| └Scope 81 | $0 | ||||||
| └Scope 82 | $0 | ||||||
| └Scope 83 | $0 | ||||||
| └Scope 84 | $0 | ||||||
| └Scope 85 | $0 | ||||||
| └Scope 86 | $0 | ||||||
| └Scope 87 | $0 | ||||||
| └Scope 88 | $0 | ||||||
| └Scope 89 | $0 | ||||||
| └Scope 90 | $0 | ||||||
| └Scope 91 | $0 | ||||||
| └Scope 92 | $0 | ||||||
| └Scope 93 | $0 | ||||||
| └Scope 94 | $0 | ||||||
| └Scope 95 | $0 | ||||||
| └Scope 96 | $0 | ||||||
| └Scope 97 | $0 | ||||||
| └Scope 98 | $0 | ||||||
| └Scope 99 | $0 | ||||||
| └Scope 100 | $0 | ||||||
| └Scope 101 | $0 | ||||||
| └Scope 102 | $0 | ||||||
| └Scope 103 | $0 | ||||||
| └Scope 104 | $0 | ||||||
| └Scope 105 | $0 | ||||||
| └Scope 106 | $0 | ||||||
| └Scope 107 | $0 | ||||||
| └Scope 108 | $0 | ||||||
| └Scope 109 | $0 | ||||||
| └Scope 110 | $0 | ||||||
| └Scope 111 | $0 | ||||||
| └Scope 112 | $0 | ||||||
| └Scope 113 | $0 | ||||||
| └Scope 114 | $0 | ||||||
| └Scope 115 | $0 | ||||||
| └Scope 116 | $0 | ||||||
| └Scope 117 | $0 | ||||||
| └Scope 118 | $0 | ||||||
| └Scope 119 | $0 | ||||||
| └Scope 120 | $0 | ||||||
| └Scope 121 | $0 | ||||||
| └Scope 122 | $0 | ||||||
| └Scope 123 | $0 | ||||||
| └Scope 124 | $0 | ||||||
| └Scope 125 | $0 | ||||||
| └Scope 126 | $0 | ||||||
| └Scope 127 | $0 | ||||||
| └Scope 128 | $0 | ||||||
| └Scope 129 | $0 | ||||||
| └Scope 130 | $0 | ||||||
| └Scope 131 | $0 | ||||||
| └Scope 132 | $0 | ||||||
| └Scope 133 | $0 | ||||||
| └Scope 134 | $0 | ||||||
| └Scope 135 | $0 | ||||||
| └Scope 136 | $0 | ||||||
| └Scope 137 | $0 | ||||||
| └Scope 138 | $0 | ||||||
| └Scope 139 | $0 | ||||||
| └Scope 140 | $0 | ||||||
| └Scope 141 | $0 | ||||||
| └Scope 142 | $0 | ||||||
| └Scope 143 | $0 | ||||||
| └Scope 144 | $0 | ||||||
| └Scope 145 | $0 | ||||||
| └Scope 146 | $0 | ||||||
| └Scope 147 | $0 | ||||||
| └Scope 148 | $0 | ||||||
| └Scope 149 | $0 | ||||||
| └Scope 150 | $0 | ||||||
| └Scope 151 | $0 | ||||||
| └Scope 152 | $0 | ||||||
| └Scope 153 | $0 | ||||||
| └Scope 154 | $0 | ||||||
| └Scope 155 | $0 | ||||||
| └Scope 156 | $0 | ||||||
| └Scope 157 | $0 | ||||||
| └Scope 158 | $0 | ||||||
| └Scope 159 | $0 | ||||||
| └Scope 160 | $0 | ||||||
| └Scope 161 | $0 | ||||||
| └Scope 162 | $0 | ||||||
| └Scope 163 | $0 | ||||||
| └Scope 164 | $0 | ||||||
| └Scope 165 | $0 | ||||||
| └Scope 166 | $0 | ||||||
| └Scope 167 | $0 | ||||||
| └Scope 168 | $0 | ||||||
| └Scope 169 | $0 | ||||||
| └Scope 170 | $0 | ||||||
| └Scope 171 | $0 | ||||||
| Section-06-007 | Architectural Woodwork | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-008 | Casework | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-009 | Countertops | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| Section-06-010 | Composite Trim / Panels | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 07 | Thermal and Moisture Protection10 | $0 | |||||
| Section-07-001 | Waterproofing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| Section-07-002 | Dampproofing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-003 | Thermal Insulation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| Section-07-004 | Air / Vapor Barriers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-005 | Roofing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| Section-07-006 | Roof / Wall Panels | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| Section-07-007 | Flashing / Sheet Metal | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| Section-07-008 | Roof Accessories | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-009 | Firestopping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-010 | Joint Sealants | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 08 | Openings10 | $0 | |||||
| Section-08-001 | Hollow Metal Doors / Frames | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| Section-08-002 | Wood Doors | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-08-003 | Specialty Doors | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-004 | Overhead / Coiling Doors | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-005 | Entrances / Storefronts | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| Section-08-006 | Windows | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| Section-08-007 | Curtain Wall | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-008 | Door Hardware | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| Section-08-009 | Glazing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| Section-08-010 | Louvers / Vents | $0 | |||||
| └Scope 01 | $0 | ||||||
| DIV 09 | Finishes10 | $0 | |||||
| Section-09-001 | Gypsum Board Assemblies | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| Section-09-002 | Tile | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| Section-09-003 | Acoustical Ceilings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| └Scope 76 | $0 | ||||||
| └Scope 77 | $0 | ||||||
| └Scope 78 | $0 | ||||||
| └Scope 79 | $0 | ||||||
| └Scope 80 | $0 | ||||||
| └Scope 81 | $0 | ||||||
| └Scope 82 | $0 | ||||||
| └Scope 83 | $0 | ||||||
| └Scope 84 | $0 | ||||||
| └Scope 85 | $0 | ||||||
| └Scope 86 | $0 | ||||||
| └Scope 87 | $0 | ||||||
| └Scope 88 | $0 | ||||||
| └Scope 89 | $0 | ||||||
| └Scope 90 | $0 | ||||||
| └Scope 91 | $0 | ||||||
| └Scope 92 | $0 | ||||||
| └Scope 93 | $0 | ||||||
| └Scope 94 | $0 | ||||||
| └Scope 95 | $0 | ||||||
| └Scope 96 | $0 | ||||||
| └Scope 97 | $0 | ||||||
| └Scope 98 | $0 | ||||||
| └Scope 99 | $0 | ||||||
| └Scope 100 | $0 | ||||||
| └Scope 101 | $0 | ||||||
| └Scope 102 | $0 | ||||||
| └Scope 103 | $0 | ||||||
| └Scope 104 | $0 | ||||||
| └Scope 105 | $0 | ||||||
| └Scope 106 | $0 | ||||||
| └Scope 107 | $0 | ||||||
| └Scope 108 | $0 | ||||||
| └Scope 109 | $0 | ||||||
| └Scope 110 | $0 | ||||||
| └Scope 111 | $0 | ||||||
| └Scope 112 | $0 | ||||||
| └Scope 113 | $0 | ||||||
| └Scope 114 | $0 | ||||||
| └Scope 115 | $0 | ||||||
| └Scope 116 | $0 | ||||||
| └Scope 117 | $0 | ||||||
| Section-09-004 | Resilient Flooring | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-09-005 | Carpet | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| Section-09-006 | Resinous / Specialty Flooring | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-09-007 | Wall Coverings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| Section-09-008 | Painting | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| └Scope 76 | $0 | ||||||
| └Scope 77 | $0 | ||||||
| └Scope 78 | $0 | ||||||
| └Scope 79 | $0 | ||||||
| └Scope 80 | $0 | ||||||
| └Scope 81 | $0 | ||||||
| └Scope 82 | $0 | ||||||
| └Scope 83 | $0 | ||||||
| └Scope 84 | $0 | ||||||
| └Scope 85 | $0 | ||||||
| └Scope 86 | $0 | ||||||
| └Scope 87 | $0 | ||||||
| └Scope 88 | $0 | ||||||
| └Scope 89 | $0 | ||||||
| └Scope 90 | $0 | ||||||
| └Scope 91 | $0 | ||||||
| └Scope 92 | $0 | ||||||
| └Scope 93 | $0 | ||||||
| └Scope 94 | $0 | ||||||
| └Scope 95 | $0 | ||||||
| └Scope 96 | $0 | ||||||
| └Scope 97 | $0 | ||||||
| └Scope 98 | $0 | ||||||
| └Scope 99 | $0 | ||||||
| └Scope 100 | $0 | ||||||
| └Scope 101 | $0 | ||||||
| └Scope 102 | $0 | ||||||
| └Scope 103 | $0 | ||||||
| └Scope 104 | $0 | ||||||
| └Scope 105 | $0 | ||||||
| └Scope 106 | $0 | ||||||
| └Scope 107 | $0 | ||||||
| └Scope 108 | $0 | ||||||
| └Scope 109 | $0 | ||||||
| └Scope 110 | $0 | ||||||
| └Scope 111 | $0 | ||||||
| └Scope 112 | $0 | ||||||
| └Scope 113 | $0 | ||||||
| └Scope 114 | $0 | ||||||
| └Scope 115 | $0 | ||||||
| └Scope 116 | $0 | ||||||
| └Scope 117 | $0 | ||||||
| └Scope 118 | $0 | ||||||
| └Scope 119 | $0 | ||||||
| └Scope 120 | $0 | ||||||
| └Scope 121 | $0 | ||||||
| └Scope 122 | $0 | ||||||
| └Scope 123 | $0 | ||||||
| └Scope 124 | $0 | ||||||
| └Scope 125 | $0 | ||||||
| └Scope 126 | $0 | ||||||
| └Scope 127 | $0 | ||||||
| └Scope 128 | $0 | ||||||
| └Scope 129 | $0 | ||||||
| └Scope 130 | $0 | ||||||
| └Scope 131 | $0 | ||||||
| └Scope 132 | $0 | ||||||
| └Scope 133 | $0 | ||||||
| └Scope 134 | $0 | ||||||
| └Scope 135 | $0 | ||||||
| └Scope 136 | $0 | ||||||
| └Scope 137 | $0 | ||||||
| └Scope 138 | $0 | ||||||
| └Scope 139 | $0 | ||||||
| └Scope 140 | $0 | ||||||
| └Scope 141 | $0 | ||||||
| └Scope 142 | $0 | ||||||
| └Scope 143 | $0 | ||||||
| └Scope 144 | $0 | ||||||
| └Scope 145 | $0 | ||||||
| └Scope 146 | $0 | ||||||
| └Scope 147 | $0 | ||||||
| └Scope 148 | $0 | ||||||
| └Scope 149 | $0 | ||||||
| └Scope 150 | $0 | ||||||
| └Scope 151 | $0 | ||||||
| └Scope 152 | $0 | ||||||
| └Scope 153 | $0 | ||||||
| └Scope 154 | $0 | ||||||
| └Scope 155 | $0 | ||||||
| └Scope 156 | $0 | ||||||
| └Scope 157 | $0 | ||||||
| └Scope 158 | $0 | ||||||
| └Scope 159 | $0 | ||||||
| └Scope 160 | $0 | ||||||
| └Scope 161 | $0 | ||||||
| └Scope 162 | $0 | ||||||
| └Scope 163 | $0 | ||||||
| └Scope 164 | $0 | ||||||
| └Scope 165 | $0 | ||||||
| └Scope 166 | $0 | ||||||
| └Scope 167 | $0 | ||||||
| └Scope 168 | $0 | ||||||
| └Scope 169 | $0 | ||||||
| └Scope 170 | $0 | ||||||
| └Scope 171 | $0 | ||||||
| └Scope 172 | $0 | ||||||
| └Scope 173 | $0 | ||||||
| └Scope 174 | $0 | ||||||
| └Scope 175 | $0 | ||||||
| └Scope 176 | $0 | ||||||
| └Scope 177 | $0 | ||||||
| └Scope 178 | $0 | ||||||
| └Scope 179 | $0 | ||||||
| └Scope 180 | $0 | ||||||
| └Scope 181 | $0 | ||||||
| └Scope 182 | $0 | ||||||
| └Scope 183 | $0 | ||||||
| └Scope 184 | $0 | ||||||
| └Scope 185 | $0 | ||||||
| └Scope 186 | $0 | ||||||
| └Scope 187 | $0 | ||||||
| └Scope 188 | $0 | ||||||
| └Scope 189 | $0 | ||||||
| └Scope 190 | $0 | ||||||
| └Scope 191 | $0 | ||||||
| └Scope 192 | $0 | ||||||
| └Scope 193 | $0 | ||||||
| └Scope 194 | $0 | ||||||
| └Scope 195 | $0 | ||||||
| └Scope 196 | $0 | ||||||
| └Scope 197 | $0 | ||||||
| └Scope 198 | $0 | ||||||
| └Scope 199 | $0 | ||||||
| └Scope 200 | $0 | ||||||
| └Scope 201 | $0 | ||||||
| └Scope 202 | $0 | ||||||
| └Scope 203 | $0 | ||||||
| └Scope 204 | $0 | ||||||
| └Scope 205 | $0 | ||||||
| └Scope 206 | $0 | ||||||
| └Scope 207 | $0 | ||||||
| └Scope 208 | $0 | ||||||
| └Scope 209 | $0 | ||||||
| └Scope 210 | $0 | ||||||
| └Scope 211 | $0 | ||||||
| └Scope 212 | $0 | ||||||
| └Scope 213 | $0 | ||||||
| └Scope 214 | $0 | ||||||
| └Scope 215 | $0 | ||||||
| └Scope 216 | $0 | ||||||
| └Scope 217 | $0 | ||||||
| └Scope 218 | $0 | ||||||
| └Scope 219 | $0 | ||||||
| └Scope 220 | $0 | ||||||
| └Scope 221 | $0 | ||||||
| └Scope 222 | $0 | ||||||
| └Scope 223 | $0 | ||||||
| └Scope 224 | $0 | ||||||
| └Scope 225 | $0 | ||||||
| └Scope 226 | $0 | ||||||
| └Scope 227 | $0 | ||||||
| └Scope 228 | $0 | ||||||
| └Scope 229 | $0 | ||||||
| └Scope 230 | $0 | ||||||
| └Scope 231 | $0 | ||||||
| └Scope 232 | $0 | ||||||
| └Scope 233 | $0 | ||||||
| └Scope 234 | $0 | ||||||
| └Scope 235 | $0 | ||||||
| └Scope 236 | $0 | ||||||
| └Scope 237 | $0 | ||||||
| └Scope 238 | $0 | ||||||
| └Scope 239 | $0 | ||||||
| └Scope 240 | $0 | ||||||
| └Scope 241 | $0 | ||||||
| └Scope 242 | $0 | ||||||
| └Scope 243 | $0 | ||||||
| └Scope 244 | $0 | ||||||
| └Scope 245 | $0 | ||||||
| └Scope 246 | $0 | ||||||
| └Scope 247 | $0 | ||||||
| └Scope 248 | $0 | ||||||
| └Scope 249 | $0 | ||||||
| └Scope 250 | $0 | ||||||
| └Scope 251 | $0 | ||||||
| └Scope 252 | $0 | ||||||
| └Scope 253 | $0 | ||||||
| └Scope 254 | $0 | ||||||
| └Scope 255 | $0 | ||||||
| └Scope 256 | $0 | ||||||
| └Scope 257 | $0 | ||||||
| └Scope 258 | $0 | ||||||
| └Scope 259 | $0 | ||||||
| └Scope 260 | $0 | ||||||
| └Scope 261 | $0 | ||||||
| └Scope 262 | $0 | ||||||
| └Scope 263 | $0 | ||||||
| └Scope 264 | $0 | ||||||
| └Scope 265 | $0 | ||||||
| └Scope 266 | $0 | ||||||
| └Scope 267 | $0 | ||||||
| └Scope 268 | $0 | ||||||
| └Scope 269 | $0 | ||||||
| └Scope 270 | $0 | ||||||
| └Scope 271 | $0 | ||||||
| └Scope 272 | $0 | ||||||
| └Scope 273 | $0 | ||||||
| └Scope 274 | $0 | ||||||
| └Scope 275 | $0 | ||||||
| └Scope 276 | $0 | ||||||
| └Scope 277 | $0 | ||||||
| └Scope 278 | $0 | ||||||
| └Scope 279 | $0 | ||||||
| └Scope 280 | $0 | ||||||
| Section-09-009 | High-Performance Coatings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-09-010 | Acoustic Treatment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 10 | Specialties9 | $0 | |||||
| Section-10-001 | Visual Display Boards | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-002 | Signage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| Section-10-003 | Toilet Compartments | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| Section-10-004 | Lockers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-005 | Fire Extinguishers / Cabinets | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-006 | Toilet / Bath Accessories | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| Section-10-007 | Wall / Corner Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-008 | Storage Shelving | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-009 | Flagpoles | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 11 | Equipment9 | $0 | |||||
| Section-11-001 | Loading Dock Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-002 | Vehicle Service Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-003 | Foodservice Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| Section-11-004 | Residential Appliances | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-005 | Laundry Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| Section-11-006 | Waste Handling Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-007 | Athletic / Recreational Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| Section-11-008 | Laboratory Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-009 | Parking Control Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 12 | Furnishings8 | $0 | |||||
| Section-12-001 | Window Treatments | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-002 | Casework | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-003 | Countertops | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-004 | Entry Mats / Grilles | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-005 | Furniture | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| Section-12-006 | Systems Furniture | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-007 | Fixed Seating | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-008 | Site Furnishings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 13 | Special Construction8 | $0 | |||||
| Section-13-001 | Special Facility Components | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-002 | Pools / Fountains | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| Section-13-003 | Controlled Environment Rooms | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-004 | Vaults / Secure Rooms | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-005 | Pre-Engineered Structures | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-006 | Building Modules | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-007 | Radiation Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-008 | Special Instrumentation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 14 | Conveying Equipment7 | $0 | |||||
| Section-14-001 | Elevators | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| Section-14-002 | Hydraulic Elevators | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-003 | Traction Elevators | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-004 | Escalators / Moving Walks | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-005 | Platform / Wheelchair Lifts | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-006 | Material Lifts | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-007 | Conveying Equipment Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 21 | Fire Suppression8 | $0 | |||||
| Section-21-001 | Fire Suppression Submittals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-002 | Sprinkler Systems | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| Section-21-003 | Wet-Pipe Sprinklers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-004 | Dry / Preaction Sprinklers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-005 | Standpipes | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| Section-21-006 | Fire Pumps | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-007 | Special Agent Suppression | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-008 | Fire Suppression Testing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 22 | Plumbing9 | $0 | |||||
| Section-22-001 | Plumbing Submittals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| Section-22-002 | Domestic Water Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| Section-22-003 | Sanitary Waste / Vent | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| Section-22-004 | Storm Drainage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| Section-22-005 | Gas Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-22-006 | Plumbing Fixtures | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| Section-22-007 | Water Heaters / Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| Section-22-008 | Insulation / Supports | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-22-009 | Testing / Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| DIV 23 | Heating, Ventilating, and Air Conditioning9 | $0 | |||||
| Section-23-001 | HVAC Submittals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| Section-23-002 | HVAC Insulation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-003 | HVAC Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-004 | Ductwork | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-005 | Air Distribution | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| Section-23-006 | Air Handling Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-007 | Packaged HVAC Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| Section-23-008 | Controls | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| Section-23-009 | Testing / Adjusting / Balancing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 25 | Integrated Automation8 | $0 | |||||
| Section-25-001 | Automation Network | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-002 | Control / Monitoring Network | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-003 | Local Control Units | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-004 | Automation Software | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-005 | Terminal Devices | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-006 | Facility Controls | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-007 | Control Sequences | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-008 | Integrated Automation Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 26 | Electrical10 | $0 | |||||
| Section-26-001 | Electrical Submittals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| └Scope 76 | $0 | ||||||
| └Scope 77 | $0 | ||||||
| └Scope 78 | $0 | ||||||
| └Scope 79 | $0 | ||||||
| Section-26-002 | Grounding / Bonding | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-26-003 | Conduit / Wire / Cable | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| Section-26-004 | Electrical Service | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| Section-26-005 | Switchboards / Panelboards | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| Section-26-006 | Transformers | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-26-007 | Wiring Devices | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-26-008 | Lighting | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| Section-26-009 | Emergency Power / Generator | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| Section-26-010 | Electrical Testing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 27 | Communications9 | $0 | |||||
| Section-27-001 | Communications Pathways | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-002 | Structured Cabling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| Section-27-003 | Equipment Rooms / Racks | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-004 | Backbone Cabling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-005 | Horizontal Cabling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-006 | Data Network Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-007 | Voice Communications | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-008 | Audio-Video Systems | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-009 | Communications Testing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 28 | Electronic Safety and Security8 | $0 | |||||
| Section-28-001 | Access Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-002 | Video Surveillance | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-003 | Intrusion Detection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-004 | Security Monitoring | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-005 | Fire Alarm / Detection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| └Scope 76 | $0 | ||||||
| └Scope 77 | $0 | ||||||
| └Scope 78 | $0 | ||||||
| └Scope 79 | $0 | ||||||
| └Scope 80 | $0 | ||||||
| └Scope 81 | $0 | ||||||
| └Scope 82 | $0 | ||||||
| └Scope 83 | $0 | ||||||
| └Scope 84 | $0 | ||||||
| └Scope 85 | $0 | ||||||
| └Scope 86 | $0 | ||||||
| └Scope 87 | $0 | ||||||
| └Scope 88 | $0 | ||||||
| └Scope 89 | $0 | ||||||
| └Scope 90 | $0 | ||||||
| └Scope 91 | $0 | ||||||
| └Scope 92 | $0 | ||||||
| └Scope 93 | $0 | ||||||
| └Scope 94 | $0 | ||||||
| └Scope 95 | $0 | ||||||
| └Scope 96 | $0 | ||||||
| └Scope 97 | $0 | ||||||
| └Scope 98 | $0 | ||||||
| └Scope 99 | $0 | ||||||
| └Scope 100 | $0 | ||||||
| └Scope 101 | $0 | ||||||
| └Scope 102 | $0 | ||||||
| └Scope 103 | $0 | ||||||
| └Scope 104 | $0 | ||||||
| └Scope 105 | $0 | ||||||
| └Scope 106 | $0 | ||||||
| └Scope 107 | $0 | ||||||
| └Scope 108 | $0 | ||||||
| └Scope 109 | $0 | ||||||
| └Scope 110 | $0 | ||||||
| └Scope 111 | $0 | ||||||
| └Scope 112 | $0 | ||||||
| └Scope 113 | $0 | ||||||
| └Scope 114 | $0 | ||||||
| └Scope 115 | $0 | ||||||
| └Scope 116 | $0 | ||||||
| └Scope 117 | $0 | ||||||
| └Scope 118 | $0 | ||||||
| └Scope 119 | $0 | ||||||
| └Scope 120 | $0 | ||||||
| └Scope 121 | $0 | ||||||
| └Scope 122 | $0 | ||||||
| └Scope 123 | $0 | ||||||
| └Scope 124 | $0 | ||||||
| └Scope 125 | $0 | ||||||
| Section-28-006 | Mass Notification | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-28-007 | Security Network / Integration | $0 | |||||
| Section-28-008 | Security Testing / Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 31 | Earthwork10 | $0 | |||||
| Section-31-001 | Site Clearing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-002 | Rough Grading | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| └Scope 30 | $0 | ||||||
| └Scope 31 | $0 | ||||||
| └Scope 32 | $0 | ||||||
| └Scope 33 | $0 | ||||||
| └Scope 34 | $0 | ||||||
| └Scope 35 | $0 | ||||||
| └Scope 36 | $0 | ||||||
| └Scope 37 | $0 | ||||||
| └Scope 38 | $0 | ||||||
| └Scope 39 | $0 | ||||||
| └Scope 40 | $0 | ||||||
| └Scope 41 | $0 | ||||||
| └Scope 42 | $0 | ||||||
| └Scope 43 | $0 | ||||||
| └Scope 44 | $0 | ||||||
| └Scope 45 | $0 | ||||||
| └Scope 46 | $0 | ||||||
| └Scope 47 | $0 | ||||||
| └Scope 48 | $0 | ||||||
| └Scope 49 | $0 | ||||||
| └Scope 50 | $0 | ||||||
| └Scope 51 | $0 | ||||||
| └Scope 52 | $0 | ||||||
| └Scope 53 | $0 | ||||||
| └Scope 54 | $0 | ||||||
| └Scope 55 | $0 | ||||||
| └Scope 56 | $0 | ||||||
| └Scope 57 | $0 | ||||||
| └Scope 58 | $0 | ||||||
| └Scope 59 | $0 | ||||||
| └Scope 60 | $0 | ||||||
| └Scope 61 | $0 | ||||||
| └Scope 62 | $0 | ||||||
| └Scope 63 | $0 | ||||||
| └Scope 64 | $0 | ||||||
| └Scope 65 | $0 | ||||||
| └Scope 66 | $0 | ||||||
| └Scope 67 | $0 | ||||||
| └Scope 68 | $0 | ||||||
| └Scope 69 | $0 | ||||||
| └Scope 70 | $0 | ||||||
| └Scope 71 | $0 | ||||||
| └Scope 72 | $0 | ||||||
| └Scope 73 | $0 | ||||||
| └Scope 74 | $0 | ||||||
| └Scope 75 | $0 | ||||||
| └Scope 76 | $0 | ||||||
| └Scope 77 | $0 | ||||||
| └Scope 78 | $0 | ||||||
| └Scope 79 | $0 | ||||||
| └Scope 80 | $0 | ||||||
| └Scope 81 | $0 | ||||||
| └Scope 82 | $0 | ||||||
| └Scope 83 | $0 | ||||||
| └Scope 84 | $0 | ||||||
| └Scope 85 | $0 | ||||||
| Section-31-003 | Excavation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-004 | Trenching | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-31-005 | Dewatering | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-31-006 | Fill / Backfill | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-31-007 | Subgrade Preparation | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-31-008 | Erosion / Sediment Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| Section-31-009 | Soil Stabilization | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-010 | Shoring / Excavation Support | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 32 | Exterior Improvements10 | $0 | |||||
| Section-32-001 | Asphalt Paving | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| Section-32-002 | Concrete Paving / Walks | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| Section-32-003 | Curbs / Gutters | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| Section-32-004 | Pavement Markings | $0 | |||||
| └Scope 01 | $0 | ||||||
| Section-32-005 | Fences / Gates | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| Section-32-006 | Retaining Walls | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-007 | Site Furnishings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-008 | Irrigation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| Section-32-009 | Planting / Landscaping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| └Scope 06 | $0 | ||||||
| └Scope 07 | $0 | ||||||
| └Scope 08 | $0 | ||||||
| └Scope 09 | $0 | ||||||
| └Scope 10 | $0 | ||||||
| └Scope 11 | $0 | ||||||
| └Scope 12 | $0 | ||||||
| └Scope 13 | $0 | ||||||
| └Scope 14 | $0 | ||||||
| └Scope 15 | $0 | ||||||
| └Scope 16 | $0 | ||||||
| └Scope 17 | $0 | ||||||
| └Scope 18 | $0 | ||||||
| └Scope 19 | $0 | ||||||
| └Scope 20 | $0 | ||||||
| └Scope 21 | $0 | ||||||
| └Scope 22 | $0 | ||||||
| └Scope 23 | $0 | ||||||
| └Scope 24 | $0 | ||||||
| └Scope 25 | $0 | ||||||
| └Scope 26 | $0 | ||||||
| └Scope 27 | $0 | ||||||
| └Scope 28 | $0 | ||||||
| └Scope 29 | $0 | ||||||
| Section-32-010 | Turf / Seeding | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| DIV 33 | Utilities8 | $0 | |||||
| Section-33-001 | Water Utilities | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| └Scope 05 | $0 | ||||||
| Section-33-002 | Sanitary Sewerage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-003 | Storm Drainage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-004 | Utility Structures | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-005 | Natural Gas Utilities | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-006 | Electrical Site Utilities | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-007 | Communications Site Utilities | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-008 | Utility Testing / Tie-Ins | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 34 | Transportation6 | $0 | |||||
| Section-34-001 | Roadways | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-34-002 | Railways / Guideways | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-34-003 | Traffic Signals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| └Scope 03 | $0 | ||||||
| └Scope 04 | $0 | ||||||
| Section-34-004 | Transportation Signage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-34-005 | Pavement Marking | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-34-006 | Transportation Lighting | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 35 | Waterway and Marine Construction7 | $0 | |||||
| Section-35-001 | Dredging | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-002 | Shoreline Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-003 | Waterway Bank Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-004 | Marine Construction / Docks | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-005 | Floating Construction | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-006 | Underwater Construction | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-007 | Dams / Levees | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 40 | Process Interconnections8 | $0 | |||||
| Section-40-001 | Process Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-002 | Gas / Vapor Process Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-003 | Liquid Process Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-004 | Process Valves | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-005 | Pipe Supports / Sleeves | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-006 | Process Piping Insulation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-007 | Instrumentation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-008 | Process Controls | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 41 | Material Processing and Handling Equipment7 | $0 | |||||
| Section-41-001 | Conveyors | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-002 | Cranes / Hoists | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-003 | Lifting Devices | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-004 | Feeders / Batching | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-005 | Storage Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-006 | Manufacturing Lines | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-007 | Processing Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 42 | Process Heating, Cooling, and Drying Equipment6 | $0 | |||||
| Section-42-001 | Process Heating Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-42-002 | Process Boilers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-42-003 | Furnaces / Kilns / Ovens | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-42-004 | Process Cooling Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-42-005 | Heat Exchangers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-42-006 | Drying Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 43 | Process Gas and Liquid Handling, Purification, and Storage Equipment7 | $0 | |||||
| Section-43-001 | Gas Handling Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-002 | Compressors / Blowers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-003 | Liquid Pumps | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-004 | Liquid Handling Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-005 | Filters / Purification | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-006 | Tanks / Storage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-007 | Pressurized Vessels | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 44 | Pollution and Waste Control Equipment6 | $0 | |||||
| Section-44-001 | Air Pollution Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-44-002 | Noise / Vibration Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-44-003 | Odor Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-44-004 | Water Pollution Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-44-005 | Solid Waste Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-44-006 | Waste Thermal Processing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 45 | Industry-Specific Manufacturing Equipment7 | $0 | |||||
| Section-45-001 | Oil / Gas Extraction Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-002 | Mining Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-003 | Food Manufacturing Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-004 | Beverage Manufacturing Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-005 | Chemical Manufacturing Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-006 | Metal / Machinery Manufacturing Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-007 | Manufacturing Equipment Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 46 | Water and Wastewater Equipment9 | $0 | |||||
| Section-46-001 | Packaged Treatment Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-002 | Screening Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-003 | Grinding / Shredding Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-004 | Oil / Grease Separation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-005 | Chemical Feed Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-006 | Clarifier Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-007 | Aeration / Secondary Treatment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-008 | Filtration / UV Treatment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-009 | Residuals / Sludge Handling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 48 | Electrical Power Generation8 | $0 | |||||
| Section-48-001 | Generators | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-002 | Solar Power Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-003 | Wind Power Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-004 | Battery / Energy Storage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-005 | Inverters / Power Controls | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-006 | Transformers / Voltage Regulation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-007 | Combined Heat and Power | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-008 | Power Generation Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
Schedule Input
Read-only estimate-to-schedule preparation
25 ready scope linesMirrors estimate automatically
| ID | Division / Section | Qty | Unit | Status |
|---|---|---|---|---|
| DIV 00 | Procurement and Contracting Requirements13 | |||
| Section-00-001 | Bid / Proposal Submitted | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-002 | Contract Executed | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-003 | Bonds Received | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-004 | Insurance Received | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-005 | Notice to Proceed | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-006 | Permit Status | Ready | ||
| └Scope 01 | A-001 | Maintain one City of Tampa-approved plan set on the job at all times. | 1 | SET | Ready |
| └Scope 02 | A-001 | Building permit record shown: BLD-20-0472570, plan approval dated 09/29/2021. | 1 | EA | Ready |
| └Scope 03 | A-001 | City note: changes or alterations require written City of Tampa approval. Administrative requirement; no measurable construction quantity on this sheet. | LS | Ready | |
| └Scope 04 | A-001 | Approval record: Site 09/16/2021; Building 09/16/2021; Mechanical 09/23/2021; Electrical 09/16/2021; Fire 09/01/2021; Natural Resources 09/01/2021; Plumbing 09/16/2021. Record only; no construction quantity. | LS | Ready | |
| Section-00-007 | Schedule of Values | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-008 | Pay Applications | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-009 | RFIs / Clarifications | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-010 | Change Orders | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-011 | Substantial Completion | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-012 | Final Closeout | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-00-013 | Warranties | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 01 | General Requirements15 | |||
| Section-01-001 | Project Summary / Scope | Chain hold | ||
| └Scope 01 | A-002 gross-building-area table | Level 1 new area. | 10200 | SF | Ready |
| └Scope 02 | A-002 gross-building-area table | Level 2 new area. | 10498 | SF | Ready |
| └Scope 03 | A-002 gross-building-area table | Level 3 new area. | 10498 | SF | Ready |
| └Scope 04 | A-002 gross-building-area table | Level 4 new area. | 10498 | SF | Ready |
| └Scope 05 | A-002 gross-building-area table | Level 5 new area. | 10498 | SF | Ready |
| └Scope 06 | A-002 gross-building-area table | Control total = 52,192 SF (10,200 + 10,498 + 10,498 + 10,498 + 10,498). Control only—do not price in addition to the five level-area lines. | SF | Ready | |
| └Scope 07 | A-003 room-count table | King Standard: Level 1 = 3, Level 2 = 5, Level 3 = 5, Level 4 = 5, Level 5 = 2. | 20 | ROOM | Ready |
| └Scope 08 | A-003 room-count table | King Suite: Level 1 = 0, Level 2 = 6, Level 3 = 6, Level 4 = 5, Level 5 = 4. | 21 | ROOM | Ready |
| └Scope 09 | A-003 room-count table | Queen/Queen Standard: Level 1 = 1, Level 2 = 9, Level 3 = 9, Level 4 = 9, Level 5 = 6. | 34 | ROOM | Ready |
| └Scope 10 | A-003 room-count table | Queen/Queen Suite: Level 1 = 0, Level 2 = 0, Level 3 = 0, Level 4 = 1, Level 5 = 2. | 3 | ROOM | Ready |
| └Scope 11 | A-003 room-count table | King ADA: Level 1 = 1; Levels 2-5 = 0. | 1 | ROOM | Ready |
| └Scope 12 | A-003 room-count table | King Suite ADA: Level 2 = 1; Levels 1 and 3-5 = 0. | 1 | ROOM | Ready |
| └Scope 13 | A-003 room-count table | Queen/Queen ADA: Level 4 = 1; Levels 1-3 and 5 = 0. | 1 | ROOM | Ready |
| └Scope 14 | A-003 room-count table | Queen/Queen Suite ADA: Level 3 = 1, Level 5 = 1; Levels 1, 2, and 4 = 0. | 2 | ROOM | Ready |
| └Scope 15 | A-003 room-count table | Control totals: Level 1 = 5, Level 2 = 21, Level 3 = 21, Level 4 = 21, Level 5 = 15; project total = 83 rooms. Control only—do not price this line in addition to the eight room-type lines. | ROOM | Ready | |
| └Scope 16 | A-006 | Plans / specification compliance statements relative to listed codes (FBC SIXTH edition 2017, 2014 NEC, 2015 NFPA, 6TH Edition Florida fire Prevention code as reference). | HOLD | Chain hold | |
| └Scope 17 | A-006 | Provide 6TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 18 | A-007 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 19 | A-008-A | Accessibility details: space allowance and reach ranges | HOLD | Chain hold | |
| └Scope 20 | A-008-A | Accessible route details | HOLD | Chain hold | |
| └Scope 21 | A-008-A | Protruding objects details | HOLD | Chain hold | |
| └Scope 22 | A-008-A | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 23 | A-008-B | WATER FOUNTAINS | HOLD | Chain hold | |
| └Scope 24 | A-008-B | DOORS and MANUVERING CLEARANCES | HOLD | Chain hold | |
| └Scope 25 | A-008-B | Accessibility/details for fixtures and clearances (as shown on sheet A008 - B) | HOLD | Chain hold | |
| └Scope 26 | A-008-B | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 27 | A-009 | Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 28 | A-030 | Room labeling for first-floor program spaces (registration, lobby, exercise room, breakfast room, mechanical, laundry, restrooms, offices, etc.). | HOLD | Chain hold | |
| └Scope 29 | A-030 | References to related sheets and details (A400, A491, A490, A492, A406, A405, A407, A809, A803, A509, S4, S1, E.1). | HOLD | Chain hold | |
| └Scope 30 | A-030 | Compliance statement referencing codes: FBC Sixth Edition 2017, 2014 NEC, 2015 NFPA, and Florida Fire Prevention Code (6th Edition). | HOLD | Chain hold | |
| └Scope 31 | A-030 | Codes referenced: "Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference." | HOLD | Chain hold | |
| └Scope 32 | A-030 | Room labels visible (exact text snippets): "EMPL", "BREAK ROOM", "MECH ROOM", "LAUNDRY", "LINEN", "WOMEN", "MEN", "EXERCISE RM", "WORK AREA", "REGISTRATION", "LOBBY", "CONNECT+PRINT", "FOOD PREP", "BREAKFAST ROOM", "WATER HEATER", "OFFICE", "VESTIBULE", "CHEM RM" | HOLD | Chain hold | |
| └Scope 33 | A-031 | Upper floors life safety plan (as labeled on sheet) | HOLD | Chain hold | |
| └Scope 34 | A-031 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 35 | A-031 | UPPER FLOORS LIFE SAFETY PLAN | HOLD | Chain hold | |
| └Scope 36 | A-032 | Roof terrace life safety plan (as titled on sheet) | HOLD | Chain hold | |
| └Scope 37 | A-032 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 38 | A-032 | MAXIMUM 320 OCCUPANTS ( SIGN TO BE PROPOSED ON THE WALL ) | HOLD | Chain hold | |
| └Scope 39 | A-032 | ROOF TERRACE LIFE SAFETY PLAN | HOLD | Chain hold | |
| └Scope 40 | A-111 | First Floor Plan (plans/specification for Level 1) | HOLD | Chain hold | |
| └Scope 41 | A-111 | Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPA | HOLD | Chain hold | |
| └Scope 42 | A-111 | Provide 5TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 43 | A-111 | Codes referenced: FBC fifth edition 2014, 2011 NEC, 2014 NFPA, Provide 5TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 44 | A-111 | Room names and numbers visible (examples): LOBBY 001, REGISTRATION 002, THE CORNER MARKET 003, FOOD PREP 006, OFFICE 007, WORK 008, LAUNDRY 019, LINEN 010, EXERCISE ROOM 011, EMPLOYEE BREAK ROOM 020, CORRIDOR 016, CORRIDOR 017, ACCESSIBLE KING 101, KING 102, KING 103, KING 104, KING SUITE 107, KING SUITE 108, VESTIBULE 000, IT CLOSET | HOLD | Chain hold | |
| └Scope 45 | A-111 | First-floor guestroom count reconciled to 7 rooms. | ROOM | Chain hold | |
| └Scope 46 | A-112 | Second Floor Plan / Level 2 layout | HOLD | Chain hold | |
| └Scope 47 | A-112 | Room identification and numbering (multiple KING, QUEEN, KING SUITE, ACCESSIBLE KING SUITE labels as shown) | HOLD | Chain hold | |
| └Scope 48 | A-112 | Guest laundry referenced (FD GUEST LAUNDRY 033 025.1) | HOLD | Chain hold | |
| └Scope 49 | A-112 | Mechanical and electrical rooms labeled (Mechanical 026, Elect. 027) | HOLD | Chain hold | |
| └Scope 50 | A-112 | Note: Provide 5TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 51 | A-112 | Drawing contains room labels such as: KING SUITE 221, KING SUITE 219, KING SUITE 217, QUEEN QUEEN 215, ACCESSIBLE KING SUITE 213, KING 209, Mechanical 026, Elect. 027, CORRIDOR 028, CHUTE 029, STORAGE 030, STAIR 1.2 033, STAIR 2.2 032, GUEST LAUNDRY 033 | HOLD | Chain hold | |
| └Scope 52 | A-112 | Second-floor guestroom count reconciled to 19 rooms. | ROOM | Chain hold | |
| └Scope 53 | A-113 | Third Floor Plan (architectural layout) as indicated on sheet A113 | HOLD | Chain hold | |
| └Scope 54 | A-113 | General note referencing compliance with FBC fifth edition 2014, 2011 NEC, 2014 NFPA | HOLD | Chain hold | |
| └Scope 55 | A-113 | Text: "Provide 5TH Edition Florida fire Prevention code as reference." | HOLD | Chain hold | |
| └Scope 56 | A-113 | Third-floor guestroom count reconciled to 19 rooms. | ROOM | Chain hold | |
| └Scope 57 | A-114 | Fourth Floor Plan (Level 4) layout of guest rooms and corridors | HOLD | Chain hold | |
| └Scope 58 | A-114 | Room labeling and numbering for fourth floor (examples include KING SUITE 419, QQ SUITE 413, ACCESSIBLE QUEEN 417) | HOLD | Chain hold | |
| └Scope 59 | A-114 | Stair locations and identifiers (STAIR 1.2 053, STAIR 2.2 052) | HOLD | Chain hold | |
| └Scope 60 | A-114 | Ancillary spaces labeled (STORAGE 050, LINEN 045, Ice Machine, COMPUTER 046, Elect. 047, CORRIDOR 048, CHUTE 049) | HOLD | Chain hold | |
| └Scope 61 | A-114 | Referencing related architectural sheets (A200, A201, A300, A313, A314, A490, A491, A804) | HOLD | Chain hold | |
| └Scope 62 | A-114 | Note: "Provide 5TH Edition Florida fire Prevention code as reference." | HOLD | Chain hold | |
| └Scope 63 | A-114 | Stair labels visible: "STAIR 1.2 053", "STAIR 2.2 052" | HOLD | Chain hold | |
| └Scope 64 | A-114 | Other room/space labels visible: "STORAGE 050", "LINEN 045", "IFG COMPUTER 046", "Elect. 047", "CORRIDOR 048", "CHUTE 049" | HOLD | Chain hold | |
| └Scope 65 | A-114 | Fourth-floor guestroom count reconciled to 19 rooms. | ROOM | Chain hold | |
| └Scope 66 | A-115 | Plans/specifications to comply with: "FBC fifth edition 2014", "2011 NEC", "2014 NFPA" and: "Provide 5TH Edition Florida fire Prevention code as reference." | HOLD | Chain hold | |
| └Scope 67 | A-115 | Code/compliance note: "Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPA Provide 5TH Edition Florida fire Prevention code as reference." | HOLD | Chain hold | |
| └Scope 68 | A-115 | Multiple room/space labels and numbers visible (examples from sheet text): SUITE 513, SUITE 507, QQ520, 514 KING, 505 KING, 503 QQ501, LINEN 055, SUITE 516, SUITE 519, SUITE 510, SUITE 508 | HOLD | Chain hold | |
| └Scope 69 | A-115 | Fifth-floor guestroom count reconciled to 19 rooms; total project room count remains 83. | ROOM | Chain hold | |
| └Scope 70 | A-116 | 1 ROOF A116 | HOLD | Chain hold | |
| └Scope 71 | A-116 | 2" minimum slope to drain 1/4" per foot. | HOLD | Chain hold | |
| └Scope 72 | A-116 | Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPA Provide 5TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 73 | A-117 | Roof slope designation at 1/4" / 12" | HOLD | Chain hold | |
| └Scope 74 | A-117 | Coordination of rooftop equipment location and requirements with MEP engineer | HOLD | Chain hold | |
| └Scope 75 | A-117 | Parapet heights and decorative parapet extensions referenced to building elevations and sections | HOLD | Chain hold | |
| └Scope 76 | A-117 | Repeated roof slope noted: SLOPE 1/4" / 12" | HOLD | Chain hold | |
| └Scope 77 | A-117 | Reference note E: 'ADJUST OVERALL DIMENSIONS AS REQUIRED TO FIT EQUIPMENT. LOCATE PUBLIC CORRIDOR.' | HOLD | Chain hold | |
| └Scope 78 | A-117 | Elevation markers shown: +61'-4", +60'-0", +63'-0", and reference to 'CURB +60'-0' T OF ROOF +63'-0'' | HOLD | Chain hold | |
| └Scope 79 | A-117 | Notes referencing codes: 'Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPA' and 'Provide 5TH Edition Florida fire Prevention code as reference.' | HOLD | Chain hold | |
| └Scope 80 | A-200 | Display of level elevations and parapet heights | HOLD | Chain hold | |
| └Scope 81 | A-200 | Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 82 | A-200 | Note: THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 83 | A-200 | Setback / fire-rating note: THIS WALL IS 5'-3" AWAY FROM PROPERTY LINE. THEREFORE REQD 2 HR. PROVIDED 2HR. | HOLD | Chain hold | |
| └Scope 84 | A-200 | Level elevations shown: Level 1 0' - 0"; Level 2 12' - 8"; Level 3 22' - 8"; Level 4 32' - 8"; Level 5 42' - 8"; ROOF 52' - 8"; ROOF 2 60' - 8" | HOLD | Chain hold | |
| └Scope 85 | A-200 | Parapet dimensions: PARAPET ROOF 52' - 8"; Parapet 1 60' - 0 1/2"; Parapet 2 63' - 0"; ROOF 2 60' - 8" | HOLD | Chain hold | |
| └Scope 86 | A-200 | Instruction: 'PROVIDE CONTRACTOR WITH COLOR PRINTS OF ELEVATIONS FOR ADDITIONAL CLARITY.' | HOLD | Chain hold | |
| └Scope 87 | A-201 | Exterior elevations (side elevations) for the building | HOLD | Chain hold | |
| └Scope 88 | A-201 | Level elevations shown: Level 1 0' - 0"; Level 2 12' - 8"; Level 3 22' - 8"; Level 4 32' - 8"; Level 5 42' - 8"; ROOF 52' - 8"; Parapet 1 60' - 0 1/2"; Parapet 2 63' - 0" | HOLD | Chain hold | |
| └Scope 89 | A-201 | Additional vertical note: ROOF 2 60' - 8" | HOLD | Chain hold | |
| └Scope 90 | A-201 | Codes referenced on sheet: FBC fifth edition 2014; 2011 NEC; 2014 NFPA; Provide 5TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 91 | A-203 | Exterior elevation work and detailing as shown on elevation drawings | HOLD | Chain hold | |
| └Scope 92 | A-203 | 01-GROUND FLOOR0" | HOLD | Chain hold | |
| └Scope 93 | A-203 | 02-SECOND FLOOR 12' - 8" | HOLD | Chain hold | |
| └Scope 94 | A-203 | 03-THIRD FLOOR 22' - 8" | HOLD | Chain hold | |
| └Scope 95 | A-203 | 04-FOURTH FLOOR 32' - 8" | HOLD | Chain hold | |
| └Scope 96 | A-203 | 05-ROOF 42' - 8" | HOLD | Chain hold | |
| └Scope 97 | A-203 | 04-FIFTH FLOOR 42' - 8" | HOLD | Chain hold | |
| └Scope 98 | A-203 | 05-ROOF 52' - 8" | HOLD | Chain hold | |
| └Scope 99 | A-203 | PROVIDE CONTRACTOR WITH COLOR PRINTS OF ELEVATIONS FOR ADDITIONAL CLARITY. | HOLD | Chain hold | |
| └Scope 100 | A-203 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 101 | A-300 | Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPA | HOLD | Chain hold | |
| └Scope 102 | A-300 | Provide 5TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 103 | A-300 | ROOF 52' - 8" | HOLD | Chain hold | |
| └Scope 104 | A-300 | ROOF 2 60' - 8" | HOLD | Chain hold | |
| └Scope 105 | A-300 | Room/space labels (examples as shown): SUITE 506 KING; SUITE 408 KING; SUITE 306 KING; SUITE 208; SUITE 507 KING; 407 KING; 307 KING; 207; VESTIBULE 000; LOBBY 001; CORRIDOR 016; BREAKFAST 005; Queen; Queen 314; Mechanical 026; Tele 036; Mech. 044; Mech. 054; CORRIDOR 89; CORRIDOR 028 | HOLD | Chain hold | |
| └Scope 106 | A-300 | Additional room labels (examples): KING SUITE 514 ACCESSIBLE; KING 421; SUITE 321; SUITE 221; ACCESSIBLE KING 105; CORRIDOR 017; QUEEN 520; QUEEN 420; QUEEN 320; QUEEN 220; KING 106 | HOLD | Chain hold | |
| └Scope 107 | A-310 | Building sections (Section 3 and Section 4 referenced) | HOLD | Chain hold | |
| └Scope 108 | A-310 | Multi-floor hotel building (levels labeled Level 1 through Level 5 and Roof) | HOLD | Chain hold | |
| └Scope 109 | A-310 | Codes / compliance notes: Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPA Provide 5TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 110 | A-310 | Level elevations (exact strings present): "0'-7 1/2" Level 1 0' - 0" Level 2 12' - 8" Level 3 22' - 8" Level 4 32' - 8" Level 5 42' - 8" ROOF 52' - 8"" | HOLD | Chain hold | |
| └Scope 111 | A-310 | Roof/parapet elevations (exact strings present): "Parapet 1 60' - 0 1/2" Parapet 2 63' - 0" ROOF 2 60' - 8"" | HOLD | Chain hold | |
| └Scope 112 | A-312 | Landscaping bed provision to avoid wicking (refer sheet 102) | HOLD | Chain hold | |
| └Scope 113 | A-312 | Text: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES" | HOLD | Chain hold | |
| └Scope 114 | A-312 | Wall sections drawn to provide information regarding specific finish systems construction and relationships (notes on sheet) | HOLD | Chain hold | |
| └Scope 115 | A-313 | Exterior wall sections and related finish/construction details | HOLD | Chain hold | |
| └Scope 116 | A-313 | WALL SECTIONS ARE DRAWN TO REPRESENT SPECIFIC STRUCTURAL SYSTEMS. REFER TO SHEETS 004 AND 005. ARCHITECT SHALL UPDATE OR CORRECT SECTIONS TO REPRESENT CHOSEN STRUCTURAL SYSTEMS PER STRUCTURAL ENGINEER. | HOLD | Chain hold | |
| └Scope 117 | A-313 | Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 118 | A-314 | EXTERIOR WALL SECTIONS 1/2" = 1'-0" | HOLD | Chain hold | |
| └Scope 119 | A-314 | WALL SECTIONS ARE DRAWN TO REPRESENT SPECIFIC STRUCTURAL SYSTEMS. REFER TO SHEETS 004 AND 005. ARCHITECT SHALL UPDATE OR CORRECT SECTIONS TO REPRESENT CHOSEN STRUCTURAL SYSTEMS PER STRUCTURAL ENGINEER. | HOLD | Chain hold | |
| └Scope 120 | A-314 | ELEVATIONS SHOWN BEYOND FOR FINISH RELATIONSHIPS ONLY. | HOLD | Chain hold | |
| └Scope 121 | A-314 | 01-GROUND FLOOR 0" | HOLD | Chain hold | |
| └Scope 122 | A-314 | 02-SECOND FLOOR 12' - 8" | HOLD | Chain hold | |
| └Scope 123 | A-314 | 03-THIRD FLOOR 22' - 8" | HOLD | Chain hold | |
| └Scope 124 | A-314 | 05-ROOF 52' - 8" | HOLD | Chain hold | |
| └Scope 125 | A-314 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 126 | A-400 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 127 | A-401 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 128 | A-402 | HISTORY WALL | HOLD | Chain hold | |
| └Scope 129 | A-402 | BREAKFAST ROOM | HOLD | Chain hold | |
| └Scope 130 | A-402 | LOBBY | HOLD | Chain hold | |
| └Scope 131 | A-402 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 132 | A-403 | RECEPTION COLUMN DETAIL | HOLD | Chain hold | |
| └Scope 133 | A-403 | CORRIDOR DETAIL | HOLD | Chain hold | |
| └Scope 134 | A-403 | TYPICAL PUBLIC SPACE MOUNTING HEIGHT | HOLD | Chain hold | |
| └Scope 135 | A-403 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 136 | A-404 | FIRST FLOOR CORRIDOR CEILING TRANSITION (detail) | HOLD | Chain hold | |
| └Scope 137 | A-404 | DRAPERY POCKET DETAIL AT CEILING (detail) | HOLD | Chain hold | |
| └Scope 138 | A-404 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 139 | A-405 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 140 | A-406 | EXERCISE ROOM drawings/specifications (multiple numbered views: -07, -05, -06, -04) | HOLD | Chain hold | |
| └Scope 141 | A-406A | Graphical and dimensional details for a hydration station (plan, elevation, section, enlarged plan, 3D view) as shown on sheet A 406A | HOLD | Chain hold | |
| └Scope 142 | A-406A | Text on sheet: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES" | HOLD | Chain hold | |
| └Scope 143 | A-407 | ENLARGED PLAN - EMPLOYEE BREAK ROOM (sheet contains enlargement of break room plan) | HOLD | Chain hold | |
| └Scope 144 | A-407 | ELEVATION - EMPLOYEE BREAK ROOM (elevation view shown) | HOLD | Chain hold | |
| └Scope 145 | A-407 | Warning on sheet: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES". | HOLD | Chain hold | |
| └Scope 146 | A-410 | TV wall elevation (LH shown) | HOLD | Chain hold | |
| └Scope 147 | A-410 | Exterior wall elevation | HOLD | Chain hold | |
| └Scope 148 | A-410 | Headboard wall elevation (LH shown) | HOLD | Chain hold | |
| └Scope 149 | A-410 | Entry wall elevation (LH shown) | HOLD | Chain hold | |
| └Scope 150 | A-410 | 5 KING GUESTROOM - TV WALL ELEVATION (LH SHOWN) | HOLD | Chain hold | |
| └Scope 151 | A-410 | 6 KING GUESTROOM - EXTERIOR WALL ELEVATION | HOLD | Chain hold | |
| └Scope 152 | A-410 | 7 KING GUESTROOM - HEADBOARD WALL ELEVATION (LH SHOWN) | HOLD | Chain hold | |
| └Scope 153 | A-410 | 8 KING GUESTROOM - ENTRY WALL ELEVATION (LH SHOWN) | HOLD | Chain hold | |
| └Scope 154 | A-411 | Wall elevations: TV/sofa wall, exterior wall, headboard wall, entry wall | HOLD | Chain hold | |
| └Scope 155 | A-411 | Elevation titles visible include: 'TV SOFA WALL ELEVATION (LH SHOWN)', 'EXTERIOR WALL ELEVATION (LH SHOWN)', and 'HEADBOARD WALL ELEVATION (LH SHOWN)'. | HOLD | Chain hold | |
| └Scope 156 | A-411 | There are graphic plan views and multiple wall elevation views on the page. | HOLD | Chain hold | |
| └Scope 157 | A-412 | Electrical plan (sheet 3A indicated) | HOLD | Chain hold | |
| └Scope 158 | A-412 | Headboard wall elevation (right-hand shown) | HOLD | Chain hold | |
| └Scope 159 | A-412 | TV / sofa wall elevation (right-hand shown) | HOLD | Chain hold | |
| └Scope 160 | A-412 | Exterior wall elevation (right-hand) | HOLD | Chain hold | |
| └Scope 161 | A-412 | KING SUITE ADA GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN) | HOLD | Chain hold | |
| └Scope 162 | A-412 | KING SUITE ADA GUESTROOM EXTERIOR WALL (RH) | HOLD | Chain hold | |
| └Scope 163 | A-412 | KING SUITE ADA GUESTROOM - TV SOFA WALL ELEVATION (RH SHOWN) | HOLD | Chain hold | |
| └Scope 164 | A-412 | The sheets include plan views and wall elevations and are labeled with sheet numbers 1 through 6 (and 3A). | HOLD | Chain hold | |
| └Scope 165 | A-413 | Headboard wall elevation (RH shown) (sheet label: 4 KING ADA GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN)) | HOLD | Chain hold | |
| └Scope 166 | A-413 | Exterior wall elevation (sheet label: 5 KING ADA GUESTROOM - EXTERIOR WALL ELEVATION) | HOLD | Chain hold | |
| └Scope 167 | A-413 | TV wall elevation (RH shown) (sheet label: 6 KING ADA GUESTROOM - TV WALL ELEVATION (RH SHOWN)) | HOLD | Chain hold | |
| └Scope 168 | A-413 | Entry wall elevation (sheet label: 7 KING ADA GUESTROOM - ENTRY WALL ELEVATION) | HOLD | Chain hold | |
| └Scope 169 | A-413 | 4 KING ADA GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN) | HOLD | Chain hold | |
| └Scope 170 | A-413 | 5 KING ADA GUESTROOM - EXTERIOR WALL ELEVATION | HOLD | Chain hold | |
| └Scope 171 | A-413 | 6 KING ADA GUESTROOM - TV WALL ELEVATION (RH SHOWN) | HOLD | Chain hold | |
| └Scope 172 | A-413 | 7 KING ADA GUESTROOM - ENTRY WALL ELEVATION | HOLD | Chain hold | |
| └Scope 173 | A-420 | TV wall elevation (left-hand shown) | HOLD | Chain hold | |
| └Scope 174 | A-420 | Exterior wall elevation for the guestroom | HOLD | Chain hold | |
| └Scope 175 | A-420 | Headboard wall elevation (left-hand shown) | HOLD | Chain hold | |
| └Scope 176 | A-420 | Entry wall elevation | HOLD | Chain hold | |
| └Scope 177 | A-420 | QUEEN QUEEN GUESTROOM - TV WALL ELEVATION (LH SHOWN) | HOLD | Chain hold | |
| └Scope 178 | A-420 | QUEEN QUEEN GUESTROOM - EXTERIOR WALL ELEVATION | HOLD | Chain hold | |
| └Scope 179 | A-420 | QUEEN QUEEN GUESTROOM - HEADBOARD WALL ELEVATION (LH SHOWN) | HOLD | Chain hold | |
| └Scope 180 | A-420 | QUEEN QUEEN GUESTROOM - ENTRY WALL ELEVATION | HOLD | Chain hold | |
| └Scope 181 | A-421 | QUEEN QUEEN SUITE GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN) | HOLD | Chain hold | |
| └Scope 182 | A-421 | SUITE GUESTROOM EXTERIOR WALL (RH) | HOLD | Chain hold | |
| └Scope 183 | A-421 | QUEEN QUEEN SUITE GUESTROOM - TV SOFA WALL ELEVATION (RH SHOWN) | HOLD | Chain hold | |
| └Scope 184 | A-422 | TV wall elevation (right hand shown) | HOLD | Chain hold | |
| └Scope 185 | A-422 | Exterior wall elevation for QUEEN QUEEN ADA GUESTROOM | HOLD | Chain hold | |
| └Scope 186 | A-422 | Headboard wall elevation (right hand shown) | HOLD | Chain hold | |
| └Scope 187 | A-422 | Sheet annotation: '4 QUEEN QUEEN ADA GUESTROOM - TV WALL ELEVATION (RH SHOWN)' | HOLD | Chain hold | |
| └Scope 188 | A-422 | Sheet annotation: '5 QUEEN QUEEN ADA GUESTROOM - EXTERIOR WALL' | HOLD | Chain hold | |
| └Scope 189 | A-422 | Sheet annotation: '6 QUEEN QUEEN ADA GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN)' | HOLD | Chain hold | |
| └Scope 190 | A-422 | Note on sheet edge: 'MUST PRINT IN COLOR' | HOLD | Chain hold | |
| └Scope 191 | A-433 | Plan detail support walls | HOLD | Chain hold | |
| └Scope 192 | A-433 | Guestroom ceiling height conditions | HOLD | Chain hold | |
| └Scope 193 | A-433 | Guestroom base stop location | HOLD | Chain hold | |
| └Scope 194 | A-433 | Wall trim required for tall ceilings | HOLD | Chain hold | |
| └Scope 195 | A-433 | Condition B guestroom cornice | HOLD | Chain hold | |
| └Scope 196 | A-433 | Typical guestroom electrical device heights | HOLD | Chain hold | |
| └Scope 197 | A-433 | Hearing impaired devices | HOLD | Chain hold | |
| └Scope 198 | A-433 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 199 | A-434 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 200 | A-435 | Reference notes and criteria notes included on sheet | HOLD | Chain hold | |
| └Scope 201 | A-435 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 202 | A-435A | Accessible bathroom layouts (multiple orientations: right, front, left, back) | HOLD | Chain hold | |
| └Scope 203 | A-435A | Reference notes and criteria notes on the sheet | HOLD | Chain hold | |
| └Scope 204 | A-435A | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 205 | A-435B | Accessible and guestroom vanity plans and sections | HOLD | Chain hold | |
| └Scope 206 | A-435B | Low wall detail at vanity | HOLD | Chain hold | |
| └Scope 207 | A-435B | Text: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES" | HOLD | Chain hold | |
| └Scope 208 | A-436 | WOOD FRAME ANCHORED TO SIDE WALLS WITH 2x6 FRONT SUPPORT MEMBER | HOLD | Chain hold | |
| └Scope 209 | A-436 | ALL CLEAN-OUTS TO BE FLUSH TO FLOORS / WALLS. | HOLD | Chain hold | |
| └Scope 210 | A-436 | FLOOR DRAIN. | HOLD | Chain hold | |
| └Scope 211 | A-436 | Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 212 | A-438 | Work room elevations (multiple) | HOLD | Chain hold | |
| └Scope 213 | A-438 | Detail/reference callout to A312 | HOLD | Chain hold | |
| └Scope 214 | A-438 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 215 | A-490 | Stair 1 plans and elevations for Levels 1 through Roof | HOLD | Chain hold | |
| └Scope 216 | A-490 | Steel wall mounting bracket detail | HOLD | Chain hold | |
| └Scope 217 | A-490 | Parapet elevations/details | HOLD | Chain hold | |
| └Scope 218 | A-490 | Steel wall mounting bracket dimensions text: 'STEEL WALL MOUNTING BRACKET 3 1/2" MAX 2 1/4" MIN 1 1/4" DIA.' | HOLD | Chain hold | |
| └Scope 219 | A-490 | Stair and tread/riser notes found on sheet (exact excerpts preserved elsewhere in this JSON) | HOLD | Chain hold | |
| └Scope 220 | A-490 | Level elevations shown: 'Level 1 0' - 0"', 'Level 2 12' - 8"', 'Level 3 22' - 8"', 'Level 4 32' - 8"', 'Level 5 42' - 8"', 'ROOF 52' - 8"', 'Parapet 1 60' - 0 1/2"', 'Parapet 2 63' - 0"', 'ROOF 2 60' - 8"' | HOLD | Chain hold | |
| └Scope 221 | A-490 | Statement on sheet: 'THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES' | HOLD | Chain hold | |
| └Scope 222 | A-491 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 223 | A-491 | Visible drawing label: Stair 2 | HOLD | Chain hold | |
| └Scope 224 | A-492 | Section 18 | HOLD | Chain hold | |
| └Scope 225 | A-492 | Roof elevation listed: ROOF 52' - 8" | HOLD | Chain hold | |
| └Scope 226 | A-492 | Additional roof/parapet note: ROOF 2 60' - 8" | HOLD | Chain hold | |
| └Scope 227 | A-492 | Notice on sheet: THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 228 | A-503 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 229 | A-504 | Sill trim detail | HOLD | Chain hold | |
| └Scope 230 | A-504 | Cove light detail (plan and elevation) | HOLD | Chain hold | |
| └Scope 231 | A-504 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 232 | A-505 | Registration / feature wall details (illustrated on sheet) | HOLD | Chain hold | |
| └Scope 233 | A-505 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 234 | A-506 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 235 | A-507 | PRINT & CONNECT DESK REAR ELEVATION | HOLD | Chain hold | |
| └Scope 236 | A-507 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 237 | A-508 | CONNECT AND PRINT DETAILS | HOLD | Chain hold | |
| └Scope 238 | A-508 | BUSINESS DESK | HOLD | Chain hold | |
| └Scope 239 | A-508 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 240 | A-509 | THE CORNER MARKET PLAN - WITH BEER & WINE | HOLD | Chain hold | |
| └Scope 241 | A-509 | 3D VIEW - THE CORNER MARKET - WITH BEER & WINE | HOLD | Chain hold | |
| └Scope 242 | A-509 | THE CORNER MARKET - EQUIP. SECTION - WITH BEER & WINE | HOLD | Chain hold | |
| └Scope 243 | A-509 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 244 | A-509A | THE CORNER MARKET - EQUIP. SECTION - WITHOUT BEER & WINE ALT. | HOLD | Chain hold | |
| └Scope 245 | A-509A | THE CORNER MARKET - PLAN - WITHOUT BEER & WINE ALT. | HOLD | Chain hold | |
| └Scope 246 | A-509A | Various section/elevation details shown on sheet (visual; specific construction elements not fully legible) | HOLD | Chain hold | |
| └Scope 247 | A-509A | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 248 | A-510 | Section through reach-in unit | HOLD | Chain hold | |
| └Scope 249 | A-510 | Recessed base detail | HOLD | Chain hold | |
| └Scope 250 | A-510 | Service wall elevations/details for 'THE CORNER MARKET' | HOLD | Chain hold | |
| └Scope 251 | A-510 | Entry vestibule elevation/detail for 'THE CORNER MARKET' | HOLD | Chain hold | |
| └Scope 252 | A-510 | Document contains instruction: 'THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES'. | HOLD | Chain hold | |
| └Scope 253 | A-511 | PROVIDE J-BOX FOR HARDWIRE CONNECTION OR OUTLET FOR PLUG-IN CONNECTION ACCORDINGLY. | HOLD | Chain hold | |
| └Scope 254 | A-511 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 255 | A-512 | BUFFET END WALL (visible label on sheet) | HOLD | Chain hold | |
| └Scope 256 | A-512 | AXON (axonometric) BUFFET COUNTER (visible label on sheet) | HOLD | Chain hold | |
| └Scope 257 | A-512 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 258 | A-513 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 259 | A-550 | DRAIN PIPE - SEE MECH. | HOLD | Chain hold | |
| └Scope 260 | A-550 | Provide 5th Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 261 | A-550 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 262 | A-570 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES (text on sheet) | HOLD | Chain hold | |
| └Scope 263 | A-571 | Text on sheet: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES" | HOLD | Chain hold | |
| └Scope 264 | A-572 | Porte Cochere: sections and cross-sections | HOLD | Chain hold | |
| └Scope 265 | A-572 | Porte Cochere: enlarged plan | HOLD | Chain hold | |
| └Scope 266 | A-572 | Porte Cochere: 3-D view | HOLD | Chain hold | |
| └Scope 267 | A-572 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 268 | A-572A | Column enclosure at porte cochere (detail shown) | HOLD | Chain hold | |
| └Scope 269 | A-572A | Connection at bearing wall and fascia | HOLD | Chain hold | |
| └Scope 270 | A-572A | Porte cochere column detail and entry | HOLD | Chain hold | |
| └Scope 271 | A-572A | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 272 | A-574 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 273 | A-600 | Provide fire-rating specifications for doors (multiple entries show 20 MIN, 45 MIN, 60 MIN, 90 MIN). | HOLD | Chain hold | |
| └Scope 274 | A-600 | Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 275 | A-600 | GENERAL NOTE: "HINGE-MOUNTED DOOR STOPS NOT ALLOWED." | HOLD | Chain hold | |
| └Scope 276 | A-600 | GENERAL NOTE: "DOOR GUARDS AT THE GUESTROOM ENTRY DOORS REQUIRE A SPACER TO CLEAR THE DOOR TRIM." | HOLD | Chain hold | |
| └Scope 277 | A-600 | "SEE ALSO SHEETS 111 OR 310 FOR AUTOMATIC ENTRY DOOR ELEVATIONS." | HOLD | Chain hold | |
| └Scope 278 | A-600 | "SEE SHEET 231 FOR DOOR TYPE \"J\" T FRAME WIDTH" | HOLD | Chain hold | |
| └Scope 279 | A-600 | "DOUBLE ACTING DOOR W/ VINYL ACRYLIC CLADDING - REFER TO SPEC" (door 27 note) | HOLD | Chain hold | |
| └Scope 280 | A-800 | Food prep (labeled as "FOOD PREP") | HOLD | Chain hold | |
| └Scope 281 | A-800 | Breakfast area (labeled as "BREAKFAST") | HOLD | Chain hold | |
| └Scope 282 | A-800 | General Notes | HOLD | Chain hold | |
| └Scope 283 | A-800 | Criteria Notes | HOLD | Chain hold | |
| └Scope 284 | A-800 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 285 | A-801 | BUFFET | HOLD | Chain hold | |
| └Scope 286 | A-801 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 287 | A-802 | Equipment plans and elevations for 'THE MARKET' / 'THE CORNER MARKET'. | HOLD | Chain hold | |
| └Scope 288 | A-802 | Two plan variants shown: without beer & wine service, and with beer & wine service. | HOLD | Chain hold | |
| └Scope 289 | A-802 | Equipment schedule for 'THE MARKET' (table present on sheet). | HOLD | Chain hold | |
| └Scope 290 | A-802 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 291 | A-802 | EQUIPMENT SCHEDULE - THE MARKET | HOLD | Chain hold | |
| └Scope 292 | A-804 | Partial interior elevations for guestrooms and lobby | HOLD | Chain hold | |
| └Scope 293 | A-804 | Enlarged upper floor corridor plan | HOLD | Chain hold | |
| └Scope 294 | A-804 | Symbols legend | HOLD | Chain hold | |
| └Scope 295 | A-804 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 296 | A-805 | Typical corridor / corridor enlargement (shown) | HOLD | Chain hold | |
| └Scope 297 | A-805 | KING SUITE (multiple) | HOLD | Chain hold | |
| └Scope 298 | A-805 | GUEST LAUNDRY | HOLD | Chain hold | |
| └Scope 299 | A-805 | Mechanical room | HOLD | Chain hold | |
| └Scope 300 | A-805 | Electrical (Elect.) room | HOLD | Chain hold | |
| └Scope 301 | A-805 | Chute | HOLD | Chain hold | |
| └Scope 302 | A-805 | Ceiling legend and general/criteria/reference notes | HOLD | Chain hold | |
| └Scope 303 | A-805 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 304 | A-805 | CEILING LEGEND | HOLD | Chain hold | |
| └Scope 305 | A-806 | GUEST LAUNDRY FLOOR PLAN | HOLD | Chain hold | |
| └Scope 306 | A-806 | GUEST LAUNDRY ELEVATION | HOLD | Chain hold | |
| └Scope 307 | A-806 | GUEST LAUNDRY FOLDING TABLE | HOLD | Chain hold | |
| └Scope 308 | A-806 | STORAGE | HOLD | Chain hold | |
| └Scope 309 | A-806 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 310 | A-807 | Equipment schedule for guest laundry (label: EQUIPMENT SCHEDULE - GUEST LAUNDRY) | HOLD | Chain hold | |
| └Scope 311 | A-807 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 312 | A-807 | EQUIPMENT SCHEDULE - GUEST LAUNDRY | HOLD | Chain hold | |
| └Scope 313 | A-807 | GUEST LAUNDRY | HOLD | Chain hold | |
| └Scope 314 | A-808 | Stair floor finish detail | HOLD | Chain hold | |
| └Scope 315 | A-808 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 316 | A-809 | Reference and compliance with the design standards chapter 'LAUNDRY BACK OF HOUSE'. | HOLD | Chain hold | |
| └Scope 317 | A-809 | Architect is responsible for designing the project in accordance with the entire design standards. | HOLD | Chain hold | |
| └Scope 318 | A-809 | A competent laundry consultant should review the plan for compliance if changes are required. | HOLD | Chain hold | |
| └Scope 319 | A-809 | Top-of-sheet instruction: 'THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES' | HOLD | Chain hold | |
| └Scope 320 | A-810 | Equipment schedule (BOH laundry) header present | HOLD | Chain hold | |
| └Scope 321 | A-810 | Room labels visible: LAUNDRY 019, LINEN 010, EMPLOYEE BREAK ROOM 016 | HOLD | Chain hold | |
| └Scope 322 | A-810 | Equipment schedule header visible: 'EQUIPMENT SCHEDULE - BOH LAUND...' | HOLD | Chain hold | |
| └Scope 323 | A-810 | Note on sheet: 'THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES' | HOLD | Chain hold | |
| └Scope 324 | A-810 | Graphic elements: plan view showing equipment, doors, and room layouts (laundry area diagram) | HOLD | Chain hold | |
| └Scope 325 | A1-22 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 326 | A1-23 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 327 | A1-24 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 328 | LAUNDRY-PLAN-2026 | Placement of three units labeled T-80 (shown grouped) | HOLD | Chain hold | |
| └Scope 329 | LAUNDRY-PLAN-2026 | Placement of two units labeled T-1200 (shown grouped) | HOLD | Chain hold | |
| └Scope 330 | LAUNDRY-PLAN-2026 | Placement of one unit labeled HM-200 | HOLD | Chain hold | |
| └Scope 331 | LAUNDRY-PLAN-2026 | Designation of adjacent linen room (LINEN 010) and laundry room (LAUNDRY 019) | HOLD | Chain hold | |
| └Scope 332 | LAUNDRY-PLAN-2026 | Equipment/annotation tags shown: T-1200, T-1200, HM-200, T-80, T-80, T-80 | HOLD | Chain hold | |
| └Scope 333 | LAUNDRY-PLAN-2026 | Room labels shown: LINEN 010, LAUNDRY 019 | HOLD | Chain hold | |
| Section-01-002 | Work Restrictions / Site Rules | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-01-003 | Project Meetings | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-01-004 | Construction Schedule | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-01-005 | Progress Photos / Documentation | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-01-006 | Submittals | Chain hold | ||
| └Scope 01 | C-7 [Civil] | Backfill, aggregate, and compaction to specified standards (98% AASHTO T-180), with shop drawings required for filter fabric and stone | HOLD | Chain hold | |
| └Scope 02 | C-8 [Civil] | Manufacturer submittal requirements (3 sets: structural evaluation and manufacturer certification) | HOLD | Chain hold | |
| └Scope 03 | C-12.1 [Civil] | Manufacturer submittal information: Standard, Options, Accessories | HOLD | Chain hold | |
| └Scope 04 | ID001 [Interior] | Shop drawings required for all fixtures, equipment, and millwork (Note 22). | HOLD | Chain hold | |
| └Scope 05 | S003 [Structural] | Verify compliance with approved submittals Field inspection Y Periodic | HOLD | Chain hold | |
| └Scope 06 | S003 [Structural] | 1705.2 Steel Construction: Fabricator and erector documents Submittal Review Y Each submittal | HOLD | Chain hold | |
| └Scope 07 | S003 [Structural] | 1705.2.2 Steel Construction Other Than Structural Steel: Material verification of cold-formed steel deck: a. Identification markings Field inspection Y Periodic; b. Manufacturer's certified test reports Submittal Review Y Each submittal | HOLD | Chain hold | |
| └Scope 08 | S003 [Structural] | 1705.2 Steel Construction 1. Fabricator and erector documents Submittal Review Y Each submittal | HOLD | Chain hold | |
| Section-01-007 | Quality Control | Chain hold | ||
| └Scope 01 | A-001 | City of Tampa identifies the project as a Threshold Building. Inspection/special-inspector scope is not quantified from this cover sheet. | LS | Chain hold | |
| └Scope 02 | A-002 | New-construction hotel; Type II-B; 60'-0" building height; 5 stories shown after the one-story sprinkler increase over the Table 503 allowance. Building attributes only; no priceable quantity. | LS | Ready | |
| └Scope 03 | A-003 | Code basis includes jurisdictional requirements, IBC with state amendments, NFPA 101, NFPA 13, NFPA 70, IMC, IEC, IPC, NFPA 72, and ADA. Compliance note; no measurable quantity. | LS | Ready | |
| └Scope 04 | A-003 | Rated components: interior bearing walls 2 HR; columns 2 HR; roof assemblies 1 HR; floor/floor-ceiling assemblies 2 HR; exterior bearing walls 2 HR; exterior nonbearing walls 0 HR. Assembly areas/counts require plan/detail links and remain blank. | LS | Chain hold | |
| └Scope 05 | A-004 IT-1 | Periodic verification of soils per IBC 1704.7 and Chapter 18. Number of site visits is not established on this sheet. | VISIT | Chain hold | |
| └Scope 06 | A-004 IT-2 | Periodic inspection of excavation and filling per IBC 1704.7 and Section 3304. Number of site visits is not established on this sheet. | VISIT | Chain hold | |
| └Scope 07 | A-004 IT-5 | Periodic verification that the required concrete design mix is used. Inspection count requires the approved mix submittals and placement schedule. | VISIT | Chain hold | |
| └Scope 08 | A-004 IT-5 | Periodic sampling of fresh concrete; slump, air content, temperature, and strength-test specimens per ASTM C172, ASTM C31, and the cited ACI/IBC provisions. Test/visit count requires concrete volumes and pour schedule. | VISIT | Chain hold | |
| └Scope 09 | A-004 IT-5 | Periodic inspection of reinforcing steel, including prestressing tendons, and placement per the cited ACI/IBC provisions. Inspection count requires the concrete placement sequence. | VISIT | Chain hold | |
| └Scope 10 | A-004 IT-15 | Periodic EIFS special inspection per IBC 1704.5. Inspection count requires installed-area sequencing and the approved EIFS inspection plan. | VISIT | Chain hold | |
| └Scope 11 | A-004 IT-16 | Periodic verification of the required seismic quality-assurance plan in accordance with IBC Section 1705. Number of visits is not established on this sheet. | VISIT | Chain hold | |
| └Scope 12 | A-004 IT-18 | Detention-basin special inspection required per IBC 1704.13. Continuous/periodic frequency and number of visits are not selected on this sheet. | VISIT | Chain hold | |
| └Scope 13 | A-007 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 14 | A-008-A | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 15 | A-008-B | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 16 | A-031 | Plan approval / code compliance review (City of Tampa) | HOLD | Chain hold | |
| └Scope 17 | A-031 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 18 | A-032 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 19 | A-200 | Notes calling out code compliance references and plan approval requirements | HOLD | Chain hold | |
| └Scope 20 | A-200 | Note: The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 21 | A-200 | Window-area calculation (first floor): 25% WINDOW AREA PERMITTED ON FF=(14.17X12.67X.25=44.88 SQ FT) PROVIDED=43 SQFT. 23.95% | HOLD | Chain hold | |
| └Scope 22 | A-200 | Window-area calculation (upper floor): 25% WINDOW AREA PERMITTED ON UPPER FL=(14.17X10X.25=35.43 SQ FT) PROVIDED=33.94 SQFT. 23.95% | HOLD | Chain hold | |
| └Scope 23 | A-201 | Stamp text: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES" and "It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division." | HOLD | Chain hold | |
| └Scope 24 | A-203 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 25 | A-312 | Text: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes" | HOLD | Chain hold | |
| └Scope 26 | A-314 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 27 | A-400 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 28 | A-401 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 29 | A-402 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 30 | A-403 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 31 | A-404 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 32 | A-405 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 33 | A-406 | Plan approval language: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES" | HOLD | Chain hold | |
| └Scope 34 | A-406 | Warning: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes" | HOLD | Chain hold | |
| └Scope 35 | A-406A | Plan approval / code compliance stamping and instructions from City of Tampa Construction Services Division | HOLD | Chain hold | |
| └Scope 36 | A-406A | Text on sheet: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes" | HOLD | Chain hold | |
| └Scope 37 | A-407 | Note on sheet: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes". | HOLD | Chain hold | |
| └Scope 38 | A-433 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 39 | A-434 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 40 | A-435 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 41 | A-435A | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 42 | A-435B | Text: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes" | HOLD | Chain hold | |
| └Scope 43 | A-438 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 44 | A-491 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 45 | A-492 | Text on sheet: The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 46 | A-503 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 47 | A-504 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 48 | A-505 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 49 | A-506 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 50 | A-507 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 51 | A-508 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 52 | A-509 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 53 | A-509A | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 54 | A-510 | Document contains statement: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes.' | HOLD | Chain hold | |
| └Scope 55 | A-511 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 56 | A-512 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 57 | A-513 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 58 | A-550 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 59 | A-570 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes (text on sheet) | HOLD | Chain hold | |
| └Scope 60 | A-571 | Text on sheet: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes" | HOLD | Chain hold | |
| └Scope 61 | A-572 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 62 | A-572A | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 63 | A-574 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 64 | A-610 | CONSTRUCTION SERVICES DIVISION PLAN APPROVAL THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 65 | A-610 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 66 | A-800 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 67 | A-801 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 68 | A-802 | Architectural plan approval and code compliance review by City of Tampa Construction Services Division. | HOLD | Chain hold | |
| └Scope 69 | A-802 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 70 | A-804 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 71 | A-805 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 72 | A-806 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 73 | A-807 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 74 | A-808 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 75 | A-809 | Top-of-sheet note: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes' | HOLD | Chain hold | |
| └Scope 76 | A-810 | Note on sheet: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes' | HOLD | Chain hold | |
| └Scope 77 | A1-22 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 78 | A1-23 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 79 | A1-24 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 80 | ENERGY-1 [Energy-Calculations] | PROPOSE A 83 ROOM, 5-STORY FAIRFIELD INN & SUITES - MARRIOTT. | HOLD | Chain hold | |
| └Scope 81 | ENERGY-1 [Energy-Calculations] | Site consists of a 1.351 ACRE parcel | HOLD | Chain hold | |
| └Scope 82 | ENERGY-1 [Energy-Calculations] | 1.018 ACRES of impervious surface | HOLD | Chain hold | |
| └Scope 83 | ENERGY-1 [Energy-Calculations] | JURISDICTIONAL AGENCY: CITY OF TAMPA (SITE PLAN) BLD-20-0472570 | HOLD | Chain hold | |
| └Scope 84 | S003 [Structural] | S003 SPECIAL INSPECTIONS | HOLD | Chain hold | |
| Section-01-008 | Temporary Facilities / Utilities | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-01-009 | Temporary Controls / Safety / Protection | Chain hold | ||
| └Scope 01 | A-002 | CHAIN HOLD - base sheet states FBC 2014 Fifth Edition, while permit-review notes reference the Sixth Edition Florida Fire Prevention Code and other later code editions. Confirm the controlling permitted code set before pricing code-driven changes. | HOLD | Chain hold | |
| └Scope 02 | A-002 | CHAIN HOLD - exit table refers to A0.1.2 for detailed exit width, travel-distance, and occupancy calculations, while the sheet index/life-safety set uses A-031, A-032, and A-033. No egress construction quantity is added until that reference is reconciled. | HOLD | Chain hold | |
| └Scope 03 | A-003A | BROKEN CHAIN - General Notes and Symbol Legends is listed in the A-003 architectural index but is not present in the active Fairfield architectural drawing folder. No quantity is added. | HOLD | Chain hold | |
| └Scope 04 | A-004 IT-4 | CHAIN HOLD - periodic inspection is marked for modular retaining walls with the note 'if over 5'-0" of fill,' but the required checkbox is blank. Confirm applicability from the civil/structural retaining-wall scope before adding inspection visits. | HOLD | Chain hold | |
| └Scope 05 | A-004 | CHAIN HOLD - the Special Inspections Firm column is blank. Do not carry an inspector/vendor allowance or visit count until responsibility and firm assignment are confirmed. | HOLD | Chain hold | |
| └Scope 06 | A-006 | CHAIN HOLD - Document references multiple code/edition strings ("FBC SIXTH edition 2017", "6TH Edition Florida fire Prevention code", "2014 NEC", "2015 NFPA") which may require clarification as to the authoritative edition to be followed. | No contracting parties, permit numbers, or signatures are present on the provided page to confirm authorization. | HOLD | Chain hold | |
| └Scope 07 | A-007 | CHAIN HOLD - The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes. | It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division. | HOLD | Chain hold | |
| └Scope 08 | A-008-A | CHAIN HOLD - The document explicitly states that stamping does not permit or approve violations of City or State codes. | The document contains multiple dates (8.10.15, 01/23/2020, 9/29/2021) which may indicate different drawing/approval/review events; their relationships are not stated within the document. | HOLD | Chain hold | |
| └Scope 09 | A-008-B | CHAIN HOLD - The document contains explicit legal cautions that changes or alterations are unlawful without written approval (could impact scope changes). | Stamping does not imply approval of any violation of City or State codes (limits assumptions about compliance beyond stated review). | HOLD | Chain hold | |
| └Scope 10 | A-030 | CHAIN HOLD - The sheet includes the advisory: "It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division." (implies legal risk if alterations are made without approval). | The sheet states: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes." (limits implied approval scope). | HOLD | Chain hold | |
| └Scope 11 | A-030 | First-floor life safety plan for the Fairfield Inn & Suites (sheet A030). | HOLD | Chain hold | |
| └Scope 12 | A-032 | CHAIN HOLD - The sheet contains a large 'Not Reviewed' overlay while also containing a review notation 'REVIEWED FOR CODE COMPLIANCE BLD-20-0472570 9/29/2021' - this is a conflicting status that could cause confusion about approval/permit status. | Limited visible contact and project identification information on this sheet may impede verification of current approval status. | HOLD | Chain hold | |
| └Scope 13 | A-111 | CHAIN HOLD - No explicit contractual disputes, claims, or risk allocations are stated on the sheet. | No explicit conflicts or code non-compliance annotations are shown on the visible sheet. | HOLD | Chain hold | |
| └Scope 14 | A-112 | CHAIN HOLD - No contractor, owner, or construction-manager names are shown on this sheet to confirm responsibilities or contractual relationships. | Sheet shows multiple revision dates but does not include revision descriptions on the provided page to indicate what changed at each revision. | No explicit permit numbers, approval stamps, signatures, or dates of permit issuance are visible on this page. | HOLD | Chain hold | |
| └Scope 15 | A-113 | CHAIN HOLD - No owner, contractor, or subcontractor identified on this sheet (party information limited to architect and a vague "Engineers/ maintenance" reference). | The sheet references multiple codes/editions (FBC fifth edition 2014 and text referencing "5TH Edition Florida fire Prevention code") which should be cross-checked with project requirements; the sheet does not provide further clarification on which code edition governs. | Graphic drawing and dense text may hide additional notes or details not legible in the provided text extract or image. | HOLD | Chain hold | |
| └Scope 16 | A-115 | CHAIN HOLD - Document is a single sheet and does not contain explicit identification of owner, contractor, or commissioning/installation parties on the visible area. | Multiple abbreviations and short codes (e.g., QQ, VTAC) appear without definition on this sheet; could cause ambiguity if taken alone. | HOLD | Chain hold | |
| └Scope 17 | A-115 | Fifth Floor plan drawings for the Fairfield Inn project (sheet A115). | HOLD | Chain hold | |
| └Scope 18 | A-117 | CHAIN HOLD - Rooftop equipment is shown for architectural intent only; MEP coordination required - potential for equipment location/clearance conflicts if not coordinated (Reference note D). | Scuppers and roof drains are required to be sized based on local rainfall and codes (Reference note A); sizing not provided on sheet - risk of undersized drainage if not specified. | Detail reference 'SEE DETAIL X/XXX' is shown but the specific detail/number is not present on this sheet - missing detail could cause construction uncertainty. | Parapet heights have multiple numeric references (+61'-4", +60'-0", +63'-0") and text 'ALL PARAPET HEIGHTS NOT NOTED TO BE 56'-0'' - potential ambiguity in which parapet locations correspond to which heights without cross-reference to elevations/sections. | Sheet contains partially fragmented text and dimensions (e.g., '18'-0 5/8"', '141312') that are unclear in isolation and may lead to misinterpretation. | HOLD | Chain hold | |
| └Scope 19 | A-117 | Reference note D: 'ROOFTOP EQUIPMENT SHOWN FOR ARCHITECTUAL INTENT ONLY. COORDINATE EQUIPMENT REQUIREMENTS W/ MEP ENGINEER.' | HOLD | Chain hold | |
| └Scope 20 | A-120 Rev.0 | SUPERSEDED - not added to takeoff; A-120 Rev.01 is the controlling first-floor reflected ceiling plan. | HOLD | Chain hold | |
| └Scope 21 | A-200 | CHAIN HOLD - Note on sheet: 'BUILDING ELEVATION ARE APPROXIMATE AND WILL VARY BASED ON STRUCTURAL SYSTEM.' - indicates elevations may change once structural information is finalized. | Multiple revision dates and review stamp imply the document has been revised multiple times; latest shown revision dates 05.22.2020 and 12.30.2020 and plan approval 9/29/2021. | Document instructs to 'REFER TO EXTERIOR FINISH INDEX FOR MATERIALS AND COLORS' - finish details are not contained on this sheet and must be checked elsewhere. | HOLD | Chain hold | |
| └Scope 22 | A-200 | Exterior elevations (front and back) for the Fairfield Inn project | HOLD | Chain hold | |
| └Scope 23 | A-200 | Exterior finish key entries visible: EF1 EF2 EF2b EF2a EF4 ST1 SP1 EF4a EF3 (and descriptive phrases such as 'DARK EIFS FINISH COLOR', 'ACCENT EIFS COLOR', 'MAIN BUILDING EIFS COLOR', 'CULTURED STONE', 'STAIR TOWER EIFS COLOR', 'EXTERIOR ACCENT FINISH -CEMENT BOARD SIDING -EXTERIOR PLAM (OPTIONAL)') | HOLD | Chain hold | |
| └Scope 24 | A-201 | CHAIN HOLD - Sheet includes note: "BUILDING ELEVATION ARE APPROXIMATE AND WILL VARY BASED ON STRUCTURAL SYSTEM." - indicates elevations may change based on structural design. | Note: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes" - indicates potential conflict if other documents or work deviate from codes. | Instruction that modifications require written approval from City of Tampa Construction Services Division - potential for legal/permit risk if changes are made without approval. | Multiple revision dates and a plan-approval date later than original drawing date (original 10.06.14 vs approval 9/29/2021) - potential for mismatches between drawing versions if full revision history is not tracked. | HOLD | Chain hold | |
| └Scope 25 | A-201 | Exterior finishes per Exterior Finish Index (EIFS, cultured stone, cement board siding, exterior PLAM (optional)) | HOLD | Chain hold | |
| └Scope 26 | A-201 | Signage: optional cartouche type signage; alternate location for cartouche building signage | HOLD | Chain hold | |
| └Scope 27 | A-201 | Notes: "OPTIONAL \"CARTOUCHE\" TYPE SIGNAGE ON SIDE OF BUILDING. LOCATE AS APPROPRIATE BASED ON BUILDING ORIENTATION." and "SIDE ENTRY CANOPY. SEE ENLARGED ELEVATIONS FOR DETAILS." | HOLD | Chain hold | |
| └Scope 28 | A-203 | CHAIN HOLD - Inconsistent elevation values present in the sheet text: e.g., '05-ROOF 42' - 8"' and separately '05-ROOF 52' - 8"' (both appear in the document). | Labeling inconsistency: '04-FIFTH FLOOR 42' - 8"' appears which may conflict with other floor numbering shown. | Note: 'BUILDING ELEVATION ARE APPROXIMATE AND WILL VARY BASED ON STRUCTURAL SYSTEM.' indicates elevations are not final and may change. | HOLD | Chain hold | |
| └Scope 29 | A-203 | Wall sections and details based on preferred optional rainscreen siding (adjust to V.E. options) | HOLD | Chain hold | |
| └Scope 30 | A-203 | WALL SECTIONS AND DETAILS BASED ON PREFFERED OPTIONAL RAINSCREEN SIDING. ADJUST ACCORDINGLY TO SUIT V.E. OPTIONS. | HOLD | Chain hold | |
| └Scope 31 | A-300 | CHAIN HOLD - Document shows both 'ROOF 52' - 8"' and 'ROOF 2 60' - 8"' which are different roof elevation labels in the same sheet. | Two parapet elevations are shown: 'Parapet 1 60' - 0 1/2"' and 'Parapet 2 63' - 0"' (differences observable on sheet). | HOLD | Chain hold | |
| └Scope 32 | A-310 | CHAIN HOLD - No explicit risks or conflicts are stated on the sheet. | Potential ambiguity from multiple dates on the sheet (10.06.14, 12.31.15, 02.18.16) without clear labeling of which is issue date vs. revision date. | HOLD | Chain hold | |
| └Scope 33 | A-312 | CHAIN HOLD - Note: "ARCHITECT SHALL VERIFY THAT SECTIONS ARE DRAWN ACCURATELY FOR CHOSEN FINISH SYSTEMS." (implies potential discrepancy between drawing and selected finish systems if not verified) | Note: "ARCHITECT SHALL UPDATE OR CORRECT SECTIONS TO REPRESENT CHOSEN STRUCTURAL SYSTEMS PER STRUCTURAL ENGINEER." (requires coordination; potential conflict if not updated) | Note: "DESIGNER TO HOLD MINIMUM CEILING HEIGHTS AS INDICATED, FLOOR TO FLOOR HEIGHTS MAY NEED TO BE ADJUSTED TO ACCOMMODATE DUCTWORK." (indicates potential conflicts between mechanical routing and ceiling/floor heights) | Instruction to "OFFSET UTILITIES IN CORRIDOR TO ALLOW FOR RECESSED LIGHTING" (coordination requirement that could create schedule or build conflicts if not resolved) | HOLD | Chain hold | |
| └Scope 34 | A-312 | Foundation and structural elements to be designed/coordinated by structural engineer (foundation system, bond beams) | HOLD | Chain hold | |
| └Scope 35 | A-312 | Elevator coordination notes: "ELEVATOR DOOR, COORDINATE WITH MANUF.", "ELEVATOR SHAFT, COORDINATE WITH MANUF.", "ELEVATOR PIT, COORDINATE WITH MANUF.", "ELEVATOR OVERRUN, COORDINATE WITH MANUF." | HOLD | Chain hold | |
| └Scope 36 | A-313 | CHAIN HOLD - ARCHITECT SHALL VERIFY THAT SECTIONS ARE DRAWN ACCURATELY FOR CHOSEN FINISH SYSTEMS (coordination risk if not updated). | ARCHITECT SHALL UPDATE OR CORRECT SECTIONS TO REPRESENT CHOSEN STRUCTURAL SYSTEMS PER STRUCTURAL ENGINEER (potential for mismatch between structural and architectural sections). | DESIGNER TO HOLD MINIMUM CEILING HEIGHTS AS INDICATED, FLOOR TO FLOOR HEIGHTS MAY NEED TO BE ADJUSTED TO ACCOMMODATE DUCTWORK (possible coordination/height conflicts). | OFFSET UTILITIES IN CORRIDOR TO ALLOW FOR RECESSED LIGHTING (coordination requirement noted). | Coordinate elevator door/shaft/pit/overrun with manufacturer (coordination risk if not done). | Gutters/downspouts/overflows must be routed to daylight in areas that will not drain across walking surfaces (drainage/egress risk if not followed). | HOLD | Chain hold | |
| └Scope 37 | A-313 | Coordinate elevator components (door, shaft, pit, overrun) with manufacturer | HOLD | Chain hold | |
| └Scope 38 | A-313 | ELEVATOR DOOR, COORDINATE WITH MANUF. | HOLD | Chain hold | |
| └Scope 39 | A-313 | ELEVATOR SHAFT, COORDINATE WITH MANUF. | HOLD | Chain hold | |
| └Scope 40 | A-313 | ELEVATOR PIT, COORDINATE WITH MANUF. | HOLD | Chain hold | |
| └Scope 41 | A-313 | ELEVATOR OVERRUN, COORDINATE WITH MANUF. | HOLD | Chain hold | |
| └Scope 42 | A-313 | GYP. BD. SOFFIT, FRAME AROUND STEEL BEAM, COORDINATE WITH STRUCTURE | HOLD | Chain hold | |
| └Scope 43 | A-313 | WALL SECTIONS ARE DRAWN TO PROVIDE INFORMATION REGARDING SPECIFIC FINISH SYSTEMS CONSTRUCTION AND RELATIONSHIPS. ARCHITECT SHALL VERIFY THAT SECTIONS ARE DRAWN ACCURATELY FOR CHOSEN FINISH SYSTEMS. | HOLD | Chain hold | |
| └Scope 44 | A-314 | CHAIN HOLD - Architect is required to verify that sections are drawn accurately for chosen finish systems and to update/correct sections per structural engineer: indicates potential coordination risk between architectural and structural design. | Note to offset utilities in corridor to allow for recessed lighting: potential coordination/conflict between MEP and architectural finishes. | References to multiple sheets and disciplines (004, 005, 006, 910, 102, 940/941, 611) indicate potential for missing coordination if those referenced sheets are not reconciled with these wall sections. | HOLD | Chain hold | |
| └Scope 45 | A-314 | Coordinate elevators with manufacturer (door, shaft, pit, overrun). | HOLD | Chain hold | |
| └Scope 46 | A-314 | Coordinate wall sections with structural engineer and update per structural engineer (refer to sheets 004, 005, 940, 941). | HOLD | Chain hold | |
| └Scope 47 | A-314 | WALL SECTIONS ARE DRAWN TO PROVIDE INFORMATION REGARDING SPECIFIC FINISH SYSTEMS CONSTRUCTION AND RELATIONSHIPS. ARCHITECT SHALL VERIFY THAT SECTIONS ARE DRAWN ACCURATELY FOR CHOSEN FINISH SYSTEMS. | HOLD | Chain hold | |
| └Scope 48 | A-314 | ELEVATOR DOOR, COORDINATE WITH MANUF. | HOLD | Chain hold | |
| └Scope 49 | A-314 | ELEVATOR SHAFT, COORDINATE WITH MANUF. | HOLD | Chain hold | |
| └Scope 50 | A-314 | ELEVATOR PIT, COORDINATE WITH MANUF. | HOLD | Chain hold | |
| └Scope 51 | A-314 | ELEVATOR OVERRUN, COORDINATE WITH MANUF. | HOLD | Chain hold | |
| └Scope 52 | A-314 | GYP. BD. SOFFIT, FRAME AROUND STEEL BEAM, COORDINATE WITH STRUCTURE | HOLD | Chain hold | |
| └Scope 53 | A-314 | Fairfield Inn & Suites Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference. | HOLD | Chain hold | |
| └Scope 54 | A-400 / A-406 | CHAIN HOLD - prototype references to an outdoor-pool option are not added; project pool scope is carried from the indoor-pool sheets A-405 and A-571. | HOLD | Chain hold | |
| └Scope 55 | A-401 | CHAIN HOLD - Document states it is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division. | Stamping of plan 'shall not be held to permit or approve the violation of any City or State Codes' (limits implied authorization). | HOLD | Chain hold | |
| └Scope 56 | A-402 | CHAIN HOLD - Document contains an architect's statement of compliance and a separate City of Tampa review-for-code-compliance entry (BLD-20-0472570 9/29/2021); both appear on the same sheet. | The stamping includes a disclaimer that stamping 'shall not be held to permit or approve the violation of any City or State Codes' which limits reliance on the stamp for code permissiveness. | HOLD | Chain hold | |
| └Scope 57 | A-403 | CHAIN HOLD - Sheet contains explicit warning that making changes or alterations without written approval from the City of Tampa Construction Services Division is unlawful. | Sheet states that the stamping of the plan shall not be held to permit or approve the violation of any City or State Codes. | HOLD | Chain hold | |
| └Scope 58 | A-404 | CHAIN HOLD - Document explicitly states that making changes or alterations without written approval from the City of Tampa Construction Services Division is unlawful (source text on sheet). | Document explicitly states that the stamping of the plan does not permit or approve violations of any City or State Codes (source text on sheet). | HOLD | Chain hold | |
| └Scope 59 | A-405 | CHAIN HOLD - The stamping explicitly states it does not permit or approve violations of City or State Codes. | Changes or alterations without written approval from City of Tampa Construction Services Division are unlawful (risk if modified). | HOLD | Chain hold | |
| └Scope 60 | A-406 | CHAIN HOLD - The plan contains explicit warnings that changes or alterations without written approval are unlawful; any undocumented changes could create compliance risk. | The stamping explicitly states it does not permit or approve violations of City or State codes, indicating that separate compliance confirmation may be required for some items. | HOLD | Chain hold | |
| └Scope 61 | A-407 | CHAIN HOLD - Document explicitly prohibits unauthorized changes or alterations without written approval from City of Tampa Construction Services Division. | Stamping does not authorize or approve violations of City or State codes, which could indicate requirements remain to be met or verified on-site. | HOLD | Chain hold | |
| └Scope 62 | A-410 | CHAIN HOLD - No named contract parties, dates, or revision history are visible on the sheet, which limits ability to establish provenance or enforceability. | Absence of signatory, stamp, or issue date on the visible portion reduces confidence in this sheet as a stand-alone certified document. | Multiple small text callouts and dimensions are present but not fully legible in the provided image; interpretations of those could be uncertain. | HOLD | Chain hold | |
| └Scope 63 | A-412 | CHAIN HOLD - Document is labeled ADA (King Suite ADA Guestroom) indicating accessibility design requirements are relevant (fact on sheet). | No explicit risks, conflicts, or change notices are shown on the visible portion of the document. | HOLD | Chain hold | |
| └Scope 64 | A-413 | CHAIN HOLD - Inconsistent labeling observed: sheet title/header reads 'KING ACC GUESTROOM A-413' while multiple sheet references use 'KING ADA GUESTROOM'. This may indicate a labeling inconsistency or OCR/readability issue in the image. | No revision or document date shown on the visible portion of the sheet - inability to confirm currentness of the drawing. | HOLD | Chain hold | |
| └Scope 65 | A-421 / A-422 | CHAIN HOLD - the A-003 room mix includes 2 Queen/Queen Suite ADA rooms, but no separately titled accessible QQ suite sheet is present; confirm whether A-421 or A-422 governs before multiplying finishes or FF&E. | HOLD | Chain hold | |
| └Scope 66 | A-433 | CHAIN HOLD - Stamping disclaimer: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes' (implies responsibility to verify code compliance). | Warning that it is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division (risk of noncompliance if changes are made without approval). | HOLD | Chain hold | |
| └Scope 67 | A-434 | CHAIN HOLD - The stamping of the plan explicitly states it shall not be held to permit or approve violations of City or State codes. | Alterations made without written approval from the City of Tampa Construction Services Division would be unlawful per the sheet. | HOLD | Chain hold | |
| └Scope 68 | A-435 | CHAIN HOLD - Document contains the statement that changes or alterations are unlawful without written approval from the City of Tampa Construction Services Division (administrative/legal constraint). | HOLD | Chain hold | |
| └Scope 69 | A-435A | CHAIN HOLD - Sheet stamping states it does not permit or approve violations of City or State Codes (implies responsibility to ensure compliance). | HOLD | Chain hold | |
| └Scope 70 | A-436 | CHAIN HOLD - Drinking fountain is optional unless required by local jurisdiction - potential jurisdictional compliance risk if local code requires a fountain. | Requirement that water closet waste lines be located in wall chases (not in exterior walls) may conflict with existing site conditions or structural constraints. | Floor clean-out requirement to be inconspicuous and not in guestrooms may affect coordination and routing; sheet does not show all coordination outcomes. | There are multiple code and edition references in a single line ("FBC SIXTH edition 2017 2014 NEC 2015 NFPA") which could lead to ambiguity without further clarification in specifications. | HOLD | Chain hold | |
| └Scope 71 | A-436 | Provide blocking in wall for all fixtures, grab bars and accessories. Coordinate location with manufacturer's installation requirements. | HOLD | Chain hold | |
| └Scope 72 | A-436 | Drinking fountain is an optional item unless required by local jurisdiction. | HOLD | Chain hold | |
| └Scope 73 | A-436 | BOWL OPENING VERIFY DEPTH WITH FAUCET REQ'MTS | HOLD | Chain hold | |
| └Scope 74 | A-436 | COORDINATE FLOOR SLOPE TO DRAIN WITH THE TILE PATTERN. | HOLD | Chain hold | |
| └Scope 75 | A-438 | CHAIN HOLD - The sheet contains the advisory that stamping does not permit or approve code violations (observed text: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes'). | The sheet contains a notice that changes are unlawful without written approval from the City of Tampa Construction Services Division, which could indicate permit/control risks if changes are made without that approval. | HOLD | Chain hold | |
| └Scope 76 | A-490 | CHAIN HOLD - No contractor or construction firm (e.g., Mason Forge) is identified on this sheet. | No owner or general contractor listed on the sheet; responsibility for installation/acceptance not specified on this sheet. | Multiple revision lines present; full revision history context for the set is not included on this single sheet. | HOLD | Chain hold | |
| └Scope 77 | A-491 | CHAIN HOLD - Document explicitly prohibits making changes or alterations without written approval from the City of Tampa Construction Services Division. | Stamp includes statement that stamping shall not be held to permit or approve the violation of any City or State Codes (limits implied permissions). | HOLD | Chain hold | |
| └Scope 78 | A-492 | CHAIN HOLD - Multiple elevation values appear on the sheet that may require coordination: Parapet 1 60' - 0 1/2", Parapet 2 63' - 0", ROOF 52' - 8", ROOF 2 60' - 8", and a standalone '63'-0"' value. These differing numeric elevation values are present on the drawing and could require reconciliation. | The sheet contains revision entries and a City review stamp; the sheet also states that changes are unlawful without written approval - any undocumented changes could be non-compliant. | HOLD | Chain hold | |
| └Scope 79 | A-503 | CHAIN HOLD - Document explicitly states it is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division. | Stamping does not constitute permission to violate City or State codes. | HOLD | Chain hold | |
| └Scope 80 | A-504 | CHAIN HOLD - Document explicitly states it is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division (legal/contractual constraint on changes). | Stamping of the plan does not permit or approve violations of City or State codes (limits interpretation of approval). | HOLD | Chain hold | |
| └Scope 81 | A-505 | CHAIN HOLD - The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes. | It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division. | HOLD | Chain hold | |
| └Scope 82 | A-507 | CHAIN HOLD - The stamp includes the statement that stamping shall not be held to permit or approve violation of any City or State Codes (potentially indicating review limitations). | Document shows review for code compliance but does not include owner, contractor, or explicit project address on the visible sheet. | HOLD | Chain hold | |
| └Scope 83 | A-508 | CHAIN HOLD - The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes (limitation on stamp/approval). | It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division (legal constraint). | HOLD | Chain hold | |
| └Scope 84 | A-509 | CHAIN HOLD - The sheet explicitly states that the stamping shall not be held to permit or approve violations of City or State codes (limitation noted on face of sheet). | Changes or alterations without written approval from City of Tampa Construction Services Division are unlawful (regulatory compliance risk if changed). | HOLD | Chain hold | |
| └Scope 85 | A-509 / A-509A | ALTERNATE HOLD - owner selection between Corner Market with beer and wine and the without-beer-and-wine alternate is unresolved; do not add both. | HOLD | Chain hold | |
| └Scope 86 | A-509A | CHAIN HOLD - The sheet explicitly states the stamping does not permit or approve violations of any City or State Codes (limitation noted on sheet). | No explicit conflicts or outstanding code violations are stated on the visible sheet. | HOLD | Chain hold | |
| └Scope 87 | A-511 | CHAIN HOLD - Coordination required between electrical work and furniture vendor: 'NOTE: COORDINATE OUTLET REQUIREMENT W/ FURNITURE VENDOR'. Risk of miscoordination if not followed. | Banquette components are specified 'BY OTHERS' (multiple references). Responsibility and timing for supply/installation may be unclear on this sheet and could cause scope gaps if not coordinated. | Sheet carries a strict warning that changes require written approval from City of Tampa Construction Services Division; unapproved changes would be unlawful. | HOLD | Chain hold | |
| └Scope 88 | A-511 | NOTE: COORDINATE OUTLET REQUIREMENT W/ FURNITURE VENDOR | HOLD | Chain hold | |
| └Scope 89 | A-512 | CHAIN HOLD - The document explicitly states that changes or alterations without written approval are unlawful - risk of noncompliance if plans are modified on-site without approval. | The stamping of the plan does not constitute approval to violate City or State codes - potential compliance risk if work deviates from codes despite stamped plans. | HOLD | Chain hold | |
| └Scope 90 | A-550 | CHAIN HOLD - Multiple repeated and overlapping text blocks and abbreviations on the sheet (duplicated notes) may create ambiguity for installers (e.g., repeated 'EXT. FINISH ABOVE 40'-0" TO BE HARD STUCCO...' blocks). | References to mechanical and structural information are present as 'SEE MECH.' and 'SEE STRUCT FOR PRECAST DETAILS' but no mechanical or structural sheet numbers are provided on this sheet, which may lead to coordination issues. | Some abbreviations and truncated words (e.g., 'FR.', 'W.P.', 'RUNN') appear in the text and could be ambiguous without a legend or glossary. | HOLD | Chain hold | |
| └Scope 91 | A-571 | CHAIN HOLD - The sheet explicitly states that stamping does not authorize violations of City or State codes, indicating that compliance remains the responsibility of project parties. | The sheet warns that changes without written approval from the City of Tampa Construction Services Division are unlawful. | HOLD | Chain hold | |
| └Scope 92 | A-572A | CHAIN HOLD - Architect's attestation is qualified: "TO THE BEST OF ARCHITECT'S KNOWLEDGE THE PLANS AND SPECIFICATIONS COMPLY WITH THE MINIMUM BUILDING CODES." (qualified language may limit absolute assurance). | Explicit statement that stamping does not permit or approve violations of city/state codes indicates the stamp is not an unconditional approval for any non-compliant items. | HOLD | Chain hold | |
| └Scope 93 | A-574 | CHAIN HOLD - Multiple dates appear on the sheet (01/23/2020, 8.10.15, 9/29/2021) without an explicit revision label tying them together. | Architect identity is not unambiguously presented in the parsed text (sheet shows 'AP ARCHITECTURE' but full firm/individual names and signatures are not fully legible in provided text). | Project address and owner/client are not present on the provided sheet, limiting attribution and contract context. | HOLD | Chain hold | |
| └Scope 94 | A-600 | CHAIN HOLD - "THRESHOLD TO MATCH FRAME WIDTH; VERIFY ACTUAL FRAME WIDTH PRIOR TO ORDERING THRESHOLD FOR DOOR TYPE REFER TO DOOR SCHEDULE" - indicates potential procurement/coordination risk if frame width is not verified prior to ordering thresholds. | "VERIFY SIZES OF DOORS LEADING INTO ROOMS HOUSING EQUIPMENT... TO ENSURE DOOR IS WIDE ENOUGH TO ALLOW FOR REMOVAL AND REPLACEMENT OF EQUIPMENT." - risk if equipment access not verified. | Notes require verification of actual frame width and tile/finish transitions (coordination risk between architect, supplier and installer). | Automatic door hardware is by supplier ("AUTOMATIC DOOR HDWR BY SUPPLIER") - coordination required between supplier and installer. | HOLD | Chain hold | |
| └Scope 95 | A-600 | Coordinate automatic door hardware for specified vestibule locations ("AUTOMATIC DOOR HDWR BY SUPPLIER"). | HOLD | Chain hold | |
| └Scope 96 | A-600 | GENERAL NOTE: "VERIFY SIZES OF DOORS LEADING INTO ROOMS HOUSING EQUIPMENT, SUCH AS THE LAUNDRY ROOM OR THE MECHANICAL ROOM, TO ENSURE DOOR IS WIDE ENOUGH TO ALLOW FOR REMOVAL AND REPLACEMENT OF EQUIPMENT." | HOLD | Chain hold | |
| └Scope 97 | A-600 | "THRESHOLD TO MATCH FRAME WIDTH; VERIFY ACTUAL FRAME WIDTH PRIOR TO ORDERING THRESHOLD FOR DOOR TYPE REFER TO DOOR SCHEDULE" | HOLD | Chain hold | |
| └Scope 98 | A-610 | CHAIN HOLD - The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes (limitation noted on sheet). | It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division (constraint on changes). | HOLD | Chain hold | |
| └Scope 99 | A-610 | Various dimensioned storefront/window elevations and alternates (as depicted on sheet) | HOLD | Chain hold | |
| └Scope 100 | A-800 | CHAIN HOLD - Multiple dates appear on the sheet (8.10.15, 01/23/2020, 9/29/2021) with no explicit explanation of their meaning or sequence. | No project name or project address is shown on the visible sheet; cannot confirm the project this sheet belongs to. | No named architect, contractor, or other primary contact is legibly present on the visible sheet. | The presence of a "THRESHOLD BUILDING" stamp may have legal/code implications that are not described on this sheet. | Equipment schedule and many small-note details are present but may be only partially legible in this image; detailed verification of equipment quantities/specifications is not possible from this single sheet. | HOLD | Chain hold | |
| └Scope 101 | A-801 | CHAIN HOLD - It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division (explicit restriction). | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes (limitation on authority of stamp). | HOLD | Chain hold | |
| └Scope 102 | A-802 | CHAIN HOLD - The document states changes or alterations are unlawful without written approval from the City of Tampa Construction Services Division, which implies compliance risk if the plans are altered on site. | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes (potential liability/interpretation risk if code conflicts exist). | HOLD | Chain hold | |
| └Scope 103 | A-804 | CHAIN HOLD - Multiple dates are present on the sheet (8.10.15, 01/23/2020, 9/29/2021); relationship between these dates is not specified on the visible text and may indicate revisions, reviews, or different document events that need clarification. | The plan stamping specifically disclaims that stamping permits or approves code violations and disallows changes without written approval; any undocumented alterations would be non-compliant per the sheet text. | HOLD | Chain hold | |
| └Scope 104 | A-804 | Upper corridor carpet plan (including an alternate Axminster option) | HOLD | Chain hold | |
| └Scope 105 | A-804 | Visible plan/details include: PARTIAL INT. ELEVATION - GUESTROOM ENTRY; PARTIAL INT. ELEVATION GUESTROOM LOBBY; PARTIAL INT. ELEVATION UPPER ELEVATOR LOBBY; UPPER CORRIDOR CARPET PLAN - ALTERNATE AXMINSTER; UPPER CORRIDOR CARPET PLAN; ENLARGED UPPER FLOOR CORRIDOR PLAN; SYMBOLS | HOLD | Chain hold | |
| └Scope 106 | A-805 | CHAIN HOLD - Key identifying information (owner/contractor names, full project address) is not legible or not present on this sheet. | Multiple dates appear (8.10.15, 01/23/2020, 9/29/2021) without an explicit revision history on this sheet, which could cause ambiguity about applicable version. | Some notes and stamps (seal and signature area) are present but not legible at the resolution provided. | HOLD | Chain hold | |
| └Scope 107 | A-806 | CHAIN HOLD - The sheet explicitly states that the stamping of the plan does not permit or approve violations of City or State codes (limitation on implied approval). | The sheet warns it is unlawful to make changes without written approval from the City of Tampa Construction Services Division (risk if changes are made without approval). | No explicit contractual disputes, claims, or conflicts involving 'Mason Forge' are present on this sheet. | HOLD | Chain hold | |
| └Scope 108 | A-807 | CHAIN HOLD - The sheet explicitly states changes or alterations are unlawful without written approval from the City of Tampa Construction Services Division; making unapproved changes would create a legal/compliance risk. | The stamping carries a disclaimer that it does not permit violations of any City or State Codes; any noncompliance cannot be justified by the stamp. | HOLD | Chain hold | |
| └Scope 109 | A-808 | CHAIN HOLD - Document contains notice that changes or alterations are unlawful without written approval (administrative/legal restriction). | Stamping does not constitute approval to violate City or State codes (limitation on granted approval). | HOLD | Chain hold | |
| └Scope 110 | A-809 | CHAIN HOLD - Sheet states: 'THIS PLAN IS A PROTOTYPE AND ALL FACTORS MAY CHANGE. SITE CONDITIONS AND/OR LOCAL CODES MAY SUPERSEDE THE DESIGN.' | Architect is instructed to have a competent laundry consultant review the plan for compliance with any changes required - implying potential for design changes or conflicts requiring consultant input | Warning that it is unlawful to make changes without written approval from City of Tampa indicates legal risk if changes are made without authorization | HOLD | Chain hold | |
| └Scope 111 | A-809 | Plans are described as a prototype; site conditions and local codes may supersede the design. | HOLD | Chain hold | |
| └Scope 112 | A-809 | Criteria note A1 text present: 'SEE SHEET 621 FOR INFORMATION REGARDING CONSTRUCTION REQUIRED FOR LAUNDRY EQUIPMENT. REFER TO DESIGN STANDARDS "LAUNDRY BACK OF HOUSE" CHAPTER FOR MAIN REQUIREMENTS RELATED TO THIS SHEET. ARCHITECT IS RESPONSIBLE FOR DESIGNING PROJECT IN ACCORDANCE WITH THE ENTIRE DESIGN STANDARDS. THIS PLAN IS A PROTOTYPE AND ALL FACTORS MAY CHANGE. SITE CONDITIONS AND/OR LOCAL CODES MAY SUPERSEDE THE DESIGN. ARCHITECT SHOULD HAVE A COMPETENT LAUNDRY CONSULTANT REVIEW THE PLAN FOR COMPLIANCE WITH ANY CHANGES REQUIRED.' | HOLD | Chain hold | |
| └Scope 113 | A-810 | CHAIN HOLD - The sheet contains legal/administrative restrictions stating plans must not be changed without written approval from the City of Tampa Construction Services Division; any unapproved changes would be a compliance risk. | Equipment schedule table text and many small annotations on the sheet are not fully legible in the provided image, preventing verification of specific equipment models, quantities, or capacities from this source alone. | HOLD | Chain hold | |
| └Scope 114 | A-series / ID-series | CHAIN CONTROL - architectural and interior drawings overlap at finishes, ceilings, millwork, guestrooms, restrooms, pool, and public spaces. Details define scope but are not separate quantities from their governing plans/schedules. | HOLD | Chain hold | |
| └Scope 115 | A1-22 | CHAIN HOLD - Plans/specifications are stated to comply only 'TO THE BEST OF ARCHITECT'S KNOWLEDGE' - implies limited representation as printed. | Altering the plans without written approval is unlawful (conflict/risk if changes are made in the field without approval). | Stamping does not excuse violation of City or State codes (possible compliance risk if stamped plans contain code violations). | HOLD | Chain hold | |
| └Scope 116 | A1-23 | CHAIN HOLD - Document explicitly prohibits changes without written approval from the City of Tampa Construction Services Division (potential compliance risk if changes are made without approval). | HOLD | Chain hold | |
| └Scope 117 | A1-24 | CHAIN HOLD - The sheet includes the statement that the stamping of the plan does not permit or approve violations of any City or State Codes (potentially relevant if discrepancies are found between stamped approval and code-compliant work). | HOLD | Chain hold | |
| └Scope 118 | C-1A [Civil] | CHAIN HOLD - Existing 'BROKEN ASPHALT' noted on site (as shown on plan) - potential site condition requiring remediation | A 'RETENTION POND' is located on the property (as shown on plan) - potential constraint for development or grading | Chain link fence and other existing site improvements are shown which may affect access or construction | HOLD | Chain hold | |
| └Scope 119 | C-3 [Civil] | CHAIN HOLD - Existing underground utility lines within the construction area must be located prior to construction to avoid damage and subsurface erosion; if underground pipes are not properly removed or plugged, they may serve as conduits for subsurface erosion which may lead to excessive settlement. | Contractor responsible for notifying and coordinating with utilities at least 48 hours in advance; failure to coordinate could cause conflicts or delays. | Soils may require removal/backfill if 'muck-like' material is discovered; potential for additional work and testing. | Compliance/testing requirements (compaction, asphalt cores, concrete cylinders, etc.) place responsibility and risk on contractor for nonconforming work. | Document notes that there may be deficiencies or discrepancies among drawings and specifications and that these must be reported prior to bid date; unresolved discrepancies could create scope conflicts. | Some tabular site coverage and parking presentation in the page is formatted ambiguously (e.g., parking breakdown rows), which could lead to misinterpretation if relied upon without full plan set. | HOLD | Chain hold | |
| └Scope 120 | C-4 [Civil] | CHAIN HOLD - Risk of contact with existing underground utilities, gas mains and overhead electric in the right-of-way (explicit WARNING). | Potential requirement for dewatering permit if dewatering thresholds are exceeded; contractor responsibility to ensure dewatering activity is below specified threshold or obtain permit at contractor expense. | No construction within public ROW without ROW permit from City of Tampa (regulatory constraint). | No work on City wastewater infrastructure until approved by City of Tampa Wastewater Department's engineering staff (approval constraint). | Erosion/sediment leaving site - notes emphasize contractor responsibility to prevent soil sediment from leaving the site. | HOLD | Chain hold | |
| └Scope 121 | C-5 [Civil] | CHAIN HOLD - NO DISCHARGE IS PERMITTED INTO WETLAND AREAS. IF TURBID WATER IS RELEASED, STOP DISCHARGE IMMEDIATELY AND CORRECT THE PROBLEM. | PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | HOLD | Chain hold | |
| └Scope 122 | C-6 [Civil] | CHAIN HOLD - General Note 5: THE CONTRACTOR SHALL COORDINATE WITH THE EXISTING ADJACENT BUSINESSES TO ENSURE THERE IS NO DISRUPTION TO THEIR RESPECTIVE OPERATIONS. (indicates potential coordination/risk) | General Note 6: THE CONTRACTOR AT ITS OWN DISCRETION SHALL MAINTAIN THE CONSTRUCTION SITE SECURE FROM TRESPASS. (site security risk acknowledged) | Pylon sign requires separate building permit (potential permit/approval conflict if not obtained) | Multiple owners/parcel ownership (TAMPA BUSCH HOTEL, LLC and CITY OF TAMPA) shown - property ownership boundaries may present coordination needs (fact present on sheet) | HOLD | Chain hold | |
| └Scope 123 | C-7 [Civil] | CHAIN HOLD - NOTES: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO DRAINAGE SYSTEM AND SHALL RESTORE ANY DAMAGED STRUCTURES (risk of contractor liability). | TRENCH TO BE CONSTRUCTED AND ADHERED TO OSHA'S TRENCH SAFETY CODE (safety compliance risk if not followed). | CALCAREOUS MATERIAL IS PROHIBITED (material availability/compatibility risk if encountered). | FILTER FABRIC SHALL REMAIN IN PLACE UNTIL PAVING IS COMPLETE (sequence risk for paving). | REQUIREMENT: CONTRACTOR SHALL BE CERTIFIED TO INSTALL HDPE PIPE FROM MANUFACTURER (qualification risk if contractor is not certified). | MAINTENANCE REQUIREMENTS (quarterly first year, annual thereafter); failure to perform may risk system performance. | HOLD | Chain hold | |
| └Scope 124 | C-8 [Civil] | CHAIN HOLD - Document contains two different values for 'MINIMUM INSTALLED STORAGE': "31.0 CUBIC FEET" (in one table) and "35.0 CUBIC FEET" (in a repeated summary block). | Multiple dates and revision entries are present (11-7-08; 1/3/16; APRIL 2015; 3/22/21) without a single explicit revision history field; potential ambiguity about the controlling version. | General note: 'STORMTECH DETAILS DO NOT SUPERSEDE ANY STATE OR LOCAL REGULATORY SPECIFICATIONS' - responsibility placed on consulting/design engineer to ensure compliance (risk of nonconformance if engineer does not verify). | Requirement that contractor must prevent vehicles that exceed Stormtech's requirements from traveling across or parking over the stormwater system - operational/construction coordination risk if not enforced. | Document prohibits substitutions: 'NO SUBSTITUTION OF ALTERNATE MATERIAL IS PERMITTED.' - risk if specified products are unavailable. | HOLD | Chain hold | |
| └Scope 125 | C-9 [Civil] | CHAIN HOLD - No contractor, construction manager, or cost/contract documents are shown on this page (unable to confirm responsible construction party from this sheet). | Signature/seal is shown as digital but the exact date/time of signature is not fully visible on the provided page. | Project number, permit stamp(s), and permit approval status are not clearly provided on this page (there is 'PROJECT No:' with no value shown). | No direct reference to 'Mason Forge' on the provided page; cannot verify any relationship to Mason Forge from this document alone. | HOLD | Chain hold | |
| └Scope 126 | C-10 [Civil] | CHAIN HOLD - Multiple dates/revisions present (APRIL 2015; 1/3/16; 3/22/21; C 2013) without a single clear 'issued' date on this page. | Two different street addresses appear on the sheet: '9306 N 30TH STREET' and '9301 N 29TH STREET' - potential ambiguity about which parcel this sheet refers to. | Sheet annotations show 'NOT TO SCALE' in multiple places, which limits use for scaling measurements. | No contract/owner or contractor names explicitly identified on this page (only engineering firm). | HOLD | Chain hold | |
| └Scope 127 | C-12 [Civil] | CHAIN HOLD - UTILITY CONFLICT DETAIL: conflict point where 12" HDPE storm pipe and 6" PVC fire service and 4" PE water service intersect (shown on drawing). | NOTATION: "UTILITY CONFLICT (SEE DETAILS THIS SHEET)" indicating identified utility spatial conflicts on the plan. | VALVES ON EXISTING CITY OF TAMPA WATER MAINS ARE TO BE OPERATED BY CITY PERSONNEL ONLY (operational coordination risk/delay if not scheduled). | REQUIREMENTS FOR COORDINATION WITH MULTIPLE CITY DEPARTMENTS AND INSPECTORS (CEI, Planning Division, Wastewater Department) introduce potential schedule/risk if notifications/submittals are not made in required timeframes. | HOLD | Chain hold | |
| └Scope 128 | C-12.1 [Civil] | CHAIN HOLD - SPECIAL PRECAUTIONS (warnings and installation constraints are included on the sheet) | DO NOT COMPACT BACKFILL MECHANICALLY (installation warning shown) | High Temperature Kitchen Water (special precaution heading present) | Hydrostatic/Pressureable Inlets/Outlets (installation constraint shown) | Below Grade Installation Slab Requirements (installation constraint shown) | Secure Cover Adapters (installation note shown) | Corrugated Riser Pipe Requirements (installation requirement shown) | HOLD | Chain hold | |
| └Scope 129 | C-13 [Civil] | CHAIN HOLD - SCOPE: NO SUBSTITUTIONS - NO ALTERNATES (may restrict procurement options) | Oil filled motors are not considered equal to air filled motors and therefore will not be considered an equal to the HOMA PUMPS. | Contractor shall verify power source prior to ordering equipment (risk if not verified). | Concrete grout as required by engineer to prevent flotation (requires coordination with structural/earthwork). | PUMP CONTROL PANEL SHALL BE LOCATED 3 FEET FROM WETWELL PERIMETER AT POINT "A" (site location constraint) | HOLD | Chain hold | |
| └Scope 130 | C-14 [Civil] | CHAIN HOLD - If connection to the water main results in depressurization below 20 PSI, precautionary boil water notices or advisories must be issued as described in the notes (public health risk). | Groundwater presence requires wrapping Class I-A material with non-woven geo-textile (note 12); unsuitable or wet soils must be replaced as directed by geotechnical engineer or owner (note 11). | Separation and crossing requirements with other utilities are strict (3 ft, 6 ft, 10 ft horizontal separations; vertical offsets of 6 inches to 12 inches depending on pipe types) - nonconformance could create conflicts at utility crossings. | Deflection testing requirement (no greater than 5% deflection) and leakage limits (200 gallons per inch per mile per day) impose potential rework risk if tests fail. | Contractor is required to comply with OSHA trench safety regulations; failure to do so is a safety/legal risk. | HOLD | Chain hold | |
| └Scope 131 | C-15 [Civil] | CHAIN HOLD - Multiple expansion/joint spacing requirements appear: sidewalks: 1/2" expansion joints at a maximum of 50' o.c.; curbs: 1/2" pre-molded expansion joint required every 500' and construction joint required every 10' maximum (4' minimum). These differing spacings will require coordination in areas where curb and sidewalk interfaces occur. | Sheet references slab thickness as TS = SLAB THICKNESS (SEE PLAN) but slab thickness value is not provided on this sheet and requires plan reference. | Dowel installation refers to 'PNA RECOMMENDATION' but the PNA installation document/specification is not included on this sheet. | HOLD | Chain hold | |
| └Scope 132 | C-16 [Civil] | CHAIN HOLD - Sign note: 'CONFIRM WITH BUILDING DEPT, IF HIGHER FINE, THEN USE LOCAL JURISDICTIONAL SIGNAGE' - indicates potential conflict between shown sign fine and local jurisdiction requirements | Multiple revision dates (APRIL 2015; 1/3/16; 3/22/21) without explicit revision summary on this extract could create ambiguity about controlling/latest detail set | OCR/parsing shows typographical errors such as 'MUSH' instead of 'MUST' in several material notes - original intent likely 'MUST' and should be verified on original sealed drawing | HOLD | Chain hold | |
| └Scope 133 | C-18 [Civil] | CHAIN HOLD - Multiple 'PER CITY COMMENTS' revision dates over several years (APRIL 2015; 1/3/16; 3/22/21; 4/5/22) indicating the sheet was revised multiple times (no further detail on nature of revisions is provided on this page). | Note on sheet: 'PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.' - legal/authentication constraint for non-electronic copies. | HOLD | Chain hold | |
| └Scope 134 | C-19 [Civil] | CHAIN HOLD - Multiple 'PER CITY COMMENTS' revisions (1/3/16 and 3/22/21) indicate the city requested changes; the nature of those changes is not legible in the provided excerpt. | The drawing states printed copies are not considered signed and sealed - legal acceptance may depend on verifying the electronic signature. | No contractor, owner contact, or explicit permit numbers (other than FDOT standard-plan references and Newkirk's credentials) are visible in the provided image; that absence can impede direct contract/permit interpretation. | HOLD | Chain hold | |
| └Scope 135 | C-19 / C-20 | CHAIN HOLD - maintenance-of-traffic and lane/sidewalk closure requirements are carried as potential scope only until jurisdictional applicability and phasing are confirmed. | HOLD | Chain hold | |
| └Scope 136 | C-21 [Civil] | CHAIN HOLD - NO SUBSTITUTIONS OR CHANGES OF ANY KIND WILL BE ALLOWED AT THE TIME OF BIDDING (note may restrict procurement flexibility). | ANY EXISTING TREES CREDITED TOWARDS REQUIRED BUFFERS OR LANDSCAPE REQUIREMENTS REMOVED FOR ANY REASON SHALL BE REPLACED WITH TREES MEETING CITY APPROVAL (risk/condition related to tree removal and replacement). | THE CONTRACTOR SHALL VERIFY EXISTENCE AND LOCATION OF ALL EXISTING UTILITIES AND UNDERGROUND CONDITIONS PRIOR TO HIS COMMENCEMENT OF THE ANY WORK (utility conflict risk noted). | EQUIPMENT SHALL BE OPERATED IN A MANNER AS NOT TO INJURE OR DESTROY ANY TREES SHOWN TO REMAIN (risk of damage liability to existing trees). | ALL PLANT MATERIAL SHALL BE GUARANTEED ONE YEAR AFTER ACCEPTANCE BY OWNER (performance warranty obligation). | HOLD | Chain hold | |
| └Scope 137 | C-22 [Civil] | CHAIN HOLD - Plan is schematic only (note: THE PLAN IS SCHEMATIC ONLY) - potential for coordination issues if not field-verified. | Quantities for irrigation materials are not given (note: QUANTITIES FOR IRRIGATION MATERIALS ARE NOT GIVEN). Contractor must compute quantities from plan. | Contractor must verify existence/location of existing utilities prior to work - risk if utilities are not correctly located. | Electrical to controller is to be provided by the electrical contractor (coordination required between trades). | Irrigation lines are shown under pavement 'for clarity only' - actual installation under pavement requires sleeving and minimization of piping under pavement; potential conflict if installed differently. | All trenching shall be kept out of the drip line of existing trees (field constraints may limit routing). | HOLD | Chain hold | |
| └Scope 138 | C-23 [Civil] | CHAIN HOLD - Multiple 'PER CITY COMMENTS' revision entries (1/3/16 and 3/22/21) indicate the sheet was revised in response to city comments; specific city approvals or outstanding comments are not shown on this sheet. | The sheet includes the note that printed copies are not considered signed and sealed which affects legal validity of non-electronic reproductions. | HOLD | Chain hold | |
| └Scope 139 | E1.0 [Electrical] | CHAIN HOLD - No owner or contractor names shown on this sheet - lack of identified contracting parties may impede assignment or responsibility determinations. | Project street address is not provided (only 'Tampa, FL' and project name); this may cause ambiguity for permitting or site coordination. | CAD FILE and SHEET NUMBER fields appear blank on the parsed header; missing metadata could complicate drawing management. | Only one page (page 1/1) provided; other coordinating discipline sheets and details are not present for cross-checking. | HOLD | Chain hold | |
| └Scope 140 | E1.1 [Electrical] | CHAIN HOLD - No contractor/owner/permit number explicitly identified on this sheet (field(s) such as SHEET NUMBER and CAD FILE appear present but not populated in the parsed text). | Full plan notes and many small annotations on the sheet are not fully legible in the provided image; cannot confirm details that may affect scope or code compliance from this single sheet alone. | HOLD | Chain hold | |
| └Scope 141 | E1.3 [Electrical] | CHAIN HOLD - No contractor, owner, or construction manager is named on this sheet (absence of party identification on-sheet). | No explicit mention of 'Mason Forge' appears in the visible document text (no positive evidence linking this sheet to Mason Forge). | Revision block shows a date ('12.05.2025') but no revision description or multiple revision entries are visible on this sheet image. | HOLD | Chain hold | |
| └Scope 142 | E1.4 [Electrical] | CHAIN HOLD - No contractor, owner, or other contracting party identified on this sheet; responsibility and contractual relationships are not shown on this page. | Sheet-level information alone does not show permit status, approvals, or signatures. | CAD FILE and SHEET NUMBER fields appear present but no CAD filename or a specific sheet number beyond E1.4 is provided in the parsed text. | HOLD | Chain hold | |
| └Scope 143 | E2.1 [Electrical] | CHAIN HOLD - No explicit contractual parties (owner, contractor) or signatures visible on the sheet to confirm authorization or responsibility. | No permit numbers or issuance stamps visible on the provided sheet. | Potential ambiguity between 'REVISIONS: 12.05.2025 DATE:' and the printed '12.5.25' (both present). | HOLD | Chain hold | |
| └Scope 144 | E2.3 [Electrical] | CHAIN HOLD - No explicit risks, conflicts, contractor information, or permit numbers are stated on this sheet. | HOLD | Chain hold | |
| └Scope 145 | E2.4 [Electrical] | CHAIN HOLD - Sheet as provided does not show owner, contractor, or construction manager names on this page. | CAD FILE field is present but has no visible value on this page. | Full project address (street number and specific Tampa address) is not shown on this sheet. | No explicit contract numbers, permit numbers, or signature/stamp visible on this page. | HOLD | Chain hold | |
| └Scope 146 | E2.5 [Electrical] | CHAIN HOLD - Two different date formats/entries are present: "REVISIONS: 12.05.2025" and separately "12.5.25" which could cause ambiguity as to the effective document date. | Only a single sheet is provided; lack of adjacent sheets or index may hide related notes, legends, or panel schedules referenced elsewhere. | No signatures, stamp, permit numbers, or explicit approval blocks are visible on the provided page. | HOLD | Chain hold | |
| └Scope 147 | E3.1 [Electrical] | CHAIN HOLD - Potential inconsistency/ambiguity in date format: sheet shows both "REVISIONS: 12.05.2025" and elsewhere "12.5.25" which may refer to the same revision/date but are formatted differently. | No owner, contractor, or permit authority identified on this page; responsibility and approvals are not shown here. | HOLD | Chain hold | |
| └Scope 148 | E3.3 [Electrical] | CHAIN HOLD - No contractor, owner, or permit authority identified on this sheet excerpt (risk: responsibility and permitting status not shown). | Sheet label 'SHEET NUMBER:' and 'CAD FILE:' are present but no values are extracted from parsed text (possible missing indexing or incomplete metadata). | Compliance statement is declarative but no referenced approval stamp, signature, permit number, or issuing authority is present on the parsed text. | HOLD | Chain hold | |
| └Scope 149 | E3.5 [Electrical] | CHAIN HOLD - The drawing shows a 'REVISIONS:' label and both '12.05.2025 DATE:' and '12.5.25' on the sheet; formats differ which could lead to confusion about official revision labeling. | No owner, contractor, permit numbers, or issuing authority are identified on the provided sheet, which limits confirmation of approval or permitting status. | The 'SHEET NUMBER:' and 'CAD FILE:' fields appear on the sheet header but are not populated in the parsed text, which could indicate missing metadata. | HOLD | Chain hold | |
| └Scope 150 | E3-series / F-series | CHAIN CONTROL - electrical fire-alarm design drawings and fire-alarm-system shop/permit drawings overlap. Carry each device, pathway, interface, calculation, and sequence once after reconciliation; do not double-add. | HOLD | Chain hold | |
| └Scope 151 | E4.0 [Electrical] | CHAIN HOLD - Sheet-level metadata fields (SHEET NUMBER, CAD FILE) are shown but not populated on this page; this may hamper cross-referencing. | Only a single title sheet / cover is provided here - scope, contractors, signatures, and other contract documents are not present, limiting ability to confirm responsibilities. | Small/low-resolution text in the sheet image (right side) may contain additional notes that are not legible in this extract. | HOLD | Chain hold | |
| └Scope 152 | E4.1 [Electrical] | CHAIN HOLD - No party named 'Mason Forge' appears on this sheet (no reference to Mason Forge in the visible text). | SHEET NUMBER: and CAD FILE: fields appear on the sheet header but are blank / not populated in the parsed text (possible missing metadata). | Some legend and keyed-note text on the sheet (lower-right and lower-center) is not fully transcribed and may contain contractually relevant notes that are not available from the provided text. | HOLD | Chain hold | |
| └Scope 153 | E4.2 [Electrical] | CHAIN HOLD - No owner, general contractor, electrical engineer, or other project party is identified on this sheet (only the architect block is present) - risk: missing responsible parties for construction or permit coordination. | Some notes and the circuit legend on the sheet are small/partially illegible in the provided extract; this may cause ambiguity in circuit assignments or fixture types if used without other sheets. | The sheet includes a note: 'UPDATED DIMENSIONS ACCORDING TO LATEST HOTEL/OWNER CHANGES.' This indicates dimensions on the sheet may have been recently changed and may not match other documentation if not coordinated. | HOLD | Chain hold | |
| └Scope 154 | E5.1 [Electrical] | CHAIN HOLD - Sheet does not identify project owner or general contractor on this page; only the architecture/preparer is shown. | Header fields 'SHEET NUMBER:' and 'CAD FILE:' appear in the form but are not populated in the parsed header text (potentially incomplete metadata). | Some small-print notes on the sheet are low-resolution/illegible in the provided image which may hide additional requirements or specifications. | HOLD | Chain hold | |
| └Scope 155 | E5.2 [Electrical] | CHAIN HOLD - No contractor or owner identified on the sheet; party information limited to the architect. | Several table cells and entries appear incomplete or truncated (e.g., some circuit rows lack full descriptions, some breaker/phase columns partially blank) which may cause ambiguity when used as sole source of truth. | Manufacturer and model fields in panel headers appear blank ('MANUFAC. MDL #' column is empty) - makes verification of specified equipment impossible from this sheet alone. | Some numeric/text formatting appears inconsistent or garbled (example: a circuit shows 'R #123' which may be OCR/artifact; verify against original drawings). | HOLD | Chain hold | |
| └Scope 156 | E5.3 [Electrical] | CHAIN HOLD - Several typographic/OCR anomalies in the schedules: occurrences of '#123' in place of '#12' in some rows and a '#REF!' token in one heat-pump row (e.g. in 4C/3C blocks) which may indicate data corruption or drawing annotation errors. | Some panel schedule numeric columns appear duplicated or misaligned (e.g., 'CONNECTED TOTAL (VA) 78000 44000' - it's not explicit which value corresponds to which field without the original layout context). | Sheet number and CAD file fields are blank in the title block (text: 'SHEET NUMBER: CAD FILE:' with no value), which may impede tracking. | Manufacturer and model fields have limited or unclear entries (text shows '22K' in header area but no consistent manufacturer/model data for each panel). | Project-level parties beyond the architect (owner, general contractor, electrical contractor, MEP engineer) are not present on this sheet, which may cause responsibility ambiguity if used alone. | HOLD | Chain hold | |
| └Scope 157 | E5.4 [Electrical] | CHAIN HOLD - Several spreadsheet/print artifacts and error tokens present in schedules (e.g., '#N/A', '#REF!') which may indicate data or formula errors in source file | Some circuit rows appear truncated or misaligned (example: '10 11 20A 1 C 1200 1 20A 3/4" #12 R Guest room' missing clear separators in text extraction) | Manufacturer and model fields show '-' or are blank for panel MFG/MDL values | Sheet header shows 'DATE: SHEET NUMBER: CAD FILE:' with no values filled, indicating missing metadata on this print | Potential inconsistencies between 'CONNECTED TOTAL (VA)' and subsequent 'SIZING TOTAL (VA)' blocks in text extraction that may be due to layout/OCR issues rather than actual calculation errors | HOLD | Chain hold | |
| └Scope 158 | ENERGY-1 | CHAIN CONTROL - energy calculations establish envelope, lighting, and HVAC performance criteria; they modify corresponding construction scopes and are not a separate duplicate installation quantity. | HOLD | Chain hold | |
| └Scope 159 | ENERGY-1 [Energy-Calculations] | CHAIN HOLD - FLOOD ZONE "X" is indicated on the Flood Zone Map (documented on cover). | Soil type is (9) CANDLER-URBAN LAND COMPLEX, 0 TO 5 PERCENT SLOPES (documented on cover). | Geotechnical services provided by BAY AREA SINKHOLE INVESTIGATION & CIVIL ENGINEERING (presence of sinkhole investigation as a contracted service is documented). | Legal descriptions reference vacated/closed streets: Parcel 1 references portion of Norwood Street vacated and abandoned by the City of Tampa; Parcel 2 references closed street halves abutting parcels (documented in legal description). | HOLD | Chain hold | |
| └Scope 160 | F1-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Multiple contractors share responsibilities (electrical, mechanical, sprinkler, hardware, elevator contractor, system supplier). The document repeatedly requires coordination (e.g., elevator recall, conduit run deviations require system supplier approval) which creates potential coordination risk if unclear. | Conduit run deviations are explicitly prohibited without prior approval from the system supplier; deviations resulting in excessive voltage drop, additional parts, engineering, etc., are the sole responsibility of the electrical contractor-this places execution risk on the electrical contractor for field routing changes. | Division of responsibilities for mounting and provisioning some devices (e.g., door holders: hardware and/or electrical contractor; duct detectors: mechanical contractor; flow switches: sprinkler contractor) could lead to scope overlap or dispute if not explicitly assigned in contracts. | HOLD | Chain hold | |
| └Scope 161 | F2-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - FIELD TO VERIFY LOCATION OF RISER (UP) - note indicates riser location not final | FIELD TO VERIFY LOCATION OF BACK-FLOW AND PIV SWITCHES. (PRIOR TO INSTALL) - note indicates these device locations must be confirmed prior to installation | The stamping note warns that stamped plan does not permit or approve violations of City/State codes (potential compliance risk if deviations occur). | HOLD | Chain hold | |
| └Scope 162 | F3-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Riser location not confirmed on drawings: "FIELD TO VERIFY LOCATION OF RISER (UP/DN) JB" - indicates a site verification required before certain installations. | Sheet appears to be part of a set but shows "SHEET 03 OF" with the total number not provided on this extract (possibility of missing coordination info on other sheets). | HOLD | Chain hold | |
| └Scope 163 | F4-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Field note on drawing: NAC PS•2 FIELD TO VERIFY LOCATION OF RISER (UP/DN) - indicates a field verification is required and potential risk if riser location (up/down) is not confirmed. | Plan contains the statement that changes or alterations are unlawful without written City approval - potential legal/compliance risk if modifications are made without approval. | HOLD | Chain hold | |
| └Scope 164 | F5-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Riser location not finalized on plan: 'FIELD TO VERIFY LOCATION OF RISER (UP/DN)' (potential coordination risk) | Plans contain the warning that changes or alterations without written approval from City of Tampa are unlawful (risk if work deviates without approval) | The stamping of the plan explicitly states it does not permit or approve violations of City or State Codes (potential for unresolved code interpretation) | HOLD | Chain hold | |
| └Scope 165 | F6-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - "FIELD TO VERIFY LOCATION OF ELEVATOR MODULES" - indicates elevator module locations are unresolved on this sheet | "FIELD TO VERIFY LOCATION OF RISER (DN) 1A,3B" - indicates riser location(s) need verification | The sheet contains many device tags and short-hand notations (e.g., PS•2•N3•01, FP•1•L2 .3•D034) that require the project legend/symbol schedule (not present on this single sheet) to interpret fully | HOLD | Chain hold | |
| └Scope 166 | F7-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Multiple notes require field verification of device locations and determination of circuit pathways (uncertainty remains until field verification is completed). | The plan explicitly states changes/alterations are unlawful without written approval from the City of Tampa Construction Services Division (regulatory / approval risk if altered). | HOLD | Chain hold | |
| └Scope 167 | F8-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Sheet shows 'SHEET 08 OF' but total sheet count is not present on this sheet (possible document completeness issue). | Document header and some lines appear truncated in the provided parsed text (see sheet bottom and right), which may hide information or notes. | HOLD | Chain hold | |
| └Scope 168 | F9-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Plan states it is unlawful to make changes/alterations without written approval from the City of Tampa Construction Services Division (administrative/legal restriction) | Stamping note: stamping does not permit or approve violations of City or State codes (limitation on implied approval) | HOLD | Chain hold | |
| └Scope 169 | F10-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Sheet contains the warning: 'It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division.' | Sheet notes: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes.' | HOLD | Chain hold | |
| └Scope 170 | F11-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - *BATTERY BOX SIZE CAPACITY NOT SPECIFIED. REFER TO MANUFACTURER DOCUMENTATION. (explicitly noted on sheet - risk of selecting incorrect enclosure/battery box). | Plans include a stamping and code compliance review note that changes or alterations without written approval from City of Tampa are unlawful - constraint for modifications to the design. | HOLD | Chain hold | |
| └Scope 171 | F14-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Observed circuit voltage drop percentages (as printed): PS•1 N1 VOLTAGE DROP %: 1.21 % | PS•1 N2 VOLTAGE DROP %: 10.06 % | PS•1 N4 VOLTAGE DROP %: 10.63 % | PS•1 N5 VOLTAGE DROP %: 7.60 % | PS•1 N6 VOLTAGE DROP %: 3.47 % | Minimum operational voltage printed on sheets: MIN. OPERATIONAL VOLTAGE: 16 (volts) - end-of-line voltages listed and vary per circuit (e.g., PS•1 N2 END OF LINE VOLTAGE: 18.35; PS•1 N4 END OF LINE VOLTAGE: 18.23; PS•1 N5 END OF LINE VOLTAGE: 18.85; PS•1 N6 END OF LINE VOLTAGE: 19.69; PS•1 N1 END OF LINE VOLTAGE: 20.15) | HOLD | Chain hold | |
| └Scope 172 | F15-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Document shows several circuits with voltage drop percentages and values that are explicitly recorded (examples include Voltage Drop %: 10.33 % for PS•1 N3, 10.96 % for PS•2 N4, 8.89 % for PS•2 N6). These values are present in the report as data points. | Some circuits have maximum voltage drop values listed (e.g., MAX. VOLTAGE DROP: 2.11 for PS•1 N3; 2.24 for PS•2 N4). These are recorded facts in the document. | End-of-line voltages vary by circuit and are recorded (examples: PS•1 N3 END OF LINE VOLTAGE: 18.29; PS•2 N4 END OF LINE VOLTAGE: 18.16). | HOLD | Chain hold | |
| └Scope 173 | F17-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - The sheet contains the statement: 'It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division.' | The sheet contains the statement: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes.' | No explicit contractor or owner is identified on this sheet (potential coordination gap if relied on alone). | HOLD | Chain hold | |
| └Scope 174 | F18-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Note on sheet: "COORDINATE WITH AHJ/ELEVATOR CONTRACTOR FOR FINAL REQUIREMENTS." (coordination required with authority having jurisdiction and elevator contractor) | Sheet contains requirements and conditional statements that impose dependencies (e.g., heater/heat detector requirements depend on presence/spacing of sprinkler heads). | The plan stamping includes a warning that changes or alterations are unlawful without written approval from the City of Tampa Construction Services Division. | HOLD | Chain hold | |
| └Scope 175 | ID000 [Interior] | CHAIN HOLD - Document contains the explicit limitation: 'THIS DRAWING IS FOR INTERIOR DESIGN PURPOSES ONLY. ALL MEASUREMENTS ARE TO BE FIELD VERIFIED.' - indicates measurements on the drawing are not guaranteed. | Multiple revisions and revision dates (including 12/20/2022) appear; risk of differing versions across sets. | Cover/index page alone does not include technical construction or MEP/structural details; scope limited to interior design sheets referenced. | HOLD | Chain hold | |
| └Scope 176 | ID001 [Interior] | CHAIN HOLD - NO ALLOWANCES WILL BE SUBSEQUENTLY MADE ON BEHALF OF THE CONTRACTOR BY REASON OF ANY OMISSION ON HIS PART TO INCLUDE THE COST OF ALL ITEMS OF WORK OR MATERIAL WHETHER OR NOT THEY ARE SPECIFICALLY REQUIRED TO ATTAIN THE COMPLETED CONDITIONS PROPOSED IN THE DRAWINGS. (Note 2) | CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FACTS, OMISSIONS OR ERRORS OF SUBCONTRACTORS AND OF PERSONS DIRECTLY OR INDIRECTLY EMPLOYED BY THEM. (Note 6) | NO WORK DEFECTIVE IN WORKMANSHIP OR QUALITY OR DEFICIENT IN ANY REQUIREMENTS OF THE CONTRACT DOCUMENTS WILL BE ACCEPTABLE DESPITE ANY FAILURE ON THE PART OF THE DESIGNER TO DISCOVER OR POINT OUT SUCH DEFICIENCIES DURING CONSTRUCTION. (Note 11) | THERE SHALL BE NO SUBSTITUTION OF MATERIALS WHERE A MANUFACTURER HAS BEEN SPECIFIED. WHERE THE TERM "OR EQUAL" IS USED, THE DESIGNER ALONE SHALL DETERMINE THE EQUALITY BASED UPON INFORMATION SUBMITTED BY THE CONTRACTOR. (Note 17) | HOLD | Chain hold | |
| └Scope 177 | ID121 [Interior] | CHAIN HOLD - Multiple coordination responsibilities noted (GC, AOR, DAI designers, Owner, Purchasing Agent) which present potential coordination risks (electrical, fire, blocking, millwork, equipment fit). | Note: 'ALL MEASUREMENTS ARE TO BE FIELD VERIFIED.' indicates risk if as-built dimensions are not checked prior to work or procurement. | Decorative wall graphic electrical/fire/safety coordination required to ensure no interference with overall design intent (note 8) - potential for conflict with MEP/fire systems. | Responsibilities are split among parties (Owner provides equipment, Purchasing Agent provides fixtures, GC installs) which can cause procurement/installation schedule or compatibility issues if not coordinated. | HOLD | Chain hold | |
| └Scope 178 | ID122 [Interior] | CHAIN HOLD - Owner-supplied equipment and fixtures require verification in writing and coordination (notes 2, 7, 10, 14) - potential for fit/coordination issues if not confirmed. | G.C. responsibilities for blocking, millwork, plumbing fixtures, and electrical coordination (notes 3, 4, 11, 13, 18) - risk if G.C. and AOR/DAI are not coordinated. | G.C. must coordinate electrical/fire/safety elements and build-outs for decorative wall graphic with DAI designers (note 8) - potential safety/code conflict if not coordinated. | Purchasing agent is "wholly responsible for site verification of wall to wall FF&E prior to purchasing" (note 16) - risk of procurement errors otherwise. | Reference to details on other sheets (ID402, ID510) - risk if those sheets are not available/consistent. | HOLD | Chain hold | |
| └Scope 179 | ID123 [Interior] | CHAIN HOLD - Coordination requirement: "G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT." (risk if not coordinated) | Coordination requirement: "G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR." (risk if not coordinated) | Purchasing risk: "PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING." (risk of procurement errors if not verified) | Potential fit risk: "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK." | HOLD | Chain hold | |
| └Scope 180 | ID124 [Interior] | CHAIN HOLD - Sheet notes indicate coordination requirements that, if not met, could result in conflicts: 'G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT.' | Purchasing agent is 'WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING' (risk if not performed). | Notes emphasize field verification of all measurements: '*ALL MEASUREMENTS ARE TO BE FIELD VERIFIED.*' (risk of discrepancies if not verified). | GC to confirm equipment sizes provided by Owner for fit within casegoods/millwork (a coordination risk if sizes are not confirmed). | HOLD | Chain hold | |
| └Scope 181 | ID125 [Interior] | CHAIN HOLD - Multiple notes require coordination between G.C., AOR, OWNER, PURCHASING AGENT and DAI designers (e.g., electrical/fire/safety elements at elevator lobby walls), indicating potential coordination risk if not executed as noted (Note 8, Note 15). | Equipment provided by Owner requires G.C. verification of sizes to fit within millwork (Note 7) - coordination risk if sizes are not confirmed in writing. | Purchasing Agent is stated as 'WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING' (Note 16) - potential procurement/fit risk if site verification is not completed. | HOLD | Chain hold | |
| └Scope 182 | ID131 [Interior] | CHAIN HOLD - Multiple coordination items requiring verification by G.C., AOR and Purchasing Agent (e.g., blocking, equipment sizes, electrical/fire/safety elements) introduce risk if not coordinated. | Notes repeatedly require 'VERIFY SPECIFICATIONS IN WRITING FROM OWNER' and 'G.C. TO CONFIRM SIZES' - risk of mismatch between owner-supplied equipment and constructed millwork/casegoods if not confirmed. | References to AOR for mounting heights and lighting locations imply reliance on another discipline's drawings (potential for conflicts if not reconciled). | Some fields on the sheet header are blank (e.g., 'DRAWN BY', 'ISSUE', 'PROJECT #') which may impede traceability. | HOLD | Chain hold | |
| └Scope 183 | ID132 [Interior] | CHAIN HOLD - 8. DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | 15. REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C. | 16. DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | 18. G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 184 | ID133 [Interior] | CHAIN HOLD - THIS DRAWING IS FOR INTERIOR DESIGN PURPOSES ONLY. ALL MEASUREMENTS ARE TO BE FIELD VERIFIED. | G.C. / PURCHASING AGENT responsible for site verification of wall-to-wall FF&E prior to purchasing (note 16). | Coordination required: electrical/fire/safety and build-outs at elevator lobby walls with DAI designers to avoid interference with design intent (note 8). | G.C. to coordinate all electrical requirements at millwork with AOR (note 18). | Potential ambiguity: multiple "HEIGHT: FINISH: VARIES" and repeated typical notes (e.g., PG-407 TYP.) indicate field verification/coordination required. | HOLD | Chain hold | |
| └Scope 185 | ID200 [Interior] | CHAIN HOLD - Note 8: 'DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT.' | Note 7: 'EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.' | Note 2: 'TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.' | Note 18: 'G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.' | Potential coordination items implicit in notes: owner-provided equipment, signage blocking, electrical/fire/safety penetrations, and millwork/equipment fit require verification and coordination (as stated in notes). | HOLD | Chain hold | |
| └Scope 186 | ID400 [Interior] | CHAIN HOLD - G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | ALL MEASUREMENTS ARE TO BE FIELD VERIFIED (risk if not verified). | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK (risk if sizes not confirmed). | HOLD | Chain hold | |
| └Scope 187 | ID400.1 [Interior] | CHAIN HOLD - Multiple coordination items require verification: 'VERIFY SPECIFICATIONS IN WRITING FROM OWNER.' | G.C. responsibilities repeatedly noted (blocking, plumbing fixtures, millwork, electrical coordination) indicating potential coordination risk if not executed. | Purchasing agent is 'WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING.' (potential single-point risk for FF&E verification). | Note 8: G.C. to coordinate electrical/fire/safety elements with DAI designers to ensure no interference with design intent - indicates potential conflict if not coordinated. | HOLD | Chain hold | |
| └Scope 188 | ID401 [Interior] | CHAIN HOLD - G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. (coordination risk noted on sheet) | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. (potential fit/conflict risk) | PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. (risk of incorrect purchasing if not verified) | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. (coordination requirement) | HOLD | Chain hold | |
| └Scope 189 | ID402 [Interior] | CHAIN HOLD - "G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT." | "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK." (risk of fit conflict) | "PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING." (risk allocation / verification requirement) | Sheet repeatedly states measurements must be field verified (potential risk if not verified). | Coordination required with AOR for accessory locations & specs (possible coordination conflicts) | HOLD | Chain hold | |
| └Scope 190 | ID403 [Interior] | CHAIN HOLD - Multiple notes require coordination between G.C., AOR, PURCHASING AGENT and DAI DESIGNERS (e.g. electrical/fire/safety elements and millwork coordination) - indicates potential coordination risk if not executed. | Note that many items are 'per the owner' or 'per the purchasing agent' (TVs, fixtures, fitness equipment) and require verification by G.C.; risk exists if owner/purchasing agent specs are not provided in writing. | Repeated instruction that all measurements are to be field verified implies risk if site verification is not completed prior to fabrication/installation. | HOLD | Chain hold | |
| └Scope 191 | ID404 [Interior] | CHAIN HOLD - G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | ALL MEASUREMENTS ARE TO BE FIELD VERIFIED. | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 192 | ID420 [Interior] | CHAIN HOLD - Notes indicate conditions requiring contact with DAI: "12'-6" MIN. IF NARROWER CONTACT DAI" and "MIN.; IF SHORTER CONTACT DAI", which imply potential scope changes if field conditions differ. | Multiple notes specify blocking required and equipment provided by owner; if owner equipment differs from interior design specification manual, confirmation is required (note D). | The drawing states "ITEMS NOT LISTED ARE THE SAME AS SHOWN ON THE LEFT HAND ROOM" which could cause ambiguity if rooms differ and are not separately documented. | HOLD | Chain hold | |
| └Scope 193 | ID422 [Interior] | CHAIN HOLD - ALL MEASUREMENTS ARE TO BE FIELD VERIFIED. | IF NARROWER CONTACT DAI (note on plan: "12'-6" MIN. IF NARROWER CONTACT DAI") | IF SHORTER CONTACT DAI (note: "' MIN.; IF SHORTER CONTACT DAI") | VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT. | ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING | L. INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION. (coordination caution) | MOTORIZED SHADE CONTROLS: NOTE: "OUTLET BEHIND CORNICE FOR MOTORIZED SHADE (MUST BE CONCEALED)" (coordination/installation constraint) | HOLD | Chain hold | |
| └Scope 194 | ID423 [Interior] | CHAIN HOLD - Drawing is for interior design purposes only and measurements must be field verified (potential risk if used for construction without verification). | Multiple notes require verification or confirmation by Purchasing Agent (e.g., note D and J) which could delay procurement or result in wrong items if not confirmed. | Owner-provided equipment (TV, other equipment) may differ from interior design specification; note D requires confirmation that selected equipment will fit within casegoods. | Some outlets are required to be placed to avoid same cavity within partition (note L) - coordination risk between trades if not followed. | Specific ADA condition: low wall to be 34 1/2" to top of stone cap to allow room for ADA grab bar above (note H) - requires verification to meet accessibility code. | HOLD | Chain hold | |
| └Scope 195 | ID424 [Interior] | CHAIN HOLD - Equipment provided by owner; note requires confirmation if equipment differs from interior design specification manual to ensure fit within casegoods (potential mismatch risk). | Notes instruct field verification of all measurements ('ALL MEASUREMENTS ARE TO BE FIELD VERIFIED') indicating potential discrepancies between drawing and field conditions. | Several dimensional notes: '25'-8" MIN.; IF SHORTER CONTACT DAI', '12'-6" MIN. IF NARROWER CONTACT DAI', '14'-11 1/4" MIN.; IF SHORTER CONTACT DAI' indicate critical dimensional constraints and need to consult DAI if dimensions differ. | Outlet location note L indicates outlets should avoid occurring in same cavity within partition-coordination required to avoid conflict. | Motorized shade outlet must be concealed behind cornice per detail 1/ID520 - coordination required between millwork and electrical trades. | HOLD | Chain hold | |
| └Scope 196 | ID430 [Interior] | CHAIN HOLD - CEILING HEIGHT callout indicates a difference for first floor guestrooms: "CEILING HEIGHT AT THE FIRST FLOOR GUESTROOMS IS 11'-4\"" and "**USE (X-407-AC) ON FIRST FLOOR IN LIEU OF (X-407)**" - this is a conditional change that must be coordinated for first-floor rooms. | Multiple conditional dimension notes: "12'-6\" MIN. IF NARROWER CONTACT DAI", "IF SHORTER CONTACT DAI" - dimensions depend on field conditions and require confirmation. | Notes indicate Owner-supplied equipment and requirement to confirm fit within casegoods (Note D) and purchasing agent confirmation for left/right versions (Note J) - potential procurement/fit risk if not coordinated. | HOLD | Chain hold | |
| └Scope 197 | ID431 [Interior] | CHAIN HOLD - Note D warns equipment provided by owner may differ from interior design specification manual and requires confirmation that selected equipment will fit within casegoods - potential coordination risk. | Dimension constraints: '12'-6" MIN. IF NARROWER CONTACT DAI' and '19'-4" MIN.; IF SHORTER CONTACT DAI' indicate minimum dimensional requirements that may trigger design changes if not met. | Multiple references to providing blocking and concealed outlets require coordination with trades (electrical, millwork, furniture vendor) to ensure installations do not conflict. | Instruction 'OUTLET BEHIND CORNICE FOR MOTORIZED SHADE (MUST BE CONCEALED)' creates installation coordination requirement and risk if cornice detail (1/ID520) is not followed. | HOLD | Chain hold | |
| └Scope 198 | ID432 [Interior] | CHAIN HOLD - Multiple notes require field verification of dimensions: 'ALL MEASUREMENTS ARE TO BE FIELD VERIFIED.' | Notes indicating possible dimensional conflicts and requirement to contact DAI: examples include 'MIN.; IF SHORTER CONTACT DAI' and '12'-6" MIN. IF NARROWER CONTACT DAI' (text appears truncated in places) | Items require coordination with Purchasing Agent (potential procurement risk): 'ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING' | Potential coordination required for owner-supplied equipment and TV: 'TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.' and 'EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.' | Note N requires coordination/verification of mirror opening height: 'VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.' | HOLD | Chain hold | |
| └Scope 199 | ID433 [Interior] | CHAIN HOLD - NOTE D: 'EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.' (risk of mismatch) | NOTE J: 'ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING' (procurement risk if not confirmed) | DIMENSION NOTE: '16'-23 4" MIN.; IF SHORTER CONTACT DAI 12'-6" MIN. IF NARROWER CONTACT DAI' (indicates potential nonconformance and requirement to contact DAI) | Multiple device heights and outlet placements require coordination between electrical and millwork/FF&E (implied coordination risk). | HOLD | Chain hold | |
| └Scope 200 | ID440 [Interior] | CHAIN HOLD - Document states all measurements are to be field verified (indicates risk of relying on sheet dimensions without site verification). | Note D advises owner-provided equipment may differ from interior design specification and requires confirmation that selected equipment will fit within casegoods (coordination risk if not confirmed). | Multiple parties/roles are referenced (owner, purchasing agent, G.C., furniture vendor) but specific responsible parties or contact names (other than checked-by initials) are not provided on this sheet, which may create coordination ambiguity. | HOLD | Chain hold | |
| └Scope 201 | ID441 [Interior] | CHAIN HOLD - EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS. | PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT. | INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION (coordination risk between trades). | NOTE: 'ARCHITECTURAL LIGHT BY G.C.' implies coordination responsibility between design and general contractor. | HOLD | Chain hold | |
| └Scope 202 | ID442 [Interior] | CHAIN HOLD - "ALL MEASUREMENTS ARE TO BE FIELD VERIFIED." - implies that built conditions may differ and dimensions on sheet are not guaranteed. | Notes indicating: "IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS." - potential risk of equipment size mismatch. | Multiple instructions to PROVIDE BLOCKING in walls for various items; lack of verified blocking in field could cause installation issues. | Some items noted as 'NOT USED' (P, 8, 16) which may require clarification. | Sheet is for interior design purposes only; not a full construction/permitting drawing set (possible scope/conflict if used as sole construction document). | HOLD | Chain hold | |
| └Scope 203 | ID500 [Interior] | CHAIN HOLD - The drawing explicitly requires field verification of all measurements ('ALL MEASUREMENTS ARE TO BE FIELD VERIFIED'), indicating risk if dimensions on the sheet are used without site verification. | Final specifications and final sizes of cabinets/drawers/cubbies are to be determined with the owner by the G.C.; lack of final sizes on this sheet could lead to coordination conflicts. | Multiple references to external Marriott detail sheets (e.g., 'SEE MARRIOTT 1/B321', 'SEE MARRIOTT 2/B320', etc.) indicate dependency on those referenced sheets for full detail; missing or inconsistent referenced sheets could create conflicts. | HOLD | Chain hold | |
| └Scope 204 | ID501 [Interior] | CHAIN HOLD - Sheet instructs: "ALL MEASUREMENTS ARE TO BE FIELD VERIFIED." Potential risk that dimensions on the drawing may not match field conditions. | Safe deposit box: "VERIFY CLEAR DIMENSION REQUIREMENTS WITH EQUIPMENT." Indicates risk/need to coordinate equipment dimensions with cabinet clearances. | Clock outlet / surveillance monitor: "COORD. LOCATION W/ SURVEILLANCE MONITOR & MONITOR MOUNT INSTALLATION." Potential coordination conflict between electrical and AV mounting. | Multiple references to "REFER TO MARRIOTT PROTOTYPE" indicate reliance on prototype documents not included on this sheet; missing prototype detail could cause ambiguity. | HOLD | Chain hold | |
| └Scope 205 | ID502 [Interior] | CHAIN HOLD - All measurements are to be field verified (sheet note) - potential risk if dimensions are assumed without field verification. | Coordination required with AOR (architect of record) for structural column wrap (sheet references AOR's set). | Requirement to provide outlet on table side per brand standards implies coordination with electrical scope - potential coordination risk. | Multiple notes to provide blocking to secure lounge screen to ceiling/wall/column - implies field coordination to verify framing and blocking availability. | HOLD | Chain hold | |
| └Scope 206 | ID503 [Interior] | CHAIN HOLD - EQUIPMENT IS PER THE OWNER. G.C. TO VERIFY FINAL SIZES AND SPECIFICATIONS PRIOR TO FABRICATION AND INSTALLATION. | ALL MEASUREMENTS ARE TO BE FIELD VERIFIED. (field verification required) | DIMENSIONS MARKED "V.I.F." indicate field verification required and potential for changes. | NOTE: "VERIFY DEPTH WITH FAUCET REQ'MTS" (possible conflict between bowl opening depth and faucet requirements) | CUT SKIRT TOP TO MATCH BOWL PROFILE W/ CLEARANCE TO REMOVE SKIRT (installation/maintenance clearance consideration) | HOLD | Chain hold | |
| └Scope 207 | ID504 [Interior] | CHAIN HOLD - TV AND MOUNTING BRACKET ARE PER THE OWNER. G.C. TO VERIFY SPECIFICATION AND BLOCKING REQUIREMENTS PRIOR TO INSTALLATION. (risk if GC does not verify/blocking not provided) | TRASH BIN BY OWNER (coordination risk if owner does not provide bin to match shown details) | All measurements are to be field verified (indicates potential discrepancy risk between drawing and field conditions) | HOLD | Chain hold | |
| └Scope 208 | ID505 [Interior] | CHAIN HOLD - ALL MEASUREMENTS ARE TO BE FIELD VERIFIED (potential for discrepancies between drawing dimensions and field conditions). | THIS DRAWING IS FOR INTERIOR DESIGN PURPOSES ONLY (may lack construction-level/structural details or approvals). | HOLD | Chain hold | |
| └Scope 209 | ID506 [Interior] | CHAIN HOLD - Measurements on the drawing must be field verified (sheet note), indicating potential risk if used without verification. | Some typical contract/permit information and signatures are not present on this sheet (e.g., no contractor, no permit stamps), which may conflict with use as a construction-only drawing. | HOLD | Chain hold | |
| └Scope 210 | ID507 [Interior] | CHAIN HOLD - Multiple notes require field verification: "ALL MEASUREMENTS ARE TO BE FIELD VERIFIED." and "VERIFY CLEAR OPENING DIMENSION IN FIELD." - potential for discrepancy between drawing dimensions and site conditions. | Electrical requirements referenced to sheet 720 (SEE 720 FOR ELECTRICAL REQUIREMENTS.) - if sheet 720 is not available, electrical installation specifics are not present on this sheet. | Reference to Marriott details on 3/B341 for ceiling soffit - potential for coordination issues if 3/B341 is not reviewed. | HOLD | Chain hold | |
| └Scope 211 | ID508 [Interior] | CHAIN HOLD - Equipment coordination: JUICE MACHINE (BY OTHERS) - indicates equipment provided by others and requires coordination (sheet notes direct to see sheets 411 and 412 for equipment specifics). | Field verification required: ALL MEASUREMENTS ARE TO BE FIELD VERIFIED - potential for on-site dimensional conflicts. | Ventilation constraint: 'VENT INTO FOOD PREP ROOM ONLY.' - requires routing/coordination with food prep room systems as shown. | Optional items: 'PULL CABINET LOCK (OPTIONAL)' - scope/selection ambiguity unless clarified. | HOLD | Chain hold | |
| └Scope 212 | ID509 [Interior] | CHAIN HOLD - NOTE: ADJUST DETAIL IF REMOTE COMPRESSORS ARE USED. (require coordination/adjustment) | PROVIDE CLEARANCE AROUND EQUIPMENT: 2" PREFERRED; 1" MINIMUM (potential site-fit conflict if not provided) | EQUIPMENT CABINETS TO PROVIDE ADEQUATE VENTALATION THROUGH BACK PANELS AS REQ'D. (coordination risk with equipment manufacturer) | Inconsistent spelling/format of vendor references (TRAVADO / TRADAVO / TRAVADO.COM) which may require clarification | HOLD | Chain hold | |
| └Scope 213 | ID510 [Interior] | CHAIN HOLD - Multiple notes require field verification: "ALL MEASUREMENTS ARE TO BE FIELD VERIFIED." | Note to "VERIFY PANEL THICKNESS." (indicates potential for variation or mismatch if not confirmed) | Numerous 'AS REQ'D' and 'AS SCHEDULED' instructions (e.g., 'STEEL FRAMING AS REQ'D', 'BASE AS SCHEDULED') which may lead to scope ambiguity without referenced schedules/specifications. | Drawing references IFI for manufacturer for wood panel system ("SEE ALSO IFI FOR MANUFACTURER") but specific manufacturer/specification not provided on this sheet. | HOLD | Chain hold | |
| └Scope 214 | ID512 [Interior] | CHAIN HOLD - Installation requires verification of manufacturer requirements and verification of specification with owner and brand (risk if not verified). | Measurements are to be field verified (risk of discrepancy between drawing dimensions and field conditions). | Access panel location/requirements to be coordinated with GC (GC recommendations referenced). | Waste bin is the owner's responsibility (coordination/risk if owner does not supply). | HOLD | Chain hold | |
| └Scope 215 | ID520 [Interior] | CHAIN HOLD - ALL MEASUREMENTS ARE TO BE FIELD VERIFIED (note on sheet). | Sheet calls for coordination with wall and window construction for mounting of sheer roller shade and track locations (coordination requirement). | CORNICE PROVIDED BY G.C. (possible coordination/ responsibility note between interior design and general contractor). | Coordinate base stop location with furniture; blocking required (coordination risk if not provided). | HOLD | Chain hold | |
| └Scope 216 | ID600 [Interior] | CHAIN HOLD - Measurements must be field verified - as noted on the sheet ('ALL MEASUREMENTS ARE TO BE FIELD VERIFIED'). Unverified measurements present a verification risk. | Guestroom finish information is not on this sheet and is referenced to other sheets (ID420-ID442); missing guestroom details on this sheet could cause incomplete scope if those sheets are not reviewed. | HOLD | Chain hold | |
| └Scope 217 | LAUNDRY-PLAN-2026 | Graphic/layout of proposed laundry area for Fairfield Inn (equipment placement and room labeling) | HOLD | Chain hold | |
| └Scope 218 | LAUNDRY-PLAN-2026 | Title text: Proposed laundry area plan for FAIRFIELD INN 9301 N 29th Street - Tampa FL | HOLD | Chain hold | |
| └Scope 219 | LAUNDRY-PLAN-2026 | Title/caption repeated at bottom: PROPOSED LAUNDRY AREA PLAN FOR FAIRFIELD INN 9301 N 29TH STREET - TAMPA FL LAUNDRY PRO OF FLORIDA SCALE 3/16 IN = 1 FT 27FEB2026 | HOLD | Chain hold | |
| └Scope 220 | LAUNDRY-PLAN-2026 / A-809 / A-810 | CHAIN NOTE - latest 2026 laundry sketch controls listed equipment counts; reconcile final equipment models, utilities, and permitted-room layout before pricing. | HOLD | Chain hold | |
| └Scope 221 | M/P/E coordination | CHAIN CONTROL - sleeves, penetrations, firestopping, equipment power, controls, drains, condensate, and access requirements must be reconciled across disciplines before quantities are released. | HOLD | Chain hold | |
| └Scope 222 | M1.1 [Mechanical] | CHAIN HOLD - Administrative header fields DATE, SHEET NUMBER, and CAD FILE appear blank in the parsed text; lack of explicit signed/dated professional stamp or seal visible in provided text. | Project 'Tampa, FL - Fairfield Inn' appears but no owner, contractor, or permit authority is named on this page. | Multiple similar labels (e.g., 'STANDPIPE' and 'Stand pipe') may indicate OCR variability; plan-level coordination items may be present elsewhere. | Possible ambiguity between revision date formats ('12.05.2025' vs '12.5.25') in the extracted text. | HOLD | Chain hold | |
| └Scope 223 | M1.2 [Mechanical] | CHAIN HOLD - No owner, contractor, or other project party names are present on the provided sheet beyond the architect; potential ambiguity on responsible parties for construction/permits. | Key administrative fields shown on the sheet (DATE, SHEET NUMBER, CAD FILE) have no extracted values in the provided text. | Only a single sheet image is provided; coordination or conflicts with other disciplines/sheets cannot be assessed from this page alone. | HOLD | Chain hold | |
| └Scope 224 | M1.3 [Mechanical] | CHAIN HOLD - No owner, contractor, or other project party names are present on the provided sheet - limits ability to attribute responsibility or contracting party. | The document shows a code compliance statement prefaced by "TO THE BEST OF MY KNOWLEDGE," which is a declarative statement but no formal seal, signature, or issuing authority is visible on this sheet. | Key fields in header are empty or not populated in the provided extract: "SHEET NUMBER:" and "CAD FILE:" have no values following them in the header area. | HOLD | Chain hold | |
| └Scope 225 | M1.6 [Mechanical] | CHAIN HOLD - No contractor, owner, or other project party names are shown on the provided page. | No permit numbers, approval stamps, signatures, or explicit authorization are visible on the provided page. | No explicit mention of Mason Forge appears on the provided page. | HOLD | Chain hold | |
| └Scope 226 | M2.1 [Mechanical] | CHAIN HOLD - The sheet header fields 'DATE:', 'SHEET NUMBER:', and 'CAD FILE:' are present but blank on the provided copy; missing values may complicate identification/version control. | Only a city/state (Tampa, FL) is given as the project location; a full project address is not provided on this sheet. | No owner, contractor, or engineer parties are identified on this sheet in the provided parsed text. | HOLD | Chain hold | |
| └Scope 227 | P1.0 [Plumbing] | CHAIN HOLD - DATE: field in header is blank (no explicit document date provided) | SHEET NUMBER and CAD FILE fields in header appear blank/are not filled in on this sheet image | No owner, contractor, or permit number is shown on this cover sheet image | Many table entries are small and not legible at this image resolution, so critical fixture counts, sizes, and connection details are not verifiable from this image alone | HOLD | Chain hold | |
| └Scope 228 | P1.2 [Plumbing] | CHAIN HOLD - Sheet header fields 'SHEET NUMBER:' and 'CAD FILE:' are present but have no values shown on this page (potential missing metadata). | Date strings appear in two formats on the sheet: 'REVISIONS: 12.05.2025' and 'DATE: 12.5.25' (possible ambiguity in date formatting). | Owner, contractor, and other project team parties are not identified on this sheet (lack of contact/contractor info may impede coordination). | HOLD | Chain hold | |
| └Scope 229 | P1.3 [Plumbing] | CHAIN HOLD - The sheet does not identify a contractor or construction party (no mention of Mason Forge on this sheet). | No permit numbers or authority having jurisdiction approvals are shown on this sheet. | HOLD | Chain hold | |
| └Scope 230 | P1.5 [Plumbing] | CHAIN HOLD - No permit numbers, approval stamps, or signatures are visible in the parsed text. | No design consultants or engineers (mechanical/plumbing/structural) are explicitly identified in the parsed text, which may complicate responsibility tracing. | The sheet references enlarged guestroom piping to another sheet (P3.1); isolated use of this single sheet without P3.1 could omit critical piping details. | HOLD | Chain hold | |
| └Scope 231 | P1.6 [Plumbing] | CHAIN HOLD - This sheet does not identify the owner, general contractor, subcontractors or permit numbers. | No mention of Mason Forge is present on the provided sheet. | Sheet-level information only; cannot confirm coordination with other disciplines or full permit status from this page alone. | HOLD | Chain hold | |
| └Scope 232 | P2.1 [Plumbing] | CHAIN HOLD - No owner, contractor, or permit/authority having jurisdiction is identified on the visible portion of the sheet. | Sheet shows a general compliance statement but does not display specific permit numbers, approvals, or signatures on the visible area. | Graphic plan content is dense; some annotation/labels in the plan image are too small to read clearly which may hide further scope, notes, or constraints. | HOLD | Chain hold | |
| └Scope 233 | P3.1 [Plumbing] | CHAIN HOLD - Document displays a certification of code compliance but does not show a visible signature, stamp, or approving authority on the provided image. | Key project parties (owner, contractor) are not identified on the visible sheet. | HOLD | Chain hold | |
| └Scope 234 | P5.1 [Plumbing] | CHAIN HOLD - Electrical continuation to GFIC and to alarm panel is referenced to electrical drawings ("REFER TO ELECTRICAL DRAWINGS FOR CONTINUATION TO GFIC. REFER TO ELECTRICAL DRAWINGS FOR CONT. TO ALARM PANEL."), indicating coordination required between plumbing and electrical disciplines. | Manufacturer installation instructions required ("FOLLOW MANUFACTURERS INSTALLATION IINSTRUCTIONS"), so deviation could create non-compliance if not followed. | Document text contains typographical errors (e.g., "SYTEM", "IINSTRUCTIONS", "OFSCREEN") which could introduce ambiguity in interpretation. | HOLD | Chain hold | |
| └Scope 235 | P5.2 [Plumbing] | CHAIN HOLD - Sheet header fields for DATE:, SHEET NUMBER:, CAD FILE: appear blank in the provided image/text. | No owner, contractor, permit numbers or signature blocks are visible on this sheet. | HOLD | Chain hold | |
| └Scope 236 | S003 [Structural] | CHAIN HOLD - Conflict-of-interest requirement: inspection/testing agent must be engaged by Owner or Owner's Agent; must disclose any conflicts to the Building Official (per Notes). | Special inspections may be waived for approved fabricators per IBC 1704.2.5.2 - possible ambiguity on whether fabricator approvals apply to this project (not stated). | Agent list entries are blank on the sheet (INSPECTION AGENTS FIRM ADDRESS TELEPHONE NO. 1. 3. 4.), which could indicate missing assignment of inspectors/agents. | HOLD | Chain hold | |
| └Scope 237 | S202 [Structural] | CHAIN HOLD - Document contains the word 'FORTH' (spelled F-O-R-T-H) instead of the more common 'FOURTH' in the sheet title - this typographical discrepancy could cause minor confusion in references or indexing. | No contractor, subcontractor, or Mason Forge reference is present on the sheet; absence of contracting information could complicate attribution or responsibility if this sheet is used as sole evidence. | HOLD | Chain hold | |
| Section-01-010 | Product Delivery / Storage / Handling | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-01-011 | Execution / Cutting / Patching | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-01-012 | Cleaning / Waste Management | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-01-013 | Closeout Procedures | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-01-014 | O&M Manuals / Record Docs | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-01-015 | Demonstration / Training | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 02 | Existing Conditions10 | |||
| Section-02-001 | Existing Conditions Assessment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-02-002 | Surveys / Documentation | Chain hold | ||
| └Scope 01 | C-1A [Civil] | Depiction of parcel boundary lines with bearings and distances | HOLD | Chain hold | |
| └Scope 02 | C-1A [Civil] | Numerical annotations and dimensions along property lines | HOLD | Chain hold | |
| └Scope 03 | C-1A [Civil] | Multiple boundary bearings and distances shown (examples visible on plan): "S89'43'31"E 139.63", "S89'43'31"E 136.28", "N89'43'31"W 139.62" | HOLD | Chain hold | |
| └Scope 04 | C-1A [Civil] | North arrow/survey orientation symbol visible (top-left area of plan) | HOLD | Chain hold | |
| └Scope 05 | C-4 [Civil] | SILT FENCE ALONG PROPERTY LINE (SEE DETAIL, SHEET No. 5) | HOLD | Chain hold | |
| └Scope 06 | C-10 [Civil] | Existing condition tie-ins: match existing grade at property line, existing retaining wall, existing retention pond | HOLD | Chain hold | |
| └Scope 07 | ENERGY-1 [Energy-Calculations] | Drawings set includes: COVER; BOUNDARY AND TOPOGRAPHIC SURVEY; DEVELOPMENT INFORMATION; DEMOLITION AND SWPPP PLAN; SWPPP DETAILS AND NOTES; SITE LAYOUT PLAN; DRAINAGE PLAN; STORMTECH DETAILS; GRADING PLAN; CROSS SECTIONS; UTILITY PLAN; GREASE TRAP DETAILS; LIFT STATION PLAN; UTILITY DETAILS AND NOTES; MISCELLANEOUS DETAILS AND NOTES; CITY OF TAMPA STANDARD DETAILS; MAINTENANCE OF TRAFFIC DETAILS; LANDSCAPE PLAN; IRRIGATION PLAN; LANDSCAPE AND IRRIGATION DETAILS | HOLD | Chain hold | |
| Section-02-003 | Selective Demolition | Chain hold | ||
| └Scope 01 | C-4 [Civil] | DEMOLITION AND SWPPP PLAN | HOLD | Chain hold | |
| Section-02-004 | Site Demolition | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-02-005 | Structure Demolition | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-02-006 | Hazardous Material Testing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-02-007 | Hazardous Material Abatement | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-02-008 | Asbestos / Lead / Mold Remediation | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-02-009 | Facility Remediation | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-02-010 | Existing Utility Locate / Protection | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 03 | Concrete14 | |||
| Section-03-001 | Concrete Submittals / Mix Designs | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-03-002 | Concrete Forming | Chain hold | ||
| └Scope 01 | C-12 [Civil] | Provide as-built drawings (hard copy and PDF) conforming to City of Tampa Water Department Water Pipe Network As Built Requirements Manual | HOLD | Chain hold | |
| └Scope 02 | S003 [Structural] | Inspection of formwork for shape, lines, location and dimensions Field inspection Y Periodic | HOLD | Chain hold | |
| Section-03-003 | Concrete Reinforcing / Rebar | Chain hold | ||
| └Scope 01 | C-16 [Civil] | Provide/construct dumpster enclosure with 8" CMU walls, 6" monolithic slab, concrete-filled CMU cells with rebar and grout per details | HOLD | Chain hold | |
| └Scope 02 | C-16 [Civil] | Provide vertical/horizontal reinforcement, control and expansion joints per specified intervals | HOLD | Chain hold | |
| └Scope 03 | C-16 [Civil] | Conform masonry and concrete materials and mixes to ASTM C90, ASTM C270, ASTM C476, ACI practices, and A615-85 Grade 60 rebar | HOLD | Chain hold | |
| └Scope 04 | S003 [Structural] | Verify grade, type, and size of reinforcement and anchor bolts, and prestressing tendons and anchorages Field Inspection Y Periodic | HOLD | Chain hold | |
| └Scope 05 | S003 [Structural] | 1705.3 Concrete Construction: Inspection of reinforcing steel installation Shop (3) and field inspection Y Periodic | HOLD | Chain hold | |
| Section-03-004 | Embeds / Anchor Bolts / Accessories | Chain hold | ||
| └Scope 01 | C-8 [Civil] | Installation notes and requirements for stone embedment, foundation, and overfill | HOLD | Chain hold | |
| └Scope 02 | S003 [Structural] | 1705.2 Steel Construction: Embedments Field inspection Y Periodic | HOLD | Chain hold | |
| Section-03-005 | Vapor Retarder / Slab Prep | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-03-006 | Cast-In-Place Concrete | Chain hold | ||
| └Scope 01 | A-116 | Provision of 6'x8' concrete platform 6" high with 1:12 ramp (location shown on plan). | HOLD | Chain hold | |
| └Scope 02 | A-116 | 6'x8' CONCRETE PLATFORM 6" HIGH 1:12 RAMP | HOLD | Chain hold | |
| └Scope 03 | A-116 | One 6-ft x 8-ft concrete roof platform, 6 inches high, with 1:12 ramp. | EA | Chain hold | |
| └Scope 04 | A-117 | Concrete platform (6'x6') and 1:12 ramp on roof | HOLD | Chain hold | |
| └Scope 05 | A-117 | Noted dimensions on sheet: '6'x6' CONCRETE PLATFORM', '1:12 RAMP', '31'-6" PAINTED WOOD ROOF SHADE CANOPY.', '31'-3 3/8"', '18'-0 5/8"', '42'-0"' | HOLD | Chain hold | |
| └Scope 06 | A-117 | One 6-ft x 6-ft concrete roof platform with 1:12 ramp. | EA | Chain hold | |
| └Scope 07 | A-313 | CONCRETE WALL FILLED WITH FOAM INSULATION | HOLD | Chain hold | |
| └Scope 08 | A-314 | Concrete wall filled with foam insulation; bond beams per structural engineer. | HOLD | Chain hold | |
| └Scope 09 | A-314 | CONCRETE WALL FILLED WITH FOAM INSULATION | HOLD | Chain hold | |
| └Scope 10 | A-492 | Noted: TOP OF CONCRETE PLATFORM | HOLD | Chain hold | |
| └Scope 11 | A-570 | Exterior walk-off mat to concrete sidewalk detail | HOLD | Chain hold | |
| └Scope 12 | A-572A | Reinforced bearing wall footing (detail shown) | HOLD | Chain hold | |
| └Scope 13 | C-3 [Civil] | Provide concrete sidewalks, curb, gutter, paving, landscape areas, and required testing and compaction per notes and referenced standards. | HOLD | Chain hold | |
| └Scope 14 | C-4 [Civil] | Concrete sidewalk removal (984 SF total) | HOLD | Chain hold | |
| └Scope 15 | C-6 [Civil] | Sidewalks and curb type installations (TYPE 'D' and TYPE 'F' curbs, curb ramps per FACBC, 5' wide concrete sidewalk references) | HOLD | Chain hold | |
| └Scope 16 | C-6 [Civil] | PAVING: 6" CONCRETE (4,000 P.S.I. @ 28 DAYS) | HOLD | Chain hold | |
| └Scope 17 | C-6 [Civil] | CONCRETE PAVEMENT: 4" THICK CONCRETE (3,000 P.S.I. @ 28 DAYS), CLASS I | HOLD | Chain hold | |
| └Scope 18 | C-6 [Civil] | Crushed concrete base examples: 6" CRUSHED CONCRETE (LBR=130) and 8" CRUSHED CONCRETE (LBR=130) (as shown) | HOLD | Chain hold | |
| └Scope 19 | C-6 [Civil] | * ALTERNATE 12" STABILIZED SUBBASE: 6" CRUSHED CONCRETE (LBR=130) MIN OF 98% MODIFIED PROCTOR MAX DENSITY PER AASHTO T-180 (4" MAX LIFTS) (text exact) | HOLD | Chain hold | |
| └Scope 20 | C-7 [Civil] | Construction of control structure CS-01 including 3' wide concrete weir and aluminum skimmer | HOLD | Chain hold | |
| └Scope 21 | C-10 [Civil] | Details for foundation planters and thickened-edge sidewalks | HOLD | Chain hold | |
| └Scope 22 | C-10 [Civil] | 4.3' FOUNDATION PLANTER | HOLD | Chain hold | |
| └Scope 23 | C-10 [Civil] | 4' FOUNDATION PLANTER | HOLD | Chain hold | |
| └Scope 24 | C-10 [Civil] | 8.2' FOUNDATION PLANTER | HOLD | Chain hold | |
| └Scope 25 | C-12.1 [Civil] | Below Grade Installation Slab Requirements | HOLD | Chain hold | |
| └Scope 26 | C-14 [Civil] | Installation of fire hydrants and FDC (free-standing) and related concrete shear pad and anchorage details | HOLD | Chain hold | |
| └Scope 27 | C-15 [Civil] | Provide isolation joint where concrete pavement abuts a rigid structure | HOLD | Chain hold | |
| └Scope 28 | C-15 [Civil] | Concrete walks: 4" thick, 3,000 PSI; 8" thick across driveways | HOLD | Chain hold | |
| └Scope 29 | C-15 [Civil] | Curbs: 28 day, 3000 P.S.I. concrete | HOLD | Chain hold | |
| └Scope 30 | C-15 [Civil] | TS = SLAB THICKNESS (SEE PLAN) | HOLD | Chain hold | |
| └Scope 31 | C-15 [Civil] | CONCRETE WALKS SHALL BE 4 INCHES THICK HAVING A 3,000 PSI STRENGTH, POURED OVER PROPERLY PREPARED SUBGRADE. | HOLD | Chain hold | |
| └Scope 32 | C-15 [Civil] | ALL CONCRETE SIDEWALKS SHALL BE 8 INCHES THICK ACROSS DRIVEWAYS. | HOLD | Chain hold | |
| └Scope 33 | C-16 [Civil] | Install 8" diameter schedule 40 steel bollards filled with concrete and painted traffic yellow at indicated locations | HOLD | Chain hold | |
| └Scope 34 | C-16 [Civil] | BOLLARD DETAIL: 8" DIAMETER SCHEDULE 40 (0.258" WALL THICKNESS) FILLED WITH CONCRETE AND PAINTED TRAFFIC YELLOW | HOLD | Chain hold | |
| └Scope 35 | C-21 [Civil] | 27. REMOVAL OF ALL CONSTRUCTION DEBRIS, LIMEROCK, EXCESS OF BUILDERS SAND, CONCRETE AND MORTAR DEBRIS, EXISTING WEEDS AND GRASS, AND ALL FOREIGN MATERIALS IN THE PLANTING BED AND SOD AREAS SHALL BE REMOVED AND A MINIMUM OF 3' OF CLEAN SAND WITH A pH 5.5-6.5 SHALL BE INSTALLED PRIOR TO ANY INSTALLATION OF PLANTS OR TREES. | HOLD | Chain hold | |
| └Scope 36 | S003 [Structural] | Fresh concrete sampling, perform slump and air content tests and determine temperature of concrete Shop (3) and field inspection Y Continuous | HOLD | Chain hold | |
| └Scope 37 | S003 [Structural] | Concrete strength testing and verification of compliance with construction documents Field testing and review of laboratory reports Y Periodic | HOLD | Chain hold | |
| └Scope 38 | S003 [Structural] | 1705.6 Soils: Verify materials below shallow foundations are adequate to achieve the design bearing capacity. Field inspection Y Periodic | HOLD | Chain hold | |
| └Scope 39 | S003 [Structural] | 1705.6 Soils 1. Verify materials below shallow foundations are adequate to achieve the design bearing capacity. Field inspection Y Periodic | HOLD | Chain hold | |
| └Scope 40 | S101 [Structural] | FOUNDATION PLAN (sheet S101) | HOLD | Chain hold | |
| └Scope 41 | S101 [Structural] | S101 FOUNDATION PLAN | HOLD | Chain hold | |
| └Scope 42 | S301 [Structural] | FOUNDATION SECTIONS (sheet S301) | HOLD | Chain hold | |
| └Scope 43 | S301 [Structural] | S301 FOUNDATION SECTIONS | HOLD | Chain hold | |
| └Scope 44 | S302 [Structural] | Foundation sections (as indicated by title 'FOUNDATION SECTIONS' on sheet S302) | HOLD | Chain hold | |
| └Scope 45 | S302 [Structural] | S302 FOUNDATION SECTIONS | HOLD | Chain hold | |
| └Scope 46 | S303 [Structural] | Foundation sections (sheet S303) - indicated by sheet title; detailed section drawings not legible in provided image | HOLD | Chain hold | |
| └Scope 47 | S303 [Structural] | Document title: S303 FOUNDATION SECTIONS | HOLD | Chain hold | |
| Section-03-007 | Concrete Placement | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-03-008 | Concrete Finishing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-03-009 | Curing / Protection | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-03-010 | Concrete Joints / Sawcutting | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-03-011 | Testing / Field Quality Control | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-03-012 | Precast Concrete | Chain hold | ||
| └Scope 01 | A-005 Detail 5 | Upper-level floor assembly: precast 8-inch concrete slab with 1-inch gypcrete; UL J-994, 2 HR, STC 62. Area/location link pending. | SF | Chain hold | |
| └Scope 02 | A-116 | Roof construction: 1- Glue R40 rigid insulation to bottom of roof slab. 2- Suspend gwb ceiling to bottom of insulation. 3- Install 2" structural concrete topping on precast slab. 2" minimum slope to drain 1/4" per foot. 4- waterproof top of topping with liquid W.P. 5- SET TILE ON TOP OF MORTAR OVER w.p. | HOLD | Chain hold | |
| └Scope 03 | A-203 | CMU knee wall with precast bench top (see guestroom plans for typical window locations) | HOLD | Chain hold | |
| └Scope 04 | A-203 | CMU KNEE WALL WITH PRECAST BENCH TOP SEE GUESTROOM PLANS FOR TYP. WINDOW LOCATIONS | HOLD | Chain hold | |
| └Scope 05 | A-550 | Construct hollow core roof deck with sloped poured concrete (2" min.) and thinset tile (12"x12") waterproofing. | HOLD | Chain hold | |
| └Scope 06 | A-550 | HOLLOW CORE ROOF DECK | HOLD | Chain hold | |
| └Scope 07 | A-572A | Porte cochere precast bench detail | HOLD | Chain hold | |
| └Scope 08 | A-572A | Visible detail titles: "COLUMN ENCLOSURE @ PORTE COCHERE", "REINFORCED BEARING WALL FOOTING", "PORTE COCHERE PRECAST BENCH DETAIL", "BEAM CONNECTION @ STONE ENTRY WALL", "LIGHT COVE @ STOREFRONT", "BEAM CONNECTION & LIGHT COVE", "CONNECTION @ BEARING WALL & FASCIA", "BEAM CONNECTION AT BEARING WALL", "PORTE COCHERE COLUMN DETAIL & ENTRY", "PORTE COCHERE COLUMN DETAIL" | HOLD | Chain hold | |
| └Scope 09 | C-7 [Civil] | Precast drainage structures per FDOT specifications (various diameters shown: 4' dia, 5' dia, etc.) | HOLD | Chain hold | |
| Section-03-013 | Grouting | Chain hold | ||
| └Scope 01 | S003 [Structural] | Verification of proportions of materials in premixed or preblended mortar, prestressing grout, and grout other than self-consolidating grout, as delivered to the project site Field inspection Y Continuous | HOLD | Chain hold | |
| └Scope 02 | S003 [Structural] | (D) Levels B and C Quality Assurance: Verification of Slump Flow and Visual Stability Index (VSI) of self-consolidating grout as delivered to the project Field testing Y Continuous | HOLD | Chain hold | |
| └Scope 03 | S003 [Structural] | Verify proportions of site-mixed mortar, grout and prestressing grout for bonded tendons Field Inspection Y Periodic | HOLD | Chain hold | |
| └Scope 04 | S003 [Structural] | Verify placement of grout and prestressing grout for bonded tendons Field Inspection Y Continuous | HOLD | Chain hold | |
| └Scope 05 | S003 [Structural] | (D) Levels B and C Quality Assurance: 1. Verification of Slump Flow and Visual Stability Index (VSI) of self-consolidating grout as delivered to the project Field testing Y Continuous | HOLD | Chain hold | |
| Section-03-014 | Concrete Cutting / Core Drilling | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 04 | Masonry14 | |||
| Section-04-001 | Masonry Submittals / Samples | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-002 | Mortar / Grout | Chain hold | ||
| └Scope 01 | S003 [Structural] | Verify construction of mortar joints Field Inspection Y Periodic | HOLD | Chain hold | |
| Section-04-003 | Masonry Reinforcing / Anchors | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-004 | Masonry Accessories | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-005 | CMU / Concrete Unit Masonry | Chain hold | ||
| └Scope 01 | A-005 Detail 1 | Exterior wall: 8-inch CMU wall; refer structural drawings. Location and area link pending. | SF | Chain hold | |
| └Scope 02 | A-005 Detail 2 | Corridor wall: 8-inch CMU wall with 1-1/2-inch furring channel and 5/8-inch gypsum board; UL U-905, 2 HR, STC 62. Location and area link pending. | SF | Chain hold | |
| └Scope 03 | A-201 | Cultured stone indicated (ST1) | HOLD | Chain hold | |
| └Scope 04 | A-312 | Specify exterior finish systems: EIFS (drainable), phenolic resin panels or cement board siding on rainscreen, cultured stone veneer over CMU | HOLD | Chain hold | |
| └Scope 05 | A-312 | Exterior finish systems as scheduled: "EIFS SYSTEM (ALL EIFS TO BE DRAINABLE)", "PHENOLIC RESIN PANELS OR CEMENT BOARD SIDING ON RAINSCREEN SYSTEM", "CULTURED STONE VENEER OVER CMU", "EDPM ROOFING" (exact phrasing preserved) | HOLD | Chain hold | |
| └Scope 06 | A-313 | Provide cultured stone veneer over CMU where indicated | HOLD | Chain hold | |
| └Scope 07 | A-314 | Provide cultured stone veneer over CMU. | HOLD | Chain hold | |
| └Scope 08 | A-314 | EXT. FINISH ABOVE 40'-0" TO BE HARD STUCCO ON 1/2" EXT PLYWD ON 2X4 FRAMING ON CMU (TYP) ALL WOOD TO BE FR. | HOLD | Chain hold | |
| └Scope 09 | A-490 | CMU wall anchor requirement to support 250 LB lateral load | HOLD | Chain hold | |
| └Scope 10 | A-490 | Handrail detail: '8" CMU WALL ANCHOR TO SUPPORT 250 LB LAT LOAD' | HOLD | Chain hold | |
| └Scope 11 | A-550 | Install hard stucco above 40'-0" on 12" exterior plywood on 2x4 framing on CMU (typ). | HOLD | Chain hold | |
| └Scope 12 | A-550 | EXT. FINISH ABOVE 40'-0" TO BE HARD STUCCO ON 12" EXT PLYWD ON 2X4 FRAMING ON CMU (TYP) ALL WOOD TO BE FR. | HOLD | Chain hold | |
| └Scope 13 | S003 [Structural] | Verify placement of masonry units Field Inspection Y Periodic | HOLD | Chain hold | |
| └Scope 14 | S003 [Structural] | Verify size and location of structural masonry elements Field Inspection Y Periodic | HOLD | Chain hold | |
| Section-04-006 | Brick / Clay Unit Masonry | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-007 | Masonry Veneer | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-008 | Flashing / Weeps / Drainage | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-009 | Lintels / Bond Beams | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-010 | Control / Expansion Joints | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-011 | Stone Assemblies | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-012 | Cast Stone / Manufactured Stone | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-013 | Masonry Cleaning / Protection | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-04-014 | Masonry Restoration / Repair | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 05 | Metals10 | |||
| Section-05-001 | Structural Steel | Chain hold | ||
| └Scope 01 | A-572A | Beam connection at stone entry wall (detail shown) | HOLD | Chain hold | |
| └Scope 02 | A-572A | Beam connection and light cove details | HOLD | Chain hold | |
| └Scope 03 | A-572A | Beam connection at bearing wall | HOLD | Chain hold | |
| └Scope 04 | ID502 [Interior] | Panel secure to floor with steel framing | HOLD | Chain hold | |
| └Scope 05 | ID502 [Interior] | Annotation: PANEL SECURE TO FLOOR WITH STEEL FRAMING | HOLD | Chain hold | |
| └Scope 06 | ID505 [Interior] | PROVIDE STEEL FRAMING AS REQ'D: (3) POSTS AT EACH END SUPPORTING STEEL MEMBERS RUNNING END TO END SUPPORTING TOP. | HOLD | Chain hold | |
| └Scope 07 | ID505 [Interior] | PROVIDE STEEL FRAMING AS REQ'D: (3) POSTS AT EACH END SUPPORTING STEEL MEMBERS RUNNING END TO END SUPPORTING TOP. RETURN STONE DOWN FACE AT OUTSIDE END OF TABLE. HARDWOOD VENEER PLANKS ON PLYWOOD PANELING ON INSIDE FACE. HARDWOOD SILL PIECE AT BASE, TYP. | HOLD | Chain hold | |
| └Scope 08 | ID505 [Interior] | 306 STEEL FRAMING AS REQ'D | HOLD | Chain hold | |
| └Scope 09 | ID510 [Interior] | STEEL FRAMING AS REQUIRED TO SUPPORT STEEL PLATES AT HEARTH AND ALSO HEARTH CANTILEVER | HOLD | Chain hold | |
| └Scope 10 | S001 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 11 | S001 [Structural] | GENERAL NOTES | HOLD | Chain hold | |
| └Scope 12 | S002 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 13 | S002 [Structural] | S002 GENERAL NOTES | HOLD | Chain hold | |
| └Scope 14 | S003 [Structural] | (C) Level C Quality Assurance: Verification of f'm and f'AAC prior to construction and for every 5,000 SF during construction Testing by unit strength method or prism test method Y Periodic | HOLD | Chain hold | |
| └Scope 15 | S003 [Structural] | Verify use of approved design mix Shop (3) and field inspection Y Periodic | HOLD | Chain hold | |
| └Scope 16 | S003 [Structural] | MStruct Engineering, PLLC Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 17 | S003 [Structural] | (C) Level C Quality Assurance: 1. Verification of f'm and f'AAC prior to construction and for every 5,000 SF during construction Testing by unit strength method or prism test method Y Periodic | HOLD | Chain hold | |
| └Scope 18 | S101 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 19 | S201 [Structural] | Second floor framing plan (as indicated by sheet title 'SECOND FLOOR FRAMING PLAN' and sheet number S201). | HOLD | Chain hold | |
| └Scope 20 | S201 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 21 | S201 [Structural] | S201 SECOND FLOOR FRAMING PLAN | HOLD | Chain hold | |
| └Scope 22 | S202 [Structural] | Third, Forth, and Fifth floor framing plan (structural framing layout) | HOLD | Chain hold | |
| └Scope 23 | S202 [Structural] | THIRD, FORTH, AND FIFTH FLOOR FRAMING PLAN | HOLD | Chain hold | |
| └Scope 24 | S202 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 25 | S203 [Structural] | Roof framing plan (as depicted on sheet S203) | HOLD | Chain hold | |
| └Scope 26 | S203 [Structural] | Structural Design (as stated in company header) | HOLD | Chain hold | |
| └Scope 27 | S203 [Structural] | Inspection (as stated in company header) | HOLD | Chain hold | |
| └Scope 28 | S203 [Structural] | Testing (as stated in company header) | HOLD | Chain hold | |
| └Scope 29 | S203 [Structural] | S203 ROOF FRAMING PLAN | HOLD | Chain hold | |
| └Scope 30 | S203 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 31 | S301 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 32 | S302 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 33 | S401 [Structural] | FRAMING SECTIONS | HOLD | Chain hold | |
| └Scope 34 | S401 [Structural] | Structural Design | HOLD | Chain hold | |
| └Scope 35 | S401 [Structural] | Inspection | HOLD | Chain hold | |
| └Scope 36 | S401 [Structural] | Testing | HOLD | Chain hold | |
| └Scope 37 | S401 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 38 | S402 [Structural] | Framing sections (sheet title: 'FRAMING SECTIONS' - sheet number S402). Note: detailed framing section content is not legible in the provided image. | HOLD | Chain hold | |
| └Scope 39 | S402 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 40 | S403 [Structural] | FRAMING SECTIONS | HOLD | Chain hold | |
| └Scope 41 | S403 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 42 | S404 [Structural] | Framing sections (sheet S404) | HOLD | Chain hold | |
| └Scope 43 | S404 [Structural] | Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| └Scope 44 | S405 [Structural] | Framing sections (sheet title indicates content is framing sections) | HOLD | Chain hold | |
| └Scope 45 | S405 [Structural] | Header text: Structural Design ● Inspection ● Testing | HOLD | Chain hold | |
| Section-05-002 | Steel Joists | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-05-003 | Metal Decking | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-05-004 | Cold-Formed Metal Framing | Chain hold | ||
| └Scope 01 | A-005 Detail 3 | Interior shaft framing: steel J-track and C-H shaped studs at 24 inches O.C.; sizes per structural drawings and plans. Link pending. | LF | Chain hold | |
| └Scope 02 | A-005 Detail 4 | Nonrated interior partition framing: 4-inch metal studs at 16 inches O.C. Location and length link pending. | LF | Chain hold | |
| └Scope 03 | A-005 Details 6-7 | Load-bearing interior/exterior stud framing: 8-inch metal studs at 16 inches O.C.; refer structural drawings. Link pending. | LF | Chain hold | |
| └Scope 04 | A-112 | Suspended aluminum plank ceiling system (pre-finished 8"X96" aluminum planks attached to galvanized metal runners suspended from joists) | HOLD | Chain hold | |
| └Scope 05 | A-112 | Ceiling system note: SUSPENDED ALUMINUM PLANK CEILING SYSTEM W/ PRE FINISHED 8"X96" ALUMINUM PLANKS ATTACHED TO GALVANIZED METAL RUNNERS SUSPENDED FROM JOISTS. | HOLD | Chain hold | |
| └Scope 06 | A-113 | Suspended aluminum plank ceiling system: "PRE FINISHED 8"X96" ALUMINUM PLANKS ATTACHED TO GALVANIZED METAL RUNNERS SUSPENDED FROM JOISTS." | HOLD | Chain hold | |
| └Scope 07 | A-113 | SUSPENDED ALUMINUM PLANK CEILING SYSTEM W/ PRE FINISHED 8"X96" ALUMINUM PLANKS ATTACHED TO GALVANIZED METAL RUNNERS SUSPENDED FROM JOISTS. | HOLD | Chain hold | |
| └Scope 08 | A-120 | Install GWB on metal stud walls/ceilings (notations: "GWB on Mtl. Stud") | HOLD | Chain hold | |
| └Scope 09 | S003 [Structural] | 1705.2.2 Connection of cold-formed steel deck to supporting structure: Welding Y Periodic; Other fasteners verify conformance Y Periodic | HOLD | Chain hold | |
| Section-05-005 | Metal Fabrications | Chain hold | ||
| └Scope 01 | A-117 | Painted wood roof shade canopy as shown | HOLD | Chain hold | |
| └Scope 02 | A-117 | Noted rooftop items: 'Area of refuge', 'Stand pipe', 'Chute', 'PAINTED WOOD ROOF SHADE CANOPY.' | HOLD | Chain hold | |
| └Scope 03 | A-201 | Louvered sunshade | HOLD | Chain hold | |
| └Scope 04 | A-201 | Side entry canopy (see enlarged elevations for details) | HOLD | Chain hold | |
| └Scope 05 | A-201 | Notes for exterior elements: "LOUVERED SUNSHADE"; "PTAC LOUVER INTEGRAL W/ WINDOW FRAME. FINISH TO MATCH WINDOW FRAME"; "WINDOW WILL BE FROSTED TO CREATED VISUAL SCREEN TO LAUNDRY ROOM" | HOLD | Chain hold | |
| └Scope 06 | A-203 | Aluminum roof shade canopy | HOLD | Chain hold | |
| └Scope 07 | A-203 | REFER TO EXTERIOR FINISH INDEX FOR TYPICAL FINISHES FOR EXTERIOR ELEMENTS SUCH AS TYPICAL LOUVER COLOR, DOOR FRAMES, CANOPY STRUCTURES, ETC. | HOLD | Chain hold | |
| └Scope 08 | A-203 | ALUMINUM ROOF SHADE CANOPY. | HOLD | Chain hold | |
| └Scope 09 | A-570 | Light bollard detail | HOLD | Chain hold | |
| └Scope 10 | A-570 | Dumpster enclosure section | HOLD | Chain hold | |
| └Scope 11 | A-570 | Dumpster enclosure elevation | HOLD | Chain hold | |
| └Scope 12 | A-570 | Dumpster enclosure gate elevation | HOLD | Chain hold | |
| └Scope 13 | A-570 | Dumpster enclosure plan | HOLD | Chain hold | |
| └Scope 14 | A-572 | One porte cochere assembly; details continue on A-572A. | EA | Chain hold | |
| └Scope 15 | A-574 | Roof shade canopy details (plan, cross section, long section, 3D view) as shown on sheet A 574 | HOLD | Chain hold | |
| └Scope 16 | A-574 | ROOF SHADE CANOPY DETAILS | HOLD | Chain hold | |
| └Scope 17 | A-574 | One roof shade canopy assembly with plan, long section, cross section, and 3D view. | EA | Chain hold | |
| Section-05-006 | Metal Stairs | Chain hold | ||
| └Scope 01 | A-490 | Stair sections for Level 1, Level 2, Roof, and Levels 3,4,5 (as listed) | HOLD | Chain hold | |
| └Scope 02 | A-490 | Stair 1 assembly serving Level 1 through roof. | EA | Chain hold | |
| └Scope 03 | A-491 | Stair 2 - stair section/details (shown on sheet A491) | HOLD | Chain hold | |
| └Scope 04 | A-491 | Stair 2 assembly serving Level 1 through roof. | EA | Chain hold | |
| └Scope 05 | A-808 | Stair landing elevation detail | HOLD | Chain hold | |
| └Scope 06 | A-808 | Detail labels shown: STAIR LANDING ELEVATION; STAIR FLOOR FINISH DETAIL | HOLD | Chain hold | |
| Section-05-007 | Pipe / Tube Railings | Chain hold | ||
| └Scope 01 | A-008-B | HANDRAILS and GRAB BARS | HOLD | Chain hold | |
| └Scope 02 | A-490 | Handrail wall-mounted detail (wood handrail with return to wall) | HOLD | Chain hold | |
| └Scope 03 | A-490 | Handrail detail text: 'WD WALL MOUNTED HANDRAIL WITH RETURN TO WALL AT EACH END.' | HOLD | Chain hold | |
| Section-05-008 | Gratings / Floor Plates | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-05-009 | Decorative Metal | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-05-010 | Steel Erection / Field Welding | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 06 | Wood, Plastics, and Composites10 | |||
| Section-06-001 | Rough Carpentry | Chain hold | ||
| └Scope 01 | A-313 | ROOFING MEMBRANE OVER CEMENT BOARD AND PLYWOOD SHEATHING | HOLD | Chain hold | |
| └Scope 02 | A-314 | ROOFING MEMBRANE OVER CEMENT BOARD AND PLYWOOD SHEATHING TRIM AND FLASHING | HOLD | Chain hold | |
| Section-06-002 | Wood Framing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-06-003 | Sheathing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-06-004 | Blocking / Backing | Chain hold | ||
| └Scope 01 | A-435B | Grab bar blocking examples | HOLD | Chain hold | |
| └Scope 02 | A-435B | Transfer bathtub/shower seat blocking example | HOLD | Chain hold | |
| └Scope 03 | A-435B | Visible detail labels: "ACCESSIBLE SHOWER - UPPER LEVELS - EXAMPLE", "ACCESSIBLE SHOWER - GROUND LEVEL - EXAMPLE", "PLAN STANDARD SHOWER", "SHOWER CORNER DETAIL", "GRAB BAR BLOCKING - EXAMPLE", "TRANSFER BATHTUB/SHOWER SEAT BLOCKING - EXAMPLE", "ACCESSIBLE VANITY PLAN - EXAMPLE", "GUESTROOM BATH VANITY PLAN", "TUB SURROUND EDGE", "TUB AT NON RATED WALL", "TUB/SHOWER AT 1HR WALL", "LOW WALL DETAIL @ VANITY" | HOLD | Chain hold | |
| └Scope 04 | A-436 | BLOCKING | HOLD | Chain hold | |
| └Scope 05 | A-550 | Provide blocking at strap fastener locations (typ). | HOLD | Chain hold | |
| └Scope 06 | A-550 | PROVIDE BLOCKING AT STRAP FASTENER- TYP. | HOLD | Chain hold | |
| └Scope 07 | ID001 [Interior] | Provide wood blocking in walls for millwork and accessories as required (Note 30). | HOLD | Chain hold | |
| └Scope 08 | ID121 [Interior] | TV and mounting hardware are the Owner's responsibility; GC to provide blocking as required (note 2). | HOLD | Chain hold | |
| └Scope 09 | ID121 [Interior] | G.C. is to provide blocking as required (note 4). | HOLD | Chain hold | |
| └Scope 10 | ID121 [Interior] | Surface mounted signage for fitness is per the Owner; refer to brand interior signage specification for blocking requirements (note 14). | HOLD | Chain hold | |
| └Scope 11 | ID121 [Interior] | Multiple responsibility notes as shown (examples): 'TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.'; 'RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION.'; 'G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.'; 'EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.'; 'FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.'; 'MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.'; 'PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510.' | HOLD | Chain hold | |
| └Scope 12 | ID122 [Interior] | Provide blocking where required for owner-supplied items (note 2, note 4). | HOLD | Chain hold | |
| └Scope 13 | ID122 [Interior] | Surface mounted signage for fitness by owner; refer to brand interior signage specification for blocking (note 14). | HOLD | Chain hold | |
| └Scope 14 | ID122 [Interior] | Exact note 2: "TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED." | HOLD | Chain hold | |
| └Scope 15 | ID122 [Interior] | Exact note 4: "G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM." | HOLD | Chain hold | |
| └Scope 16 | ID123 [Interior] | TV and mounting hardware are provided by owner; contractor to provide blocking as required. | HOLD | Chain hold | |
| └Scope 17 | ID123 [Interior] | G.C. to provide blocking where required. | HOLD | Chain hold | |
| └Scope 18 | ID123 [Interior] | Surface mounted signage for fitness provided by owner; refer to brand interior signage specification for blocking requirements. | HOLD | Chain hold | |
| └Scope 19 | ID123 [Interior] | Note 2: "TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED." | HOLD | Chain hold | |
| └Scope 20 | ID124 [Interior] | TV and mounting hardware are by Owner; blocking to be provided as required (per note 2). | HOLD | Chain hold | |
| └Scope 21 | ID124 [Interior] | GC to provide blocking as required (per note 4). | HOLD | Chain hold | |
| └Scope 22 | ID124 [Interior] | Surface mounted signage for fitness is by Owner; refer to brand interior signage specification for blocking (per note 14). | HOLD | Chain hold | |
| └Scope 23 | ID124 [Interior] | NOTE (from sheet notes): "TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED." | HOLD | Chain hold | |
| └Scope 24 | ID124 [Interior] | NOTE: "G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM." | HOLD | Chain hold | |
| └Scope 25 | ID125 [Interior] | TV mounting hardware is provided by the owner; provide blocking as required (Note 2). | HOLD | Chain hold | |
| └Scope 26 | ID125 [Interior] | G.C. to provide blocking as required for items referenced (Note 4 and multiple notes referring to blocking). | HOLD | Chain hold | |
| └Scope 27 | ID125 [Interior] | Surface mounted signage for fitness is per Owner; refer to brand interior signage specification for blocking requirements (Note 14). | HOLD | Chain hold | |
| └Scope 28 | ID125 [Interior] | "2. TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED." | HOLD | Chain hold | |
| └Scope 29 | ID131 [Interior] | TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 30 | ID131 [Interior] | G.C. TO PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 31 | ID131 [Interior] | NOTE (COMMON AREAS #2): 'TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.' | HOLD | Chain hold | |
| └Scope 32 | ID132 [Interior] | 2. TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 33 | ID132 [Interior] | 4. G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM. | HOLD | Chain hold | |
| └Scope 34 | ID133 [Interior] | 2. TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 35 | ID133 [Interior] | 4. G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM. | HOLD | Chain hold | |
| └Scope 36 | ID133 [Interior] | 14. SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION. | HOLD | Chain hold | |
| └Scope 37 | ID200 [Interior] | TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 38 | ID200 [Interior] | G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM. | HOLD | Chain hold | |
| └Scope 39 | ID200 [Interior] | SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION. | HOLD | Chain hold | |
| └Scope 40 | ID400 [Interior] | TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 41 | ID400 [Interior] | G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM. | HOLD | Chain hold | |
| └Scope 42 | ID400 [Interior] | SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION. | HOLD | Chain hold | |
| └Scope 43 | ID400.1 [Interior] | 2. TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 44 | ID400.1 [Interior] | 4. G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM. | HOLD | Chain hold | |
| └Scope 45 | ID400.1 [Interior] | 14. SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION. | HOLD | Chain hold | |
| └Scope 46 | ID401 [Interior] | 2. TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 47 | ID401 [Interior] | 4. G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM. | HOLD | Chain hold | |
| └Scope 48 | ID401 [Interior] | 14. SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION. | HOLD | Chain hold | |
| └Scope 49 | ID402 [Interior] | TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 50 | ID402 [Interior] | G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM. | HOLD | Chain hold | |
| └Scope 51 | ID402 [Interior] | SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION. | HOLD | Chain hold | |
| └Scope 52 | ID403 [Interior] | Note 2: "TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED." | HOLD | Chain hold | |
| └Scope 53 | ID403 [Interior] | Note 4: "G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM." | HOLD | Chain hold | |
| └Scope 54 | ID403 [Interior] | Notes (numbered) include specific responsibility instructions such as: "TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.", "RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C.", "G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.", "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.", "FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.", "MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.", "PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING." | HOLD | Chain hold | |
| └Scope 55 | ID404 [Interior] | TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 56 | ID404 [Interior] | G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM. | HOLD | Chain hold | |
| └Scope 57 | ID404 [Interior] | SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION. | HOLD | Chain hold | |
| └Scope 58 | ID420 [Interior] | Multiple installation notes labeled A through S (e.g., "A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.") are included verbatim. | HOLD | Chain hold | |
| └Scope 59 | ID422 [Interior] | A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 60 | ID422 [Interior] | C. TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 61 | ID422 [Interior] | F. RESTROOM ACCESSORY PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 62 | ID422 [Interior] | K. PROVIDE BLOCKING AT HEADBOARD AS REQUIRED. | HOLD | Chain hold | |
| └Scope 63 | ID422 [Interior] | N. PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT. | HOLD | Chain hold | |
| └Scope 64 | ID422 [Interior] | R. PROVIDE BLOCKING AT VALET HOOKS AS REQUIRED. | HOLD | Chain hold | |
| └Scope 65 | ID423 [Interior] | Blocking provisions (headboard, robe hooks, restroom accessories, millwork, TV blocking) | HOLD | Chain hold | |
| └Scope 66 | ID423 [Interior] | Provision for TV (TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.) | HOLD | Chain hold | |
| └Scope 67 | ID423 [Interior] | NOTES A THROUGH S are provided; examples include: A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.; B. ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.; C. TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.; D. EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.; E. FIXTURE PER PLUMBING FIXTURE MATRIX IN DESIGN GUIDE PROJECT MANUAL.; F. RESTROOM ACCESSORY PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.; G. ARCHITECTURAL LIGHT BY G.C.; H. IN THIS ROOM ONLY, LOW WALL TO BE 34 1/2" TO TOP OF STONE CAP TO ALLOW ROOM FOR ADA GRAB BAR ABOVE.; I. 12" X 12" CUT-OUT AT SIDE OF CABINET FOR ACCESS TO REFRIGERATOR OUTLET; J. ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING; K. PROVIDE BLOCKING AT HEADBOARD AS REQUIRED.; L. INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION. HATCHED AREA INDICATES SPACE WHERE OUTLETS SHOULD OCCUR.; M. SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET.; N. PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.; O. DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP.; P. NOT USED; Q. THERMOSTAT. ALIGN WITH OUTLET BELOW WHERE OCCURS. SEE ELEVATION FOR ADDITIONAL INFORMATION. ALIGN DEVICES VERTICALLY 6" FROM EDGE OF WALL.; R. PROVIDE BLOCKING AT VALET HOOKS AS REQUIRED.; S. EXPOSED PARTITIONS ABOVE BACK AND SIDES OF WARDROBE TO BE FINISHED | HOLD | Chain hold | |
| └Scope 68 | ID424 [Interior] | Provide blocking at headboard as required (Note K). | HOLD | Chain hold | |
| └Scope 69 | ID424 [Interior] | Robe hook per toilet & bath accessory matrix in the design guide project manual; provide blocking as required (Note A). | HOLD | Chain hold | |
| └Scope 70 | ID424 [Interior] | TV provided by owner; provide blocking as required (Note C). | HOLD | Chain hold | |
| └Scope 71 | ID424 [Interior] | Provide electrical and blocking at wall for a hardwired lit-mirror at vanity; mirror requires a switch at the wall; verify height of opening at back of mirror with purchasing agent (Note N). | HOLD | Chain hold | |
| └Scope 72 | ID424 [Interior] | Provide blocking at valet hooks as required (Note R). | HOLD | Chain hold | |
| └Scope 73 | ID424 [Interior] | Restroom accessory per toilet & bath accessory matrix in design guide project manual; provide blocking as required (Note F). | HOLD | Chain hold | |
| └Scope 74 | ID424 [Interior] | Note: 'TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.' | HOLD | Chain hold | |
| └Scope 75 | ID424 [Interior] | Note: 'PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.' | HOLD | Chain hold | |
| └Scope 76 | ID430 [Interior] | Notes A through S describing blocking, outlets, fixtures and vendor responsibilities | HOLD | Chain hold | |
| └Scope 77 | ID430 [Interior] | NOTES A THROUGH S are present and include specific instructions such as: "A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.", "B. ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.", "C. TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.", "D. EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.", "H. IN THIS ROOM ONLY, LOW WALL TO BE 34 1/2\" TO TOP OF STONE CAP TO ALLOW ROOM FOR ADA GRAB BAR ABOVE.", "J. ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING", "N. PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY.", "Q. THERMOSTAT. ALIGN WITH OUTLET BELOW WHERE OCCURS. SEE ELEVATION FOR ADDITIONAL INFORMATION. ALIGN DEVICES VERTICALLY 6\" FROM EDGE OF WALL.", etc. | HOLD | Chain hold | |
| └Scope 78 | ID431 [Interior] | Provide blocking for TV, robe hooks, headboard, valet hooks, and other accessories as noted | HOLD | Chain hold | |
| └Scope 79 | ID431 [Interior] | Provide electrical and blocking for a hardwired lit-mirror at vanity and a switch at the wall | HOLD | Chain hold | |
| └Scope 80 | ID431 [Interior] | Note A: 'ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.' | HOLD | Chain hold | |
| └Scope 81 | ID431 [Interior] | Note C: 'TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.' | HOLD | Chain hold | |
| └Scope 82 | ID432 [Interior] | Notes for blocking, appliance cut-outs, and fixture provisions (Notes A through S) | HOLD | Chain hold | |
| └Scope 83 | ID432 [Interior] | Notes A through S appear in full (e.g., 'A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.' through 'S. EXPOSED PARTITIONS ABOVE BACK AND SIDES OF WARDROBE TO BE FINISHED') | HOLD | Chain hold | |
| └Scope 84 | ID432 [Interior] | Specific note text: 'N. PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.' | HOLD | Chain hold | |
| └Scope 85 | ID433 [Interior] | PROVIDE BLOCKING AS REQUIRED (multiple notes reference blocking at headboard, robe hook, restroom accessories, wardrobes, valet hooks, and cabinet walls). | HOLD | Chain hold | |
| └Scope 86 | ID433 [Interior] | TV PROVIDED BY OWNER; PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 87 | ID433 [Interior] | PROVIDE ELECTRICAL AND BLOCKING FOR HARDWIRED LIT-MIRROR AT VANITY; MIRROR REQUIRES A SWITCH AT THE WALL. | HOLD | Chain hold | |
| └Scope 88 | ID433 [Interior] | NOTE C: TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 89 | ID433 [Interior] | NOTE K: PROVIDE BLOCKING AT HEADBOARD AS REQUIRED. | HOLD | Chain hold | |
| └Scope 90 | ID433 [Interior] | NOTE N: PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT. | HOLD | Chain hold | |
| └Scope 91 | ID440 [Interior] | A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 92 | ID440 [Interior] | C. TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 93 | ID440 [Interior] | F. RESTROOM ACCESSORY PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 94 | ID440 [Interior] | K. PROVIDE BLOCKING AT HEADBOARD AS REQUIRED. | HOLD | Chain hold | |
| └Scope 95 | ID440 [Interior] | N. PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT. | HOLD | Chain hold | |
| └Scope 96 | ID440 [Interior] | R. PROVIDE BLOCKING AT VALET HOOKS AS REQUIRED. | HOLD | Chain hold | |
| └Scope 97 | ID441 [Interior] | ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 98 | ID441 [Interior] | TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 99 | ID441 [Interior] | RESTROOM ACCESSORY PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 100 | ID441 [Interior] | PROVIDE BLOCKING AT HEADBOARD AS REQUIRED. | HOLD | Chain hold | |
| └Scope 101 | ID441 [Interior] | PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY (MIRROR REQUIRES A SWITCH AT THE WALL). | HOLD | Chain hold | |
| └Scope 102 | ID441 [Interior] | PROVIDE BLOCKING AT VALET HOOKS AS REQUIRED. | HOLD | Chain hold | |
| └Scope 103 | ID441 [Interior] | Text on sheet: 'PROVIDE BLOCKING IN WALL FOR ROD' | HOLD | Chain hold | |
| └Scope 104 | ID441 [Interior] | Text on sheet: 'PROVIDE BLOCKING IN WALL FOR ROD FX-701ADA' (appears in plan callouts) | HOLD | Chain hold | |
| └Scope 105 | ID441 [Interior] | Note A: 'ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.' | HOLD | Chain hold | |
| └Scope 106 | ID442 [Interior] | Blocking locations for wall-mounted items and equipment | HOLD | Chain hold | |
| └Scope 107 | ID442 [Interior] | A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 108 | ID442 [Interior] | C. TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED. | HOLD | Chain hold | |
| └Scope 109 | ID501 [Interior] | Installation of wood plank wall finish system (3/8" and 8" planks referenced) secured on linear clips to blocking | HOLD | Chain hold | |
| └Scope 110 | ID501 [Interior] | Provide blocking in wall and ceiling as required for monitor, monitor mount, safe deposit box and wood base | HOLD | Chain hold | |
| └Scope 111 | ID501 [Interior] | Recessed surveillance monitor provision and coordination of outlet and blocking | HOLD | Chain hold | |
| └Scope 112 | ID502 [Interior] | Provide blocking to secure lounge screen to wall and ceiling as req'd | HOLD | Chain hold | |
| └Scope 113 | ID502 [Interior] | Provide blocking to secure lounge screen to ceiling as req'd | HOLD | Chain hold | |
| └Scope 114 | ID502 [Interior] | Repeated annotation: PROVIDE BLOCKING TO SECURE LOUNGE SCREEN TO WALL AND CEILING AS REQ'D | HOLD | Chain hold | |
| └Scope 115 | ID502 [Interior] | Annotation: LOUNGE SCREEN SECURED TO COLUMN AS REQUIRED. BLOCKING AS REQ'D | HOLD | Chain hold | |
| └Scope 116 | ID503 [Interior] | 2x4 WOOD FRAME AND 2x6 FRONT SUPPORT MEMBER BLOCKING | HOLD | Chain hold | |
| └Scope 117 | ID504 [Interior] | TV and mounting (note: provided by owner; G.C. to verify blocking/specification) | HOLD | Chain hold | |
| └Scope 118 | ID504 [Interior] | Note on TV: TV AND MOUNTING BRACKET ARE PER THE OWNER. G.C. TO VERIFY SPECIFICATION AND BLOCKING REQUIREMENTS PRIOR TO INSTALLATION. | HOLD | Chain hold | |
| └Scope 119 | ID505 [Interior] | HARDWOOD VENEER PLANKS LAMINATED TO 3/4" PLYWOOD BACKING; PANELS SECURED BACK-TO-BACK ALONG CENTER OF TABLE. | HOLD | Chain hold | |
| └Scope 120 | ID505 [Interior] | 14" HARDWOOD VENEER PLANKS LAMINATED TO 34" PLYWOOD BACKING; PANELS SECURED TOGETHER BACK- TO - BACK ALONG CENTER OF TABLE. ALL EXPOSED REVEALS TO BE STAINED TO MATCH VENEER PLANKS, TYP. | HOLD | Chain hold | |
| └Scope 121 | ID506 [Interior] | Enclose column with WOOD VENEER (303) PANELS on shims or blocking as required. | HOLD | Chain hold | |
| └Scope 122 | ID506 [Interior] | Construction notes: PANELS TO ENCLOSE COLUMN ON SHIMS OR BLOCKING AS REQUIRED | HOLD | Chain hold | |
| └Scope 123 | ID510 [Interior] | Provide blocking at wood panel supports. | HOLD | Chain hold | |
| └Scope 124 | ID510 [Interior] | Elevator wall construction: provide blocking at wood panel supports; elevator door jamb detail referenced. | HOLD | Chain hold | |
| └Scope 125 | ID520 [Interior] | Provide blocking in ceiling or wall for 96" wide ceiling mounted drapery track. | HOLD | Chain hold | |
| └Scope 126 | ID520 [Interior] | Provide base stop mounted 6" AFF; coordinate location with furniture and provide blocking in wall. | HOLD | Chain hold | |
| └Scope 127 | ID520 [Interior] | CEILING MOUNTED DRAPERY TRACK IS 96" WIDE, PROVIDE BLOCKING IN CEILING OR WALL AS REQUIRED. | HOLD | Chain hold | |
| Section-06-005 | Finish Carpentry | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-06-006 | Millwork | Chain hold | ||
| └Scope 01 | A-030 | Typical life-safety legend entries visible: 1/2-HOUR RATED WALL, 1-HOUR RATED WALL, 2-HOUR RATED WALL, TRAVEL DISTANCE, 2-HOUR RATED SHAFT, FIRE EXTINGUISHER, FIRE EXTINGUISHER & CABINET, TOTAL OCCUPANTS, EXISTING AVAILABLE CAPACITY, REQUIRED EXIT WIDTH, PROVIDED EXIT WIDTH, SYMBOL KEY | HOLD | Chain hold | |
| └Scope 02 | A-310 | Interior spaces shown/identified on sheet including: Lobby (001), Registration (002), Connect & Print (004), Meeting Room (102), Employee Break Room (020), Laundry (019), Water Heater (007), IT Closet (013 A), multiple Linen rooms (010, 035, 045, 055), Ice Machines, multiple Queen rooms and King Suite rooms (various room numbers) | HOLD | Chain hold | |
| └Scope 03 | A-310 | Rooms and room numbers explicitly shown (partial list, exact strings preserved): "LOBBY 001", "REGISTRATION 002", "CONNECT & PRINT 004", "MEETING ROOM 102", "EMPLOYEE BREAK ROOM 020", "LAUNDRY 019", "WATER HEATER 007", "IT CLOSET 013 A", "LINEN M 010", "LINEN 035", "LINEN 045", "LINEN 055", "ICE MACHINE" (multiple), and many guest room labels such as "QUEEN QUEEN 220", "KING SUITE 506", etc. | HOLD | Chain hold | |
| └Scope 04 | A-402 | BREAKFAST BUFFET & LOBBY | HOLD | Chain hold | |
| └Scope 05 | A-402 | LOBBY - RECEPTION WALL & BANQUETTE | HOLD | Chain hold | |
| └Scope 06 | A-403 | COLUMN ENCLOSURE & CABINETRY | HOLD | Chain hold | |
| └Scope 07 | A-403 | CORNER TRIM DETAIL AT BANQUETTE | HOLD | Chain hold | |
| └Scope 08 | A-404 | SOFFIT @ FARM TABLE (detail) | HOLD | Chain hold | |
| └Scope 09 | A-433 | Pre-packaged wood soffit note/detail | HOLD | Chain hold | |
| └Scope 10 | A-503 | Detailed drawings and elevations of welcome desk assemblies (multiple views, 3D view shown). | HOLD | Chain hold | |
| └Scope 11 | A-503 | Transaction wall and transaction ledge details associated with the welcome desk. | HOLD | Chain hold | |
| └Scope 12 | A-503 | Hardware dimensions table (incl. ventilation & clearance) for equipment adjacent to or in the welcome desk. | HOLD | Chain hold | |
| └Scope 13 | A-504 | Detailing and construction/installation details for welcome desk components including CPU cabinet | HOLD | Chain hold | |
| └Scope 14 | A-504 | Trash cabinet detail | HOLD | Chain hold | |
| └Scope 15 | A-504 | ADA transaction surface detail for welcome desk | HOLD | Chain hold | |
| └Scope 16 | A-504 | Keyboard and printer cabinet detail | HOLD | Chain hold | |
| └Scope 17 | A-504 | Transaction ledge detail | HOLD | Chain hold | |
| └Scope 18 | A-505 | WELCOME DESK DETAILS | HOLD | Chain hold | |
| └Scope 19 | A-506 | Coffee bar details | HOLD | Chain hold | |
| └Scope 20 | A-506 | Farm table / farmtable screen wall details | HOLD | Chain hold | |
| └Scope 21 | A-507 | CONNECT & PRINT DESK LEFT ELEVATION | HOLD | Chain hold | |
| └Scope 22 | A-507 | CONNECT & PRINT DESK RIGHT ELEVATION | HOLD | Chain hold | |
| └Scope 23 | A-507 | CONNECT & PRINT DESK FRONT ELEVATION | HOLD | Chain hold | |
| └Scope 24 | A-507 | CONNECT & PRINT WALL ELEVATION | HOLD | Chain hold | |
| └Scope 25 | A-507 | CONNECT & PRINT LIVING ROOM PLAN | HOLD | Chain hold | |
| └Scope 26 | A-508 | CONNECT & PRINT & PRINTER | HOLD | Chain hold | |
| └Scope 27 | A-509 | THE CORNER MARKET CABINETS - WITH BEER & WINE | HOLD | Chain hold | |
| └Scope 28 | A-509 | THE CORNER MARKET - CABINET SECTION - WITH BEER & WINE | HOLD | Chain hold | |
| └Scope 29 | A-509A | THE CORNER MARKET - CABINET SECTION - WITHOUT BEER & WINE ALT. | HOLD | Chain hold | |
| └Scope 30 | A-510 | Interior cabinet details for 'THE CORNER MARKET' (amenities cabinet detail) | HOLD | Chain hold | |
| └Scope 31 | A-510 | Inside corner detail at market cabinet | HOLD | Chain hold | |
| └Scope 32 | A-511 | Banquette seating details (elevations, sections, end/knee wall details) as shown on detail group 508. | HOLD | Chain hold | |
| └Scope 33 | A-511 | Provision and coordination of electrical outlet/J-box for banquette seating per note: 'PROVIDE J-BOX FOR HARDWIRE CONNECTION OR OUTLET FOR PLUG-IN CONNECTION ACCORDINGLY.' | HOLD | Chain hold | |
| └Scope 34 | A-511 | Millwork surround and millwork details (e.g., 3/4" PLAM PANEL, 4 1/4" MILLWORK SURROUND). | HOLD | Chain hold | |
| └Scope 35 | A-511 | Coordination with furniture vendor and 'by others' suppliers for banquette components and outlets. | HOLD | Chain hold | |
| └Scope 36 | A-511 | 508 - BANQUETTE KNEE WALL | HOLD | Chain hold | |
| └Scope 37 | A-512 | BREAKFAST BUFFET DETAILS (sheet content) | HOLD | Chain hold | |
| └Scope 38 | A-512 | BREAKFAST BUFFET CABINET & JUICE MACHINE (visible label on sheet) | HOLD | Chain hold | |
| └Scope 39 | A-512 | BREAKFAST BUFFET COUNTER (visible label on sheet) | HOLD | Chain hold | |
| └Scope 40 | E2.1 [Electrical] | THE CORNER MARKET 003 | HOLD | Chain hold | |
| └Scope 41 | F1-00 [FIRE-ALARM-SYSTEM] | Electrical contractor to furnish 120VAC power, conduit, junction boxes, backboxes, terminal cabinets, gutters, wirepath riser, junction boxes, and access panels as specified. | HOLD | Chain hold | |
| └Scope 42 | ID000 [Interior] | Details for welcome desk, feature wall, lounge screen, quick print, communal table/coffee bar, recycle cabinet, banquette seating, buffet, corner market, lounge, hydration station, guestroom details (ID500 - ID520 series) | HOLD | Chain hold | |
| └Scope 43 | ID121 [Interior] | Equipment provided by Owner; G.C. to confirm sizes to confirm fit within casegoods/millwork (note 7). | HOLD | Chain hold | |
| └Scope 44 | ID121 [Interior] | Millwork by G.C.; ensure style & finishes per brand standards (note 11). | HOLD | Chain hold | |
| └Scope 45 | ID121 [Interior] | Guest laundry counter millwork is per the G.C.; coordinate drawing for counter with AOR; finish in 304 laminate per brand standards (note 13). | HOLD | Chain hold | |
| └Scope 46 | ID121 [Interior] | GC to coordinate all electrical requirements at millwork with AOR (note 18). | HOLD | Chain hold | |
| └Scope 47 | ID122 [Interior] | G.C. to provide millwork; ensure style & finishes per brand standards (note 11). | HOLD | Chain hold | |
| └Scope 48 | ID122 [Interior] | Equipment provided by owner; G.C. to confirm sizes to confirm fit within casegoods/millwork (note 7). | HOLD | Chain hold | |
| └Scope 49 | ID122 [Interior] | Guest laundry counter millwork by G.C.; coordinate with AOR; finish in 304 laminate per brand standards (note 13). | HOLD | Chain hold | |
| └Scope 50 | ID122 [Interior] | G.C. to coordinate all electrical requirements at millwork with AOR (note 18). | HOLD | Chain hold | |
| └Scope 51 | ID122 [Interior] | Exact note 7: "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK." | HOLD | Chain hold | |
| └Scope 52 | ID123 [Interior] | Millwork by G.C.; ensure style & finishes are per the brand standards. | HOLD | Chain hold | |
| └Scope 53 | ID123 [Interior] | Guest laundry counter millwork by G.C.; finish in 304 laminate per brand standards. | HOLD | Chain hold | |
| └Scope 54 | ID123 [Interior] | G.C. to coordinate electrical requirements at millwork with AOR. | HOLD | Chain hold | |
| └Scope 55 | ID124 [Interior] | Equipment provided by Owner; GC to confirm equipment sizes for fit within millwork (per note 7). | HOLD | Chain hold | |
| └Scope 56 | ID124 [Interior] | Millwork by G.C.; ensure style & finishes per brand standards (per note 11). | HOLD | Chain hold | |
| └Scope 57 | ID124 [Interior] | Guest laundry counter millwork per G.C.; coordinate with AOR; finish in 304 laminate per brand standards (per note 13). | HOLD | Chain hold | |
| └Scope 58 | ID124 [Interior] | GC to coordinate electrical requirements at millwork with AOR (per note 18). | HOLD | Chain hold | |
| └Scope 59 | ID124 [Interior] | NOTE: "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK." | HOLD | Chain hold | |
| └Scope 60 | ID125 [Interior] | Equipment provided by Owner; G.C. to confirm sizes to confirm fit within casegoods/millwork (Note 7). | HOLD | Chain hold | |
| └Scope 61 | ID125 [Interior] | Millwork by G.C.; ensure style & finishes per brand standards (Note 11). | HOLD | Chain hold | |
| └Scope 62 | ID125 [Interior] | Guest laundry counter millwork by G.C.; coordinate with AOR; finish in 304 laminate per brand standards (Note 13). | HOLD | Chain hold | |
| └Scope 63 | ID131 [Interior] | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | HOLD | Chain hold | |
| └Scope 64 | ID131 [Interior] | MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 65 | ID131 [Interior] | GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 66 | ID131 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 67 | ID132 [Interior] | 7. EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | HOLD | Chain hold | |
| └Scope 68 | ID132 [Interior] | 11. MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 69 | ID132 [Interior] | 13. GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 70 | ID132 [Interior] | 18. G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 71 | ID133 [Interior] | 7. EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | HOLD | Chain hold | |
| └Scope 72 | ID133 [Interior] | 11. MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 73 | ID133 [Interior] | 13. GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 74 | ID133 [Interior] | 18. G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 75 | ID200 [Interior] | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | HOLD | Chain hold | |
| └Scope 76 | ID200 [Interior] | MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 77 | ID200 [Interior] | GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 78 | ID200 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 79 | ID400 [Interior] | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | HOLD | Chain hold | |
| └Scope 80 | ID400 [Interior] | MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 81 | ID400 [Interior] | GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 82 | ID400 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 83 | ID400 [Interior] | Specific instruction: SEE SHEET ID501, DETAIL 1 FOR FEATURE WALL DETAILS | HOLD | Chain hold | |
| └Scope 84 | ID400.1 [Interior] | 7. EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | HOLD | Chain hold | |
| └Scope 85 | ID400.1 [Interior] | 11. MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 86 | ID400.1 [Interior] | 13. GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 87 | ID400.1 [Interior] | 18. G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 88 | ID401 [Interior] | 7. EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | HOLD | Chain hold | |
| └Scope 89 | ID401 [Interior] | 11. MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 90 | ID401 [Interior] | 13. GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 91 | ID401 [Interior] | 18. G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 92 | ID402 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 93 | ID402 [Interior] | MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 94 | ID402 [Interior] | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | HOLD | Chain hold | |
| └Scope 95 | ID403 [Interior] | Note 7: "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK." | HOLD | Chain hold | |
| └Scope 96 | ID403 [Interior] | Note 11: "MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS." | HOLD | Chain hold | |
| └Scope 97 | ID403 [Interior] | Note 13: "GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS." | HOLD | Chain hold | |
| └Scope 98 | ID404 [Interior] | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | HOLD | Chain hold | |
| └Scope 99 | ID404 [Interior] | MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 100 | ID404 [Interior] | GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 101 | ID404 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. | HOLD | Chain hold | |
| └Scope 102 | ID422 [Interior] | B. ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT. | HOLD | Chain hold | |
| └Scope 103 | ID422 [Interior] | I. 12" X 12" CUT-OUT AT SIDE OF CABINET FOR ACCESS TO REFRIGERATOR OUTLET | HOLD | Chain hold | |
| └Scope 104 | ID422 [Interior] | M. SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET. | HOLD | Chain hold | |
| └Scope 105 | ID424 [Interior] | Electrical outlet behind millwork for equipment (Note B). | HOLD | Chain hold | |
| └Scope 106 | ID424 [Interior] | Switched outlet for cabinet lights; cabinet light provided by furniture vendor; wardrobe includes plug-in light under shelf; optional uplight (X-270LTOPT) also plug into this switched outlet (Note M). | HOLD | Chain hold | |
| └Scope 107 | ID424 [Interior] | 12" x 12" cut-out at side of cabinet for access to refrigerator outlet (Note I). | HOLD | Chain hold | |
| └Scope 108 | ID430 [Interior] | FF&E note: "CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET." | HOLD | Chain hold | |
| └Scope 109 | ID431 [Interior] | Provide electrical outlet behind millwork and outlet behind cornice for motorized shade (must be concealed) | HOLD | Chain hold | |
| └Scope 110 | ID431 [Interior] | Provide duplex outlet for microwave and power strip and switched outlet for cabinet lights | HOLD | Chain hold | |
| └Scope 111 | ID431 [Interior] | Note B: 'ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.' | HOLD | Chain hold | |
| └Scope 112 | ID432 [Interior] | Specific note text: 'M. SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET.' | HOLD | Chain hold | |
| └Scope 113 | ID433 [Interior] | PROVIDE ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT. | HOLD | Chain hold | |
| └Scope 114 | ID433 [Interior] | SWITCHED OUTLET FOR CABINET LIGHTS; CABINET LIGHT PROVIDED BY FURNITURE VENDOR. (WARDROBE PLUG-IN LIGHT UNDER SHELF, OPTIONAL UPLIGHT X-270LTOPT). | HOLD | Chain hold | |
| └Scope 115 | ID433 [Interior] | NOTE B: ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT. | HOLD | Chain hold | |
| └Scope 116 | ID433 [Interior] | NOTE M: SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET. | HOLD | Chain hold | |
| └Scope 117 | ID440 [Interior] | B. ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT. | HOLD | Chain hold | |
| └Scope 118 | ID440 [Interior] | I. 12" X 12" CUT-OUT AT SIDE OF CABINET FOR ACCESS TO REFRIGERATOR OUTLET | HOLD | Chain hold | |
| └Scope 119 | ID440 [Interior] | M. SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET. | HOLD | Chain hold | |
| └Scope 120 | ID441 [Interior] | ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT. | HOLD | Chain hold | |
| └Scope 121 | ID441 [Interior] | 12" X 12" CUT-OUT AT SIDE OF CABINET FOR ACCESS TO REFRIGERATOR OUTLET | HOLD | Chain hold | |
| └Scope 122 | ID441 [Interior] | SWITCHED OUTLET FOR CABINET LIGHTS (CABINET LIGHT PROVIDED BY FURNITURE VENDOR). | HOLD | Chain hold | |
| └Scope 123 | ID442 [Interior] | B. ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT. | HOLD | Chain hold | |
| └Scope 124 | ID500 [Interior] | Welcome desk millwork details (plan, front/back/side elevations, sections) | HOLD | Chain hold | |
| └Scope 125 | ID500 [Interior] | Black melamine interiors for cabinets/drawers/open boxes (referred to repeatedly as 'BLACK MELAMINE INTERIOR', 'BLACK MELAMIINE INTERIOR') | HOLD | Chain hold | |
| └Scope 126 | ID500 [Interior] | Cabinet doors and drawers: references to (303), (304A), (308), (216) components | HOLD | Chain hold | |
| └Scope 127 | ID500 [Interior] | Instructional note: 'PRINTER & EQUIPMENT IS PER THE OWNER. G.C. TO WORK WITH THE OWNER TO VERIFY FINAL SPECS AND DETERMINE FINAL SIZES OF CABINETS, DRAWERS AND CUBBYS. TYPICAL.' | HOLD | Chain hold | |
| └Scope 128 | ID501 [Interior] | Installation of steel outer frame and millwork frame box for art piece | HOLD | Chain hold | |
| └Scope 129 | ID501 [Interior] | Safe deposit box cabinet installation with melamine interior and adjustable shelving per details | HOLD | Chain hold | |
| └Scope 130 | ID501 [Interior] | Referenced detail/parts: "1/2\" MILLWORK FRAME BOX FOR ART PIECE." | HOLD | Chain hold | |
| └Scope 131 | ID502 [Interior] | Secure lounge screen to structural column as required; structural column wrapped with wood panels (refer to AOR's set) | HOLD | Chain hold | |
| └Scope 132 | ID503 [Interior] | CABINET (313) WITH BLACK MELAMINE INTERIOR | HOLD | Chain hold | |
| └Scope 133 | ID504 [Interior] | Communal table (plan, elevations and details) | HOLD | Chain hold | |
| └Scope 134 | ID504 [Interior] | Coffee bar (plan, elevations and sections) | HOLD | Chain hold | |
| └Scope 135 | ID504 [Interior] | Lighting group above communal table (lighting group detail referenced) | HOLD | Chain hold | |
| └Scope 136 | ID504 [Interior] | Cabinetry with black melamine interior | HOLD | Chain hold | |
| └Scope 137 | ID505 [Interior] | COMMUNAL TABLE TO BE SUPPLIED BY G.C. | HOLD | Chain hold | |
| └Scope 138 | ID505 [Interior] | RECEPTACLE FOR POWER/USB PROVIDED BY MILLWORKER AND INSTALLED IN TABLE APRON; ROUTE PLUG AND CORD THROUGH CHASE BEHIND APRON. | HOLD | Chain hold | |
| └Scope 139 | ID505 [Interior] | RECEPTACLE TO BE "MINI-TAP" AS MANUF. BY BYRNE; 12' CORD THROUGH MILLWORK TO OUTLET AT WALL; COLOR TO BE BLACK; (2) EACH SIDE, OR SIMILAR. | HOLD | Chain hold | |
| └Scope 140 | ID505 [Interior] | RECEPTACLE FOR POWER/USB PROVIDED BY MILLWORKER AND INSTALLED IN TABLE APRON. ROUTE PLUG AND CORD THROUGH CHASE BEHIND APRON; RECEPTACLE TO BE "MINI-TAP" AS MANUF. BY BYRNE; 12' CORD THROUGH MILLWORK TO OUTLET AT WALL; COLOR TO BE BLACK; (2) EACH SIDE, OR SIMILAR | HOLD | Chain hold | |
| └Scope 141 | ID506 [Interior] | Recycling cabinet plan, elevations, and sections (ID506). | HOLD | Chain hold | |
| └Scope 142 | ID506 [Interior] | Provide CABINET WITH BLACK MELAMINE INTERIOR (material references 214, 302, 303). | HOLD | Chain hold | |
| └Scope 143 | ID506 [Interior] | Material callouts: CABINET WITH BLACK MELAMINE INTERIOR 214302303 | HOLD | Chain hold | |
| └Scope 144 | ID507 [Interior] | Banquette isometric, section, elevation, plan and knee wall detail | HOLD | Chain hold | |
| └Scope 145 | ID507 [Interior] | Metal elements at banquette (metal divider elements, steel plate detail) | HOLD | Chain hold | |
| └Scope 146 | ID507 [Interior] | Millwork cap and surround at back of banquette and ends | HOLD | Chain hold | |
| └Scope 147 | ID507 [Interior] | Specification and location of pop-up duplex receptacles in millwork | HOLD | Chain hold | |
| └Scope 148 | ID507 [Interior] | Pop-up receptacle location: INSTALLED INTO TOP OF MILLWORK WALL; RECEPTACLE TO BE CENTERED ON METAL DIVIDERS. | HOLD | Chain hold | |
| └Scope 149 | ID507 [Interior] | Graphic/text note: CORNER PIECES AT EACH END TO BE PART OF BANQUETTE CONSTRUCTION (repeated callouts appear) | HOLD | Chain hold | |
| └Scope 150 | ID508 [Interior] | BUFFET - MILLWORK ELEVATION | HOLD | Chain hold | |
| └Scope 151 | ID508 [Interior] | BUFFET - ISOMETRIC | HOLD | Chain hold | |
| └Scope 152 | ID508 [Interior] | BUFFET - SECTION @ JUICE MACHINE | HOLD | Chain hold | |
| └Scope 153 | ID508 [Interior] | BUFFET - SECTION @ PASTRIES | HOLD | Chain hold | |
| └Scope 154 | ID508 [Interior] | METAL EDGE TRIM @ BUFFET | HOLD | Chain hold | |
| └Scope 155 | ID508 [Interior] | Black melamine cabinet frame and interior | HOLD | Chain hold | |
| └Scope 156 | ID508 [Interior] | Tile finish on rear wall at buffet | HOLD | Chain hold | |
| └Scope 157 | ID508 [Interior] | Ventilation fans, top and bottom of cabinet w/ thermostat (vent into food prep room only) | HOLD | Chain hold | |
| └Scope 158 | ID508 [Interior] | Juicer cabinet ventilation details (including 3" filter fan @ top edge) | HOLD | Chain hold | |
| └Scope 159 | ID508 [Interior] | Equipment / element labels: VENTILATION FANS, TOP AND BOTTOM OF CABINET W/ THERMOSTAT. VENT INTO FOOD PREP ROOM ONLY. | HOLD | Chain hold | |
| └Scope 160 | ID509 [Interior] | PLAM drawer fronts and PLAM panels to match cabinets | HOLD | Chain hold | |
| └Scope 161 | ID509 [Interior] | Black melamine interior for cabinets | HOLD | Chain hold | |
| └Scope 162 | ID509 [Interior] | Plywood cabinet frame with PLAM finish | HOLD | Chain hold | |
| └Scope 163 | ID509 [Interior] | PLAM casework to enclose and support equipment (verify with equipment manufacturer) | HOLD | Chain hold | |
| └Scope 164 | ID509 [Interior] | Provide clearance and ventilation for refrigeration/equipment cabinets (2" preferred; 1" minimum) | HOLD | Chain hold | |
| └Scope 165 | ID509 [Interior] | OUTLET PLYWOOD CABINET FRAME W/ PLAM FINISH | HOLD | Chain hold | |
| └Scope 166 | ID509 [Interior] | PLAM CASEWORK TO ENCLOSE AND SUPPORT EQUIPMENT. VERIFY REQUIREMENTS WITH EQUIP. MANUFACTURER | HOLD | Chain hold | |
| └Scope 167 | ID512 [Interior] | Provide adjustable shelves in millwork surround for towel storage. | HOLD | Chain hold | |
| └Scope 168 | ID512 [Interior] | Provide cabinet with black melamine interior. | HOLD | Chain hold | |
| └Scope 169 | ID520 [Interior] | PTAC unit room cabinet to be installed on manufacturer's provided metal subbase. | HOLD | Chain hold | |
| └Scope 170 | ID520 [Interior] | PTAC UNIT ROOM CABINET INSTALLED ON MANUFACTURER'S PROVIDED METAL SUBBASE | HOLD | Chain hold | |
| └Scope 171 | P1.1 [Plumbing] | Multiple room labels visible on the plan (examples as shown): WATER HEATER 007, STAIR 2.1 022, FOOD PREP 006, LOBBY 001, REGISTRATION 002, WORK 008, LAUNDRY 019, LINEN010, EXERCISE ROOM 011, EMPLOYEE BREAK ROOM 020, CORRIDOR 016, ELEVATOR 3500 lbs, THE CORNER MARKET 003, BREAKFAST 005, KING SUITE 108, KING SUITE 107, KING 102, KING 103, KING 104, KING 101, KING 105, Women's 013a, Men's 012a, STORAGE | HOLD | Chain hold | |
| Section-06-007 | Architectural Woodwork | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-06-008 | Casework | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-06-009 | Countertops | Chain hold | ||
| └Scope 01 | ID503 [Interior] | SOLID SURFACE (308) COUNTERTOPS (INCLUDING WATERFALL TRANSITION) | HOLD | Chain hold | |
| └Scope 02 | ID503 [Interior] | STONE COUNTER TOP & BACKSPLASH | HOLD | Chain hold | |
| └Scope 03 | ID508 [Interior] | Installation of stone countertop w/ eased edge 3/4" | HOLD | Chain hold | |
| Section-06-010 | Composite Trim / Panels | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 07 | Thermal and Moisture Protection10 | |||
| Section-07-001 | Waterproofing | Chain hold | ||
| └Scope 01 | A-005 Detail 1 | Waterproofing on CMU exterior wall. Product, location, and area links pending. | SF | Chain hold | |
| └Scope 02 | A-120 | Provide waterproof paint to 12' - 0" A.F.F. and elsewhere as noted (note: "All paint to be waterproof (typical).", "Waterproof paint 12' - 0" A.F.F.") | HOLD | Chain hold | |
| └Scope 03 | A-120 | Note: All paint to be waterproof (typical). | HOLD | Chain hold | |
| └Scope 04 | A1-22 | Note on sheet: All paint to be waterproof (typical). | HOLD | Chain hold | |
| └Scope 05 | A1-23 | Typical note: 'All paint to be waterproof (typical).' | HOLD | Chain hold | |
| └Scope 06 | A1-23 | Note: All paint to be waterproof (typical). | HOLD | Chain hold | |
| └Scope 07 | A1-24 | Note: All paint to be waterproof (typical). | HOLD | Chain hold | |
| Section-07-002 | Dampproofing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-07-003 | Thermal Insulation | Chain hold | ||
| └Scope 01 | A-005 Detail 1 | Install 1-inch rigid insulation and fill CMU cells with foam insulation. Location and area links pending. | SF | Chain hold | |
| └Scope 02 | A-005 Details 6-7 | Batt insulation in load-bearing interior and exterior stud walls. Location and area links pending. | SF | Chain hold | |
| └Scope 03 | A-300 | Shade insulation | HOLD | Chain hold | |
| └Scope 04 | A-300 | R40 insulation | HOLD | Chain hold | |
| └Scope 05 | A-300 | Note: Shade insulation | HOLD | Chain hold | |
| └Scope 06 | A-300 | Note: R40 insulation | HOLD | Chain hold | |
| └Scope 07 | A-313 | Provide R-5 and R-40 rigid insulation as noted | HOLD | Chain hold | |
| └Scope 08 | A-313 | R-40 RIGID INSULATION 8" | HOLD | Chain hold | |
| └Scope 09 | A-314 | R-40 RIGID INSULATION | HOLD | Chain hold | |
| └Scope 10 | A-490 | Single ply membrane roof over rigid insulation note | HOLD | Chain hold | |
| └Scope 11 | A-490 | Roof note: 'Single ply membrane roof over rigid insulation' | HOLD | Chain hold | |
| └Scope 12 | A-492 | Materials and components noted: R-40 RIGID INSULATION 8" | HOLD | Chain hold | |
| └Scope 13 | A-550 | Provide R-40 rigid insulation at roof assembly. | HOLD | Chain hold | |
| └Scope 14 | A-550 | R-40 RIGID INSULATION | HOLD | Chain hold | |
| └Scope 15 | C-13 [Civil] | Stator winding shall be open type with Class F insulation and shall be heat-shrink fitted into the stator housing. | HOLD | Chain hold | |
| Section-07-004 | Air / Vapor Barriers | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-07-005 | Roofing | Chain hold | ||
| └Scope 01 | A-116 | Roof plan layout and roof drainage (scuppers) as shown on A116. | HOLD | Chain hold | |
| └Scope 02 | A-116 | Roof construction sequence/requirements as listed in the roof construction note 1-5 (exact text present on sheet). | HOLD | Chain hold | |
| └Scope 03 | A-117 | Flashing and roof penetration details to be provided per roof membrane manufacturer to maintain warranty | HOLD | Chain hold | |
| └Scope 04 | A-117 | Reference note B: 'PROVIDE ACCESSORIES & DETAIL FLASHING, ROOF PENETRATION, CORNER DETAILS, ETC AS RECOMMENDED BY ROOF MEMBRANE MANUFACTURER AND AS REQ'D TO MAINTAIN WARRANTY.' | HOLD | Chain hold | |
| └Scope 05 | A-312 | Roofing: EPDM roofing (text shows "EDPM ROOFING"), roofing membrane details, roof drains, gutters, downspouts, and overflows | HOLD | Chain hold | |
| └Scope 06 | A-312 | Roofing notes: "ROOFING MEMBRANE OVER CANT STRIP AND LAPPED WITH FLASHING" | HOLD | Chain hold | |
| └Scope 07 | A-313 | Provide roofing membrane over cant strip and lapped flashing; EDPM roofing | HOLD | Chain hold | |
| └Scope 08 | A-313 | EDPM ROOFING | HOLD | Chain hold | |
| └Scope 09 | A-313 | ROOFING MEMBRANE OVER CANT STRIP AND LAPPED WITH FLASHING | HOLD | Chain hold | |
| └Scope 10 | A-314 | Provide EDPM roofing. | HOLD | Chain hold | |
| └Scope 11 | A-314 | Provide roofing membrane over cant strip and lapped with flashing. | HOLD | Chain hold | |
| └Scope 12 | A-314 | EDPM ROOFING | HOLD | Chain hold | |
| └Scope 13 | A-314 | ROOFING MEMBRANE OVER CANT STRIP AND LAPPED WITH FLASHING | HOLD | Chain hold | |
| └Scope 14 | A-550 | Provide continuous metal coping and single ply membrane roofing turned up on walls and parapets (typ). | HOLD | Chain hold | |
| └Scope 15 | A-550 | SINGLE PLY MEMBRANE ROOFING TURN UP ON WALL | HOLD | Chain hold | |
| └Scope 16 | A-550 | RUN ROOFING UP ON PARAPET (TYP) | HOLD | Chain hold | |
| └Scope 17 | A-550 | ROOFING SYSTEM-SLOPE TO DRAIN | HOLD | Chain hold | |
| Section-07-006 | Roof / Wall Panels | Chain hold | ||
| └Scope 01 | A-005 Details 1 and 7 | Exterior finish is referenced to elevations; material, locations, and quantities are not added until that chain is verified. | HOLD | Chain hold | |
| └Scope 02 | A-200 | Exterior finish key (EF1, EF2, EF2b, EF2a, EF4, ST1, SP1, EF4a, EF3) with finish naming | HOLD | Chain hold | |
| └Scope 03 | A-200 | Reference to additional documentation (Exterior Finish Index, color prints) | HOLD | Chain hold | |
| └Scope 04 | A-200 | Reference note: REFER TO EXTERIOR FINISH INDEX FOR MATERIALS AND COLORS. | HOLD | Chain hold | |
| └Scope 05 | A-201 | EIFS finish color notes: DARK EIFS FINISH COLOR - TEXTURED; PEARLESCENT ACCENT EIFS FINISH COLOR; ACCENT EIFS COLOR; MAIN BUILDING EIFS COLOR | HOLD | Chain hold | |
| └Scope 06 | A-201 | Stair tower EIFS color noted | HOLD | Chain hold | |
| └Scope 07 | A-201 | Exterior finish key items exactly as shown: EF1 EF2 EF2b EF2a EF4 ST1 SP1 EF4a EF3 | HOLD | Chain hold | |
| └Scope 08 | A-203 | Exterior finish instructions (refer to Exterior Finish Index for materials and colors) | HOLD | Chain hold | |
| └Scope 09 | A-203 | 1" EFIS reveal (see 550 series for details) | HOLD | Chain hold | |
| └Scope 10 | A-203 | REFER TO EXTERIOR FINISH INDEX FOR MATERIALS AND COLORS. | HOLD | Chain hold | |
| └Scope 11 | A-203 | ALIGN RUSTICATION ACROSS BUILDING, MAINTAIN CONSISTENCY BETWEEN DARK AND LIGHT EFIS FINISHES. | HOLD | Chain hold | |
| └Scope 12 | A-312 | Landscaping: "LANDSCAPING BEDS PROVIDED TO AVOID WICKING AT EXTERIOR FINISH SYSTEM, RE: SHEET 102 FOR PLANTING TYPES." | HOLD | Chain hold | |
| └Scope 13 | A-313 | Installation of drainable EIFS systems and flashing at window heads per EIFS manufacturer and window shop instructions | HOLD | Chain hold | |
| └Scope 14 | A-313 | Provide phenolic resin panels or cement board siding on rainscreen | HOLD | Chain hold | |
| └Scope 15 | A-313 | Provide landscaping beds to avoid wicking at exterior finish system (see sheet 102) | HOLD | Chain hold | |
| └Scope 16 | A-313 | EXTERIOR FINISH SYSTEMS AS SCHEDULED: EFIS SYSTEM ( ALL EIFS TO BE DRAINABLE) | HOLD | Chain hold | |
| └Scope 17 | A-313 | FLASHING AT ALL WINDOW HEADS AS REQUIRED BY EIFS MANU AND WINDOW SHOPS INSTRUCTIONS. (TYP) | HOLD | Chain hold | |
| └Scope 18 | A-313 | LANDSCAPING BEDS PROVIDED TO AVOID WICKING AT EXTERIOR FINISH SYSTEM, RE: SHEET 102 FOR PLANTING TYPES. | HOLD | Chain hold | |
| └Scope 19 | A-314 | Provide EIFS system (all EIFS to be drainable). | HOLD | Chain hold | |
| └Scope 20 | A-314 | Provide phenolic resin panels or cement board siding on rainscreen system. | HOLD | Chain hold | |
| └Scope 21 | A-314 | Provide landscaping beds to avoid wicking at exterior finish system (ref: sheet 102). | HOLD | Chain hold | |
| └Scope 22 | A-314 | TYP. EFIS WALL SECTION | HOLD | Chain hold | |
| └Scope 23 | A-314 | TYP. RAINSCREEN WALL SECTION | HOLD | Chain hold | |
| └Scope 24 | A-314 | EXTERIOR FINISH SYSTEMS AS SCHEDULED: EFIS SYSTEM (ALL EIFS TO BE DRAINABLE) | HOLD | Chain hold | |
| └Scope 25 | A-314 | LANDSCAPING BEDS PROVIDED TO AVOID WICKING AT EXTERIOR FINISH SYSTEM, RE: SHEET 102 FOR PLANTING TYPES. | HOLD | Chain hold | |
| Section-07-007 | Flashing / Sheet Metal | Chain hold | ||
| └Scope 01 | A-112 | Roof drains (typ.) shown | HOLD | Chain hold | |
| └Scope 02 | A-112 | Roof drain noted: ROOF DRAIN (TYP) | HOLD | Chain hold | |
| └Scope 03 | A-116 | Scupper | HOLD | Chain hold | |
| └Scope 04 | A-117 | Roof drainage layout including scuppers and roof drains | HOLD | Chain hold | |
| └Scope 05 | A-117 | Provision of thru-wall scuppers and roof drains sized per local rainfall and codes | HOLD | Chain hold | |
| └Scope 06 | A-117 | Downspout connections to tie into sewer/storm water system per design & construction standards | HOLD | Chain hold | |
| └Scope 07 | A-117 | Scuppers are shown and labeled 'Scupper' multiple times | HOLD | Chain hold | |
| └Scope 08 | A-117 | Roof drains labeled 'RD' and 'ROOF DRAIN' on sheet | HOLD | Chain hold | |
| └Scope 09 | A-117 | Reference note A: 'THRU WALL SCUPPERS AND ROOF DRAINS SHALL BE SIZED BASED ON LOCAL RAINFALL AND AS REQUIRED PER LOCAL CODES.' | HOLD | Chain hold | |
| └Scope 10 | A-117 | Symbols legend entries include: ROOF TOP ACCESS HATCH & ACCESS HATCH CURB; DECORATIVE EXTENSION OF PARAPET FROM ADJACENT WALL; OVERFLOW THRU WALL SCUPPER; DOWNSPOUT & OVERFLOW SCUPPER; DOWNSPOUT TO TIE INTO SEWER / STORM WATER SYSTEM PER DESIGN & CONSTRUCTION STANDARDS. | HOLD | Chain hold | |
| └Scope 11 | A-312 | Provide metal coping cap at parapets | HOLD | Chain hold | |
| └Scope 12 | A-312 | Provide gutters, downspouts, roof drains and overflows as required for local rainfall. "OVERFLOWS TO DAYLIGHT IN AREAS THAT WILL NOT DRAIN ACROSS WALKING SURFACES" | HOLD | Chain hold | |
| └Scope 13 | A-313 | Provide metal coping cap at parapets | HOLD | Chain hold | |
| └Scope 14 | A-313 | Provide gutters, downspouts, roof drains and overflows; route overflows to daylight where required | HOLD | Chain hold | |
| └Scope 15 | A-313 | GUTTERS, DOWNSPOUTS, ROOF DRAINS AND OVERFLOWS AS REQUIRED FOR LOCAL RAINFALL. OVERFLOWS TO DAYLIGHT IN AREAS THAT WILL NOT DRAIN ACROSS WALKING SURFACES | HOLD | Chain hold | |
| └Scope 16 | A-314 | Provide gutters, downspouts, roof drains and overflows as required for local rainfall; overflows to daylight in areas that will not drain across walking surfaces. | HOLD | Chain hold | |
| └Scope 17 | A-314 | Provide metal coping cap at parapets. | HOLD | Chain hold | |
| └Scope 18 | A-314 | GUTTERS, DOWNSPOUTS, ROOF DRAINS AND OVERFLOWS AS REQUIRED FOR LOCAL RAINFALL. OVERFLOWS TO DAYLIGHT IN AREAS THAT WILL NOT DRAIN ACROSS WALKING SURFACES | HOLD | Chain hold | |
| └Scope 19 | A-314 | PROVIDE METAL COPING CAP AT PARAPETS | HOLD | Chain hold | |
| └Scope 20 | A-550 | Provide prefabricated membrane flashing at plumbing vent stacks and other round penetrations. | HOLD | Chain hold | |
| └Scope 21 | A-550 | Provide roof scupper in 4" flange set in full bed of mastic and fastened at 3" o.c.; provide min 8" wide downspout. | HOLD | Chain hold | |
| └Scope 22 | A-550 | 3'-4"MIN CONT METAL COPING | HOLD | Chain hold | |
| └Scope 23 | A-550 | ROOF DRAIN/OVERFLOW - SEE MECH. | HOLD | Chain hold | |
| └Scope 24 | A-550 | FLASHING PLIES DRIP EDGE SET IN FULL BED OF SEALANT. | HOLD | Chain hold | |
| └Scope 25 | A-550 | PREFIN. MET. FLASHING WITH CLEAT ATTACHMENT- SEAL SHOP SOLDERED 20 OZ. | HOLD | Chain hold | |
| └Scope 26 | A-550 | SCUPPER SET IN 4" FLANGE IN FULL BED OF MASTIC AND FASTEN AT 3" O.C. | HOLD | Chain hold | |
| └Scope 27 | A-550 | MIN 8" WIDE DOWNSPOUT | HOLD | Chain hold | |
| └Scope 28 | A-550 | PLUMBING VENT STACK OR OTHER ROUND TYPE PENETRATION PREFABRICATED MEMBRANE FLASHING | HOLD | Chain hold | |
| └Scope 29 | A-571 | Pool coping detail | HOLD | Chain hold | |
| Section-07-008 | Roof Accessories | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-07-009 | Firestopping | Chain hold | ||
| └Scope 01 | A-005 Detail 9 | Firestop PVC wall penetration through 1 HR/2 HR gypsum-board stud wall; UL W-L-2110. Penetration count link pending. | EA | Chain hold | |
| └Scope 02 | P5.2 [Plumbing] | USE PROSET FIRESTOP PENETRATORS, OR EQUAL FOR ALL PIPE PENETRATIONS AND FIXTURE OPENINGS THROUGH FIRE RATED FLOORS AND WALLS. BUILDING CODE REQUIRED SYSTEM NUMBERS ARE LISTED & DETAILED BELOW. | HOLD | Chain hold | |
| Section-07-010 | Joint Sealants | Chain hold | ||
| └Scope 01 | A-005 Details 1-2 | Acoustic sealant at wall base where indicated. Wall-length link pending. | LF | Chain hold | |
| └Scope 02 | ID503 [Interior] | SEALANT AROUND ENTIRE BOWL | HOLD | Chain hold | |
| DIV 08 | Openings10 | |||
| Section-08-001 | Hollow Metal Doors / Frames | Chain hold | ||
| └Scope 01 | A-600 | Provide door schedule information: door types, widths, heights, thicknesses, elevations, materials, finishes, thresholds, hardware and frame materials. | HOLD | Chain hold | |
| └Scope 02 | A-600 | GENERAL NOTE: "ALL HOLLOW METAL DOORS AND FRAMES TO BE PAINTED." | HOLD | Chain hold | |
| └Scope 03 | A-600 | Door schedule entry: "01 GUEST ENTRY 3'-0" 6'-8" 1 3/4" C SCWD PLAM T1B HM 20 MIN" | HOLD | Chain hold | |
| └Scope 04 | A-600 | Door schedule entry: "01A GUEST ENTRY ACCESSIBLE 3'-0" 6'-8" 1 3/4" C SCWD PLAM IFI T1C HM 20 MIN" | HOLD | Chain hold | |
| └Scope 05 | A-600 | Door schedule entry: "02 GUEST BATH 3'-0" 6'-8" 1 3/4" B SCWD PLAM" | HOLD | Chain hold | |
| └Scope 06 | A-600 | Door schedule entry: "03 ACCESSIBLE GUEST BATH 3'-0" 6'-8" 1 3/4" B SCWD PLAM IFI T2E HM" | HOLD | Chain hold | |
| └Scope 07 | A-600 | Door schedule entry: "15 A, B POOL / PATIO VESTIBULE 3'-0" 7'-5" 1 3/4" A.1 ALUM CLR. ANOD T15 ALUM FINISH TO MATCH TYP STOREFRONT" | HOLD | Chain hold | |
| └Scope 08 | A-600 | Door schedule entry: "26 VESTIBULE (INTERIOR) 6'-0" 7'-5" 1 3/4" J ALUM CLR. ANOD MFR T15C ALUM TILE TRANSITION AT THRESHOLD; AUTOMATIC DOOR HDWR BY SUPPLIER" | HOLD | Chain hold | |
| └Scope 09 | A-600 | Door schedule entry: "21A-21.1A POOL EQ & CHEM ST RM. 3'-0*/2'-0\"" 6'-8" 1 3/4" B HM PTD T18 HM 45 MIN" | HOLD | Chain hold | |
| └Scope 10 | A-600 | Door schedule entry: "50 STAIR (INTERIOR) 3'-0" 6'-8" 1 3/4" G SCWD PLAM T10A HM 90 MIN" | HOLD | Chain hold | |
| └Scope 11 | A-600 | Door schedule entry: "51 STAIR (EXTERIOR) 3'-0" 6'-8" 1 3/4" B HM PTD T11A HM 90 MIN" | HOLD | Chain hold | |
| Section-08-002 | Wood Doors | Chain hold | ||
| └Scope 01 | ID508 [Interior] | Frame wood door and base wood door as called out | HOLD | Chain hold | |
| Section-08-003 | Specialty Doors | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-08-004 | Overhead / Coiling Doors | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-08-005 | Entrances / Storefronts | Chain hold | ||
| └Scope 01 | A-203 | Finish aluminum cladding at cove to match storefront | HOLD | Chain hold | |
| └Scope 02 | A-203 | FINISH ALUMINUM CLADDING AT COVE TO MATCH STOREFRONT. | HOLD | Chain hold | |
| └Scope 03 | A-572A | Light cove at storefront (detail shown) | HOLD | Chain hold | |
| └Scope 04 | A-610 | VESTIBULE STOREFRONT & DOOR TYPE 1 | HOLD | Chain hold | |
| └Scope 05 | A-610 | 3-D VIEWS OF STOREFRONT | HOLD | Chain hold | |
| └Scope 06 | A-610 | Sheet contains the caption: VESTIBULE STOREFRONT & DOOR TYPE 1 | HOLD | Chain hold | |
| └Scope 07 | A-610 | Sheet contains the caption: 3-D VIEWS OF STOREFRONT | HOLD | Chain hold | |
| └Scope 08 | C-4 [Civil] | Install temporary gravel construction entrance (20' x 50' min.) and maintain daily | HOLD | Chain hold | |
| └Scope 09 | C-4 [Civil] | PROPOSED CONSTRUCTION ENTRANCE (SEE DETAIL, SHEET No. 5) | HOLD | Chain hold | |
| └Scope 10 | C-4 [Civil] | TEMPORARY GRAVEL CONSTRUCTION ENTRANCE TO BE CONSTRUCTED AFTER EXISTING PAVEMENT REMOVAL (20' x 50' MIN.) (SEE DETAIL, SHEET No. 5) | HOLD | Chain hold | |
| └Scope 11 | C-5 [Civil] | CONSTRUCTION ENTRANCE DETAIL | HOLD | Chain hold | |
| └Scope 12 | E4.2 [Electrical] | Note (legible) about specific guestrooms: 'GUESTROOMS 208, 211, 214, 306, 311, 314, 408, 411, 414, 508, 511, AND 514 SHALL HAVE (2) DECORATIVE SCONCE AT ENTRANCE.' | HOLD | Chain hold | |
| Section-08-006 | Windows | Chain hold | ||
| └Scope 01 | A-200 | Window area calculations for first and upper floors and percent provided | HOLD | Chain hold | |
| └Scope 02 | A-201 | Windows: typical guestroom windows (ground and upper floors); PTAC louver integral with window frame | HOLD | Chain hold | |
| └Scope 03 | A-201 | Typical notes present: "TYPICAL GUESTROOM WINDOW @ GROUND FLOOR" and "TYPICAL GUESTROOM WINDOW FOR UPPER FLOOR" | HOLD | Chain hold | |
| └Scope 04 | A-203 | Align windows at head across building (typ.) | HOLD | Chain hold | |
| └Scope 05 | A-203 | Aluminum jamb and header extension with accent finish to match window (see window schedule) | HOLD | Chain hold | |
| └Scope 06 | A-203 | ALIGN WINDOWS AT HEAD ACCROSS BUILDING (TYP.) | HOLD | Chain hold | |
| └Scope 07 | A-203 | ALUMINUM JAMB AND HEADER EXTENSION. FINISH ACCENT COLOR TO MATCH WINDOW. SEE WINDOW SCHED TO FINISH. | HOLD | Chain hold | |
| └Scope 08 | A-312 | Window type coordination per sheet 611 (aluminum panel window) | HOLD | Chain hold | |
| └Scope 09 | A-312 | Windows note: "ALUMINUM PANEL WINDOW, RE: 611 FOR TYPE" | HOLD | Chain hold | |
| └Scope 10 | A-313 | ALUMINUM PANEL WINDOW, RE: 611 FOR TYPE | HOLD | Chain hold | |
| └Scope 11 | A-314 | ALUMINUM PANEL WINDOW, RE: 611 FOR TYPE | HOLD | Chain hold | |
| └Scope 12 | A-610 | WINDOW TYPE ELEVATIONS | HOLD | Chain hold | |
| └Scope 13 | A-610 | Sheet contains the caption: WINDOW TYPE ELEVATIONS | HOLD | Chain hold | |
| └Scope 14 | ID422 [Interior] | Legend entries visible include: CEILING LT FIXTURE, WALL MTD LT FIXTURE, TV, GFI OUTLET & SWITCH FOR MOTORIZED WINDOW TREATMENTS, RACEWAY & WIRING JUNCTION BOX, LIGHT SWITCH, TELEPHONE OUTLET, TV OUTLET, GROUND FAULT INTERRUPTER, DUPLEX RECEPTACLE, THERMOSTAT, MASTER SWITCH | HOLD | Chain hold | |
| └Scope 15 | ID520 [Interior] | Provide (1) track system for window treatment: traversing blackout side drapery and a sheer roller shade mounted inside wall opening where possible. | HOLD | Chain hold | |
| └Scope 16 | ID520 [Interior] | WINDOW TREATMENT CONSISTS OF A (1) TRACK SYSTEM FOR ALL CEILING HEIGHTS: - TRAVERSING BLACKOUT SIDE DRAPERY. - A SHEER ROLLER SHADE MOUNTED INSIDE WALL OPENING FOR WINDOW AS POSSIBLE, COORDINATE WITH WALL AND WINDOW CONSTRUCTION. | HOLD | Chain hold | |
| Section-08-007 | Curtain Wall | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-08-008 | Door Hardware | Chain hold | ||
| └Scope 01 | A-600 | Provide threshold details for guest bathroom and guestroom entry doors. | HOLD | Chain hold | |
| └Scope 02 | A-600 | GENERAL NOTE: "DOOR HARDWARE TO BE CENTERED ON RAIL OF PANEL DOORS." | HOLD | Chain hold | |
| └Scope 03 | A-600 | Threshold detail labels shown: "GUEST BATHROOM DOOR THRESHOLD" and "GUESTROOM ENTRY DOOR THRESHOLD" | HOLD | Chain hold | |
| Section-08-009 | Glazing | Chain hold | ||
| └Scope 01 | A-008-B | LAVATORIES and MIRRORS | HOLD | Chain hold | |
| └Scope 02 | A-600 | Provide glazing requirements ("PROVIDE SAFETY GLAZING AT ALL GLAZING"; "T = TEMPERED GLAZING CLEAR TEMPERED GLASS"). | HOLD | Chain hold | |
| └Scope 03 | A-600 | GENERAL NOTE: "PROVIDE SAFETY GLAZING AT ALL GLAZING." | HOLD | Chain hold | |
| └Scope 04 | ID423 [Interior] | Provision for hardwired lit-mirror at vanity (note N) | HOLD | Chain hold | |
| └Scope 05 | ID432 [Interior] | Coordination with Purchasing Agent for items and mirror opening verification | HOLD | Chain hold | |
| └Scope 06 | ID503 [Interior] | MIRRORS (SEE ELEVATIONS) | HOLD | Chain hold | |
| └Scope 07 | ID509 [Interior] | Veneer frame with tempered glass door | HOLD | Chain hold | |
| Section-08-010 | Louvers / Vents | Chain hold | ||
| └Scope 01 | A-203 | Blank louver to match guestroom louver | HOLD | Chain hold | |
| DIV 09 | Finishes10 | |||
| Section-09-001 | Gypsum Board Assemblies | Chain hold | ||
| └Scope 01 | A-005 Detail 3 | Interior shaft wall: 1-inch Gold Bond Fire-Shield shaftliner on shaft side and two layers 5/8-inch Gold Bond Type X gypsum board on room side; water-resistant products; UL U-438, 2 HR, STC 59. Link pending. | SF | Chain hold | |
| └Scope 02 | A-005 Detail 4 | Nonrated interior wall: one layer 5/8-inch gypsum board each side; STC 49. Link pending. | SF | Chain hold | |
| └Scope 03 | A-005 Detail 6 | Load-bearing interior stud wall: one layer 5/8-inch Type X gypsum board each side; UL 423, 1 HR, STC 58. Link pending. | SF | Chain hold | |
| └Scope 04 | A-005 Detail 7 | Load-bearing exterior stud wall: one layer 5/8-inch Type X DensGlass exterior sheathing and one layer 5/8-inch Type X gypsum board interior; UL 423, 1 HR, STC 58. Link pending. | SF | Chain hold | |
| └Scope 05 | A-005 Detail 8 | One-hour steel-column fire-resistive enclosure with two layers 5/8-inch gypsum board; UL X-526. Column count link pending. | EA | Chain hold | |
| └Scope 06 | A-005 Detail 10 | One-hour steel-beam fire-resistive enclosure with two layers 5/8-inch gypsum board below precast floor; UL N-505. Beam-length link pending. | LF | Chain hold | |
| └Scope 07 | A-120 | Construct GWB bulkheads with indicated depths (e.g., "GWB Bulkhead 8" Deep", "GWB Bulkhead 10" Deep", "GWB Bulkhead 14" Deep") | HOLD | Chain hold | |
| └Scope 08 | A-120 | Multiple ceiling/finish notes present such as "2' x 2' ACT", "GWB on Mtl. Stud", "GWB Bulkhead 8" Deep", and elevations noted as "8' - 0", "8' - 6", "9' - 2"", etc. | HOLD | Chain hold | |
| └Scope 09 | A-312 | Dropped ceiling types noted: "(2) LAYERS TYPE \"X\" GWB ACOUSTICAL CEILING TILE SYSTEM", "(1) LAYER GWB" | HOLD | Chain hold | |
| └Scope 10 | A-313 | Provide gypsum board soffits, aluminum clad soffits with scheduled cove lighting | HOLD | Chain hold | |
| └Scope 11 | A-313 | Interior dropped ceiling types as indicated (2-layer Type X GWB acoustical tile, 1-layer GWB) | HOLD | Chain hold | |
| └Scope 12 | A-313 | DROPPED CEILING, SUSPENDED OR FRAMED, (2) LAYERS TYPE "X" GWB ACOUSTICAL CEILING TILE SYSTEM | HOLD | Chain hold | |
| └Scope 13 | A-313 | DROPPED CEILING, SUSPENDED OR FRAMED, (1) LAYER GWB | HOLD | Chain hold | |
| └Scope 14 | A-313 | ALUMINUM CLAD SOFFIT WITH SCHED. COVE LIGHT FIXTURE | HOLD | Chain hold | |
| └Scope 15 | A-314 | Provide dropped ceilings as specified (two layers Type X GWB acoustical tile system or one layer GWB as noted). | HOLD | Chain hold | |
| └Scope 16 | A-314 | DROPPED CEILING, SUSPENDED OR FRAMED, (2) LAYERS TYPE "X" GWB ACOUSTICAL CEILING TILE SYSTEM | HOLD | Chain hold | |
| └Scope 17 | A-314 | DROPPED CEILING, SUSPENDED OR FRAMED, (1) LAYER GWB | HOLD | Chain hold | |
| └Scope 18 | A-314 | ALUMINUM CLAD SOFFIT WITH SCHED. COVE LIGHT FIXTURE | HOLD | Chain hold | |
| └Scope 19 | A-404 | SOFFIT DETAIL @ GYP. BD. CEILINGS (detail) | HOLD | Chain hold | |
| └Scope 20 | A-404 | CEILING DETAIL @ RECEPTION (detail) | HOLD | Chain hold | |
| └Scope 21 | A-404 | SOFFIT DETAIL (general) | HOLD | Chain hold | |
| └Scope 22 | A-404 | TYPICAL CORRIDOR CEILING DETAIL (detail) | HOLD | Chain hold | |
| └Scope 23 | A-404 | SOFFIT @ ELEVATOR LOBBY (detail) | HOLD | Chain hold | |
| └Scope 24 | A-404 | LIGHT COVE SOFFIT AT ELEVATOR (detail) | HOLD | Chain hold | |
| └Scope 25 | A-404 | Visible sheet title: CEILING DETAILS | HOLD | Chain hold | |
| └Scope 26 | A-433 | Floating soffit details at guest suites (plan, section, and 3D views) | HOLD | Chain hold | |
| └Scope 27 | A-433 | Plan detail of soffit | HOLD | Chain hold | |
| └Scope 28 | A-433 | Floating soffit detail | HOLD | Chain hold | |
| └Scope 29 | A-433 | 3D view - wing wall & soffit detail | HOLD | Chain hold | |
| └Scope 30 | A-433 | Interior elevation of soffit wall from bedroom side | HOLD | Chain hold | |
| └Scope 31 | A-550 | Provide 5/8" gypsum wall board (GWB) suspended on metal grid where indicated. | HOLD | Chain hold | |
| └Scope 32 | C-15 [Civil] | Apply curing compound to pavement vertical edge at a coverage rate of 300 SF max per gallon immediately after removing bulkhead | HOLD | Chain hold | |
| └Scope 33 | ID501 [Interior] | Provide 2x wall construction with 5/8" gypsum board where required to support art piece and finish | HOLD | Chain hold | |
| └Scope 34 | ID507 [Interior] | Reference to ceiling soffit detail on 3/B341 | HOLD | Chain hold | |
| └Scope 35 | ID508 [Interior] | Wood plank ceiling system finish on bottom and face of bulkhead | HOLD | Chain hold | |
| └Scope 36 | ID510 [Interior] | GYPSUM BOARD ON 2X FRAMING BASE AS SCHEDULED | HOLD | Chain hold | |
| └Scope 37 | ID512 [Interior] | Wrap bulkhead and side walls with wallcovering. | HOLD | Chain hold | |
| Section-09-002 | Tile | Chain hold | ||
| └Scope 01 | A-120 | Install 2' x 2' ACT (acoustic ceiling tile) at various areas (notations: "2' x 2' ACT") | HOLD | Chain hold | |
| └Scope 02 | A-403 | INTERIOR WALL OF MAT TO FLOOR TILE | HOLD | Chain hold | |
| └Scope 03 | A-436 | ORIENT VALLEY PERPENDICULAR TO WALLS AND SCRIBE TILE BASE TO FLOOR. | HOLD | Chain hold | |
| └Scope 04 | A-571 | Pool depth marker tile detail | HOLD | Chain hold | |
| └Scope 05 | C-5 [Civil] | GEOTEXTILE FABRIC INLET PROTECTION | HOLD | Chain hold | |
| └Scope 06 | C-8 [Civil] | Geotextile type and strip width requirements (AASHTO M288 Class 1 and Class 2) | HOLD | Chain hold | |
| └Scope 07 | C-14 [Civil] | POTABLE WATER PIPES SHALL BE HYDROSTATICALLY TESTED FOR PRESSURE AND LEAKAGE IN ACCORDANCE WITH AWWA STANDARD C600 FOR DUCTILE IRON PIPES AND C605 FOR PVC PIPES, RESPECTIVELY. | HOLD | Chain hold | |
| └Scope 08 | C-14 [Civil] | POTABLE WATER PIPES MUST BE MANUFACTURED IN ACCORDANCE WITH THE FOLLOWING AWWA SPECIFICATIONS: DUCTILE IRON PIPE (3 INCHES TO 54 INCHES) - AWWA C150 AND AWWA C151; PVC PIPE: (1) AWWA C900/ASTM 1784 (1 INCH TO 12 INCHES) WITH CL200 MINIMUM; (2) AWWA C905 (14 INCHES TO 48 INCHES). | HOLD | Chain hold | |
| Section-09-003 | Acoustical Ceilings | Chain hold | ||
| └Scope 01 | A-405 | Visible sheet labels and callouts: POOL 015; POOL DECK; INDOOR POOL FLOOR PLAN; INDOOR POOL RCP | HOLD | Chain hold | |
| └Scope 02 | A-407 | ENLARGED RCP - EMPLOYEE BREAK ROOM (reflected ceiling plan for break room) | HOLD | Chain hold | |
| └Scope 03 | A-410 | King Guestroom reflected ceiling plan (RCP) | HOLD | Chain hold | |
| └Scope 04 | A-411 | Reflected ceiling plan (RCP) for KING SUITE GUESTROOM | HOLD | Chain hold | |
| └Scope 05 | A-411 | Multiple sheet/figure references appear on the sheet including: 'KING SUITE GUESTROOM FF&E PLAN LEFT FACING', 'PLAN RIGHT FACING', 'FINISH PLAN', and 'RCP PLAN'. | HOLD | Chain hold | |
| └Scope 06 | A-412 | Reflected ceiling plan (RCP) for King Suite ADA Guestroom | HOLD | Chain hold | |
| └Scope 07 | A-413 | Reflected ceiling plan (RCP) for King ADA guestroom (sheet label: 3 KING ADA GUESTROOM RCP PLAN) | HOLD | Chain hold | |
| └Scope 08 | A-420 | Reflected Ceiling Plan (RCP) | HOLD | Chain hold | |
| └Scope 09 | A-422 | Reflected ceiling plan (RCP) for QUEEN QUEEN ADA GUESTROOM | HOLD | Chain hold | |
| └Scope 10 | A-511 | SEE 400 SERIES ENLARGED LOBBY RCP FOR FIXTURE TYPE & PLAN CONFIGURATION | HOLD | Chain hold | |
| └Scope 11 | A1-22 | Third Reflected Ceiling Plan (sheet A122) - reflected ceiling plan information for the referenced level/sheet. | HOLD | Chain hold | |
| └Scope 12 | A1-23 | Fourth Reflected Ceiling Plan (sheet title indicates reflected ceiling plan for the fourth level) | HOLD | Chain hold | |
| └Scope 13 | A1-23 | Fourth Reflected Ceiling Plan | HOLD | Chain hold | |
| └Scope 14 | A1-24 | Fifth Reflected Ceiling Plan (as shown on sheet A124) | HOLD | Chain hold | |
| └Scope 15 | A1-24 | Fifth Reflected Ceiling Plan | HOLD | Chain hold | |
| └Scope 16 | C-4 [Civil] | TOTAL DISTURBED AREA DUE TO CONSTRUCTION ACTIVITY IS 2.1 ± ACRES | HOLD | Chain hold | |
| └Scope 17 | C-5 [Civil] | THE CONTRACTOR SHALL DEMONSTRATE A METHOD OF MAINTENANCE, USING A SEWN FLAP, HAND HOLDS, OR OTHER METHOD TO PREVENT ACCUMULATED SEDIMENT FROM ENTERING THE INLET. | HOLD | Chain hold | |
| └Scope 18 | C-7 [Civil] | Installation of 15" RCP outfall (INV 37.00) and connections to existing inlet with watertight seals | HOLD | Chain hold | |
| └Scope 19 | C-7 [Civil] | SUMMARY OF DRAINAGE: 5 YEAR, 24 HOUR (FDOT) PRE: 7.44 (INCHES) POST: 10.56 (INCHES) ... (document shows table; exact numbers visible elsewhere on sheet) | HOLD | Chain hold | |
| └Scope 20 | C-8 [Civil] | Compaction and construction equipment limits and compaction densities (95% Standard Proctor / AASHTO T-180 guidance) | HOLD | Chain hold | |
| └Scope 21 | C-8 [Civil] | THE STRUCTURAL DESIGN ... SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12 ARE MET. | HOLD | Chain hold | |
| └Scope 22 | C-8 [Civil] | ONLY CHAMBERS THAT ARE APPROVED BY THE ENGINEER WILL BE ALLOWED. THE CONTRACTOR SHALL SUBMIT (3 SETS) OF THE FOLLOWING TO THE ENGINEER FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE: a. A STRUCTURAL EVALUATION BY A REGISTERED STRUCTURAL ENGINEER ... b. A CERTIFICATION BY THE MANUFACTURER THAT THE CHAMBERS ARE IN ACCORDANCE WITH ASTM F2418-05. | HOLD | Chain hold | |
| └Scope 23 | C-8 [Civil] | CHAMBERS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY. | HOLD | Chain hold | |
| └Scope 24 | C-8 [Civil] | INSTALLATION OF CHAMBERS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S LATEST INSTALLATION INSTRUCTIONS. | HOLD | Chain hold | |
| └Scope 25 | C-9 [Civil] | Placement of fill in one-foot lifts; compaction 98% for paved areas and 95% for unpaved areas per AASHTO T-180 modified Proctor. | HOLD | Chain hold | |
| └Scope 26 | C-9 [Civil] | GENERAL EARTHWORK NOTE 1: IF ANY MUCK OR MUCK-LIKE MATERIAL IS DISCOVERED, IT WILL BE REQUIRED TO BE REMOVED, BACKFILLED WITH APPROPRIATE FILL, COMPACTED, AND TESTED USING AASHTO T-180 MODIFIED PROCTOR METHOD. | HOLD | Chain hold | |
| └Scope 27 | C-9 [Civil] | GENERAL EARTHWORK NOTE 2: ALL FILLING IS TO BE PERFORMED IN ONE-FOOT LIFTS. THE COMPACTION REQUIREMENT IS 98% FOR PAVED AREAS AND 95% FOR UNPAVED AREAS PER AASHTO T-180 MODIFIED PROCTOR TEST. | HOLD | Chain hold | |
| └Scope 28 | C-12 [Civil] | Pressure testing, chlorination/disinfection and bacteriological testing per City and F.A.C. requirements | HOLD | Chain hold | |
| └Scope 29 | C-12.1 [Civil] | DO NOT COMPACT BACKFILL MECHANICALLY | HOLD | Chain hold | |
| └Scope 30 | C-13 [Civil] | Installation shall be in strict accordance with the manufacturer's recommendations in the locations shown on the drawing. | HOLD | Chain hold | |
| └Scope 31 | C-13 [Civil] | A factory representative shall be provide for a one (1) time start-up. | HOLD | Chain hold | |
| └Scope 32 | C-13 [Civil] | INSPECTION & TESTING: A factory representative shall be provide for a one (1) time start-up and shall have complete knowledge of the proper operation and maintenance of complete system. | HOLD | Chain hold | |
| └Scope 33 | C-14 [Civil] | Flushing, disinfection and bacteriological clearance per AWWA C-651 and FDEP requirements | HOLD | Chain hold | |
| └Scope 34 | C-14 [Civil] | Trench excavation, bedding, haunching, initial and final backfill per specified material classes and compaction requirements (ASTM standards referenced) | HOLD | Chain hold | |
| └Scope 35 | C-14 [Civil] | Bacteriological sampling (sample valve, corp. stop) as shown on detail | HOLD | Chain hold | |
| └Scope 36 | C-14 [Civil] | ALL PUBLIC WATER SYSTEM COMPONENTS, EXCLUDING FIRE HYDRANTS, THAT WILL BE INSTALLED UNDER THIS PROJECT AND THAT WILL COME INTO CONTACT WITH DRINKING WATER WILL CONFORM TO NSF INTERNATIONAL STANDARD 61. | HOLD | Chain hold | |
| └Scope 37 | C-14 [Civil] | ALL PROPOSED WATER MAINS SHALL BE FLUSHED, DISINFECTED AND BACTERIOLOGICALLY CLEARED FOR SERVICE IN ACCORDANCE WITH AWWA SPECIFICATIONS C-651 AND THE FDEP PROTECTION REQUIREMENTS. | HOLD | Chain hold | |
| └Scope 38 | C-15 [Civil] | Provide 6" subbase compacted and tested to 98% density per AASHTO T-180 modified proctor and stabilized to minimum L.B.R. 40 | HOLD | Chain hold | |
| └Scope 39 | C-21 [Civil] | 8. ALL PLANTING BEDS SHALL BE TREATED WITH 'ROUND-UP' AND 'RONSTAR'. USE AS DIRECTED BY MANUFACTURERS. | HOLD | Chain hold | |
| └Scope 40 | C-21 [Civil] | 11. THE CONTRACTOR SHALL VERIFY EXISTENCE AND LOCATION OF ALL EXISTING UTILITIES AND UNDERGROUND CONDITIONS PRIOR TO HIS COMMENCEMENT OF THE ANY WORK. | HOLD | Chain hold | |
| └Scope 41 | C-21 [Civil] | 13. ALL PERMIT AND VARIANCE APPLICATIONS SHALL BE MADE BY THE CONTRACTOR. | HOLD | Chain hold | |
| └Scope 42 | C-21 [Civil] | 14. PRIOR TO CONSTRUCTION OF PLANTING BEDS, ALL AREAS ARE TO HAVE SOIL TESTS CONDUCTED TO DETERMINE pH AND SOIL FERTILITY. IT IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO AMEND THE SOIL... | HOLD | Chain hold | |
| └Scope 43 | C-21 [Civil] | 15. EQUIPMENT SHALL BE OPERATED IN A MANNER AS NOT TO INJURE OR DESTROY ANY TREES SHOWN TO REMAIN. CONTRACTOR SHALL NOT CAUSE OR ALLOW THE CLEANING OF EQUIPMENT OR MATERIAL WITHIN THE DRIP LINE OF ANY TREE... | HOLD | Chain hold | |
| └Scope 44 | C-22 [Civil] | THE CONTRACTOR SHALL VERIFY THE EXISTENCE AND LOCATION OF ALL EXISTING UTILITIES AND CONDITIONS PRIOR TO ITS COMMENCEMENT OF THE IRRIGATION WORK. | HOLD | Chain hold | |
| └Scope 45 | C-22 [Civil] | THE PLAN IS SCHEMATIC ONLY. THE CONTRACTOR SHALL INSTALL PIPING IN A MINIMUM NUMBER OF TRENCHES AND SHALL INSTALL PIPE IN A MINIMUM LENGTH. | HOLD | Chain hold | |
| └Scope 46 | C-22 [Civil] | QUANTITIES FOR IRRIGATION MATERIALS ARE NOT GIVEN. THE CONTRACTOR SHALL DETERMINE THIS FROM THE PLAN. | HOLD | Chain hold | |
| └Scope 47 | C-22 [Civil] | ELECTRICAL TO CONTROLLER SHALL BE SUPPLIED BY ELECTRICAL CONTRACTOR (NOT IRRIGATION CONTRACTOR). | HOLD | Chain hold | |
| └Scope 48 | C-23 [Civil] | Tree anchoring details (manufacturer-provided, froganchor reference) | HOLD | Chain hold | |
| └Scope 49 | C-23 [Civil] | No mulch shall be placed within 6" of TREE TRUNK (exact phrase appears multiple times) | HOLD | Chain hold | |
| └Scope 50 | C-23 [Civil] | PLANTING PIT IS TO BE 1.5 TIMES THE ROOT BALL (exact phrase appears) | HOLD | Chain hold | |
| └Scope 51 | E1.2 [Electrical] | Code compliance statement text (exact as shown): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 52 | E2.6 [Electrical] | Exact compliance statement on sheet: "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 53 | E3.3 [Electrical] | Compliance statement text (exact phrases preserved where shown): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 54 | E4.0 [Electrical] | Plans and specifications intended to comply with the listed codes (see verifiedFacts for exact code list) | HOLD | Chain hold | |
| └Scope 55 | E4.1 [Electrical] | Compliance / certification statement transcribed exactly as shown: "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 56 | E4.2 [Electrical] | General notes and a guestroom circuit legend (legend present on sheet but contents not fully legible in provided extract) | HOLD | Chain hold | |
| └Scope 57 | ENERGY-1 [Energy-Calculations] | CONTACT NUMBERS: CONSTRUCTION SERVICES CENTER - CITY OF TAMPA (813) 274-3100, OPTION 1; WATER - TAMPA WATER DEPARTMENT (813) 274-8121; WASTEWATER - TAMPA WASTEWATER DEPARTMENT (813) 274-8078; GAS - TECO PEOPLES GAS (813) 299-7342; ELECTRIC - TAMPA ELECTRIC 813-635-1500; TELEPHONE - VERIZON (800) 837-4966; CABLE - BRIGHTHOUSE NETWORKS (813) 684-6400 | HOLD | Chain hold | |
| └Scope 58 | F1-00 [FIRE-ALARM-SYSTEM] | Installation to be done in accordance with listed codes and statutes (see verifiedFacts). | HOLD | Chain hold | |
| └Scope 59 | F1-00 [FIRE-ALARM-SYSTEM] | Provide a point-addressable fire alarm system with Contact I.D. monitoring to remote supervising station via the Digital Alarm Communicator built into the FACP. | HOLD | Chain hold | |
| └Scope 60 | F1-00 [FIRE-ALARM-SYSTEM] | Mechanical contractor to perform fan shutdown functions, damper closures, mount duct smoke detectors, weather-protect duct detectors exposed to weather, and perform air velocity testing. | HOLD | Chain hold | |
| └Scope 61 | F1-00 [FIRE-ALARM-SYSTEM] | Sprinkler contractor to provide waterflow switches and valve tamper supervisory switches (listed as "PROVIDED BY SPRINKLER CONTRACTOR"). | HOLD | Chain hold | |
| └Scope 62 | F1-00 [FIRE-ALARM-SYSTEM] | Provide connections/interface modules for elevator recall, coordinated with elevator contractor. | HOLD | Chain hold | |
| └Scope 63 | F1-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SHALL POINT ADDRESSABLE & FIRE ALARM MONITORING SHALL BE CONTACT I.D. POINT ADDRESSABLE TO THE REMOTE SUPERVISING STATION VIA THE DIGITAL ALARM COMMUNICATOR BUILT IN THE FIRE ALARM CONTROL PANEL. | HOLD | Chain hold | |
| └Scope 64 | F3-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DRAWN BY: [REDACTED] | HOLD | Chain hold | |
| └Scope 65 | F10-00 [FIRE-ALARM-SYSTEM] | End-of-line resistor locations indicated: EOL 47k and EOL 5.1k (exact callouts as shown on sheet) | HOLD | Chain hold | |
| └Scope 66 | F11-00 [FIRE-ALARM-SYSTEM] | FP•1 panel calculation lines (as shown): SECONDARY STANDBY LOAD (A) 0.747 24 17.92; SECONDARY ALARM LOAD (A) 2.53 0.083 0.211; STANDBY AND ALARM SUBTOTAL (AMP HOURS) 18.13; DERATING FACTOR 1.25; SECONDARY LOAD REQUIREMENTS (AMP HOURS) 22.67; PROVIDE (2) 12V 26AH BATTERIES. | HOLD | Chain hold | |
| └Scope 67 | F11-00 [FIRE-ALARM-SYSTEM] | FP•1•ACS panel calculation lines (as shown): SECONDARY STANDBY LOAD (A) 0.025 24 0.60; SECONDARY ALARM LOAD (A) 0.0643 0.083 0.005; STANDBY AND ALARM SUBTOTAL (AMP HOURS) 0.605; DERATING FACTOR 1.25; SECONDARY LOAD REQUIREMENTS (AMP HOURS) 0.757; PROVIDE (2) 12V 7AH BATTERIES. | HOLD | Chain hold | |
| └Scope 68 | F11-00 [FIRE-ALARM-SYSTEM] | PS•1 panel calculation lines (as shown): SECONDARY STANDBY LOAD (A) 0.1219 24 2.93; SECONDARY ALARM LOAD (A) 2.84 0.083 0.237; STANDBY AND ALARM SUBTOTAL (AMP HOURS) 3.16; DERATING FACTOR 1.25; SECONDARY LOAD REQUIREMENTS (AMP HOURS) 3.95; PROVIDE (2) 12V 7AH BATTERIES. | HOLD | Chain hold | |
| └Scope 69 | F15-00 [FIRE-ALARM-SYSTEM] | Device listings including detectors (FSP-951 W/B200S-LF-WH), horn strobes (P2WLED), compact horn strobe (P2GWKLED), and control modules (FCM-1). | HOLD | Chain hold | |
| └Scope 70 | F16-00 [FIRE-ALARM-SYSTEM] | Wiring sizes and notes present exactly as shown: '14/2 AWG CABLE', '16/2 AWG CABLE', 'EOL (47K)', 'SIGNAL LINE CIRCUIT (SLC) 32 VDC MAX. SHIELDED-TWISTED PAIR IS RECOMMENDED' | HOLD | Chain hold | |
| └Scope 71 | ID000 [Interior] | Reflected Ceiling Plans for levels 1-5 (ID131, ID132, ID133) | HOLD | Chain hold | |
| └Scope 72 | ID001 [Interior] | Contractor to check contract documents, field conditions and dimensions for accuracy and confirm that work is buildable (Note 2). | HOLD | Chain hold | |
| └Scope 73 | ID001 [Interior] | Contractor to submit written RFIs to designer and obtain written clarifications prior to proceeding (Note 2, Note 32). | HOLD | Chain hold | |
| └Scope 74 | ID001 [Interior] | Contractor to provide a complete job; omissions in notes do not relieve contractor of responsibilities unless specifically noted (Note 3). | HOLD | Chain hold | |
| └Scope 75 | ID001 [Interior] | General contractor responsible for distribution of drawings to trades and coordination of subcontractors (Note 5, Note 6). | HOLD | Chain hold | |
| └Scope 76 | ID001 [Interior] | General contractor responsible for permits applicable to trades/subcontractors (Note 8). | HOLD | Chain hold | |
| └Scope 77 | ID001 [Interior] | Contractor to submit a detailed construction schedule showing phasing and interruptions to MEP/plumbing services to owner for approval (Note 9). | HOLD | Chain hold | |
| └Scope 78 | ID001 [Interior] | Contractor to assume sole responsibility for job site conditions and safety for the duration of the project (Note 10). | HOLD | Chain hold | |
| └Scope 79 | ID001 [Interior] | Verify that fixtures/equipment will fit through doors, elevators, stairs and access corridors prior to manufacture (Note 23). | HOLD | Chain hold | |
| └Scope 80 | ID001 [Interior] | Submit samples of all finish materials and products for designer approval prior to manufacture or purchase (Note 27). | HOLD | Chain hold | |
| └Scope 81 | ID001 [Interior] | 2. CONTRACTOR IS RESPONSIBLE FOR CHECKING CONTRACT DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS FOR ACCURACY AND CONFIRMATION THAT WORK IS BUILDABLE AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION. IF THERE ARE ANY QUESTIONS REGARDING THESE OR OTHER COORDINATION ISSUES THE CONTRACTOR SHALL SUBMIT THEM IN WRITING TO THE DESIGNER AND IS RESPONSIBLE FOR OBTAINING A WRITTEN CLARIFICATION FROM THE DESIGNER PRIOR TO PROCEEDING WITH WORK IN QUESTION, OR RELATED WORK. NO ALLOWANCES WILL BE SUBSEQUENTLY MADE ON BEHALF OF THE CONTRACTOR BY REASON OF ANY OMISSION ON HIS PART TO INCLUDE THE COST OF ALL ITEMS OF WORK OR MATERIAL WHETHER OR NOT THEY ARE SPECIFICALLY REQUIRED TO ATTAIN THE COMPLETED CONDITIONS PROPOSED IN THE DRAWINGS. | HOLD | Chain hold | |
| └Scope 82 | ID001 [Interior] | 3. IT IS INTENDED THAT THE CONTRACTOR PROVIDE A COMPLETE JOB AND ANY OMISSIONS IN THESE NOTES OR IN THE OUTLINE OF THE WORK SHALL NOT BE CONSTRUED AS RELIEVING THE CONTRACTOR OF SUCH RESPONSIBILITIES IMPLIED BY THE SCOPE OF WORK EXCEPT FOR ITEMS SPECIFICALLY NOTED. | HOLD | Chain hold | |
| └Scope 83 | ID001 [Interior] | 8. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PERMITS APPLICABLE TO SPECIFIC TRADES OR SUBCONTRACTORS' WORK. | HOLD | Chain hold | |
| └Scope 84 | ID122 [Interior] | Exact note 3: "RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR." | HOLD | Chain hold | |
| └Scope 85 | ID122 [Interior] | Exact note 8: "DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT." | HOLD | Chain hold | |
| └Scope 86 | ID122 [Interior] | Exact note 10: "FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY." | HOLD | Chain hold | |
| └Scope 87 | ID123 [Interior] | Room labels visible (examples preserved exactly): "KING SUITE 321", "KING SUITE 319", "KING SUITE 317", "QUEEN QUEEN 315", "QUEEN QUEEN 320", "ICE MACHINE CHUTE 039", "LINEN 035", "ENGINEERS/ MECHANICAL ROOM 040", "ACCESSIBLE QUEEN QUEEN SUITE 313", "TELEPHONE 036", "ELEC. 037" and many others shown on plan | HOLD | Chain hold | |
| └Scope 88 | ID131 [Interior] | LEVEL 1 REFLECTED CEILING PLAN | HOLD | Chain hold | |
| └Scope 89 | ID132 [Interior] | Document contains reflected ceiling plans for Level 2 and Level 3 (LEVEL 2 & 3 REFLECTED CEILING PLAN). | HOLD | Chain hold | |
| └Scope 90 | ID133 [Interior] | LEVEL 4 & 5 REFLECTED CEILING PLAN | HOLD | Chain hold | |
| └Scope 91 | ID133 [Interior] | Examples of room-specific finish height callouts as shown on sheet exactly as printed: "402 HEIGHT: FINISH: 8'-0'" | HOLD | Chain hold | |
| └Scope 92 | ID402 [Interior] | Multiple finish height callouts shown, for example: "HEIGHT: FINISH: 8'-6" 415", "HEIGHT: FINISH: 9'-0" 404", "HEIGHT: FINISH: 8'-0" 400" (exact strings as shown) | HOLD | Chain hold | |
| └Scope 93 | ID403 [Interior] | Finish heights shown (exact text as shown): "HEIGHT: FINISH: 8'-0\"", "HEIGHT: FINISH: 8'-9\"", "HEIGHT: FINISH: 12'-0\"", "TYP. HEIGHT: FINISH: 8'-0\"" | HOLD | Chain hold | |
| └Scope 94 | ID420 [Interior] | Reflected Ceiling Plan (RCP) for King guestroom | HOLD | Chain hold | |
| └Scope 95 | ID420 [Interior] | Document contains text: "KING GUESTROOM FF&E PLAN", "KING GUESTROOM FINISH PLAN", "KING GUESTROOM RCP PLAN" and multiple wall elevation titles. | HOLD | Chain hold | |
| └Scope 96 | ID420 [Interior] | Ceiling/finish heights exactly as shown: "HEIGHT: FINISH: 9'-4" A.F.F." and note "*CEILING HEIGHT AT THE FIRST FLOOR GUESTROOMS IS 11'-4"* **USE (X-407-AC) ON FIRST FLOOR IN LIEU OF (X-407)**". | HOLD | Chain hold | |
| └Scope 97 | ID420 [Interior] | Electrical and fixture legend items exactly as shown: "CEILING LT FIXTURE", "WALL MTD LT FIXTURE", "TV OUTLET", "GFI", "DUPLEX RECEPTACLE", "THERMOSTAT", "MASTER SWITCH", "DATA DUPLEX" and annotations for AFF heights such as "@ 60" AFF", "TYP. @ 18" AFF", "@ 12" AFF". | HOLD | Chain hold | |
| └Scope 98 | ID422 [Interior] | KING ADA GUESTROOM RCP PLAN | HOLD | Chain hold | |
| └Scope 99 | ID423 [Interior] | Reflected ceiling plan (RCP) | HOLD | Chain hold | |
| └Scope 100 | ID424 [Interior] | Architectural light by general contractor (Note G). | HOLD | Chain hold | |
| └Scope 101 | ID424 [Interior] | Document contains sheets/captions: FF&E PLAN; FINISH PLAN; RCP PLAN; ELECTRICAL PLAN; HEADBOARD WALL ELEVATION (RH SHOWN); TV | SOFA WALL ELEVATION (RH SHOWN); EXTERIOR WALL (RH); WING WALL (RH) | HOLD | Chain hold | |
| └Scope 102 | ID430 [Interior] | Reflected ceiling plan (RCP) | HOLD | Chain hold | |
| └Scope 103 | ID431 [Interior] | Reflected ceiling plan (RCP) for Queen Queen ADA Guestroom | HOLD | Chain hold | |
| └Scope 104 | ID432 [Interior] | Reflected ceiling plan (RCP) | HOLD | Chain hold | |
| └Scope 105 | ID432 [Interior] | Multiple plan/elevation labels present: 'FF&E PLAN', 'FINISH PLAN', 'RCP', 'HEADBOARD WALL ELEVATION (RH SHOWN)', 'TV | SOFA WALL ELEVATION (RH SHOWN)', 'EXTERIOR WALL (RH)', 'WING WALL (RH SHOWN)' | HOLD | Chain hold | |
| └Scope 106 | ID442 [Interior] | Reflected ceiling plans (RCP) | HOLD | Chain hold | |
| └Scope 107 | ID500 [Interior] | Engineered stone transaction ledge with eased edge (called out as '34" ENGINEERED STONE TRANSACTION LEDGE W/EASED EDGE. (308)') | HOLD | Chain hold | |
| └Scope 108 | ID500 [Interior] | Multiple material/component callouts exist including exact text: 'BLACK MELAMINE INTERIOR', 'ENGINEERED STONE TRANSACTION LEDGE W/EASED EDGE. (308)', 'VENEER', 'REVEAL METAL EDGE', 'EDGE PULL LOCKABLE DRAWER (303) WITH BLACK MELAMIINE INTERIOR', 'KEYBOARD DRAWER (303)', '4" HOLE FOR WIRE MANAGING', 'OPEN BOX (303) WITH BLACK MELAMIINE INTERIOR' | HOLD | Chain hold | |
| └Scope 109 | ID501 [Interior] | Install 1/4" impact wall covering piece installed direct to back of box | HOLD | Chain hold | |
| └Scope 110 | ID501 [Interior] | Referenced detail/parts: "1/4\" IMPACT WALL COVERING PIECE INSTALLED DIRECT TO BACK OF BOX." | HOLD | Chain hold | |
| └Scope 111 | ID503 [Interior] | DIMENSIONS/NOTES SHOWN: (examples extracted exactly as shown) "4'-0" V.I.F.", "6'-2" V.I.F.", "2'-5" MIN. CLEAR", "3'-6"", "2'-10"", "1'-4 1/2\"", "1' - 10\" MIN. BOWL OPENING VERIFY DEPTH WITH FAUCET REQ'MTS" | HOLD | Chain hold | |
| └Scope 112 | ID512 [Interior] | Verify installation requirements with equipment manufacturer and owner/brand. | HOLD | Chain hold | |
| └Scope 113 | ID600 [Interior] | Room schedule row examples (text preserved exactly as shown): | HOLD | Chain hold | |
| └Scope 114 | M1.6 [Mechanical] | Compliance statement text (exact as shown): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 115 | P1.4 [Plumbing] | Code compliance statement exactly as printed: "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 116 | P5.1 [Plumbing] | Follow manufacturer's installation instructions. | HOLD | Chain hold | |
| └Scope 117 | P5.1 [Plumbing] | FOLLOW MANUFACTURERS INSTALLATION IINSTRUCTIONS. | HOLD | Chain hold | |
| Section-09-004 | Resilient Flooring | Chain hold | ||
| └Scope 01 | A-005 Details 1, 2, 4, 6, and 7 | Wall base required/as scheduled. Type, locations, and lengths await finish-schedule chain. | LF | Chain hold | |
| Section-09-005 | Carpet | Chain hold | ||
| └Scope 01 | A-436 | Locate floor clean-outs in inconspicuous locations, and not in guestrooms. Floor clean-outs located in carpet areas to be fitted with carpet inserts. | HOLD | Chain hold | |
| └Scope 02 | A-436 | FLOOR CLEAN-OUTS LOCATED IN CARPET AREAS TO BE FITTED WITH CARPET INSERTS. | HOLD | Chain hold | |
| └Scope 03 | ID122 [Interior] | Refer to seaming diagrams per brand standards for carpet installation (note 17). | HOLD | Chain hold | |
| └Scope 04 | ID124 [Interior] | Refer to seaming diagrams per brand standards for proper carpet installation (per note 17). | HOLD | Chain hold | |
| └Scope 05 | ID131 [Interior] | REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET. | HOLD | Chain hold | |
| └Scope 06 | ID133 [Interior] | 17. REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET. | HOLD | Chain hold | |
| └Scope 07 | ID400 [Interior] | REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET. | HOLD | Chain hold | |
| └Scope 08 | ID400.1 [Interior] | 17. REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET. | HOLD | Chain hold | |
| └Scope 09 | ID401 [Interior] | 17. REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET. | HOLD | Chain hold | |
| └Scope 10 | ID404 [Interior] | REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET. | HOLD | Chain hold | |
| Section-09-006 | Resinous / Specialty Flooring | Chain hold | ||
| └Scope 01 | A-005 Details 1 and 5 | One-inch gypcrete over upper-level precast concrete floor. Area link pending. | SF | Chain hold | |
| Section-09-007 | Wall Coverings | Chain hold | ||
| └Scope 01 | A-511 | Wall finishes and coverings: 'WALL COVERING ON SCHEDULED PARTITION', 'TEXTURED PANEL WALL COVERING', 'VINYL WALLCOVERING', 'PAINT WALL BELOW & INSIDE OF COVE TO MATCH WALL COVER'. | HOLD | Chain hold | |
| └Scope 02 | A-511 | HARDWOOD BASE, TERMINATE WALL COVERING UNDER BASE | HOLD | Chain hold | |
| └Scope 03 | ID507 [Interior] | Wall covering on scheduled partition referenced on sheet | HOLD | Chain hold | |
| Section-09-008 | Painting | Chain hold | ||
| └Scope 01 | A-120 | Apply spray paint in noted areas (notations: "Spray paint") | HOLD | Chain hold | |
| └Scope 02 | A-410 | King Guestroom finish plan | HOLD | Chain hold | |
| └Scope 03 | A-410 | 3 KING GUESTROOM FINISH PLAN | HOLD | Chain hold | |
| └Scope 04 | A-411 | Finish plan for KING SUITE GUESTROOM | HOLD | Chain hold | |
| └Scope 05 | A-412 | Finish plan for King Suite ADA Guestroom | HOLD | Chain hold | |
| └Scope 06 | A-412 | KING SUITE ADA GUESTROOM FINISH PLAN | HOLD | Chain hold | |
| └Scope 07 | A-413 | Finish plan for King ADA guestroom (sheet label: 2 KING ADA GUESTROOM FINISH PLAN) | HOLD | Chain hold | |
| └Scope 08 | A-413 | 2 KING ADA GUESTROOM FINISH PLAN | HOLD | Chain hold | |
| └Scope 09 | A-420 | Finish plan for the guestroom | HOLD | Chain hold | |
| └Scope 10 | A-420 | QUEEN QUEEN GUESTROOM - FINISH PLAN | HOLD | Chain hold | |
| └Scope 11 | A-421 | QUEEN QUEEN SUITE GUESTROOM FINISH PLAN | HOLD | Chain hold | |
| └Scope 12 | A-422 | Finish plan for QUEEN QUEEN ADA GUESTROOM | HOLD | Chain hold | |
| └Scope 13 | A-422 | Sheet annotation: '2 QUEEN QUEEN ADA GUESTROOM FINISH PLAN' | HOLD | Chain hold | |
| └Scope 14 | A-600 | Match exterior paint and finishes ("EXTERIOR PAINT COLOR TO MATCH ADJACENT EXTERIOR MATERIALS.") | HOLD | Chain hold | |
| └Scope 15 | A-806 | Spray paint areas | HOLD | Chain hold | |
| └Scope 16 | C-12 [Civil] | PRIVATE 8" DOUBLE DETECTOR CHECK ASSEMBLY WITH BYPASS METER AMES 3000SS (PAINTED RED) (SEE CITY DETAIL, SHEET No. 18) | HOLD | Chain hold | |
| └Scope 17 | C-22 [Civil] | RISERS ARE TO BE HIDDEN COMPLETELY IN SHRUBBERY OR PAINTED BLACK AND IN NO CASE BE HIGHER THAN THE SHRUBBERY INSTALLED. | HOLD | Chain hold | |
| └Scope 18 | C-22 [Civil] | ALL SPRAY HEADS ARE TO BE A MINIMUM OF 6" POP-UP AND ALL HEADS IN PLANTING AREAS TO BE 12" POP-UP OR RISERS. RISERS SHALL BE PAINTED GREEN OR BLACK. | HOLD | Chain hold | |
| └Scope 19 | ID000 [Interior] | Level 1 Furniture/Finish Plan (ID121) | HOLD | Chain hold | |
| └Scope 20 | ID000 [Interior] | Level 2 Furniture/Finish Plan & Typical Corridor Elevations (ID122) | HOLD | Chain hold | |
| └Scope 21 | ID000 [Interior] | Level 3 Furniture/Finish Plan (ID123) | HOLD | Chain hold | |
| └Scope 22 | ID000 [Interior] | Level 4 Furniture/Finish Plan (ID124) | HOLD | Chain hold | |
| └Scope 23 | ID000 [Interior] | Level 5 Furniture/Finish Plan (ID125) | HOLD | Chain hold | |
| └Scope 24 | ID000 [Interior] | Elevations - first floor corridor (ID200) and lobby/market/enlarged elevations (ID400, ID400.1) | HOLD | Chain hold | |
| └Scope 25 | ID000 [Interior] | Guestroom plan sheets and restroom details (ID420 - ID444 series as listed) | HOLD | Chain hold | |
| └Scope 26 | ID000 [Interior] | Finish schedule for guestrooms across 5 stories (ID600 and finish schedule block) | HOLD | Chain hold | |
| └Scope 27 | ID000 [Interior] | Finish schedule indicates TOTAL 88 ROOMS | HOLD | Chain hold | |
| └Scope 28 | ID000 [Interior] | Finish schedule lists room counts and room numbers for ID420, ID422, ID423, ID424, ID430, ID431, ID432, ID433 | HOLD | Chain hold | |
| └Scope 29 | ID000 [Interior] | Copyright/ownership statement: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 30 | ID001 [Interior] | GENERAL NOTES AND LEGEND - ID001 05.11.2018 90% TO MARRIOTT 06.29.2018 BID SET 07.19.2018 100% TO MARRIOTT 11.02.2022 GEN 4.5 REVISIONS 12.20.2022 REVISION 1 | HOLD | Chain hold | |
| └Scope 31 | ID001 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 32 | ID121 [Interior] | Alternate title on sheet: LEVEL 1 FURNITURE/FINISH PLAN | HOLD | Chain hold | |
| └Scope 33 | ID121 [Interior] | Print instruction: MUST PRINT IN COLOR | HOLD | Chain hold | |
| └Scope 34 | ID121 [Interior] | Copyright/usage note: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 35 | ID121 [Interior] | Reference: 'SEE DETAILS ON SHEET ID510.' | HOLD | Chain hold | |
| └Scope 36 | ID121 [Interior] | Reference: 'REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.' | HOLD | Chain hold | |
| └Scope 37 | ID122 [Interior] | Interior design documentation for Level 2 furniture/finish plan and typical corridor elevations (sheet ID122). | HOLD | Chain hold | |
| └Scope 38 | ID122 [Interior] | TV and mounting hardware are per the owner; verify specifications in writing from owner (note 2). | HOLD | Chain hold | |
| └Scope 39 | ID123 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 40 | ID123 [Interior] | Referenced sheets/details: DRAWING 6 ON ID402, DETAILS ON SHEET ID510 | HOLD | Chain hold | |
| └Scope 41 | ID123 [Interior] | Plan label(s): LEVEL 3 FINISH PLAN; LEVEL 3 FURNITURE/FINISH PLAN | HOLD | Chain hold | |
| └Scope 42 | ID123 [Interior] | Plan contains PG sheet callouts: PG-001, PG-002, PG-101C, PG-102C | HOLD | Chain hold | |
| └Scope 43 | ID124 [Interior] | Exterior finishes per Architect (per note 5). | HOLD | Chain hold | |
| └Scope 44 | ID124 [Interior] | Refer to drawing 6 on ID402 for typical bathroom vanity wall elevation with detailed finish information (per note 6). | HOLD | Chain hold | |
| └Scope 45 | ID124 [Interior] | PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR | HOLD | Chain hold | |
| └Scope 46 | ID124 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 47 | ID125 [Interior] | Refer to Drawing 6 on ID402 for typical bathroom vanity wall elevation and detailed finish information (Note 6). | HOLD | Chain hold | |
| └Scope 48 | ID125 [Interior] | Alternate sheet title text: LEVEL 5 FURNITURE/FINISH PLAN 1/8" = 1'-0" | HOLD | Chain hold | |
| └Scope 49 | ID125 [Interior] | Print instruction: PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR | HOLD | Chain hold | |
| └Scope 50 | ID125 [Interior] | Property notice: "THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT." | HOLD | Chain hold | |
| └Scope 51 | ID125 [Interior] | "6. REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION." | HOLD | Chain hold | |
| └Scope 52 | ID131 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 53 | ID131 [Interior] | CEILING HEIGHT/FINISH CALL-OUTS PRESENT: examples include 'HEIGHT: FINISH: 8'-0"', 'HEIGHT: FINISH: 7'-8"', 'HEIGHT: FINISH: VARIES', 'HEIGHT: FINISH: PER THE AOR'. | HOLD | Chain hold | |
| └Scope 54 | ID131 [Interior] | REFERENCE: 'SEE ENLARGED PLANS FOR MORE INFORMATION.' (NOTES - COMMON AREAS #1) | HOLD | Chain hold | |
| └Scope 55 | ID132 [Interior] | 6. REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION. | HOLD | Chain hold | |
| └Scope 56 | ID132 [Interior] | CEILING PLAN 18" = 1'-0" | HOLD | Chain hold | |
| └Scope 57 | ID132 [Interior] | Copyright/usage notice: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 58 | ID132 [Interior] | Typical ceiling/finish heights called out in plan text: 'HEIGHT: FINISH: VARIES', 'HEIGHT: FINISH: 8'-0"', 'HEIGHT: FINISH: 7'-8"', 'HEIGHT: FINISH: 7'-8" 400' (as shown in various callouts). | HOLD | Chain hold | |
| └Scope 59 | ID132 [Interior] | Typical note on guestroom door drops: '*TYPICAL AT GUESTROOM DOOR DROPS'. | HOLD | Chain hold | |
| └Scope 60 | ID133 [Interior] | 1. SEE ENLARGED PLANS FOR MORE INFORMATION. | HOLD | Chain hold | |
| └Scope 61 | ID133 [Interior] | 5. EXTERIOR FINISHES ARE PER THE ARCHITECT. | HOLD | Chain hold | |
| └Scope 62 | ID133 [Interior] | 6. REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION. | HOLD | Chain hold | |
| └Scope 63 | ID133 [Interior] | 9. NOT USED. | HOLD | Chain hold | |
| └Scope 64 | ID133 [Interior] | 12. BE AWARE OF WALL BASE TRANSITION AT THIS LOCATION. | HOLD | Chain hold | |
| └Scope 65 | ID133 [Interior] | CEILING PLAN 18" = 1'-0" | HOLD | Chain hold | |
| └Scope 66 | ID133 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 67 | ID133 [Interior] | "404 HEIGHT: FINISH: 8'-0'" | HOLD | Chain hold | |
| └Scope 68 | ID133 [Interior] | "400 HEIGHT: FINISH: 7'-8'" | HOLD | Chain hold | |
| └Scope 69 | ID200 [Interior] | EXTERIOR FINISHES ARE PER THE ARCHITECT. | HOLD | Chain hold | |
| └Scope 70 | ID200 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 71 | ID200 [Interior] | References to other sheets: 'REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.' | HOLD | Chain hold | |
| └Scope 72 | ID400 [Interior] | Print size requirement: PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR | HOLD | Chain hold | |
| └Scope 73 | ID400 [Interior] | Copyright/reproduction notice: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 74 | ID400 [Interior] | Finish heights noted in several locations (examples): HEIGHT: FINISH: 9'-2" 400; HEIGHT: FINISH: 8'-6" 405; HEIGHT: FINISH: 8'-0" 404; HEIGHT: FINISH: 7'-4" 400 | HOLD | Chain hold | |
| └Scope 75 | ID400 [Interior] | Specific instruction: REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION | HOLD | Chain hold | |
| └Scope 76 | ID400.1 [Interior] | 1. SEE ENLARGED PLANS FOR MORE INFORMATION. | HOLD | Chain hold | |
| └Scope 77 | ID400.1 [Interior] | 5. EXTERIOR FINISHES ARE PER THE ARCHITECT. | HOLD | Chain hold | |
| └Scope 78 | ID400.1 [Interior] | 6. REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION. | HOLD | Chain hold | |
| └Scope 79 | ID400.1 [Interior] | 12. BE AWARE OF WALL BASE TRANSITION AT THIS LOCATION. | HOLD | Chain hold | |
| └Scope 80 | ID400.1 [Interior] | Referenced sheets/details: 'DRAWING 6 ON ID402', 'DETAILS ON SHEET ID510'. | HOLD | Chain hold | |
| └Scope 81 | ID400.1 [Interior] | Copyright/ownership statement: 'THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.' | HOLD | Chain hold | |
| └Scope 82 | ID401 [Interior] | 1. SEE ENLARGED PLANS FOR MORE INFORMATION. | HOLD | Chain hold | |
| └Scope 83 | ID401 [Interior] | 5. EXTERIOR FINISHES ARE PER THE ARCHITECT. | HOLD | Chain hold | |
| └Scope 84 | ID401 [Interior] | 6. REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION. | HOLD | Chain hold | |
| └Scope 85 | ID401 [Interior] | 9. NOT USED. | HOLD | Chain hold | |
| └Scope 86 | ID401 [Interior] | 12. BE AWARE OF WALL BASE TRANSITION AT THIS LOCATION. | HOLD | Chain hold | |
| └Scope 87 | ID401 [Interior] | MUST PRINT IN COLOR | HOLD | Chain hold | |
| └Scope 88 | ID401 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 89 | ID401 [Interior] | HEIGHT: FINISH: 9'-4" | HOLD | Chain hold | |
| └Scope 90 | ID401 [Interior] | EXERCISE ROOM HEIGHT: FINISH: 9'-4" | HOLD | Chain hold | |
| └Scope 91 | ID401 [Interior] | HEIGHT: FINISH: 8'-0" | HOLD | Chain hold | |
| └Scope 92 | ID401 [Interior] | HEIGHT: FINISH: 8'-2" | HOLD | Chain hold | |
| └Scope 93 | ID402 [Interior] | REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION. | HOLD | Chain hold | |
| └Scope 94 | ID402 [Interior] | Copyright/ownership note: "THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT." | HOLD | Chain hold | |
| └Scope 95 | ID402 [Interior] | Equipment note: "HYDRATION EQUIPMENT CHILLER. INSTALL AS REQ'D AND PROVIDE ALL CONNECTIONS REQUIRED FOR POWER AND WATER." | HOLD | Chain hold | |
| └Scope 96 | ID402 [Interior] | Accessory/elevation note repeated: "ELEVATIONS FOR FINISHES ONLY, REFER TO O.A.R. FOR ACCESSORY LOCATIONS & SPECS." | HOLD | Chain hold | |
| └Scope 97 | ID402 [Interior] | Callouts for many tags/details including: V-300, V-309AC, V-309BC, V-380, V-382, PR-401, PR-505, RE-200, RE-700, RE-101, etc. | HOLD | Chain hold | |
| └Scope 98 | ID403 [Interior] | Note 6: "REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION." | HOLD | Chain hold | |
| └Scope 99 | ID403 [Interior] | Copyright/ownership text: "THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT." | HOLD | Chain hold | |
| └Scope 100 | ID403 [Interior] | Printed instruction: "PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR" | HOLD | Chain hold | |
| └Scope 101 | ID404 [Interior] | EXTERIOR FINISHES ARE PER THE ARCHITECT. | HOLD | Chain hold | |
| └Scope 102 | ID404 [Interior] | REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION. | HOLD | Chain hold | |
| └Scope 103 | ID404 [Interior] | BE AWARE OF WALL BASE TRANSITION AT THIS LOCATION. | HOLD | Chain hold | |
| └Scope 104 | ID404 [Interior] | Document title on sheet: ENLARGED FLOOR PLANS & ELEVATIONS B.O.H. | HOLD | Chain hold | |
| └Scope 105 | ID404 [Interior] | Firm name and proprietary notice: 'THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.' | HOLD | Chain hold | |
| └Scope 106 | ID404 [Interior] | Note on printing: 'PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR.' | HOLD | Chain hold | |
| └Scope 107 | ID404 [Interior] | Explicit cross-references to other drawings: 'REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.' | HOLD | Chain hold | |
| └Scope 108 | ID404 [Interior] | Detail reference: 'SEE DETAILS ON SHEET ID510.' | HOLD | Chain hold | |
| └Scope 109 | ID404 [Interior] | Multiple ED/ID references on plan: ED-200, ED-202/ED-202A, ED-500A-C, ED-500B-C, ED-101, ID404 | HOLD | Chain hold | |
| └Scope 110 | ID420 [Interior] | Finish plan for King guestroom | HOLD | Chain hold | |
| └Scope 111 | ID420 [Interior] | TV wall elevation (LH shown) | HOLD | Chain hold | |
| └Scope 112 | ID420 [Interior] | Headboard wall elevation (LH shown) | HOLD | Chain hold | |
| └Scope 113 | ID420 [Interior] | Entry wall elevation (LH shown) | HOLD | Chain hold | |
| └Scope 114 | ID420 [Interior] | Exterior wall elevation (LH shown) | HOLD | Chain hold | |
| └Scope 115 | ID420 [Interior] | Electrical legend and outlet locations for guestroom | HOLD | Chain hold | |
| └Scope 116 | ID420 [Interior] | Printed instructions: "PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR". | HOLD | Chain hold | |
| └Scope 117 | ID422 [Interior] | KING ADA GUESTROOM FINISH PLAN | HOLD | Chain hold | |
| └Scope 118 | ID422 [Interior] | KING ADA GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN) | HOLD | Chain hold | |
| └Scope 119 | ID422 [Interior] | KING ADA GUESTROOM - TV WALL ELEVATION (RH SHOWN) | HOLD | Chain hold | |
| └Scope 120 | ID422 [Interior] | KING ADA GUESTROOM - ENTRY WALL ELEVATION (RH SHOWN) | HOLD | Chain hold | |
| └Scope 121 | ID422 [Interior] | D. EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS. | HOLD | Chain hold | |
| └Scope 122 | ID422 [Interior] | G. ARCHITECTURAL LIGHT BY G.C. | HOLD | Chain hold | |
| └Scope 123 | ID422 [Interior] | J. ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING | HOLD | Chain hold | |
| └Scope 124 | ID422 [Interior] | L. INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION. HATCHED AREA INDICATES SPACE WHERE OUTLETS SHOULD OCCUR. | HOLD | Chain hold | |
| └Scope 125 | ID422 [Interior] | O. DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP. | HOLD | Chain hold | |
| └Scope 126 | ID422 [Interior] | S. EXPOSED PARTITIONS ABOVE BACK AND SIDES OF WARDROBE TO BE FINISHED (RIGHT) | HOLD | Chain hold | |
| └Scope 127 | ID422 [Interior] | Printed requirement: PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR | HOLD | Chain hold | |
| └Scope 128 | ID423 [Interior] | Finish plan for King Suite Guestroom | HOLD | Chain hold | |
| └Scope 129 | ID423 [Interior] | Electrical plan / electrical legend and outlet locations | HOLD | Chain hold | |
| └Scope 130 | ID423 [Interior] | Elevations: TV/sofa wall elevation, exterior wall elevation, headboard wall elevation, entry wall, wing wall | HOLD | Chain hold | |
| └Scope 131 | ID423 [Interior] | Architectural light by G.C. (note G) | HOLD | Chain hold | |
| └Scope 132 | ID423 [Interior] | PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR | HOLD | Chain hold | |
| └Scope 133 | ID423 [Interior] | LEGAL / COPYRIGHT: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 134 | ID423 [Interior] | REFERENCE DETAIL: SEE 4/ID520 FOR CORNICE DETAIL and REFER TO DETAIL 1/ID520 FOR CORNICE DETAIL are present on sheet. | HOLD | Chain hold | |
| └Scope 135 | ID424 [Interior] | Provide electrical outlet for microwave and power strip (Note O). | HOLD | Chain hold | |
| └Scope 136 | ID424 [Interior] | Outlet behind cornice for motorized shade (must be concealed); motorized shade controls X-100 (sheet reference near cornice detail). | HOLD | Chain hold | |
| └Scope 137 | ID424 [Interior] | Copyright / reproduction note: 'THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.' | HOLD | Chain hold | |
| └Scope 138 | ID424 [Interior] | Detail reference: 'REFER TO DETAIL 1/ID520 FOR CORNICE DETAIL OUTLET BEHIND CORNICE FOR MOTORIZED SHADE (MUST BE CONCEALED)' | HOLD | Chain hold | |
| └Scope 139 | ID424 [Interior] | Note: 'EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.' | HOLD | Chain hold | |
| └Scope 140 | ID430 [Interior] | Interior finish plan for typical Queen-Queen guestrooms | HOLD | Chain hold | |
| └Scope 141 | ID430 [Interior] | Finish plan | HOLD | Chain hold | |
| └Scope 142 | ID430 [Interior] | Electrical plan | HOLD | Chain hold | |
| └Scope 143 | ID430 [Interior] | TV wall elevation | HOLD | Chain hold | |
| └Scope 144 | ID430 [Interior] | Exterior wall elevation | HOLD | Chain hold | |
| └Scope 145 | ID430 [Interior] | Headboard wall elevation | HOLD | Chain hold | |
| └Scope 146 | ID430 [Interior] | Entry wall elevation | HOLD | Chain hold | |
| └Scope 147 | ID430 [Interior] | CEILING/FINISH HEIGHTS: HEIGHT: FINISH: 9'-4" A.F.F.; NOTE: "CEILING HEIGHT AT THE FIRST FLOOR GUESTROOMS IS 11'-4"" | HOLD | Chain hold | |
| └Scope 148 | ID430 [Interior] | REPEATED INSTRUCTION: "CENTER TV ON CENTER OF HEADBOARD" (appears on plan) | HOLD | Chain hold | |
| └Scope 149 | ID430 [Interior] | INSTRUCTION: "MUST PRINT IN COLOR" and "PRINTS TO SCALE ON: 24 X 36 PAPER." | HOLD | Chain hold | |
| └Scope 150 | ID431 [Interior] | Finish plan for Queen Queen ADA Guestroom | HOLD | Chain hold | |
| └Scope 151 | ID431 [Interior] | Electrical plan for Queen Queen ADA Guestroom (includes electrical legend and device locations) | HOLD | Chain hold | |
| └Scope 152 | ID431 [Interior] | TV wall elevation, headboard wall elevation, exterior wall elevation, restroom wall elevation for the guestroom | HOLD | Chain hold | |
| └Scope 153 | ID431 [Interior] | Note: 'THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.' | HOLD | Chain hold | |
| └Scope 154 | ID431 [Interior] | Note D: 'EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.' | HOLD | Chain hold | |
| └Scope 155 | ID432 [Interior] | Finish plan | HOLD | Chain hold | |
| └Scope 156 | ID432 [Interior] | Headboard wall elevation (RH shown) | HOLD | Chain hold | |
| └Scope 157 | ID432 [Interior] | TV / sofa wall elevation (RH shown) | HOLD | Chain hold | |
| └Scope 158 | ID432 [Interior] | Exterior wall (RH) | HOLD | Chain hold | |
| └Scope 159 | ID432 [Interior] | Wing wall (RH shown) | HOLD | Chain hold | |
| └Scope 160 | ID432 [Interior] | Electrical plan for Queen Queen Suite guestroom | HOLD | Chain hold | |
| └Scope 161 | ID432 [Interior] | Specific detail reference: 'REFER TO DETAIL 1/ID520 FOR CORNICE DETAIL' | HOLD | Chain hold | |
| └Scope 162 | ID433 [Interior] | OUTLET BEHIND CORNICE FOR MOTORIZED SHADE (MUST BE CONCEALED); MOTORIZED SHADE CONTROLS. | HOLD | Chain hold | |
| └Scope 163 | ID433 [Interior] | DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP. | HOLD | Chain hold | |
| └Scope 164 | ID433 [Interior] | HEIGHT: FINISH: 9'-4" A.F.F. | HOLD | Chain hold | |
| └Scope 165 | ID440 [Interior] | D. EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS. | HOLD | Chain hold | |
| └Scope 166 | ID440 [Interior] | G. ARCHITECTURAL LIGHT BY G.C. | HOLD | Chain hold | |
| └Scope 167 | ID440 [Interior] | J. ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING | HOLD | Chain hold | |
| └Scope 168 | ID440 [Interior] | L. INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION. HATCHED AREA INDICATES SPACE WHERE OUTLETS SHOULD OCCUR. | HOLD | Chain hold | |
| └Scope 169 | ID440 [Interior] | O. DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP. | HOLD | Chain hold | |
| └Scope 170 | ID440 [Interior] | P. NOT USED | HOLD | Chain hold | |
| └Scope 171 | ID440 [Interior] | S. EXPOSED PARTITIONS ABOVE BACK AND SIDES OF WARDROBE TO BE FINISHED | HOLD | Chain hold | |
| └Scope 172 | ID440 [Interior] | Print requirement: PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR | HOLD | Chain hold | |
| └Scope 173 | ID440 [Interior] | Intellectual property notice: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 174 | ID441 [Interior] | EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS. | HOLD | Chain hold | |
| └Scope 175 | ID441 [Interior] | ARCHITECTURAL LIGHT BY G.C. | HOLD | Chain hold | |
| └Scope 176 | ID441 [Interior] | INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION. | HOLD | Chain hold | |
| └Scope 177 | ID441 [Interior] | DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP. | HOLD | Chain hold | |
| └Scope 178 | ID441 [Interior] | EXPOSED PARTITIONS ABOVE BACK AND SIDES OF WARDROBE TO BE FINISHED | HOLD | Chain hold | |
| └Scope 179 | ID441 [Interior] | Note printed: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 180 | ID441 [Interior] | Instruction printed: MUST PRINT IN COLOR | HOLD | Chain hold | |
| └Scope 181 | ID441 [Interior] | Height callout on plan: 'HEIGHT: FINISH: 8'-0" A.F.F.' | HOLD | Chain hold | |
| └Scope 182 | ID442 [Interior] | Elevations | HOLD | Chain hold | |
| └Scope 183 | ID442 [Interior] | Finish plans (ELEVFINISH PLAN) | HOLD | Chain hold | |
| └Scope 184 | ID442 [Interior] | Copyright/legal statement: "THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT." | HOLD | Chain hold | |
| └Scope 185 | ID442 [Interior] | Print instruction: "PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR" and "MUST PRINT IN COLOR" | HOLD | Chain hold | |
| └Scope 186 | ID442 [Interior] | D. EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS. | HOLD | Chain hold | |
| └Scope 187 | ID500 [Interior] | Edge pull lockable drawer (303) | HOLD | Chain hold | |
| └Scope 188 | ID500 [Interior] | Keyboard drawer (303) | HOLD | Chain hold | |
| └Scope 189 | ID500 [Interior] | Metal edge reveals and corner trim: 'REVEAL METAL EDGE', 'REVEAL METAL CORNER TRIM' | HOLD | Chain hold | |
| └Scope 190 | ID500 [Interior] | Partition cap to match veneer and rounded edge details ('PARTITION CAP TO MATCH VENEER ROUNDED EDGE') | HOLD | Chain hold | |
| └Scope 191 | ID500 [Interior] | Ownership/copyright note: 'THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.' | HOLD | Chain hold | |
| └Scope 192 | ID501 [Interior] | Copyright/proprietary text: "THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT." | HOLD | Chain hold | |
| └Scope 193 | ID501 [Interior] | Referenced detail/parts: "3\" STEEL OUTER FRAME" | HOLD | Chain hold | |
| └Scope 194 | ID501 [Interior] | Referenced detail/parts: "2X WALL CONST. WITH 5/8\" GYP. BD. AS REQ'D TO SUPPORT ART PIECE ABOVE AND WOOD PLANK FINISH SYSTEM" | HOLD | Chain hold | |
| └Scope 195 | ID502 [Interior] | Install WOOD PANEL (303) | HOLD | Chain hold | |
| └Scope 196 | ID502 [Interior] | Install TRANSLUCENT PANEL (330) | HOLD | Chain hold | |
| └Scope 197 | ID502 [Interior] | Provide WOOD FRAME (303) | HOLD | Chain hold | |
| └Scope 198 | ID502 [Interior] | Provide WOOD TRAY SHELVES (303); TYP. WOOD STOPS (303) | HOLD | Chain hold | |
| └Scope 199 | ID502 [Interior] | Provide wood veneer (303) on framing as req'd for head, sill and posts | HOLD | Chain hold | |
| └Scope 200 | ID502 [Interior] | Ensure an outlet is provided on table side per the brand standards | HOLD | Chain hold | |
| └Scope 201 | ID502 [Interior] | Material labels on sheet: WOOD PANEL (303) | HOLD | Chain hold | |
| └Scope 202 | ID502 [Interior] | Material labels on sheet: TRANSLUCENT PANEL (330) | HOLD | Chain hold | |
| └Scope 203 | ID502 [Interior] | Annotation: ENSURE AN OUTLET IS PROVIDED ON TABLE SIDE PER THE BRAND STANDARDS. | HOLD | Chain hold | |
| └Scope 204 | ID503 [Interior] | STONE SKIRT (CONTINUOUS ON EXPOSED SIDES) | HOLD | Chain hold | |
| └Scope 205 | ID503 [Interior] | DEMOUNTABLE PLAM SKIRT WITH FIXED SIDES | HOLD | Chain hold | |
| └Scope 206 | ID503 [Interior] | VITREOUS CHINA BOWL AND ASSOCIATED SUPPORTS | HOLD | Chain hold | |
| └Scope 207 | ID503 [Interior] | STEEL SUPPORT BRACKETS (PAINT WHITE) | HOLD | Chain hold | |
| └Scope 208 | ID503 [Interior] | STEEL SUPPORT BRACKETS PER SPECIFICATIONS, PAINT WHITE | HOLD | Chain hold | |
| └Scope 209 | ID503 [Interior] | EQUIPMENT IS PER THE OWNER. G.C. TO VERIFY FINAL SIZES AND SPECIFICATIONS PRIOR TO FABRICATION AND INSTALLATION. | HOLD | Chain hold | |
| └Scope 210 | ID503 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 211 | ID504 [Interior] | 1/2" adjustable melamine shelf | HOLD | Chain hold | |
| └Scope 212 | ID504 [Interior] | Stainless steel grommet (∅ 8") at trash drop | HOLD | Chain hold | |
| └Scope 213 | ID504 [Interior] | Trash drop (trash bin by owner) | HOLD | Chain hold | |
| └Scope 214 | ID504 [Interior] | Top & side splash (302) indicated on elevations | HOLD | Chain hold | |
| └Scope 215 | ID504 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 216 | ID504 [Interior] | Material note: BLACK MELAMINE INTERIOR | HOLD | Chain hold | |
| └Scope 217 | ID504 [Interior] | Grommet note: ∅ 8" STAINLESS STEEL GROMMET AT TRASH DROP | HOLD | Chain hold | |
| └Scope 218 | ID505 [Interior] | RETURN STONE DOWN FACE AT OUTSIDE END OF TABLE. | HOLD | Chain hold | |
| └Scope 219 | ID505 [Interior] | STONE TOP (306) WITH STONE WATERFALL EDGE (306). | HOLD | Chain hold | |
| └Scope 220 | ID505 [Interior] | ALL EXPOSED REVEALS TO BE STAINED TO MATCH VENEER PLANKS, TYP. | HOLD | Chain hold | |
| └Scope 221 | ID505 [Interior] | HARDWOOD SILL PIECE AT BASE, TYP. | HOLD | Chain hold | |
| └Scope 222 | ID505 [Interior] | HARDWOOD VENEER PLANKS ON PLYWOOD PANELING ON INSIDE FACE. | HOLD | Chain hold | |
| └Scope 223 | ID505 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 224 | ID506 [Interior] | Provide WOOD FRAME STOP and STEEL BASE PLATE with bolts below wood frame stop. | HOLD | Chain hold | |
| └Scope 225 | ID506 [Interior] | Provide ∅ 8" STAINLESS STEEL GROMMET FOR TRASH (330). | HOLD | Chain hold | |
| └Scope 226 | ID506 [Interior] | Views shown: PLAN, ELEVATION, SECTION (labels 1, 2, 3, 4, 5 as shown) | HOLD | Chain hold | |
| └Scope 227 | ID506 [Interior] | Material callouts: WOOD VENEER (303) | HOLD | Chain hold | |
| └Scope 228 | ID506 [Interior] | Material/callout: ∅ 8" STAINLESS STEEL GROMMET FOR TRASH 330 | HOLD | Chain hold | |
| └Scope 229 | ID506 [Interior] | Construction notes: STEEL BASE PLATE AS BOLTS BELOW WOOD FRAME STOP WOOD FRAME STOP | HOLD | Chain hold | |
| └Scope 230 | ID507 [Interior] | Metal divider plate material: HOT ROLLED STEEL, ASTM A 36, SEALED WITH PERMALAC. | HOLD | Chain hold | |
| └Scope 231 | ID507 [Interior] | Finish/material codes referenced on sheet: BR-401, BR-200/BR-200B, BR-208, BR-207, BR-501C, BR-502C, BR-503C, BR-504C, BR-505C, BR-200/BR-200B, BR-401 (as shown in text) | HOLD | Chain hold | |
| └Scope 232 | ID508 [Interior] | Installation of adjustable melamine shelf(s) | HOLD | Chain hold | |
| └Scope 233 | ID508 [Interior] | Built-in induction range and induction unit control box (as shown) | HOLD | Chain hold | |
| └Scope 234 | ID508 [Interior] | Sneeze guard frame | HOLD | Chain hold | |
| └Scope 235 | ID508 [Interior] | Metal channel as partition cap | HOLD | Chain hold | |
| └Scope 236 | ID508 [Interior] | Steel plate end cap details (1/16" steel plate laminated to plywood backer board; ASTM A 36, sealed with Permalac) | HOLD | Chain hold | |
| └Scope 237 | ID508 [Interior] | Reproduction notice: IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 238 | ID508 [Interior] | Finish references / finish numbers shown: 326, 320, 302, 325 | HOLD | Chain hold | |
| └Scope 239 | ID508 [Interior] | Equipment / element labels on sheet: JUICE MACHINE (BY OTHERS) | HOLD | Chain hold | |
| └Scope 240 | ID508 [Interior] | Equipment / element labels: 3" FILTER FAN @ TOP EDGE | HOLD | Chain hold | |
| └Scope 241 | ID509 [Interior] | Routed shelving on recessed pins and bushings (32MM OC) | HOLD | Chain hold | |
| └Scope 242 | ID509 [Interior] | Barrister drawer slides (Rockler #1847) | HOLD | Chain hold | |
| └Scope 243 | ID509 [Interior] | Custom wood wine shelf | HOLD | Chain hold | |
| └Scope 244 | ID509 [Interior] | Aluminum slatwall megawall system (313 ALUM. SLATWALL MEGAWALL; 1" OC, 18" X 52 1/2") with powder coat finish, color black | HOLD | Chain hold | |
| └Scope 245 | ID509 [Interior] | FINISH EXPOSED SURFACES TO MATCH FRONT | HOLD | Chain hold | |
| └Scope 246 | ID509 [Interior] | NOTE: ADJUST DETAIL IF REMOTE COMPRESSORS ARE USED. | HOLD | Chain hold | |
| └Scope 247 | ID509 [Interior] | EQUIPMENT HEIGHT - SEE EQUIPMENT SPECIFICATIONS | HOLD | Chain hold | |
| └Scope 248 | ID510 [Interior] | THIS DRAWING IS FOR INTERIOR DESIGN PURPOSES ONLY. | HOLD | Chain hold | |
| └Scope 249 | ID510 [Interior] | ALL MEASUREMENTS ARE TO BE FIELD VERIFIED. | HOLD | Chain hold | |
| └Scope 250 | ID510 [Interior] | Wood wall panel system installation and wood edge closure by wood panel system supplier, coordinate as required. | HOLD | Chain hold | |
| └Scope 251 | ID510 [Interior] | REMOVABLE PANEL ON 1X FRAMING TO CONCEAL WIRING | HOLD | Chain hold | |
| └Scope 252 | ID510 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 253 | ID512 [Interior] | Provide hydration equipment with chiller (install as required). | HOLD | Chain hold | |
| └Scope 254 | ID512 [Interior] | Provide all connections required for power and water for hydration equipment. | HOLD | Chain hold | |
| └Scope 255 | ID512 [Interior] | Provide suggested chiller line routing (grommet for chiller line). | HOLD | Chain hold | |
| └Scope 256 | ID512 [Interior] | Provide suggested plumbing line routing. | HOLD | Chain hold | |
| └Scope 257 | ID512 [Interior] | Add access panel per GC recommendations. | HOLD | Chain hold | |
| └Scope 258 | ID512 [Interior] | Provide 8" hole for towel drop. | HOLD | Chain hold | |
| └Scope 259 | ID512 [Interior] | Removable access panel in black melamine. | HOLD | Chain hold | |
| └Scope 260 | ID512 [Interior] | HYDRATION EQUIPMENT; PROVIDE WITH CHILLER; VERIFY ALL REQUIREMENTS FOR INSTALLATION PER MANUF. RECOMMENDATIONS. | HOLD | Chain hold | |
| └Scope 261 | ID512 [Interior] | VERIFY SPECIFICATION WITH OWNER AND BRAND. | HOLD | Chain hold | |
| └Scope 262 | ID512 [Interior] | PROVIDE ALL CONNECTIONS REQ'D FOR POWER AND WATER. | HOLD | Chain hold | |
| └Scope 263 | ID512 [Interior] | REFER TO MARRIOTT PROTOTYPE DETAIL 4/B421 | HOLD | Chain hold | |
| └Scope 264 | ID512 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 265 | ID520 [Interior] | Install wall-mounted cornice at 8'-3" A.F.F. with dust cap to support track drapery system and extend cornice to side walls. | HOLD | Chain hold | |
| └Scope 266 | ID520 [Interior] | Install blackout drapery track at 8'-8" A.F.F. to dust cap in top of cornice. | HOLD | Chain hold | |
| └Scope 267 | ID520 [Interior] | Provide adequate angle iron support for cornice and framing support within wall. | HOLD | Chain hold | |
| └Scope 268 | ID520 [Interior] | Mount drapery rod to underside of cornice (dust cap) at 8'-8" AFF. | HOLD | Chain hold | |
| └Scope 269 | ID520 [Interior] | Provide painted hardwood (3/4 plywood painted) valance and 9" metal angle brackets to support plywood where shown. | HOLD | Chain hold | |
| └Scope 270 | ID520 [Interior] | GUESTROOM CEILING HEIGHTS HIGHER THAN 9'-0" A.F.F.: INSTALL WALL-MOUNTED CORNICE, AT 8'-3" A.F.F. WITH AN APPROPRIATE DUST CAP TO SUPPORT TRACK DRAPERY SYSTEM AND EXTEND CORNICE TO SIDE WALLS. | HOLD | Chain hold | |
| └Scope 271 | ID520 [Interior] | BLACKOUT DRAPERY TRACK TO BE INSTALLED AT 8'-8" A.F.F. TO DUST CAP IN TOP OF CORNICE. | HOLD | Chain hold | |
| └Scope 272 | ID520 [Interior] | *CORNICE PROVIDED BY G.C.* | HOLD | Chain hold | |
| └Scope 273 | ID600 [Interior] | Interior finish identification for rooms listed on the sheet (room numbers and names with finish codes for floor/base/walls/ceiling). | HOLD | Chain hold | |
| └Scope 274 | ID600 [Interior] | Reference to plans & elevations for finish details (remarks column frequently states 'REFER TO PLANS & ELEVATIONS FOR FINISH DETAILS'). | HOLD | Chain hold | |
| └Scope 275 | ID600 [Interior] | Guestroom finishes excluded from this sheet and referenced to separate sheets: ID420-ID442. | HOLD | Chain hold | |
| └Scope 276 | ID600 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT. | HOLD | Chain hold | |
| └Scope 277 | ID600 [Interior] | 000 VESTIBULE 101, 117 200 - - - 317 400, 404 REFER TO PLANS & ELEVATIONS FOR FINISH DETAILS | HOLD | Chain hold | |
| └Scope 278 | ID600 [Interior] | 001 LOBBY 101, LM101 200 - V-300, V-319, 331 - - 400, 405 REFER TO PLANS & ELEVATIONS FOR FINISH DETAILS | HOLD | Chain hold | |
| └Scope 279 | ID600 [Interior] | 002 REGISTRATION 101 200,405 V-300 - V-317, V-300 V-300, 405 400, 405 REFER TO PLANS & ELEVATIONS FOR FINISH DETAILS | HOLD | Chain hold | |
| └Scope 280 | ID600 [Interior] | 005 BREAKFAST 103 214, 215 V-300 V-300, 325, 326, 320 V-300, 326, 301 V-300, 325 405, 406, 407 REFER TO PLANS & ELEVATIONS FOR FINISH DETAILS | HOLD | Chain hold | |
| Section-09-009 | High-Performance Coatings | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-09-010 | Acoustic Treatment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 10 | Specialties9 | |||
| Section-10-001 | Visual Display Boards | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-10-002 | Signage | Chain hold | ||
| └Scope 01 | A-002 | Signs are by others and separately permitted. Excluded from quantity takeoff unless the project responsibility chain is revised. | HOLD | Chain hold | |
| └Scope 02 | A-032 | Occupant signage: 'MAXIMUM 320 OCCUPANTS ( SIGN TO BE PROPOSED ON THE WALL )' | HOLD | Chain hold | |
| └Scope 03 | C-6 [Civil] | Signage and pylon sign (pylon sign requires separate building permit) | HOLD | Chain hold | |
| └Scope 04 | C-16 [Civil] | Install pedestrian/vehicle signage including STOP SIGN and HANDICAP PARKING SIGN per sign detail and MUTCD lettering | HOLD | Chain hold | |
| └Scope 05 | E4.1 [Electrical] | Circuit tags visible on sheet: R1, R2, B (as shown in plan graphics) | HOLD | Chain hold | |
| Section-10-003 | Toilet Compartments | Chain hold | ||
| └Scope 01 | A-312 | Interior partitions per sheet 004 | HOLD | Chain hold | |
| └Scope 02 | A-312 | Interior partition notes: "INTERIOR PARTITION, RE: 004 FOR PARTITION TYPE", "ELEVATOR SHAFT PARTITION, RE: 004 FOR PARTITION TYPE" | HOLD | Chain hold | |
| └Scope 03 | A-313 | ELEVATOR SHAFT PARTITION, RE: 004 FOR PARTITION TYPE | HOLD | Chain hold | |
| └Scope 04 | A-313 | REFER TO FLOOR PLANS, SHEET 006 FOR WALL PARTITION BUGS. | HOLD | Chain hold | |
| └Scope 05 | A-314 | REFER TO FLOOR PLANS, SHEET 006 FOR WALL PARTITION BUGS. | HOLD | Chain hold | |
| └Scope 06 | A-314 | ELEVATOR SHAFT PARTITION, RE: 004 FOR PARTITION TYPE | HOLD | Chain hold | |
| └Scope 07 | A-511 | Hardwood components: 'HDWD. PARTITION CAP', 'HARDWOOD BASE', 'RABETED HDWD PARTITION CAP.' | HOLD | Chain hold | |
| Section-10-004 | Lockers | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-10-005 | Fire Extinguishers / Cabinets | Chain hold | ||
| └Scope 01 | A-030 | Graphic/plan showing locations of rated walls, travel distances, shafts, fire extinguishers, exits, and occupant information. | HOLD | Chain hold | |
| └Scope 02 | C-3 [Civil] | Provide automatic fire sprinkler system, smoke detectors, fire extinguishers, and ANSUL kitchen suppression. | HOLD | Chain hold | |
| Section-10-006 | Toilet / Bath Accessories | Chain hold | ||
| └Scope 01 | ID422 [Interior] | H. IN THIS ROOM ONLY, LOW WALL TO BE 34 1/2" TO TOP OF STONE CAP TO ALLOW ROOM FOR ADA GRAB BAR ABOVE. | HOLD | Chain hold | |
| └Scope 02 | ID431 [Interior] | Coordinate fixture locations with plumbing fixture matrix and toilet & bath accessory matrix in Design Guide Project Manual | HOLD | Chain hold | |
| └Scope 03 | ID440 [Interior] | H. IN THIS ROOM ONLY, LOW WALL TO BE 34 1/2" TO TOP OF STONE CAP TO ALLOW ROOM FOR ADA GRAB BAR ABOVE. | HOLD | Chain hold | |
| └Scope 04 | ID441 [Interior] | LOW WALL TO BE 34 1/2" TO TOP OF STONE CAP TO ALLOW ROOM FOR ADA GRAB BAR ABOVE (IN THIS ROOM ONLY). | HOLD | Chain hold | |
| Section-10-007 | Wall / Corner Protection | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-10-008 | Storage Shelving | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-10-009 | Flagpoles | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 11 | Equipment9 | |||
| Section-11-001 | Loading Dock Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-11-002 | Vehicle Service Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-11-003 | Foodservice Equipment | Chain hold | ||
| └Scope 01 | A-800 | Food service equipment plan | HOLD | Chain hold | |
| └Scope 02 | A-800 | Equipment schedule - foodservice | HOLD | Chain hold | |
| └Scope 03 | A-800 | Coffee station (labeled as "COFFEE STATION") | HOLD | Chain hold | |
| └Scope 04 | A-801 | Foodservice equipment elevations | HOLD | Chain hold | |
| └Scope 05 | A-801 | COFFEE STATION | HOLD | Chain hold | |
| └Scope 06 | A-801 | PREP ROOM | HOLD | Chain hold | |
| └Scope 07 | A-802 | NOTE - Not in Kitchen Equipment Contract | HOLD | Chain hold | |
| └Scope 08 | A-802 | THE MARKET EQUIPMENT PLAN - WITHOUT BEER & WINE SERVICE | HOLD | Chain hold | |
| └Scope 09 | A-802 | THE MARKET EQUIPMENT PLAN - WITH BEER & WINE SERVICE | HOLD | Chain hold | |
| └Scope 10 | A-802 | THE MARKET EQUIPMENT ELEVATION - WITHOUT BEER & WINE SERVICE | HOLD | Chain hold | |
| └Scope 11 | A-802 | THE MARKET EQUIPMENT ELEVATION - WITH BEER & WINE SERVICE | HOLD | Chain hold | |
| └Scope 12 | E2.1 [Electrical] | EQUIPMENT SCHEDULE - FOODSERVICE | HOLD | Chain hold | |
| └Scope 13 | ID001 [Interior] | Coordinate all A/V, security, MEP, BOH, kitchen equipment with appropriate consultants (Note 21). | HOLD | Chain hold | |
| Section-11-004 | Residential Appliances | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-11-005 | Laundry Equipment | Chain hold | ||
| └Scope 01 | A-806 | ENLARGED REC - ICE DISPENSER AREA - UPPER FLOORS | HOLD | Chain hold | |
| └Scope 02 | A-806 | ENLARGED REC - ICE DISPENSER AREA - FIRST FLOOR | HOLD | Chain hold | |
| └Scope 03 | A-807 | Guest laundry equipment layout as shown on sheet (label: GUEST LAUNDRY EQUIPMENT PLAN) | HOLD | Chain hold | |
| └Scope 04 | A-807 | Typical floor ice dispenser equipment plan as shown on sheet (label: TYPICAL FLOOR ICE DISPENSER EQUIPMENT PLAN) | HOLD | Chain hold | |
| └Scope 05 | A-807 | TYPICAL FLOOR ICE DISPENSER EQUIPMENT PLAN | HOLD | Chain hold | |
| └Scope 06 | A-809 | Design and construction information for laundry equipment indicated to be on sheet 621 (see SHEET 621). | HOLD | Chain hold | |
| └Scope 07 | A-809 | Legend entries and sizes preserved exactly: '361 20"x36" ROLLING RACK', '362 24"x48" ROLLING RACK', '371 CLOTHES HANGING ROD ON FOLDING TABLE', '372 FOLDING TABLE', '382 WASHER AREA CART', '392 SOIL CLOTHES LAUNDRY CART' | HOLD | Chain hold | |
| └Scope 08 | A-810 | Layout of laundry equipment and related rooms for the back-of-house laundry area | HOLD | Chain hold | |
| └Scope 09 | A-810 | Title on sheet: LAUNDRY EQUIPMENT PLAN | HOLD | Chain hold | |
| └Scope 10 | LAUNDRY-PLAN-2026 | Proposed laundry equipment: HM-200 unit. | EA | Chain hold | |
| └Scope 11 | LAUNDRY-PLAN-2026 | Proposed laundry equipment: T-80 units. | EA | Chain hold | |
| └Scope 12 | LAUNDRY-PLAN-2026 | Proposed laundry equipment: T-1200 units. | EA | Chain hold | |
| Section-11-006 | Waste Handling Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-11-007 | Athletic / Recreational Equipment | Chain hold | ||
| └Scope 01 | ID121 [Interior] | Fitness equipment by Owner; layout shown for reference only (note 10). | HOLD | Chain hold | |
| └Scope 02 | ID122 [Interior] | Fitness equipment provided by owner; layout for reference only (note 10). | HOLD | Chain hold | |
| └Scope 03 | ID123 [Interior] | Fitness equipment provided by owner (layout for reference only). | HOLD | Chain hold | |
| └Scope 04 | ID124 [Interior] | Fitness equipment by Owner; layout is for reference only (per note 10). | HOLD | Chain hold | |
| └Scope 05 | ID125 [Interior] | Fitness equipment provided by Owner; layout for reference only (Note 10). | HOLD | Chain hold | |
| └Scope 06 | ID131 [Interior] | FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY. | HOLD | Chain hold | |
| └Scope 07 | ID133 [Interior] | 10. FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY. | HOLD | Chain hold | |
| └Scope 08 | ID200 [Interior] | FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY. | HOLD | Chain hold | |
| └Scope 09 | ID400 [Interior] | FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY. | HOLD | Chain hold | |
| └Scope 10 | ID400.1 [Interior] | 10. FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY. | HOLD | Chain hold | |
| └Scope 11 | ID401 [Interior] | 10. FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY. | HOLD | Chain hold | |
| └Scope 12 | ID402 [Interior] | FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY. | HOLD | Chain hold | |
| └Scope 13 | ID403 [Interior] | Note 10: "FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY." | HOLD | Chain hold | |
| └Scope 14 | ID404 [Interior] | FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY. | HOLD | Chain hold | |
| Section-11-008 | Laboratory Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-11-009 | Parking Control Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 12 | Furnishings8 | |||
| Section-12-001 | Window Treatments | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-12-002 | Casework | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-12-003 | Countertops | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-12-004 | Entry Mats / Grilles | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-12-005 | Furniture | Chain hold | ||
| └Scope 01 | A-400 | ENLARGED PUBLIC SPACE FURNITURE + MINOR PLAN - OUTDOOR POOL | HOLD | Chain hold | |
| └Scope 02 | A-410 | FF&E plan for King Guestroom (left facing) | HOLD | Chain hold | |
| └Scope 03 | A-410 | FF&E plan for King Guestroom (right facing) | HOLD | Chain hold | |
| └Scope 04 | A-410 | King standard guestroom FF&E/finish/RCP/elevation package applies to 20 rooms per A-003 room mix. | ROOM | Chain hold | |
| └Scope 05 | A-411 | FF&E plan for KING SUITE GUESTROOM (left and right facing) | HOLD | Chain hold | |
| └Scope 06 | A-411 | King suite guestroom FF&E/finish/RCP/elevation package applies to 21 rooms per A-003 room mix. | ROOM | Chain hold | |
| └Scope 07 | A-412 | FF&E plan for King Suite ADA Guestroom | HOLD | Chain hold | |
| └Scope 08 | A-412 | Accessible King suite guestroom package applies to 1 room per A-003 room mix. | ROOM | Chain hold | |
| └Scope 09 | A-413 | FF&E plan for King ADA/ACC guestroom (sheet label: 1 KING ADA GUESTROOM FF&E PLAN) | HOLD | Chain hold | |
| └Scope 10 | A-413 | Accessible King standard guestroom package applies to 1 room per A-003 room mix. | ROOM | Chain hold | |
| └Scope 11 | A-420 | FF&E plan (left and right facing) for a Queen/Queen guestroom | HOLD | Chain hold | |
| └Scope 12 | A-420 | Queen/Queen standard guestroom FF&E/finish/RCP/elevation package applies to 34 rooms per A-003 room mix. | ROOM | Chain hold | |
| └Scope 13 | A-421 | Queen/Queen suite guestroom package applies to 3 rooms per A-003 room mix. | ROOM | Chain hold | |
| └Scope 14 | A-422 | FF&E plan for QUEEN QUEEN ADA GUESTROOM | HOLD | Chain hold | |
| └Scope 15 | A-422 | Accessible Queen/Queen standard guestroom package applies to 1 room per A-003 room mix. | ROOM | Chain hold | |
| └Scope 16 | ID122 [Interior] | Purchasing agent responsible for site verification of wall-to-wall FF&E prior to purchasing (note 16). | HOLD | Chain hold | |
| └Scope 17 | ID123 [Interior] | Interior design: furniture and finish layout for Level 3 (sheet is for interior design purposes only). | HOLD | Chain hold | |
| └Scope 18 | ID123 [Interior] | Purchasing agent responsible for site verification of wall-to-wall FF&E prior to purchasing. | HOLD | Chain hold | |
| └Scope 19 | ID124 [Interior] | Level 4 furniture/finish layout for the project (interior design drawing). | HOLD | Chain hold | |
| └Scope 20 | ID124 [Interior] | Purchasing Agent responsible for site verification of wall-to-wall FF&E prior to purchasing (per note 16). | HOLD | Chain hold | |
| └Scope 21 | ID125 [Interior] | Purchasing Agent responsible for site verification of wall-to-wall FF&E prior to purchasing (Note 16). | HOLD | Chain hold | |
| └Scope 22 | ID131 [Interior] | PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | HOLD | Chain hold | |
| └Scope 23 | ID133 [Interior] | 16. DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | HOLD | Chain hold | |
| └Scope 24 | ID400 [Interior] | DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | HOLD | Chain hold | |
| └Scope 25 | ID400.1 [Interior] | 16. DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | HOLD | Chain hold | |
| └Scope 26 | ID401 [Interior] | 16. DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | HOLD | Chain hold | |
| └Scope 27 | ID402 [Interior] | PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | HOLD | Chain hold | |
| └Scope 28 | ID404 [Interior] | DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | HOLD | Chain hold | |
| └Scope 29 | ID420 [Interior] | FF&E layout for King guestroom (left and right facing) | HOLD | Chain hold | |
| └Scope 30 | ID422 [Interior] | KING ADA GUESTROOM FF&E PLAN (scale and plan shown) | HOLD | Chain hold | |
| └Scope 31 | ID423 [Interior] | FF&E plan for King Suite Guestroom | HOLD | Chain hold | |
| └Scope 32 | ID430 [Interior] | FF&E plan (left and right facing) | HOLD | Chain hold | |
| └Scope 33 | ID431 [Interior] | FF&E plan for Queen Queen ADA Guestroom (FF&E plan sheet referenced) | HOLD | Chain hold | |
| └Scope 34 | ID432 [Interior] | FF&E plan (right) | HOLD | Chain hold | |
| └Scope 35 | ID442 [Interior] | FF&E plans | HOLD | Chain hold | |
| └Scope 36 | ID442 [Interior] | Notes for coordination with Purchasing Agent and Furniture Vendor | HOLD | Chain hold | |
| Section-12-006 | Systems Furniture | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-12-007 | Fixed Seating | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-12-008 | Site Furnishings | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 13 | Special Construction8 | |||
| Section-13-001 | Special Facility Components | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-13-002 | Pools / Fountains | Chain hold | ||
| └Scope 01 | A-120 | Provide locations/coordination for underwater pool light fixtures per indoor pool plan (note referencing indoor pool plan) | HOLD | Chain hold | |
| └Scope 02 | A-120 | Reference: SEE INDOOR POOL PLAN BELOW FOR LOCATION OF UNDERWATER POOL LIGHT FIXTURES. | HOLD | Chain hold | |
| └Scope 03 | A-312 | Exterior wall sections and related details for guest corridors, elevator shaft, lobby wall, and indoor pool wall | HOLD | Chain hold | |
| └Scope 04 | A-405 | INDOOR POOL (labeled POOL 015) | HOLD | Chain hold | |
| └Scope 05 | A-405 | POOL DECK | HOLD | Chain hold | |
| └Scope 06 | A-405 | Interior elevations and wall sections for indoor pool | HOLD | Chain hold | |
| └Scope 07 | A-405 | Pool cover light detail | HOLD | Chain hold | |
| └Scope 08 | A-405 | Pool equipment/adjacent rooms shown on plan | HOLD | Chain hold | |
| └Scope 09 | A-406 | ENLARGED EXERCISE ROOM PLAN - OUTDOOR POOL | HOLD | Chain hold | |
| └Scope 10 | A-406 | 3D VIEW EXERCISE ENTRY - OUTDOOR POOL | HOLD | Chain hold | |
| └Scope 11 | A-406 | Sheet contains labels and drawings including: "EXERCISE ROOM -07", "EXERCISE ROOM -05", "EXERCISE ROOM -06", "EXERCISE ROOM -04", "ENLARGED EXERCISE ROOM PLAN - OUTDOOR POOL", "3D VIEW EXERCISE ENTRY - OUTDOOR POOL" | HOLD | Chain hold | |
| └Scope 12 | A-571 | Pool plans and details (sheet A571) | HOLD | Chain hold | |
| └Scope 13 | A-571 | Pool section details (Section A, Section B visible on sheet) | HOLD | Chain hold | |
| └Scope 14 | A-571 | Indoor pool detail plan | HOLD | Chain hold | |
| └Scope 15 | A-571 | One indoor pool assembly with plans, coping, depth-marker, and section details. | EA | Chain hold | |
| └Scope 16 | ID000 [Interior] | Enlarged floor plans & elevations for Breakfast Room, Exercise Room & Public Restrooms, Pool, B.O.H. (ID401, ID402, ID403, ID404) | HOLD | Chain hold | |
| Section-13-003 | Controlled Environment Rooms | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-13-004 | Vaults / Secure Rooms | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-13-005 | Pre-Engineered Structures | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-13-006 | Building Modules | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-13-007 | Radiation Protection | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-13-008 | Special Instrumentation | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 14 | Conveying Equipment7 | |||
| Section-14-001 | Elevators | Chain hold | ||
| └Scope 01 | A-111 | Elevator noted with capacity: ELEVATOR 3500 lbs | HOLD | Chain hold | |
| └Scope 02 | A-117 | Reference note C: 'REFER TO BUILDING ELEVATORS & SECTIONS FOR PARAPET HEIGHTS & FINISHES.' | HOLD | Chain hold | |
| └Scope 03 | A-310 | Elevators (two instances labeled ELEVATOR 3500 lbs) | HOLD | Chain hold | |
| └Scope 04 | A-310 | Elevator capacity text: "ELEVATOR 3500 lbs" (appears twice) | HOLD | Chain hold | |
| └Scope 05 | A-312 | Coordination for elevator components with manufacturer | HOLD | Chain hold | |
| └Scope 06 | A-402 | ELEVATOR LOBBY WALL | HOLD | Chain hold | |
| └Scope 07 | A-438 | Enlarged plan of administration area (labels observed: OFFICE, WORK, ELEVATOR, CLOSET) | HOLD | Chain hold | |
| └Scope 08 | A-438 | ELEVATOR | HOLD | Chain hold | |
| └Scope 09 | A-492 | Elevator section and details | HOLD | Chain hold | |
| └Scope 10 | A-492 | Elevator plan - Level 1 (scale 1/4" = 1'-0") | HOLD | Chain hold | |
| └Scope 11 | A-492 | Elevator plan - Levels 2, 3, 4, 5 (scale 1/4" = 1'-0") | HOLD | Chain hold | |
| └Scope 12 | A-492 | Elevator plan - Roof (scale 1/4" = 1'-0") | HOLD | Chain hold | |
| └Scope 13 | A-492 | Sheet items: 1 Elevator plan - Level 1 1/4" = 1'-0" | HOLD | Chain hold | |
| └Scope 14 | A-492 | Sheet items: 2 Elevator plan - Level 2, 3, 4, 5 1/4" = 1'-0" | HOLD | Chain hold | |
| └Scope 15 | A-492 | Sheet items: 3 Elevator plan - ROOF 1/4" = 1'-0" | HOLD | Chain hold | |
| └Scope 16 | A-492 | Elevator capacity: ELEVATOR 3500 lbs | HOLD | Chain hold | |
| └Scope 17 | A-492 | Two 3,500-lb elevators shown and coordinated across Levels 1-5 and roof. | EA | Chain hold | |
| └Scope 18 | A-804 | Partial interior elevation - upper elevator lobby | HOLD | Chain hold | |
| └Scope 19 | A-809 | Sheet text: 'LAUNDRY 019 LINEN 010 016 ELEVATOR 3500 lbs' (elevator capacity shown as 3500 lbs) | HOLD | Chain hold | |
| └Scope 20 | A-810 | Elevator callout visible: ELEVATOR 3500 lbs | HOLD | Chain hold | |
| └Scope 21 | E2.1 [Electrical] | ELEVATOR | HOLD | Chain hold | |
| └Scope 22 | ID121 [Interior] | Decorative wall graphic required at all elevator lobby walls; G.C. to coordinate all electrical/fire/safety elements and/or build outs along this wall with DAI designers (note 8). | HOLD | Chain hold | |
| └Scope 23 | ID121 [Interior] | Provide 2" wood trim at exposed edges of wood panels at elevator doors; see sheet ID510 (note 19). | HOLD | Chain hold | |
| └Scope 24 | ID122 [Interior] | Decorative wall graphic required at all elevator lobby walls; G.C. to coordinate electrical/fire/safety elements and build-outs with DAI designers (note 8). | HOLD | Chain hold | |
| └Scope 25 | ID122 [Interior] | Provide 2" wood trim at exposed edges of wood panels at elevator doors; see sheet ID510; wood trim to be stained to match baseboard 215 in the IFI (note 19). | HOLD | Chain hold | |
| └Scope 26 | ID123 [Interior] | Decorative wall graphic required at all elevator lobby walls; G.C. to coordinate electrical/fire/safety with DAI designers. | HOLD | Chain hold | |
| └Scope 27 | ID124 [Interior] | Decorative wall graphic required at all elevator lobby walls; GC to coordinate electrical/fire/safety with DAI designers (per note 8). | HOLD | Chain hold | |
| └Scope 28 | ID124 [Interior] | Provide 2" wood trim at exposed edges of wood panels at elevator doors; stain to match baseboard 215 in IFI (per note 19). | HOLD | Chain hold | |
| └Scope 29 | ID125 [Interior] | Decorative wall graphic required at all elevator lobby walls; G.C. to coordinate electrical/fire/safety/build-outs with DAI designers (Note 8). | HOLD | Chain hold | |
| └Scope 30 | ID125 [Interior] | Provide 2" wood trim at exposed edges of wood panels at elevator doors; see details on sheet ID510; stain to match baseboard 215 (Note 19 / last note mentions ID510 item). | HOLD | Chain hold | |
| └Scope 31 | ID131 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS (ELEVATOR LOBBY GRAPHIC). | HOLD | Chain hold | |
| └Scope 32 | ID131 [Interior] | PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI. | HOLD | Chain hold | |
| └Scope 33 | ID132 [Interior] | 8. DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | HOLD | Chain hold | |
| └Scope 34 | ID132 [Interior] | 19. PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI. | HOLD | Chain hold | |
| └Scope 35 | ID133 [Interior] | 8. DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | HOLD | Chain hold | |
| └Scope 36 | ID133 [Interior] | 19. PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI. | HOLD | Chain hold | |
| └Scope 37 | ID200 [Interior] | PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. | HOLD | Chain hold | |
| └Scope 38 | ID200 [Interior] | Note 19: 'PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.' | HOLD | Chain hold | |
| └Scope 39 | ID400 [Interior] | PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI. | HOLD | Chain hold | |
| └Scope 40 | ID400 [Interior] | Text excerpt (note 19): PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI. | HOLD | Chain hold | |
| └Scope 41 | ID400.1 [Interior] | 8. DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | HOLD | Chain hold | |
| └Scope 42 | ID400.1 [Interior] | 19. PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI. | HOLD | Chain hold | |
| └Scope 43 | ID401 [Interior] | 8. DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | HOLD | Chain hold | |
| └Scope 44 | ID401 [Interior] | 19. PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI. | HOLD | Chain hold | |
| └Scope 45 | ID402 [Interior] | PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI. | HOLD | Chain hold | |
| └Scope 46 | ID403 [Interior] | Note 8: "DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT." | HOLD | Chain hold | |
| └Scope 47 | ID403 [Interior] | Note 19: "PROVIDE 2\" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI." | HOLD | Chain hold | |
| └Scope 48 | ID404 [Interior] | DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | HOLD | Chain hold | |
| └Scope 49 | ID404 [Interior] | PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI. | HOLD | Chain hold | |
| └Scope 50 | M1.1 [Mechanical] | Elevator(s) annotated 'ELEVATOR 3500 lbs' | HOLD | Chain hold | |
| └Scope 51 | P1.1 [Plumbing] | The sheet displays room identifications and plumbing-related equipment labels (e.g., WATER HEATER 007, STANDPIPE, ELEVATOR 3500 lbs). | HOLD | Chain hold | |
| └Scope 52 | P5.1 [Plumbing] | ELEVATOR SHAFT BOTTOM OFSCREEN GRATE "OIL SMART" SWITCH AND ALARM PANEL. | HOLD | Chain hold | |
| └Scope 53 | P5.1 [Plumbing] | REFER TO ARCHITECTURAL SECTION 2.2.2.5, "IN ELEVATORS PROVIDED WITH FIREFIGHTERS EMERGENCY COMPLIANCE PER ASME 17.1 SAFETY CODE FOR ELEVATORS AND ESCALATORS OPERATION, A DRAIN OR SUMP PUMP SHALL BE PROVIDED". | HOLD | Chain hold | |
| Section-14-002 | Hydraulic Elevators | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-14-003 | Traction Elevators | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-14-004 | Escalators / Moving Walks | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-14-005 | Platform / Wheelchair Lifts | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-14-006 | Material Lifts | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-14-007 | Conveying Equipment Commissioning | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 21 | Fire Suppression8 | |||
| Section-21-001 | Fire Suppression Submittals | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-21-002 | Sprinkler Systems | Chain hold | ||
| └Scope 01 | A-001 | Separate fire-extinguishing-system permit required by City of Tampa Fire Marshal. | 1 | EA | Ready |
| └Scope 02 | A-001 | Separate below-ground fire-protection-system permit required by City of Tampa Fire Marshal. | 1 | EA | Ready |
| └Scope 03 | A-002 | Sprinklers = YES; NFPA 13 is checked. Sprinkler head, piping, valve, and equipment quantities are not shown on this sheet and remain blank. | LS | Chain hold | |
| Section-21-003 | Wet-Pipe Sprinklers | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-21-004 | Dry / Preaction Sprinklers | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-21-005 | Standpipes | Chain hold | ||
| └Scope 01 | A-002 | Standpipes = YES; Class I is checked. Standpipe component and hose-valve quantities are not shown on this sheet and remain blank. | LS | Chain hold | |
| └Scope 02 | A-111 | Standpipe noted on sheet: STANDPIPE | HOLD | Chain hold | |
| └Scope 03 | A-112 | Stand pipe and Area of refuge indicated | HOLD | Chain hold | |
| └Scope 04 | A-114 | Room/label examples visible on drawing: "KING SUITE 419", "ACCESSIBLE QUEEN 417", "QQ SUITE 413", "Ice Machine", "Stand pipe", "Area of refuge" | HOLD | Chain hold | |
| └Scope 05 | A-116 | Area of refuge | HOLD | Chain hold | |
| └Scope 06 | A-490 | Area of refuge / Standpipe indicated on sheet | HOLD | Chain hold | |
| └Scope 07 | A-491 | Area of refuge (noted adjacent to stair) | HOLD | Chain hold | |
| └Scope 08 | A-491 | Standpipe (noted adjacent to stair) | HOLD | Chain hold | |
| └Scope 09 | A-491 | Visible detail/label: Area of refuge Standpipe | HOLD | Chain hold | |
| └Scope 10 | C-3 [Civil] | THE BUILDING IS REQUIRED TO HAVE A AUTOMATIC FIRE SPRINKLER SYSTEM. | HOLD | Chain hold | |
| └Scope 11 | F17-00 [FIRE-ALARM-SYSTEM] | Sprinkler head locations shown in relation to detectors (label: SPRINKLER HEAD) | HOLD | Chain hold | |
| └Scope 12 | M1.1 [Mechanical] | Standpipe locations/annotation | HOLD | Chain hold | |
| └Scope 13 | P5.2 [Plumbing] | Mechanical - Fire Protection (COPPER - STEEL - CPVC SPRINKLER) | HOLD | Chain hold | |
| └Scope 14 | P5.2 [Plumbing] | Sprinkler zone control valve assembly detail | HOLD | Chain hold | |
| Section-21-006 | Fire Pumps | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-21-007 | Special Agent Suppression | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-21-008 | Fire Suppression Testing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 22 | Plumbing9 | |||
| Section-22-001 | Plumbing Submittals | Chain hold | ||
| └Scope 01 | P1.0 [Plumbing] | Shock arrestor schedule | HOLD | Chain hold | |
| └Scope 02 | P1.0 [Plumbing] | Plumbing legend (graphic symbols and abbreviations) | HOLD | Chain hold | |
| └Scope 03 | P1.0 [Plumbing] | General plumbing notes (appears as block text) | HOLD | Chain hold | |
| └Scope 04 | P1.0 [Plumbing] | Cover sheet functions: index/schedules/legends for plumbing trades | HOLD | Chain hold | |
| └Scope 05 | P1.1 [Plumbing] | Reference for piping within guestroom units provided: sheet P3.1 (enlarged guestroom plans). | HOLD | Chain hold | |
| └Scope 06 | P1.1 [Plumbing] | Intended compliance with the listed building and fire/electrical/plumbing codes (per the compliance statement). | HOLD | Chain hold | |
| └Scope 07 | P1.2 [Plumbing] | Second floor plumbing plan for the project (sheet P1.2). | HOLD | Chain hold | |
| └Scope 08 | P1.2 [Plumbing] | Reference/coordination for piping within guestrooms to enlarged guestroom plans on sheet P3.1. | HOLD | Chain hold | |
| └Scope 09 | P1.2 [Plumbing] | SECOND FLOOR PLUMBING PLAN P1.2 | HOLD | Chain hold | |
| └Scope 10 | P1.2 [Plumbing] | REFER TO ENLARGED GUESTROOM PLANS, SHEET P3.1 FOR PIPING WITHIN UNITS. (TYPICAL) | HOLD | Chain hold | |
| └Scope 11 | P1.3 [Plumbing] | Third floor plumbing plan (sheet P1.3) for the Fairfield Inn project in Tampa, FL | HOLD | Chain hold | |
| └Scope 12 | P1.3 [Plumbing] | Piping within guestroom units is referenced to Sheet P3.1 (ENLARGED GUESTROOM PLANS) | HOLD | Chain hold | |
| └Scope 13 | P1.3 [Plumbing] | Locations/labels of plumbing-related items on the third floor (e.g., "Stand pipe") | HOLD | Chain hold | |
| └Scope 14 | P1.3 [Plumbing] | THIRD FLOOR PLUMBING PLAN P1.3 | HOLD | Chain hold | |
| └Scope 15 | P1.3 [Plumbing] | REFER TO ENLARGED GUESTROOM PLANS, SHEET P3.1 FOR PIPING WITHIN UNITS. (TYPICAL) | HOLD | Chain hold | |
| └Scope 16 | P1.4 [Plumbing] | Stand pipe locations | HOLD | Chain hold | |
| └Scope 17 | P1.4 [Plumbing] | Area of refuge locations | HOLD | Chain hold | |
| └Scope 18 | P1.4 [Plumbing] | Ice machine location | HOLD | Chain hold | |
| └Scope 19 | P1.4 [Plumbing] | Piping within units to be detailed on sheet P3.1 (enlarged guestroom plans) | HOLD | Chain hold | |
| └Scope 20 | P1.4 [Plumbing] | FOURTH FLOOR PLUMBING PLAN P1.4 | HOLD | Chain hold | |
| └Scope 21 | P1.4 [Plumbing] | REFER TO ENLARGED GUESTROOM PLANS, SHEET P3.1 FOR PIPING WITHIN UNITS. (TYPICAL) | HOLD | Chain hold | |
| └Scope 22 | P1.5 [Plumbing] | Plumbing layout for the fifth floor of the Tampa, FL - Fairfield Inn (as shown on P1.5). | HOLD | Chain hold | |
| └Scope 23 | P1.5 [Plumbing] | Stand pipe(s) shown on plan. | HOLD | Chain hold | |
| └Scope 24 | P1.5 [Plumbing] | Ice Machine location shown on plan. | HOLD | Chain hold | |
| └Scope 25 | P1.5 [Plumbing] | Reference to enlarged guestroom piping details on Sheet P3.1 for piping within units (typical). | HOLD | Chain hold | |
| └Scope 26 | P1.5 [Plumbing] | On-sheet note: REFER TO ENLARGED GUESTROOM PLANS, SHEET P3.1 FOR PIPING WITHIN UNITS. (TYPICAL) | HOLD | Chain hold | |
| └Scope 27 | P1.6 [Plumbing] | Roof plumbing plan | HOLD | Chain hold | |
| └Scope 28 | P1.6 [Plumbing] | ROOF PLUMBING PLAN P1.6 | HOLD | Chain hold | |
| └Scope 29 | P2.1 [Plumbing] | Piping within guestroom units to be provided on enlarged guestroom plans on sheet P3.1 (as noted) | HOLD | Chain hold | |
| └Scope 30 | P2.1 [Plumbing] | REFER TO ENLARGED GUESTROOM PLANS, SHEET P3.1 FOR PIPING WITHIN UNITS. (TYPICAL) | HOLD | Chain hold | |
| └Scope 31 | P3.1 [Plumbing] | Typical guest room units back-to-back plumbing plan | HOLD | Chain hold | |
| └Scope 32 | P3.1 [Plumbing] | TYPICAL GUEST UNITS PLUMBING PLANS P3.1 | HOLD | Chain hold | |
| └Scope 33 | P4.1 [Plumbing] | ENLARGED KITCHEN PLUMBING PLANS P4.1 | HOLD | Chain hold | |
| └Scope 34 | P5.1 [Plumbing] | Coordinate electrical continuation to GFIC and alarm panel per electrical drawings. | HOLD | Chain hold | |
| └Scope 35 | P5.1 [Plumbing] | REFER TO ELECTRICAL DRAWINGS FOR CONT. TO ALARM PANEL. | HOLD | Chain hold | |
| └Scope 36 | P5.2 [Plumbing] | Tables for Plumbing - Plastic DWV | HOLD | Chain hold | |
| └Scope 37 | P5.2 [Plumbing] | Tables for Plumbing - Cast Iron DWV | HOLD | Chain hold | |
| └Scope 38 | P5.2 [Plumbing] | Tables for Plumbing - Water & Gas (COPPER - STEEL - CPVC - POLYBUTYLENE) | HOLD | Chain hold | |
| └Scope 39 | P5.2 [Plumbing] | Fire protection general notes | HOLD | Chain hold | |
| └Scope 40 | P5.2 [Plumbing] | PLUMBING DETAILS P5.2 | HOLD | Chain hold | |
| └Scope 41 | P5.2 [Plumbing] | PENETRATION SCHEDULES NO SCALE | HOLD | Chain hold | |
| Section-22-002 | Domestic Water Piping | Chain hold | ||
| └Scope 01 | P2.1 [Plumbing] | Domestic water distribution on first floor as shown on plan P2.1 (graphic piping and fixture locations) | HOLD | Chain hold | |
| └Scope 02 | P2.1 [Plumbing] | FIRST FLOOR DOMESTIC WATER PLAN P2.1 | HOLD | Chain hold | |
| └Scope 03 | P3.1 [Plumbing] | Typical guest room domestic water plan (single) | HOLD | Chain hold | |
| └Scope 04 | P4.1 [Plumbing] | Enlarged kitchen domestic water/plumbing plan (sheet P4.1) | HOLD | Chain hold | |
| └Scope 05 | P5.3 [Plumbing] | Plumbing riser diagrams for domestic water | HOLD | Chain hold | |
| └Scope 06 | P5.3 [Plumbing] | TYPICAL RISER DIAGRAMS - DOMESTIC WATER | HOLD | Chain hold | |
| Section-22-003 | Sanitary Waste / Vent | Chain hold | ||
| └Scope 01 | C-3 [Civil] | Provide sanitary service via private lift station with 2" force main connection to existing sanitary manhole within N 29TH STREET ROW. | HOLD | Chain hold | |
| └Scope 02 | C-4 [Civil] | Install inlet protection measures to prevent siltation in the drainage system | HOLD | Chain hold | |
| └Scope 03 | C-5 [Civil] | CURB INLET SEDIMENT PREVENTION DETAIL | HOLD | Chain hold | |
| └Scope 04 | C-12 [Civil] | Install reduced pressure backflow preventers (1" Wilkins 975 XL; 3" Ames 5000SS; 3"/private as noted) | HOLD | Chain hold | |
| └Scope 05 | C-12 [Civil] | CORE DRILL EXISTING SANITARY MANHOLE FOR 4" FORCE MAIN CONNECTION, INV 42.05 PROVIDE WATERTIGHT SEAL PER CITY DETAIL SHEET No. 18 (SEE PROFILE, SHEET No. 11) | HOLD | Chain hold | |
| └Scope 06 | C-12 [Civil] | PRIVATE 3" REDUCED PRESSURE BACKFLOW PREVENTER WITH BYPASS METER, AMES 5000SS (SEE CITY DETAIL, SHEET No. 18) | HOLD | Chain hold | |
| └Scope 07 | C-14 [Civil] | Deflection and leakage testing of flexible sewer pipe, and manhole air testing per ASTM procedures | HOLD | Chain hold | |
| └Scope 08 | C-22 [Civil] | Meter and backflow: M 1.5" IRRIGATION METER; B 1.5" REDUCED PRESSURE BACKFLOW PREVENTER | HOLD | Chain hold | |
| └Scope 09 | E1.0 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 10 | E1.1 [Electrical] | Plans and specifications claimed to comply with: 2023 FBC 8TH EDITION (Building, Plumbing, Mechanical), NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 11 | E1.1 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 12 | E1.3 [Electrical] | Code compliance statement text (verbatim as shown): 'TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70' | HOLD | Chain hold | |
| └Scope 13 | E1.4 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 14 | E1.5 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 15 | E1.6 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 16 | E2.1 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 17 | E2.2 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 18 | E2.3 [Electrical] | Compliance statement text (verbatim): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 19 | E2.4 [Electrical] | Text block: 'TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70' | HOLD | Chain hold | |
| └Scope 20 | E2.5 [Electrical] | Codes/compliance statement (verbatim): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 21 | E3.1 [Electrical] | Code compliance to: 2023 FBC 8TH EDITION (building, plumbing, mechanical), NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13/13R/13D, 2019 NFPA 72, 2020 NFPA 70 (text as printed on sheet) | HOLD | Chain hold | |
| └Scope 22 | E3.1 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 23 | E3.2 [Electrical] | Text on sheet: "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 24 | E3.4 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 25 | E3.5 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 26 | E3.6 [Electrical] | Statement on sheet: "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 27 | E4.0 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 28 | E4.2 [Electrical] | Certifying statement as shown: 'TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70' | HOLD | Chain hold | |
| └Scope 29 | E5.0 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 30 | E5.1 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 31 | E5.3 [Electrical] | Code compliance statement present: 'TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70'. | HOLD | Chain hold | |
| └Scope 32 | ID001 [Interior] | 4. ALL WORK SHALL COMPLY WITH APPLICABLE CODES, RULES, REGULATIONS, LAWS, ORDINANCES ETC. AS REQUIRED BY THE PUBLIC AUTHORITIES. IN THE EVENT OF A CONFLICT THE MOST STRINGENT REQUIREMENTS SHALL APPLY. | HOLD | Chain hold | |
| └Scope 33 | ID508 [Interior] | Equipment / element labels: VENT ABOVE JUICE MACHINE | HOLD | Chain hold | |
| └Scope 34 | ID512 [Interior] | Waste bin to be provided by owner (WASTE BIN BY OWNER). | HOLD | Chain hold | |
| └Scope 35 | M1.0 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 36 | M1.1 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 37 | M1.2 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 38 | M1.3 [Mechanical] | Code compliance statement (verbatim): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 39 | M1.5 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 40 | M2.0 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 41 | M2.1 [Mechanical] | Plans and specifications claim to comply with: 2023 FBC 8TH EDITION (Building, Plumbing, Mechanical), NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 42 | M2.1 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 43 | M2.2 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 44 | P1.0 [Plumbing] | The sheet contains a block of text: 'TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70' | HOLD | Chain hold | |
| └Scope 45 | P1.1 [Plumbing] | First floor sanitary (plumbing) plan for the specified project (sheet P1.1). | HOLD | Chain hold | |
| └Scope 46 | P1.1 [Plumbing] | Code/compliance statement (verbatim): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 47 | P1.2 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 48 | P1.3 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 49 | P1.5 [Plumbing] | Code/compliance statement (verbatim excerpt): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70" | HOLD | Chain hold | |
| └Scope 50 | P1.6 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 51 | P2.1 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 52 | P3.1 [Plumbing] | Typical guest room sanitary plan (single) | HOLD | Chain hold | |
| └Scope 53 | P3.1 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 54 | P4.1 [Plumbing] | Enlarged kitchen sanitary plan (sheet P4.1) | HOLD | Chain hold | |
| └Scope 55 | P4.1 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 56 | P4.1 [Plumbing] | ENLARGED KITCHEN SANITARY PLAN | HOLD | Chain hold | |
| └Scope 57 | P5.1 [Plumbing] | Install ZOELLER "OIL GUARD" SYSTEM MODEL 940-0006 to prevent introduction of oil into sanitary system. | HOLD | Chain hold | |
| └Scope 58 | P5.1 [Plumbing] | ZOELLER "OIL GUARD SYTEM" WITH ZOELLER "OIL GUARD" SYSTEM MODEL 940-0006 SHALL PREVENT INTRODUCTION OF OIL INTO SANITARY SYSTEM. | HOLD | Chain hold | |
| └Scope 59 | P5.2 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 60 | P5.3 [Plumbing] | Plumbing riser diagrams for sanitary piping | HOLD | Chain hold | |
| └Scope 61 | P5.3 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70 | HOLD | Chain hold | |
| └Scope 62 | P5.3 [Plumbing] | TYPICAL RISER DIAGRAMS - SANITARY PIPING | HOLD | Chain hold | |
| Section-22-004 | Storm Drainage | Chain hold | ||
| └Scope 01 | C-3 [Civil] | Install STORMTECH chamber system under pavement and discharge to existing inlet in N. 30TH STREET ROW. | HOLD | Chain hold | |
| └Scope 02 | C-7 [Civil] | Installation of StormTech SC-310 chambers (352 units) and associated stone bed and filter fabric per notes | HOLD | Chain hold | |
| └Scope 03 | C-7 [Civil] | TOTAL INSTALLED STORMTECH SYSTEM VOLUME = 12,164 CF | HOLD | Chain hold | |
| └Scope 04 | C-8 [Civil] | Stormtech SC-310 (and SC-740) chamber product technical specifications and nominal dimensions | HOLD | Chain hold | |
| └Scope 05 | C-8 [Civil] | CHAMBERS SHALL BE STORMTECH SC-740, SC-310 OR APPROVED EQUAL. | HOLD | Chain hold | |
| └Scope 06 | C-8 [Civil] | CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418-05, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". | HOLD | Chain hold | |
| └Scope 07 | C-15 [Civil] | 1/2" pre-molded expansion joint required at each side of all storm inlet structures and at all radius points | HOLD | Chain hold | |
| Section-22-005 | Gas Piping | Chain hold | ||
| └Scope 01 | P1.0 [Plumbing] | Gas piping notes | HOLD | Chain hold | |
| └Scope 02 | P1.0 [Plumbing] | Visible schedules/blocks: 'SHOCK ARRESTOR SCHEDULE', 'PLUMBING FIXTURE SPECIFICATIONS AND CONNECTION SCHEDULE', 'PLUMBING LEGEND', 'GAS PIPING NOTES' | HOLD | Chain hold | |
| Section-22-006 | Plumbing Fixtures | Chain hold | ||
| └Scope 01 | A-008-B | TOILETS STALLS and WATER CLOSETS | HOLD | Chain hold | |
| └Scope 02 | A-008-B | SHOWER STALLS | HOLD | Chain hold | |
| └Scope 03 | A-008-B | BATHTUBS | HOLD | Chain hold | |
| └Scope 04 | A-434 | 13 BATHROOM W/ SHOWER - BACK | HOLD | Chain hold | |
| └Scope 05 | A-434 | 8 BATHROOM W/ SHOWER - FRONT | HOLD | Chain hold | |
| └Scope 06 | A-434 | 5 BATHROOM W/ SHOWER - SHOWER DOOR | HOLD | Chain hold | |
| └Scope 07 | A-434 | 12 BATHROOM W/ SHOWER - RIGHT | HOLD | Chain hold | |
| └Scope 08 | A-434 | 6 BATHROOM W/ SHOWER - LEFT | HOLD | Chain hold | |
| └Scope 09 | A-434 | 4 BATHROOM FLOOR PLAN W/SHOWER | HOLD | Chain hold | |
| └Scope 10 | A-434 | 3 3D VIEW - BATHROOM W/SHOWER | HOLD | Chain hold | |
| └Scope 11 | A-434 | 11 BATHROOM W/TUB BACK | HOLD | Chain hold | |
| └Scope 12 | A-434 | 7 BATHROOM W/TUB FRONT | HOLD | Chain hold | |
| └Scope 13 | A-434 | 10 BATHROOM W/TUB RIGHT | HOLD | Chain hold | |
| └Scope 14 | A-434 | 2 BATHROOM W/TUB LEFT | HOLD | Chain hold | |
| └Scope 15 | A-434 | 9 BATHROOM FLOOR PLAN W/TUB | HOLD | Chain hold | |
| └Scope 16 | A-434 | 1 3D VIEW - BATHROOM W/TUB | HOLD | Chain hold | |
| └Scope 17 | A-435 | Accessible bathroom details with transfer shower configurations (right, left, front, back) | HOLD | Chain hold | |
| └Scope 18 | A-435 | Accessible bathroom details with roll-in shower configurations (right, left, front, back) | HOLD | Chain hold | |
| └Scope 19 | A-435 | 3D views for transfer shower and roll-in shower | HOLD | Chain hold | |
| └Scope 20 | A-435A | Accessible bathroom with transfer tub detail | HOLD | Chain hold | |
| └Scope 21 | A-435A | 3D view of transfer bathtub | HOLD | Chain hold | |
| └Scope 22 | A-435B | Accessible shower details (upper levels and ground level) as shown | HOLD | Chain hold | |
| └Scope 23 | A-435B | Standard shower plan and shower corner detail | HOLD | Chain hold | |
| └Scope 24 | A-435B | Tub surround and tub at non-rated wall detail | HOLD | Chain hold | |
| └Scope 25 | A-435B | Tub/shower at 1-hour wall detail | HOLD | Chain hold | |
| └Scope 26 | A-436 | Water closet waste lines to be located in wall chase, not in exterior walls. | HOLD | Chain hold | |
| └Scope 27 | A-436 | LOCATE FLOOR CLEAN-OUTS IN INCONSPICUOUS LOCATIONS, AND NOT IN GUESTROOMS. | HOLD | Chain hold | |
| └Scope 28 | E1.0 [Electrical] | Lighting fixture schedule | HOLD | Chain hold | |
| └Scope 29 | E2.4 [Electrical] | Plan identifies location labels for rooms, egress elements (stairs), and building equipment/fixtures such as ice machines, VTAC, stand pipe, and area of refuge. | HOLD | Chain hold | |
| └Scope 30 | E4.1 [Electrical] | Dimensioning of fixture / device locations (dimensions shown such as 12", 36", 104", 46", 60", 18", 35"). | HOLD | Chain hold | |
| └Scope 31 | ID121 [Interior] | Restroom accessories and plumbing fixtures are per the G.C.; refer to brand fixture matrix and design guidelines (note 3). | HOLD | Chain hold | |
| └Scope 32 | ID121 [Interior] | Purchasing Agent responsible for fixtures shown/tagged; installed by GC (note 15). | HOLD | Chain hold | |
| └Scope 33 | ID122 [Interior] | Restroom accessories and plumbing fixtures to be provided by G.C.; refer to brand fixture matrix and design guidelines; locations and mounting heights per AOR (note 3). | HOLD | Chain hold | |
| └Scope 34 | ID123 [Interior] | Restroom accessories and plumbing fixtures are provided by the G.C.; refer to brand fixture matrix and AOR for mounting heights. | HOLD | Chain hold | |
| └Scope 35 | ID124 [Interior] | Restroom accessories and plumbing fixtures are by G.C.; refer to brand fixture matrix and AOR for locations/mounting heights (per note 3). | HOLD | Chain hold | |
| └Scope 36 | ID124 [Interior] | NOTE: "RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR." | HOLD | Chain hold | |
| └Scope 37 | ID125 [Interior] | Restroom accessories and plumbing fixtures are per the G.C.; refer to brand fixture matrix and AOR for location and mounting heights (Note 3). | HOLD | Chain hold | |
| └Scope 38 | ID125 [Interior] | All non-decorative lighting location and legend per AOR and latest brand standards; fixtures tagged in drawings are per the Purchasing Agent; installed by G.C. (Note 15). | HOLD | Chain hold | |
| └Scope 39 | ID125 [Interior] | "3. RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR." | HOLD | Chain hold | |
| └Scope 40 | ID131 [Interior] | RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR. | HOLD | Chain hold | |
| └Scope 41 | ID131 [Interior] | NOTE (COMMON AREAS #3): 'RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.' | HOLD | Chain hold | |
| └Scope 42 | ID132 [Interior] | 3. RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR. | HOLD | Chain hold | |
| └Scope 43 | ID132 [Interior] | 15. REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C. | HOLD | Chain hold | |
| └Scope 44 | ID132 [Interior] | Plan references fixture/finish code PG-407 repeatedly: 'PG-407 TYP.' and 'PG-407'. | HOLD | Chain hold | |
| └Scope 45 | ID133 [Interior] | 3. RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR. | HOLD | Chain hold | |
| └Scope 46 | ID133 [Interior] | 15. REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C. | HOLD | Chain hold | |
| └Scope 47 | ID200 [Interior] | RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR. | HOLD | Chain hold | |
| └Scope 48 | ID200 [Interior] | REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C. | HOLD | Chain hold | |
| └Scope 49 | ID400 [Interior] | RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR. | HOLD | Chain hold | |
| └Scope 50 | ID400 [Interior] | REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C. | HOLD | Chain hold | |
| └Scope 51 | ID400.1 [Interior] | 3. RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR. | HOLD | Chain hold | |
| └Scope 52 | ID400.1 [Interior] | 15. REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C. | HOLD | Chain hold | |
| └Scope 53 | ID401 [Interior] | 3. RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR. | HOLD | Chain hold | |
| └Scope 54 | ID401 [Interior] | 15. REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C. | HOLD | Chain hold | |
| └Scope 55 | ID402 [Interior] | RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR. | HOLD | Chain hold | |
| └Scope 56 | ID402 [Interior] | ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C. | HOLD | Chain hold | |
| └Scope 57 | ID403 [Interior] | Note 3: "RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR." | HOLD | Chain hold | |
| └Scope 58 | ID403 [Interior] | Note 15: "REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C." | HOLD | Chain hold | |
| └Scope 59 | ID404 [Interior] | RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR. | HOLD | Chain hold | |
| └Scope 60 | ID404 [Interior] | REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C. | HOLD | Chain hold | |
| └Scope 61 | ID422 [Interior] | E. FIXTURE PER PLUMBING FIXTURE MATRIX IN DESIGN GUIDE PROJECT MANUAL. | HOLD | Chain hold | |
| └Scope 62 | ID424 [Interior] | Fixture per plumbing fixture matrix in design guide project manual (Note E). | HOLD | Chain hold | |
| └Scope 63 | ID431 [Interior] | Note E: 'FIXTURE PER PLUMBING FIXTURE MATRIX IN DESIGN GUIDE PROJECT MANUAL.' | HOLD | Chain hold | |
| └Scope 64 | ID432 [Interior] | Electrical legend and outlet/fixture locations | HOLD | Chain hold | |
| └Scope 65 | ID432 [Interior] | Electrical legend items visible: 'CEILING LT FIXTURE', 'WALL MTD LT FIXTURE', 'TV', 'GFI', 'T RACEWAY & WIRING', 'JUNCTION BOX', 'LIGHT SWITCH', 'TELEPHONE OUTLET', 'TV OUTLET', 'GROUND FAULT INTERRUPTER, DUPLEX RECEPTACLE', 'DUPLEX RECEPTACLE', 'THERMOSTAT', 'MASTER SWITCH', 'DATA DUPLEX', etc. | HOLD | Chain hold | |
| └Scope 66 | ID440 [Interior] | E. FIXTURE PER PLUMBING FIXTURE MATRIX IN DESIGN GUIDE PROJECT MANUAL. | HOLD | Chain hold | |
| └Scope 67 | ID441 [Interior] | FIXTURE PER PLUMBING FIXTURE MATRIX IN DESIGN GUIDE PROJECT MANUAL. | HOLD | Chain hold | |
| └Scope 68 | ID442 [Interior] | ADA restroom layouts (with tub) | HOLD | Chain hold | |
| └Scope 69 | ID442 [Interior] | ADA restroom layouts (roll-in shower / long) | HOLD | Chain hold | |
| └Scope 70 | ID501 [Interior] | Provision and installation of J18 LED light fixture in 45 degree channel with lens on all sides of frame | HOLD | Chain hold | |
| └Scope 71 | ID501 [Interior] | Referenced detail/parts: "J18 LED LIGHT FIXTURE IN 45 DEGREE CHANNEL WITH LENS ON ALL SIDES OF FRAME" | HOLD | Chain hold | |
| └Scope 72 | ID509 [Interior] | NOTE: CONCEAL WIRING FOR LED FIXTURE | HOLD | Chain hold | |
| └Scope 73 | P1.0 [Plumbing] | Plumbing fixture specifications and connection schedule (detailed table present) | HOLD | Chain hold | |
| └Scope 74 | P1.4 [Plumbing] | Fourth floor plumbing plan (layout of plumbing fixtures and related items on the fourth floor) | HOLD | Chain hold | |
| └Scope 75 | P5.2 [Plumbing] | Penetration schedules for pipe and fixture openings through fire rated floors and walls | HOLD | Chain hold | |
| Section-22-007 | Water Heaters / Equipment | Chain hold | ||
| └Scope 01 | C-6 [Civil] | Site utilities including PRIVATE LIFT STATION and ELECTRICAL TRANSFORMER PAD locations (shown) | HOLD | Chain hold | |
| └Scope 02 | C-12 [Civil] | Construct private lift station and connect force main to existing manhole (core drill existing manhole and provide watertight seal per City detail) | HOLD | Chain hold | |
| └Scope 03 | C-12 [Civil] | Install grease interceptor: 100 GPM SCHIER GB-250 (with inlet/outlet invert elevations provided) | HOLD | Chain hold | |
| └Scope 04 | C-12.1 [Civil] | Grease trap/interceptor details and installation guidance for GB-250 model | HOLD | Chain hold | |
| └Scope 05 | C-12.1 [Civil] | GREASE TRAP DETAILS | HOLD | Chain hold | |
| └Scope 06 | C-13 [Civil] | Supply one complete ECONO-GP Pre-Fab Lift Station, per design. | HOLD | Chain hold | |
| └Scope 07 | C-13 [Civil] | Pumps shall be capable of grinding and pumping domestic & commercial sewage. | HOLD | Chain hold | |
| └Scope 08 | C-13 [Civil] | PUMPS: Submersible grinder pumps shall be HOMA Model GRP. | HOLD | Chain hold | |
| └Scope 09 | C-13 [Civil] | The pumps shall be installed in the ECONO-GP FRP wetwell utilizing a dual slide rail system. | HOLD | Chain hold | |
| └Scope 10 | C-22 [Civil] | ALL IRRIGATION EQUIPMENT (PUMP, CONTROLLER, ETC.) SHALL BE PLACED WITHIN FENCED ENCLOSURE. | HOLD | Chain hold | |
| └Scope 11 | E2.1 [Electrical] | WATER HEATER 007 | HOLD | Chain hold | |
| └Scope 12 | E5.2 [Electrical] | Panel circuits include guest room receptacles (repeated entries), site lighting circuits, heat pump circuits, flagpole lights, BF heater, monument sign, and spares (as listed on schedules). | HOLD | Chain hold | |
| └Scope 13 | E5.3 [Electrical] | Heat pump branch circuits (labeled M) specified: conductor #12, 3/4" conduit, 20A breakers, 1100 VA per circuit as shown. | HOLD | Chain hold | |
| └Scope 14 | E5.4 [Electrical] | Mechanical equipment circuits: listed as 'HEAT PUMP' with breaker 20A, conductor '#12', conduit '3/4"' | HOLD | Chain hold | |
| └Scope 15 | M1.1 [Mechanical] | Water heater identified as 'WATER HEATER 007' | HOLD | Chain hold | |
| └Scope 16 | M2.0 [Mechanical] | Provide schedules for split system heat pump units | HOLD | Chain hold | |
| └Scope 17 | M2.0 [Mechanical] | SPLIT SYSTEM HEAT PUMP UNIT SCHEDULE | HOLD | Chain hold | |
| └Scope 18 | P5.1 [Plumbing] | Provide and install ZOELLER PUMP CO. MODEL 161, 115 VOLT, 1/2 HP 60Hz pump. | HOLD | Chain hold | |
| └Scope 19 | P5.1 [Plumbing] | Provide pump capacity of 93 GALLONS @ 10 FT. HEAD as indicated. | HOLD | Chain hold | |
| └Scope 20 | P5.1 [Plumbing] | Provide high liquid level pump-on and pump-off levels per drawings. | HOLD | Chain hold | |
| Section-22-008 | Insulation / Supports | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-22-009 | Testing / Commissioning | Chain hold | ||
| └Scope 01 | F1-00 [FIRE-ALARM-SYSTEM] | Testing and commissioning requirements for detectors: canned smoke for smoke detectors, listed heat source for heat detectors, introduction of CO for CO detectors. | HOLD | Chain hold | |
| DIV 23 | Heating, Ventilating, and Air Conditioning9 | |||
| Section-23-001 | HVAC Submittals | Chain hold | ||
| └Scope 01 | M1.0 [Mechanical] | Sheet is the Mechanical Cover Sheet (M1.0) containing HVAC general notes. | HOLD | Chain hold | |
| └Scope 02 | M1.0 [Mechanical] | HVAC GENERAL NOTES (title present on sheet) | HOLD | Chain hold | |
| └Scope 03 | M1.1 [Mechanical] | First floor mechanical layout (ducting, equipment locations) as shown on sheet M1.1 | HOLD | Chain hold | |
| └Scope 04 | M1.1 [Mechanical] | MATV noted | HOLD | Chain hold | |
| └Scope 05 | M1.1 [Mechanical] | Room-by-room mechanical indications for public and guest spaces (room names and room numbers shown on plan) | HOLD | Chain hold | |
| └Scope 06 | M1.1 [Mechanical] | FIRST FLOOR MECHANICAL PLAN M1.1 | HOLD | Chain hold | |
| └Scope 07 | M1.2 [Mechanical] | Second floor mechanical plan (as indicated by sheet title 'SECOND FLOOR MECHANICAL PLAN') | HOLD | Chain hold | |
| └Scope 08 | M1.2 [Mechanical] | CAD FILE: (field shown but value not provided in parsed text) | HOLD | Chain hold | |
| └Scope 09 | M1.2 [Mechanical] | SECOND FLOOR MECHANICAL PLAN M1.2 | HOLD | Chain hold | |
| └Scope 10 | M1.3 [Mechanical] | Third floor mechanical plan (sheet M1.3) | HOLD | Chain hold | |
| └Scope 11 | M1.3 [Mechanical] | Stand pipe shown/labeled on the plan | HOLD | Chain hold | |
| └Scope 12 | M1.3 [Mechanical] | General mechanical layout for rooms/corridor on third floor (plan-view shown) | HOLD | Chain hold | |
| └Scope 13 | M1.3 [Mechanical] | Graphic/drawing content: plan view of the third floor mechanical layout (single sheet image) | HOLD | Chain hold | |
| └Scope 14 | M1.4 [Mechanical] | Fourth floor mechanical plan | HOLD | Chain hold | |
| └Scope 15 | M1.4 [Mechanical] | Stand pipe (labeled on sheet as Stand pipe) | HOLD | Chain hold | |
| └Scope 16 | M1.4 [Mechanical] | Area of refuge (labeled on sheet as Area of refuge) | HOLD | Chain hold | |
| └Scope 17 | M1.4 [Mechanical] | Ice Machine (labeled on sheet as Ice Machine) | HOLD | Chain hold | |
| └Scope 18 | M1.4 [Mechanical] | FOURTH FLOOR MECHANICAL PLAN M1.4 | HOLD | Chain hold | |
| └Scope 19 | M1.5 [Mechanical] | FIFTH FLOOR MECHANICAL PLAN (sheet M1.5) | HOLD | Chain hold | |
| └Scope 20 | M1.5 [Mechanical] | Stand pipe locations | HOLD | Chain hold | |
| └Scope 21 | M1.5 [Mechanical] | Area of refuge locations | HOLD | Chain hold | |
| └Scope 22 | M1.5 [Mechanical] | Ice Machine (noted on plan) | HOLD | Chain hold | |
| └Scope 23 | M1.5 [Mechanical] | FIFTH FLOOR MECHANICAL PLAN M1.5 | HOLD | Chain hold | |
| └Scope 24 | M1.6 [Mechanical] | Mechanical roof plan (roof-mounted mechanical equipment shown) | HOLD | Chain hold | |
| └Scope 25 | M1.6 [Mechanical] | Equipment labels present on sheet: "OUTSIDE AIR", "HOOD COIL", "CONDENSER COIL", "SUPPLY AIR" | HOLD | Chain hold | |
| └Scope 26 | M1.6 [Mechanical] | Visible equipment/labels on sheet: OUTSIDE AIR, HOOD COIL, CONDENSER COIL, SUPPLY AIR | HOLD | Chain hold | |
| └Scope 27 | M2.0 [Mechanical] | Provide schedules for packaged thru-wall units | HOLD | Chain hold | |
| └Scope 28 | M2.0 [Mechanical] | Provide schedules for mini split cooling units | HOLD | Chain hold | |
| └Scope 29 | M2.0 [Mechanical] | MECHANICAL SCHEDULES M2.0 | HOLD | Chain hold | |
| └Scope 30 | M2.0 [Mechanical] | PACKAGED THRU-WALL UNIT SCHEDULE | HOLD | Chain hold | |
| └Scope 31 | M2.0 [Mechanical] | MINI SPLIT COOLING UNIT SCHEDULE | HOLD | Chain hold | |
| └Scope 32 | M2.1 [Mechanical] | Mechanical schedules shown on sheet M2.1 | HOLD | Chain hold | |
| └Scope 33 | M2.1 [Mechanical] | MECHANICAL SCHEDULES M2.1 | HOLD | Chain hold | |
| └Scope 34 | M2.2 [Mechanical] | Make up air unit detail | HOLD | Chain hold | |
| └Scope 35 | M2.2 [Mechanical] | Access door and panel details | HOLD | Chain hold | |
| └Scope 36 | M2.2 [Mechanical] | Roof discharge/intake detail | HOLD | Chain hold | |
| └Scope 37 | M2.2 [Mechanical] | General mechanical details (sheet-level) | HOLD | Chain hold | |
| └Scope 38 | M2.2 [Mechanical] | MECHANICAL DETAILS M2.2 | HOLD | Chain hold | |
| Section-23-002 | HVAC Insulation | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-23-003 | HVAC Piping | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-23-004 | Ductwork | Chain hold | ||
| └Scope 01 | F7-00 [FIRE-ALARM-SYSTEM] | Field verification of duct detector locations (FIELD TO DETERMINE PATHWAY FOR SLC CIRCUIT BELOW) | HOLD | Chain hold | |
| └Scope 02 | F7-00 [FIRE-ALARM-SYSTEM] | FIELD TO VERIFY LOCATION OF DUCT DETECTORS (FIELD TO DETERMINE PATHWAY FOR SLC CIRCUIT BELOW) | HOLD | Chain hold | |
| Section-23-005 | Air Distribution | Chain hold | ||
| └Scope 01 | A-006 | UL DESIGN INFORMATION (product/design ratings and UL product details) | HOLD | Chain hold | |
| └Scope 02 | A-112 | Vertical terminal air conditioner (VTAC) locations indicated | HOLD | Chain hold | |
| └Scope 03 | A-117 | Provision of screened/secure enclosures for mechanical equipment where required by jurisdiction | HOLD | Chain hold | |
| └Scope 04 | A-117 | Reference note F: 'PROVIDE SCREENED/SECURE ENCLOSURES FOR MECHANICAL EQUIPMENT WHERE REQUIRED BY LOCAL JURISDICTION.' | HOLD | Chain hold | |
| └Scope 05 | A-312 | Provide pathway for outdoor air ducts per sheet 910 for guestrooms and corridors | HOLD | Chain hold | |
| └Scope 06 | A-312 | Provide pathway for outdoor air ducts as directed on sheet 910, for all guestrooms and guestroom corridors | HOLD | Chain hold | |
| └Scope 07 | A-312 | Designer instruction: "DESIGNER TO HOLD MINIMUM CEILING HEIGHTS AS INDICATED, FLOOR TO FLOOR HEIGHTS MAY NEED TO BE ADJUSTED TO ACCOMMODATE DUCTWORK." | HOLD | Chain hold | |
| └Scope 08 | A-313 | Provide pathway for outdoor air ducts per sheet 910 | HOLD | Chain hold | |
| └Scope 09 | A-313 | PROVIDE PATHWAY FOR OUTDOOR AIR DUCTS AS DIRECTED ON SHEET 910, FOR ALL GUESTROOMS AND GUESTROOM CORRIDORS. | HOLD | Chain hold | |
| └Scope 10 | A-313 | DESIGNER TO HOLD MINIMUM CEILING HEIGHTS AS INDICATED, FLOOR TO FLOOR HEIGHTS MAY NEED TO BE ADJUSTED TO ACCOMMODATE DUCTWORK. | HOLD | Chain hold | |
| └Scope 11 | A-314 | Provide pathway for outdoor air ducts as directed on sheet 910 for all guestrooms and guestroom corridors. | HOLD | Chain hold | |
| └Scope 12 | A-314 | PROVIDE PATHWAY FOR OUTDOOR AIR DUCTS AS DIRECTED ON SHEET 910, FOR ALL GUESTROOMS AND GUESTROOM CORRIDORS. | HOLD | Chain hold | |
| └Scope 13 | A-436 | Exhaust fan flush mounted in ceiling, typical all public bathrooms. | HOLD | Chain hold | |
| └Scope 14 | M2.0 [Mechanical] | Provide diffuser schedule and diffuser designations | HOLD | Chain hold | |
| └Scope 15 | M2.0 [Mechanical] | DIFFUSER SCHEDULE | HOLD | Chain hold | |
| └Scope 16 | M2.2 [Mechanical] | Supply air diffuser detail | HOLD | Chain hold | |
| Section-23-006 | Air Handling Equipment | Chain hold | ||
| └Scope 01 | M2.2 [Mechanical] | Ceiling exhaust fan detail | HOLD | Chain hold | |
| └Scope 02 | M2.2 [Mechanical] | Vertical air handling unit with DX cooling coil detail | HOLD | Chain hold | |
| Section-23-007 | Packaged HVAC Equipment | Chain hold | ||
| └Scope 01 | E2.4 [Electrical] | Labels visible on plan: Area of refuge; Stand pipe; VTAC; Ice Machine; STORAGE 050; STAIR 2.4; STAIR 1.4; CORRIDOR; LINEN 045; Mechanical 046; Elect. 047; CHUTE 049; ICE MACHINE 414 (label present on drawing); multiple room numbers (e.g., 401, 402, 403, 404, 405, 406, 407, 408, 409, 410, 411, 412, 413, 414, 415, 416, 417, 418, 419, 420, 421) | HOLD | Chain hold | |
| └Scope 02 | E2.5 [Electrical] | Locations and labels for room power devices and equipment such as VTACs, ice machines, electrical room (Elect.), mechanical room, stand pipe and area of refuge are shown on the drawing. | HOLD | Chain hold | |
| └Scope 03 | E3.4 [Electrical] | Plan-level annotations for area of refuge, stand pipe, VTAC, ice machine, storage, linen, mechanical, electrical, chute, corridor and stairs | HOLD | Chain hold | |
| └Scope 04 | E3.4 [Electrical] | Plan text includes: Area of refuge, Stand pipe, VTAC, Ice Machine, STORAGE, LINEN, Mechanical, Elect., CORRIDOR, CHUTE, STAIR 1.4, STAIR 2.4 | HOLD | Chain hold | |
| └Scope 05 | E3.5 [Electrical] | VTAC (vinyl through-the-wall air conditioners) labels | HOLD | Chain hold | |
| └Scope 06 | E4.1 [Electrical] | Layout and identification of receptacle/lighting circuits for guestroom types labeled on sheet: ACC KING SUITE GUESTROOM, QUEEN/QUEEN SUITE GUESTROOM, KING GUESTROOM. | HOLD | Chain hold | |
| └Scope 07 | E5.2 [Electrical] | Wire and conduit sizes shown for many circuits (examples: '#12', '3/4"' conduit for guest room receptacles; '#8', '1"' conduit for site lighting). | HOLD | Chain hold | |
| └Scope 08 | E5.3 [Electrical] | Guest-room branch circuits (receptacles) specified: conductor #12, 3/4" conduit, 20A breakers, 1200 VA per circuit as shown. | HOLD | Chain hold | |
| └Scope 09 | E5.4 [Electrical] | Guest room receptacle circuits: listed as 'Guest room' with breaker 20A, conductor '#12', conduit '3/4"' | HOLD | Chain hold | |
| └Scope 10 | E5.4 [Electrical] | L LIGHTING K KITCHEN EQ PROVIDE EQUIPMENT GROUND BUS R RECEPTACLES E EQUIPMENT PROVIDE FEED THRU AND/OR SUB FEED LUGS FOR MULTI-SECTION PANELS M MECH EQUIP O OTHER - CKT. #ITEM | HOLD | Chain hold | |
| └Scope 11 | ID505 [Interior] | RECEPTACLES INSTALLED IN FACE OF APRON. | HOLD | Chain hold | |
| └Scope 12 | ID505 [Interior] | RECEPTACLES INSTALLED IN FACE OF APRON | HOLD | Chain hold | |
| └Scope 13 | ID507 [Interior] | Pop-up receptacle specification: "GLENBEIGH CONTEMPORARY" AS MANUF. BY BYRNE; (2) 15 AMP SIMPLEX RECEPTACLES; FINISH TO BE 'MIDNIGHT BLACK;' HARDWIRED. | HOLD | Chain hold | |
| └Scope 14 | ID520 [Interior] | Coordinate roller shade, drapery, and PTAC relationships per detail sections. | HOLD | Chain hold | |
| └Scope 15 | M1.1 [Mechanical] | PTAC units (reference PTAC-1) | HOLD | Chain hold | |
| └Scope 16 | M1.4 [Mechanical] | VTAC (labeled on sheet as VTAC) | HOLD | Chain hold | |
| └Scope 17 | M1.5 [Mechanical] | VTAC locations (noted on drawing) | HOLD | Chain hold | |
| └Scope 18 | M1.5 [Mechanical] | PTAC-1 locations (noted on drawing) | HOLD | Chain hold | |
| └Scope 19 | P1.4 [Plumbing] | VTAC locations | HOLD | Chain hold | |
| └Scope 20 | P1.5 [Plumbing] | VTAC equipment indicated on plan. | HOLD | Chain hold | |
| └Scope 21 | P1.5 [Plumbing] | On-sheet text: Stand pipe, Area of refuge, Ice Machine, VTAC (as shown on plan) | HOLD | Chain hold | |
| Section-23-008 | Controls | Chain hold | ||
| └Scope 01 | C-13 [Civil] | A heat sensor thermostat shall be attached to the top end of the motor. | HOLD | Chain hold | |
| └Scope 02 | C-13 [Civil] | Two heat sensor thermostats shall be used on three phase motors. | HOLD | Chain hold | |
| └Scope 03 | ID422 [Interior] | Q. THERMOSTAT. ALIGN WITH OUTLET BELOW WHERE OCCURS. SEE ELEVATION FOR ADDITIONAL INFORMATION. ALIGN DEVICES VERTICALLY 6" FROM EDGE OF WALL. | HOLD | Chain hold | |
| └Scope 04 | ID424 [Interior] | Align thermostat with outlet below where occurs; see elevation for additional information; align devices vertically 6" from edge of wall (Note Q). | HOLD | Chain hold | |
| └Scope 05 | ID440 [Interior] | Q. THERMOSTAT. ALIGN WITH OUTLET BELOW WHERE OCCURS. SEE ELEVATION FOR ADDITIONAL INFORMATION. ALIGN DEVICES VERTICALLY 6" FROM EDGE OF WALL. | HOLD | Chain hold | |
| └Scope 06 | ID441 [Interior] | THERMOSTAT: ALIGN WITH OUTLET BELOW; ALIGN DEVICES VERTICALLY 6" FROM EDGE OF WALL. | HOLD | Chain hold | |
| Section-23-009 | Testing / Adjusting / Balancing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 25 | Integrated Automation8 | |||
| Section-25-001 | Automation Network | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-25-002 | Control / Monitoring Network | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-25-003 | Local Control Units | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-25-004 | Automation Software | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-25-005 | Terminal Devices | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-25-006 | Facility Controls | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-25-007 | Control Sequences | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-25-008 | Integrated Automation Commissioning | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 26 | Electrical10 | |||
| Section-26-001 | Electrical Submittals | Chain hold | ||
| └Scope 01 | E1.0 [Electrical] | General electrical notes | HOLD | Chain hold | |
| └Scope 02 | E1.0 [Electrical] | Electrical symbol schedule | HOLD | Chain hold | |
| └Scope 03 | E1.0 [Electrical] | Electrical cover sheet for project E1.0 | HOLD | Chain hold | |
| └Scope 04 | E1.2 [Electrical] | Placement/labeling of guest rooms, corridors, stairs, storage, mechanical and electrical rooms as shown on the drawing. | HOLD | Chain hold | |
| └Scope 05 | E1.2 [Electrical] | Floor plan contains labeled rooms and spaces including (verbatim examples as shown): STORAGE 030, KING SUITE 217, KING SUITE 215, QUEEN QUEEN 213, ACCESSIBLE KING SUITE 211, KING 207, QUEEN QUEEN 220, QUEEN QUEEN 216, QUEEN QUEEN 214, 205 KING, 203 QUEEN QUEEN 201, LINEN 025, QUEEN QUEEN KING KING SUITE 206, KING SUITE 208, QUEEN QUEEN 212, KING SUITE 219, STAIR 1.2 033, STAIR 2.2 032, KING 209, Mechanical 026, Elect. 027, CORRIDOR 028, CHUTE 029, KING SUITE 210, GUEST LAUNDRY 023, KING, QUEEN QUEEN (multiple other room labels appear on the plan) | HOLD | Chain hold | |
| └Scope 06 | E1.4 [Electrical] | Notes and code compliance statement referencing building and electrical codes | HOLD | Chain hold | |
| └Scope 07 | E1.5 [Electrical] | Compliance verification statement for codes listed on sheet | HOLD | Chain hold | |
| └Scope 08 | E2.1 [Electrical] | STORAGE | HOLD | Chain hold | |
| └Scope 09 | E2.1 [Electrical] | ACCESSIBLE | HOLD | Chain hold | |
| └Scope 10 | E2.1 [Electrical] | KING | HOLD | Chain hold | |
| └Scope 11 | E2.1 [Electrical] | STAIR 2.1 | HOLD | Chain hold | |
| └Scope 12 | E2.1 [Electrical] | 022 | HOLD | Chain hold | |
| └Scope 13 | E2.1 [Electrical] | FOOD PREP 006 | HOLD | Chain hold | |
| └Scope 14 | E2.1 [Electrical] | CONNECT & PRINT 004 | HOLD | Chain hold | |
| └Scope 15 | E2.1 [Electrical] | LOBBY 001 | HOLD | Chain hold | |
| └Scope 16 | E2.1 [Electrical] | REGISTRATION 002 | HOLD | Chain hold | |
| └Scope 17 | E2.1 [Electrical] | WORK 008 | HOLD | Chain hold | |
| └Scope 18 | E2.1 [Electrical] | LAUNDRY 019 | HOLD | Chain hold | |
| └Scope 19 | E2.1 [Electrical] | LINEN 010 | HOLD | Chain hold | |
| └Scope 20 | E2.1 [Electrical] | EXERCISE ROOM 011 | HOLD | Chain hold | |
| └Scope 21 | E2.1 [Electrical] | QUEEN 105 | HOLD | Chain hold | |
| └Scope 22 | E2.1 [Electrical] | EMPLOYEE BREAK ROOM 020 | HOLD | Chain hold | |
| └Scope 23 | E2.1 [Electrical] | CORRIDOR 016 | HOLD | Chain hold | |
| └Scope 24 | E2.1 [Electrical] | OFFICE 007 | HOLD | Chain hold | |
| └Scope 25 | E2.1 [Electrical] | VESTIBULE 000 | HOLD | Chain hold | |
| └Scope 26 | E2.1 [Electrical] | CORRIDOR 017 | HOLD | Chain hold | |
| └Scope 27 | E2.1 [Electrical] | ELEC. ROOM + MATV | HOLD | Chain hold | |
| └Scope 28 | E2.1 [Electrical] | STAIR 1.1 023 | HOLD | Chain hold | |
| └Scope 29 | E2.1 [Electrical] | BREAKFAST 005 | HOLD | Chain hold | |
| └Scope 30 | E2.1 [Electrical] | Women's 013 | HOLD | Chain hold | |
| └Scope 31 | E2.1 [Electrical] | Men's 012 | HOLD | Chain hold | |
| └Scope 32 | E2.1 [Electrical] | Corridor 014 | HOLD | Chain hold | |
| └Scope 33 | E2.1 [Electrical] | KING KING 103 104 | HOLD | Chain hold | |
| └Scope 34 | E2.1 [Electrical] | MECH 031 | HOLD | Chain hold | |
| └Scope 35 | E2.1 [Electrical] | KING 102 | HOLD | Chain hold | |
| └Scope 36 | E2.1 [Electrical] | KING SUITE 107 | HOLD | Chain hold | |
| └Scope 37 | E2.1 [Electrical] | KING SUITE 108 | HOLD | Chain hold | |
| └Scope 38 | E2.1 [Electrical] | KING 101 | HOLD | Chain hold | |
| └Scope 39 | E2.1 [Electrical] | QUEEN | HOLD | Chain hold | |
| └Scope 40 | E2.1 [Electrical] | FIRST FLOOR POWER PLAN | HOLD | Chain hold | |
| └Scope 41 | E2.1 [Electrical] | GENERAL NOTES: | HOLD | Chain hold | |
| └Scope 42 | E2.2 [Electrical] | SECOND FLOOR POWER PLAN | HOLD | Chain hold | |
| └Scope 43 | E2.2 [Electrical] | Electrical/power layout for the second floor as shown on sheet E2.2 | HOLD | Chain hold | |
| └Scope 44 | E2.3 [Electrical] | THIRD FLOOR POWER PLAN | HOLD | Chain hold | |
| └Scope 45 | E2.3 [Electrical] | third floor electrical/power layout (as depicted on sheet E2.3) | HOLD | Chain hold | |
| └Scope 46 | E2.4 [Electrical] | Electrical power layout for the fourth floor of the referenced Fairfield Inn project (as indicated by sheet title). | HOLD | Chain hold | |
| └Scope 47 | E2.5 [Electrical] | Provide/display power layout for fifth floor of Fairfield Inn (electrical floor plan shown on sheet E2.5). | HOLD | Chain hold | |
| └Scope 48 | E2.6 [Electrical] | Electrical roof plan (roof electrical layout) as indicated on sheet E2.6 | HOLD | Chain hold | |
| └Scope 49 | E3.1 [Electrical] | Some numeric labels and load/weight markings visible on plan: "75 lbs", "120 lbs 90 lbs", "90 lbs" | HOLD | Chain hold | |
| └Scope 50 | E3.2 [Electrical] | Device placements and coverage for second-floor guest rooms, corridors, stairs, storage, mechanical, electrical, chute, and guest laundry (labels and room numbers shown on sheet) | HOLD | Chain hold | |
| └Scope 51 | E3.3 [Electrical] | A "Stand pipe" label is present in the plan | HOLD | Chain hold | |
| └Scope 52 | E3.4 [Electrical] | Coverage of guestrooms and corridor areas on the fourth floor (rooms listed explicitly on drawing: 401-421) | HOLD | Chain hold | |
| └Scope 53 | E3.4 [Electrical] | Text on plan includes room labels: 401, 402, 403, 404, 405, 406, 407, 408, 409, 410, 411, 412, 413, 414, 415, 416, 417, 418, 419, 420, 421 | HOLD | Chain hold | |
| └Scope 54 | E3.5 [Electrical] | Floor plan annotations showing Areas of refuge | HOLD | Chain hold | |
| └Scope 55 | E3.5 [Electrical] | Stand pipe locations | HOLD | Chain hold | |
| └Scope 56 | E3.5 [Electrical] | Room identification labels and numbers (example: KING SUITE 517, QUEEN QUEEN 513, etc.) | HOLD | Chain hold | |
| └Scope 57 | E3.5 [Electrical] | Stair identifications (STAIR 1.5, STAIR 2.5) | HOLD | Chain hold | |
| └Scope 58 | E3.5 [Electrical] | Mechanical and electrical room labels (Mechanical 056, Elect. 057) | HOLD | Chain hold | |
| └Scope 59 | E3.5 [Electrical] | Ice Machine, Storage, Linen, Corridor, Chute | HOLD | Chain hold | |
| └Scope 60 | E4.0 [Electrical] | ELECTRICAL GUESTROOM CONTROL | HOLD | Chain hold | |
| └Scope 61 | E4.1 [Electrical] | Electrical layout for guestrooms (sheet titled ELECTRICAL GUESTROOM PLANS, E4.1). | HOLD | Chain hold | |
| └Scope 62 | E4.2 [Electrical] | Electrical layout for guestrooms referenced on sheet E4.2 | HOLD | Chain hold | |
| └Scope 63 | E4.2 [Electrical] | Graphic/layout details for the following guestroom types: KING SUITE GUESTROOM; ACC KING GUESTROOM; ACC QUEEN/QUEEN GUESTROOM; ACC QUEEN SUITE GUESTROOM | HOLD | Chain hold | |
| └Scope 64 | E4.2 [Electrical] | Note (legible): 'UPDATED DIMENSIONS ACCORDING TO LATEST HOTEL/OWNER CHANGES.' | HOLD | Chain hold | |
| └Scope 65 | E5.0 [Electrical] | Electrical riser diagram (sheet E5.0) | HOLD | Chain hold | |
| └Scope 66 | E5.1 [Electrical] | Provide electrical detail drawings and notes as shown on sheet E5.1 | HOLD | Chain hold | |
| └Scope 67 | E5.1 [Electrical] | Area of rescue riser detail | HOLD | Chain hold | |
| └Scope 68 | E5.1 [Electrical] | Working clearance requirements for electrical equipment per N.E.C. Article 110-26 | HOLD | Chain hold | |
| └Scope 69 | E5.1 [Electrical] | ELECTRICAL DETAILS | HOLD | Chain hold | |
| └Scope 70 | E5.1 [Electrical] | WORKING CLEARANCE FOR ELECTRICAL EQUIPMENT | HOLD | Chain hold | |
| └Scope 71 | E5.2 [Electrical] | Breaker sizes shown (predominantly '20A' for listed circuits). | HOLD | Chain hold | |
| └Scope 72 | E5.3 [Electrical] | Provision of equipment ground bus (note on sheet). | HOLD | Chain hold | |
| └Scope 73 | E5.3 [Electrical] | Provision of feed-thru and/or sub-feed lugs for multi-section panels (note on sheet). | HOLD | Chain hold | |
| └Scope 74 | E5.3 [Electrical] | Load connected, sizing and demand calculations shown per panel (connected load (VA), connected ampacity (A), sizing totals, demand totals (VA), demand ampacity (A)). | HOLD | Chain hold | |
| └Scope 75 | E5.3 [Electrical] | Typical circuit rows: 'Guest room R #12 3/4" 20A 1 1200 A 1200 1 20A 3/4" #12 R Guest room' (repeated multiple times across panels). | HOLD | Chain hold | |
| └Scope 76 | E5.4 [Electrical] | Provide equipment ground bus per legend | HOLD | Chain hold | |
| └Scope 77 | E5.4 [Electrical] | Provide feed thru and/or sub feed lugs for multi-section panels per legend | HOLD | Chain hold | |
| └Scope 78 | E5.4 [Electrical] | Panel loading calculations: connected load (VA) by phase, connected totals, sizing totals, connected ampacity (A), sizing ampacity (A), demand totals and demand ampacity | HOLD | Chain hold | |
| └Scope 79 | E5.4 [Electrical] | Legend text: "PROVIDE EQUIPMENT GROUND BUS" | HOLD | Chain hold | |
| Section-26-002 | Grounding / Bonding | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-26-003 | Conduit / Wire / Cable | Chain hold | ||
| └Scope 01 | C-5 [Civil] | WIRE MESH SHALL BE HARDWARE CLOTH 23 GAUGE MIN. AND SHALL HAVE 1/4 INCH MESH. | HOLD | Chain hold | |
| └Scope 02 | C-14 [Civil] | Hydrostatic pressure and leakage testing of potable water pipes per AWWA C600/C605/C603 as applicable | HOLD | Chain hold | |
| └Scope 03 | C-14 [Civil] | ALL PIPE, PIPE FITTINGS, PIPE JOINT PACKING AND JOINTING MATERIALS, VALVES, FIRE HYDRANTS, AND METERS INSTALLED UNDER THIS PROJECT WILL CONFORM TO APPLICABLE AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARDS. | HOLD | Chain hold | |
| └Scope 04 | C-22 [Civil] | IRRIGATION SHALL MEET ALL APPLICABLE CURRENT MUNICIPAL, COUNTY, STATE OR FEDERAL CODES, ORDINANCES AND REGULATIONS THAT HAVE JURISDICTION. | HOLD | Chain hold | |
| └Scope 05 | E5.0 [Electrical] | Feeder diagram (labeled NO SCALE) | HOLD | Chain hold | |
| └Scope 06 | F1-00 [FIRE-ALARM-SYSTEM] | Provide 3/4" conduit from FACP to telephone backboard for owner-provided central station monitoring. | HOLD | Chain hold | |
| └Scope 07 | F1-00 [FIRE-ALARM-SYSTEM] | INSTALLATION TO BE DONE IN ACCORDANCE WITH ALL APPLICABLE CITY CODES, NFPA-72 2019 EDITION, NFPA-70 (NEC) 2020 EDITION, FBCB (2023 EDITION), FFPC (8TH EDITION), UNIFORM RULE 69A, RULES AND REGULATIONS OF THE STATE FIRE MARSHAL'S OFFICE, AND FLORIDA STATUTE 633. | HOLD | Chain hold | |
| └Scope 08 | F15-00 [FIRE-ALARM-SYSTEM] | Wire properties specified: 'B' 16/2 FPLP/R NAC 16 AWG, 2 COND. SOLID COPPER FPLP/R ANALOG UNSHIELDED. | HOLD | Chain hold | |
| └Scope 09 | F16-00 [FIRE-ALARM-SYSTEM] | Signal and power wiring conductor callouts: '14/2 AWG CABLE', '16/2 AWG CABLE', 'EOL (47K)' | HOLD | Chain hold | |
| └Scope 10 | F16-00 [FIRE-ALARM-SYSTEM] | Installation note present: 'INSTALLATION TO BE DONE IN ACCORDANCE WITH ALL APPLICABLE CITY CODES, NFPA-72 2019 EDITION, NFPA-70 (NEC) 2020 EDITION, FBCB (2020 EDITION), FFPC (8TH EDITION), UNIFORM RULE 69A, RULES AND REGULATIONS OF THE STATE FIRE MARSHAL'S OFFICE, AND FLORIDA STATUTE 633.' | HOLD | Chain hold | |
| └Scope 11 | ID001 [Interior] | All work must comply with applicable codes, laws, ordinances; most stringent requirement applies if conflicts exist (Note 4). | HOLD | Chain hold | |
| └Scope 12 | ID500 [Interior] | Wire management provision: '4" HOLE FOR WIRE MANAGING' | HOLD | Chain hold | |
| └Scope 13 | ID501 [Interior] | Installation of wood plank ceiling system secured to linear ceiling carriers on hanger wire | HOLD | Chain hold | |
| Section-26-004 | Electrical Service | Chain hold | ||
| └Scope 01 | C-3 [Civil] | Provide irrigation with an irrigation meter. | HOLD | Chain hold | |
| └Scope 02 | C-5 [Civil] | FINISHED SIZE, INCLUDING FLAP POCKETS WHERE REQUIRED, SHALL EXTEND A MINIMUM OF 10" AROUND THE PERIMETER TO FACILITATE MAINTENANCE OR REMOVAL. | HOLD | Chain hold | |
| └Scope 03 | C-12 [Civil] | Install private 8" double detector check assembly with bypass meter (AMES 3000SS) | HOLD | Chain hold | |
| └Scope 04 | C-16 [Civil] | BOLLARD DETAIL: 8" DIAMETER STEEL PIPE BOLLARD (2 PLACES) (DROP PIN HOLE TYPICAL 4 PLACES) | HOLD | Chain hold | |
| └Scope 05 | C-18 [Civil] | Above-ground gas meter assembly detail | HOLD | Chain hold | |
| └Scope 06 | C-22 [Civil] | ALL VALVES SHALL BE INSTALLED IN METER TYPE SIZE BOXES EQUAL TO AMETEK POLY-IRON. | HOLD | Chain hold | |
| └Scope 07 | C-22 [Civil] | PROVIDE A 6" GRAVEL SUMP AT THE BOTTOM OF ALL METER BOXES AND INSTALL 1/2" TO 1" DIAMETER GRAVEL AT THE BOTTOM OF THE VALVE PIT. | HOLD | Chain hold | |
| └Scope 08 | P5.1 [Plumbing] | Provide sump pit with recommended size 24" DIAMETER X 36" DEPTH (24"x24"x24" Min.). | HOLD | Chain hold | |
| Section-26-005 | Switchboards / Panelboards | Chain hold | ||
| └Scope 01 | E5.0 [Electrical] | Panelboard schedule (sheet contains a panelboard schedule table) | HOLD | Chain hold | |
| └Scope 02 | E5.0 [Electrical] | PANELBOARD SCHEDULE | HOLD | Chain hold | |
| └Scope 03 | E5.2 [Electrical] | PANELBOARD SCHEDULE 2A: CONNECTED LOAD (VA) 16800 16800 14400 48000 | HOLD | Chain hold | |
| └Scope 04 | E5.2 [Electrical] | PANELBOARD SCHEDULE 2A: CONNECTED TOTAL (VA) 78000 44000 SIZING TOTAL (VA) (as printed on sheet) | HOLD | Chain hold | |
| └Scope 05 | E5.2 [Electrical] | PANELBOARD SCHEDULE 2A: CONNECTED AMPACITY (A) 216.51 122.13 SIZING AMPACITY (A) (as printed on sheet) | HOLD | Chain hold | |
| └Scope 06 | E5.2 [Electrical] | PANELBOARD SCHEDULE 2A: DEMAND TOTAL (VA) 44000 | HOLD | Chain hold | |
| └Scope 07 | E5.2 [Electrical] | PANELBOARD SCHEDULE 2A: DEMAND AMPACITY (A) 122.13 | HOLD | Chain hold | |
| └Scope 08 | E5.2 [Electrical] | PANELBOARD SCHEDULE 2B: CONNECTED LOAD (VA) 10800 10800 8400 30000 | HOLD | Chain hold | |
| └Scope 09 | E5.3 [Electrical] | Electrical panelboard scheduling and load calculations for multiple panelboards (3A, 4A, 4B, 3B, 4D, 4C, 3D, 3C, 2D). | HOLD | Chain hold | |
| └Scope 10 | E5.4 [Electrical] | Provide electrical panelboard schedules for panels 5A, 5B, 5C, 5D | HOLD | Chain hold | |
| └Scope 11 | E5.4 [Electrical] | PANELBOARD SCHEDULE 5B | HOLD | Chain hold | |
| └Scope 12 | E5.4 [Electrical] | PANELBOARD SCHEDULE 5A | HOLD | Chain hold | |
| └Scope 13 | E5.4 [Electrical] | PANELBOARD SCHEDULE 5C | HOLD | Chain hold | |
| └Scope 14 | E5.4 [Electrical] | PANELBOARD SCHEDULE 5D | HOLD | Chain hold | |
| Section-26-006 | Transformers | Chain hold | ||
| └Scope 01 | ID509 [Interior] | Remote LED transformer outlet and warm white LED strip with remote driver and transformer; conceal wiring | HOLD | Chain hold | |
| Section-26-007 | Wiring Devices | Chain hold | ||
| └Scope 01 | F2-00 [FIRE-ALARM-SYSTEM] | Field verification requirements: riser location and back-flow/PIV switches prior to install. | HOLD | Chain hold | |
| Section-26-008 | Lighting | Chain hold | ||
| └Scope 01 | A-570 | Parking lot light fixture detail | HOLD | Chain hold | |
| └Scope 02 | A-809 | Lighting / ceiling notes include: 'F07 FLUORESCENT LIGHT 4'-0" LONG', 'F09 FLUORESCENT LIGHT FIXTURE 2'X4' RECESSED.', 'R16 RECESSED CAN.' | HOLD | Chain hold | |
| └Scope 03 | E1.1 [Electrical] | FIRST FLOOR LIGHTING PLAN | HOLD | Chain hold | |
| └Scope 04 | E1.2 [Electrical] | Second floor lighting layout (plan view) for the Fairfield Inn project (sheet E1.2). | HOLD | Chain hold | |
| └Scope 05 | E1.2 [Electrical] | Notes regarding emergency and exit lighting connection (note text shown on sheet). | HOLD | Chain hold | |
| └Scope 06 | E1.2 [Electrical] | A note text appears (verbatim as shown): "ALL EMERGENCY AND EXIT LIGHTS SHALL BE CONNECTED TO THE REMOTEST LIGHTING CIRCUIT NEED OF ALL LIGHTING CONTROLS." | HOLD | Chain hold | |
| └Scope 07 | E1.3 [Electrical] | THIRD FLOOR LIGHTING PLAN (sheet-level scope as titled) | HOLD | Chain hold | |
| └Scope 08 | E1.3 [Electrical] | Emergency and exit lighting connection requirement as shown: 'ALL EMERGENCY AND EXIT LIGHTS SHALL BE CONNECTED TO THE NEAREST LIGHTING CIRCUIT AHEAD OF ALL LIGHTING CIRCUITS.' | HOLD | Chain hold | |
| └Scope 09 | E1.3 [Electrical] | Document identifies itself as 'THIRD FLOOR LIGHTING PLAN' | HOLD | Chain hold | |
| └Scope 10 | E1.3 [Electrical] | Note shown on sheet (verbatim as shown): 'ALL EMERGENCY AND EXIT LIGHTS SHALL BE CONNECTED TO THE NEAREST LIGHTING CIRCUIT AHEAD OF ALL LIGHTING CIRCUITS.' | HOLD | Chain hold | |
| └Scope 11 | E1.4 [Electrical] | Lighting layout for fourth floor as shown on sheet E1.4 | HOLD | Chain hold | |
| └Scope 12 | E1.4 [Electrical] | Room lighting for individually labeled guestrooms and suites (examples: KING SUITE 417, QUEEN QUEEN 415, etc.) | HOLD | Chain hold | |
| └Scope 13 | E1.4 [Electrical] | Corridor lighting and service areas (CORRIDOR 048, Mechanical 046, Elect. 047, CHUTE 049, LINEN 045, STORAGE 050) | HOLD | Chain hold | |
| └Scope 14 | E1.4 [Electrical] | FOURTH FLOOR LIGHTING PLAN | HOLD | Chain hold | |
| └Scope 15 | E1.5 [Electrical] | Lighting layout for fifth floor (FIFTH FLOOR LIGHTING PLAN) | HOLD | Chain hold | |
| └Scope 16 | E1.5 [Electrical] | Connection requirement for emergency and exit lights: "ALL EMERGENCY AND EXIT LIGHTS SHALL BE CONNECTED TO THE NEAREST LIGHTING CIRCUIT AHEAD OF ALL LIGHTING CONTROLS." | HOLD | Chain hold | |
| └Scope 17 | E1.5 [Electrical] | FIFTH FLOOR LIGHTING PLAN | HOLD | Chain hold | |
| └Scope 18 | E1.5 [Electrical] | ALL EMERGENCY AND EXIT LIGHTS SHALL BE CONNECTED TO THE NEAREST LIGHTING CIRCUIT AHEAD OF ALL LIGHTING CONTROLS. | HOLD | Chain hold | |
| └Scope 19 | E1.6 [Electrical] | ROOF LIGHTING PLAN (sheet E1.6) | HOLD | Chain hold | |
| └Scope 20 | E5.1 [Electrical] | Exterior lighting control detail | HOLD | Chain hold | |
| └Scope 21 | E5.1 [Electrical] | Detail labels visible on sheet: TELEPHONE RISER DIAGRAM; CATV BOARD RISER DIAGRAM; AREA OF RESCUE RISER; EXTERIOR LIGHTING CONTROL DETAIL; WORKING CLEARANCE FOR ELECTRICAL EQUIPMENT | HOLD | Chain hold | |
| └Scope 22 | ID124 [Interior] | Refer to AOR's set & latest brand standards for non-decorative lighting locations and legend (per note 15). | HOLD | Chain hold | |
| └Scope 23 | ID509 [Interior] | Cove lighting and 'L' trim (Fry Reglet DRML-100) and corner molding (Fry Reglet DMCY-1250) | HOLD | Chain hold | |
| Section-26-009 | Emergency Power / Generator | Chain hold | ||
| └Scope 01 | ID507 [Interior] | Material detail: 1/16" STEEL PLATE LAMINATED TO PLYWOOD BACKER BOARD. SECURE TO WALL FRAMING WITH METAL WALL CLEATS AS REQUIRED (as shown on sheet) | HOLD | Chain hold | |
| └Scope 02 | ID510 [Interior] | 1/16" STEEL PLATE AT SIDE AND BACK OF HEARTH (GRAY SHADE). STEEL PLATE MOUNTED TO 1/2" PLYWOOD HUNG ON WALLS WITH CLEATS AS REQ'D | HOLD | Chain hold | |
| └Scope 03 | ID510 [Interior] | WOOD WALL PANEL SYSTEM SECURED TO WALL WITH METAL CLEATS AS REQ'D. VERIFY PANEL THICKNESS. | HOLD | Chain hold | |
| Section-26-010 | Electrical Testing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 27 | Communications9 | |||
| Section-27-001 | Communications Pathways | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-27-002 | Structured Cabling | Chain hold | ||
| └Scope 01 | C-9 [Civil] | VERTICAL DATA: ELEVATIONS SHOWN HEREON ARE BASED ON CITY OF TAMPA BENCH MARK B-1315 ELEVATION = 47.59' BASED ON THE NATIONAL GEODETIC VERTICAL DATUM (N.G.V.D.) SEA LEVEL DATUM OF 1929, PROVIDED BY CITY OF TAMPA - DEPARTMENT OF PUBLIC WORKS. | HOLD | Chain hold | |
| └Scope 02 | E5.1 [Electrical] | Telephone riser diagram (detail) | HOLD | Chain hold | |
| └Scope 03 | E5.1 [Electrical] | CATV board riser diagram (detail) | HOLD | Chain hold | |
| └Scope 04 | E5.2 [Electrical] | Provide electrical panel schedules for panels 2A, 2B, 2C, and SL (panel schedule data shown). | HOLD | Chain hold | |
| └Scope 05 | M2.0 [Mechanical] | Associated unit notes and equipment data shown in schedules | HOLD | Chain hold | |
| Section-27-003 | Equipment Rooms / Racks | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-27-004 | Backbone Cabling | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-27-005 | Horizontal Cabling | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-27-006 | Data Network Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-27-007 | Voice Communications | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-27-008 | Audio-Video Systems | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-27-009 | Communications Testing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 28 | Electronic Safety and Security8 | |||
| Section-28-001 | Access Control | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-28-002 | Video Surveillance | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-28-003 | Intrusion Detection | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-28-004 | Security Monitoring | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-28-005 | Fire Alarm / Detection | Chain hold | ||
| └Scope 01 | A-001 | Separate fire-alarm-system permit required by City of Tampa Fire Marshal. | 1 | EA | Ready |
| └Scope 02 | A-002 life-safety requirements | Emergency lighting, exit signs, fire alarm, smoke-detection systems, and panic hardware are all marked YES. Device counts require the referenced discipline plans and remain blank. | LS | Chain hold | |
| └Scope 03 | A-600 | "WALL MAGNETS TO BE TIED INTO FIRE ALARM SYSTEM" | HOLD | Chain hold | |
| └Scope 04 | E1.0 [Electrical] | Fire alarm symbol schedule | HOLD | Chain hold | |
| └Scope 05 | E3.1 [Electrical] | FIRST FLOOR FIRE ALARM PLAN (sheet E3.1) | HOLD | Chain hold | |
| └Scope 06 | E3.1 [Electrical] | FIRST FLOOR FIRE ALARM PLAN | HOLD | Chain hold | |
| └Scope 07 | E3.2 [Electrical] | Second-floor fire alarm plan (device/layout) as shown on sheet E3.2 | HOLD | Chain hold | |
| └Scope 08 | E3.3 [Electrical] | Third floor fire alarm plan (sheet E3.3) as the indicated scope for this sheet | HOLD | Chain hold | |
| └Scope 09 | E3.4 [Electrical] | Fourth Floor fire alarm layout and device locations as shown on floor plan | HOLD | Chain hold | |
| └Scope 10 | E3.5 [Electrical] | FIFTH FLOOR FIRE ALARM PLAN (E3.5) | HOLD | Chain hold | |
| └Scope 11 | E3.5 [Electrical] | FIFTH FLOOR FIRE ALARM PLAN | HOLD | Chain hold | |
| └Scope 12 | E3.6 [Electrical] | Fire alarm roof plan (sheet title as shown: FIRE ALARM ROOF PLAN) | HOLD | Chain hold | |
| └Scope 13 | E5.1 [Electrical] | ALL SMOKE DETECTORS SHALL BE LOW FREQUENCY TYPE PER FBC CODE | HOLD | Chain hold | |
| └Scope 14 | F1-00 [FIRE-ALARM-SYSTEM] | ALL WALL-MOUNTED AUDIBLE & VISUAL SIGNALING APPLIANCES SHALL HAVE THEIR HEIGHTS ABOVE THE FINISHED FLOOR AT 80" TO BOTTOM PER NFPA 72. | HOLD | Chain hold | |
| └Scope 15 | F1-00 [FIRE-ALARM-SYSTEM] | ALL EQUIPMENT SHALL BE U.L. LISTED. | HOLD | Chain hold | |
| └Scope 16 | F1-00 [FIRE-ALARM-SYSTEM] | ALL WIRING SHALL BE IN ACCORDANCE WITH THE N.E.C. AND AUTHORITIES HAVING JURISDICTION. | HOLD | Chain hold | |
| └Scope 17 | F1-00 [FIRE-ALARM-SYSTEM] | ALL JUNCTION BOXES SHALL BE SIZED IN ACCORDANCE WITH THE N.E.C. | HOLD | Chain hold | |
| └Scope 18 | F2-00 [FIRE-ALARM-SYSTEM] | Fire alarm system layout for 1st floor (device locations and circuit references shown with FP•1•, PS•1•, CM•1•, DM•# tags). | HOLD | Chain hold | |
| └Scope 19 | F2-00 [FIRE-ALARM-SYSTEM] | Notification appliance candela ratings shown (examples: FP•1•N1•02 15cd, FP•1•N1•03 30cd, FP•1•N1•05 75cd). | HOLD | Chain hold | |
| └Scope 20 | F2-00 [FIRE-ALARM-SYSTEM] | Device module and control designations (DM•1, DM•2, DM•3, DM•12, ADM, NAC, CM, PS references). | HOLD | Chain hold | |
| └Scope 21 | F2-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DATE: 2/9/2026 | HOLD | Chain hold | |
| └Scope 22 | F3-00 [FIRE-ALARM-SYSTEM] | Graphical layout of fire alarm devices on the 2nd floor for the Fairfield Inn project. | HOLD | Chain hold | |
| └Scope 23 | F3-00 [FIRE-ALARM-SYSTEM] | Device tagging and labeling using the project's device tag nomenclature (FP•, PS•, CM•, DM• and PS•1•N2•xx etc.). | HOLD | Chain hold | |
| └Scope 24 | F3-00 [FIRE-ALARM-SYSTEM] | Identification of end-of-line resistor values and candela ratings for notification appliances (e.g., 15cd, 185cd, EOL 47k, EOL 5.1k, EOL 2.2k). | HOLD | Chain hold | |
| └Scope 25 | F3-00 [FIRE-ALARM-SYSTEM] | Riser location to be field-verified (note present). | HOLD | Chain hold | |
| └Scope 26 | F3-00 [FIRE-ALARM-SYSTEM] | Plan submitted for City of Tampa plan approval / code review (permit number provided). | HOLD | Chain hold | |
| └Scope 27 | F3-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM 2ND FLOOR PLAN (sheet title on drawing) | HOLD | Chain hold | |
| └Scope 28 | F3-00 [FIRE-ALARM-SYSTEM] | Note on plan: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES" | HOLD | Chain hold | |
| └Scope 29 | F3-00 [FIRE-ALARM-SYSTEM] | Note on plan: "It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division." | HOLD | Chain hold | |
| └Scope 30 | F3-00 [FIRE-ALARM-SYSTEM] | Riser note: "FIELD TO VERIFY LOCATION OF RISER (UP/DN) JB" | HOLD | Chain hold | |
| └Scope 31 | F4-00 [FIRE-ALARM-SYSTEM] | Fire alarm system plan for the 3rd floor of the Fairfield Inn at 9301 N. 29TH STREET, Tampa, FL (as shown on drawing). | HOLD | Chain hold | |
| └Scope 32 | F4-00 [FIRE-ALARM-SYSTEM] | Document title: FIRE ALARM 3RD FLOOR PLAN | HOLD | Chain hold | |
| └Scope 33 | F4-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DRAWN BY: MS | HOLD | Chain hold | |
| └Scope 34 | F4-00 [FIRE-ALARM-SYSTEM] | The sheet contains numerous fire alarm device tags and location identifiers (examples preserved in sheetOrSectionReferences) | HOLD | Chain hold | |
| └Scope 35 | F4-00 [FIRE-ALARM-SYSTEM] | Label on sheet: THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 36 | F4-00 [FIRE-ALARM-SYSTEM] | Note on sheet: It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division. | HOLD | Chain hold | |
| └Scope 37 | F4-00 [FIRE-ALARM-SYSTEM] | Note on sheet: The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 38 | F5-00 [FIRE-ALARM-SYSTEM] | Fire alarm device layout and callouts for the 4th floor of the Fairfield Inn (as shown on the sheet) | HOLD | Chain hold | |
| └Scope 39 | F5-00 [FIRE-ALARM-SYSTEM] | Includes device labels and circuit references (FP•, PS•, DM•, CM• series shown on plan) | HOLD | Chain hold | |
| └Scope 40 | F5-00 [FIRE-ALARM-SYSTEM] | Provision to verify riser location in the field (note: FIELD TO VERIFY LOCATION OF RISER (UP/DN)) | HOLD | Chain hold | |
| └Scope 41 | F5-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DRAWN BY: MS | HOLD | Chain hold | |
| └Scope 42 | F5-00 [FIRE-ALARM-SYSTEM] | Plan approval reference: BLD-26-0522593 2/26/2026 | HOLD | Chain hold | |
| └Scope 43 | F5-00 [FIRE-ALARM-SYSTEM] | Text on sheet: THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES | HOLD | Chain hold | |
| └Scope 44 | F5-00 [FIRE-ALARM-SYSTEM] | Text on sheet: It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division. | HOLD | Chain hold | |
| └Scope 45 | F5-00 [FIRE-ALARM-SYSTEM] | Note on sheet: FIELD TO VERIFY LOCATION OF RISER (UP/DN) | HOLD | Chain hold | |
| └Scope 46 | F6-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM (as labeled on the sheet) | HOLD | Chain hold | |
| └Scope 47 | F6-00 [FIRE-ALARM-SYSTEM] | Plans depict device locations and cabling tags for the 5th floor of the Fairfield Inn | HOLD | Chain hold | |
| └Scope 48 | F6-00 [FIRE-ALARM-SYSTEM] | Field verification tasks: "FIELD TO VERIFY LOCATION OF ELEVATOR MODULES" | HOLD | Chain hold | |
| └Scope 49 | F6-00 [FIRE-ALARM-SYSTEM] | Field verification tasks: "FIELD TO VERIFY LOCATION OF RISER (DN) 1A,3B" | HOLD | Chain hold | |
| └Scope 50 | F6-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM (heading on sheet) | HOLD | Chain hold | |
| └Scope 51 | F6-00 [FIRE-ALARM-SYSTEM] | Note on sheet: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES" | HOLD | Chain hold | |
| └Scope 52 | F6-00 [FIRE-ALARM-SYSTEM] | Note on sheet: "It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division." | HOLD | Chain hold | |
| └Scope 53 | F6-00 [FIRE-ALARM-SYSTEM] | Note on sheet: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes" | HOLD | Chain hold | |
| └Scope 54 | F6-00 [FIRE-ALARM-SYSTEM] | Note(s) on sheet: "FIELD TO VERIFY LOCATION OF ELEVATOR MODULES" and "FIELD TO VERIFY LOCATION OF RISER (DN) 1A,3B" | HOLD | Chain hold | |
| └Scope 55 | F7-00 [FIRE-ALARM-SYSTEM] | Fire alarm roof plan (devices on roof shown and referenced) | HOLD | Chain hold | |
| └Scope 56 | F7-00 [FIRE-ALARM-SYSTEM] | Field verification of weatherproof horn strobe location (FIELD TO DETERMINE NAC CIRCUIT PATHWAY FROM BELOW) | HOLD | Chain hold | |
| └Scope 57 | F7-00 [FIRE-ALARM-SYSTEM] | Device tags and callouts present (examples: FP•1•L2 .5•D072, FP•1•L2 .5•M029, FP•1•L2 .5•D071, FP•1•L2 .5•M028) | HOLD | Chain hold | |
| └Scope 58 | F7-00 [FIRE-ALARM-SYSTEM] | FIELD TO VERIFY LOCATION OF WEATHERPROOF HORN STROBE (FIELD TO DETERMINE NAC CIRCUIT PATHWAY FROM BELOW) | HOLD | Chain hold | |
| └Scope 59 | F7-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DRAWN BY: MS | HOLD | Chain hold | |
| └Scope 60 | F7-00 [FIRE-ALARM-SYSTEM] | It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division. | HOLD | Chain hold | |
| └Scope 61 | F7-00 [FIRE-ALARM-SYSTEM] | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes | HOLD | Chain hold | |
| └Scope 62 | F8-00 [FIRE-ALARM-SYSTEM] | Fire alarm NAC riser diagram (NAC wiring and device tagging shown) | HOLD | Chain hold | |
| └Scope 63 | F8-00 [FIRE-ALARM-SYSTEM] | Fire alarm control panel (FP•1) shown and referenced | HOLD | Chain hold | |
| └Scope 64 | F8-00 [FIRE-ALARM-SYSTEM] | NAC expander / power supplies (PS•1 and PS•2) referenced | HOLD | Chain hold | |
| └Scope 65 | F8-00 [FIRE-ALARM-SYSTEM] | Dedicated 120V 20 AMP CIRCUIT for NAC expanders and fire alarm control panel | HOLD | Chain hold | |
| └Scope 66 | F8-00 [FIRE-ALARM-SYSTEM] | Annunciator (FP•1•ACS•32 / ANN•1) shown | HOLD | Chain hold | |
| └Scope 67 | F8-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DRAWN BY: MS | HOLD | Chain hold | |
| └Scope 68 | F8-00 [FIRE-ALARM-SYSTEM] | Labels present: 'DEDICATED 120V 20 AMP CIRCUIT HNG NAC EXPANDER POWER SUPPLY PS•2' and 'DEDICATED 120V 20 AMP CIRCUIT HNG FIRE ALARM CONTROL PANEL FP•1' | HOLD | Chain hold | |
| └Scope 69 | F9-00 [FIRE-ALARM-SYSTEM] | NAC (Notification Appliance Circuit) riser diagram for the fire alarm system as shown on the sheet | HOLD | Chain hold | |
| └Scope 70 | F9-00 [FIRE-ALARM-SYSTEM] | Graphic layout and circuit/component callouts (component references preserved in sheetOrSectionReferences) | HOLD | Chain hold | |
| └Scope 71 | F9-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM | HOLD | Chain hold | |
| └Scope 72 | F9-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM NAC RISER DIAGRAM | HOLD | Chain hold | |
| └Scope 73 | F10-00 [FIRE-ALARM-SYSTEM] | Provide/illustrate the fire alarm SLC (signaling line circuit) riser topology for the building (multiple floors) as shown by device loop labels and connections | HOLD | Chain hold | |
| └Scope 74 | F10-00 [FIRE-ALARM-SYSTEM] | Dedicated 120V 20 AMP circuit for fire alarm control panel (text on sheet: 'DEDICATED 120V 20 AMP CIRCUIT HNG FIRE ALARM CONTROL PANEL') | HOLD | Chain hold | |
| └Scope 75 | F10-00 [FIRE-ALARM-SYSTEM] | Label: FIRE ALARM SLC RISER DIAGRAM | HOLD | Chain hold | |
| └Scope 76 | F10-00 [FIRE-ALARM-SYSTEM] | Callout: DEDICATED 120V 20 AMP CIRCUIT HNG FIRE ALARM CONTROL PANEL | HOLD | Chain hold | |
| └Scope 77 | F11-00 [FIRE-ALARM-SYSTEM] | Battery calculation (secondary power source requirements) for fire alarm panels and annunciator(s) listed on sheet: FP•1 (NFS2-640), FP•1•ACS•32 ANN•1 (FDU-80), PS•1 (PSN-106B), PS•2 (PSN-106B). | HOLD | Chain hold | |
| └Scope 78 | F11-00 [FIRE-ALARM-SYSTEM] | Panel FP•1 (NFS2-640) totals: TOTAL STANDBY (A) 0.747; TOTAL ALARM (A) 2.53; REQUIRED STANDBY TIME (HOURS) 24; REQUIRED ALARM TIME (MINUTES) 5. | HOLD | Chain hold | |
| └Scope 79 | F11-00 [FIRE-ALARM-SYSTEM] | Panel FP•1•ACS•32 ANN•1 (FDU-80) totals: TOTAL STANDBY (A) 0.025; TOTAL ALARM (A) 0.0643; REQUIRED STANDBY TIME (HOURS) 24; REQUIRED ALARM TIME (MINUTES) 5. | HOLD | Chain hold | |
| └Scope 80 | F11-00 [FIRE-ALARM-SYSTEM] | Panel PS•1 (PSN-106B) totals: TOTAL STANDBY (A) 0.1219; TOTAL ALARM (A) 2.84; REQUIRED STANDBY TIME (HOURS) 24; REQUIRED ALARM TIME (MINUTES) 5. | HOLD | Chain hold | |
| └Scope 81 | F12-00 [FIRE-ALARM-SYSTEM] | Point-to-point voltage drop calculations for fire alarm NAC circuits identified by CM•1, CM•2, CM•3, CM•5, CM•6, CM•8, CM•9, CM•10, CM•12, CM•13 | HOLD | Chain hold | |
| └Scope 82 | F12-00 [FIRE-ALARM-SYSTEM] | Listing of devices on each circuit with part number/description, candela rating, alarm current (A), remaining alarm current (A), distance from previous device (ft), voltage drop from previous, and voltage at device | HOLD | Chain hold | |
| └Scope 83 | F12-00 [FIRE-ALARM-SYSTEM] | Use of a 10.00% additional length multiplier for distance calculations (stated: DISTANCE MEASURED USING DRAWN SEGMENT LENGTHS WITH 10.00 % ADDITIONAL LENGTH) | HOLD | Chain hold | |
| └Scope 84 | F12-00 [FIRE-ALARM-SYSTEM] | General circuit wiring properties (as shown for many circuits): 'B' 16/2 FPLP/R NAC 16 AWG, 2 COND. SOLID COPPER FPLP/R ANALOG UNSHIELDED | HOLD | Chain hold | |
| └Scope 85 | F12-00 [FIRE-ALARM-SYSTEM] | CM•1 devices: CM•1•N1•01 SWLED STROBE, WALL, WHITE 15CD ALARM CURRENT (A): 0.018 REMAINING ALARM CURRENT (A): 0.138 DISTANCE FROM PREVIOUS: 13 VOLTAGE DROP FROM PREVIOUS: 0.02 VOLTAGE AT DEVICE: 20.09; CM•1•N1•02 EOL SWLED STROBE, WALL, WHITE 185CD ALARM CURRENT (A): 0.12 REMAINING ALARM CURRENT (A): 0.12 DISTANCE FROM PREVIOUS: 6 VOLTAGE DROP FROM PREVIOUS: 0.01 VOLTAGE AT DEVICE: 20.08 | HOLD | Chain hold | |
| └Scope 86 | F12-00 [FIRE-ALARM-SYSTEM] | CM•10 devices: CM•10•N1•01 SWLED STROBE, WALL, WHITE 185CD ALARM CURRENT (A): 0.12 REMAINING ALARM CURRENT (A): 0.138 DISTANCE FROM PREVIOUS: 16 VOLTAGE DROP FROM PREVIOUS: 0.02 VOLTAGE AT DEVICE: 18.61; CM•10•N1•02 EOL SWLED STROBE, WALL, WHITE 15CD ALARM CURRENT (A): 0.018 REMAINING ALARM CURRENT (A): 0.018 DISTANCE FROM PREVIOUS: 10 VOLTAGE DROP FROM PREVIOUS: 0 VOLTAGE AT DEVICE: 18.61 | HOLD | Chain hold | |
| └Scope 87 | F12-00 [FIRE-ALARM-SYSTEM] | CM•12 devices: CM•12•N1•01 SWLED STROBE, WALL, WHITE 185CD ALARM CURRENT (A): 0.12 REMAINING ALARM CURRENT (A): 0.138 DISTANCE FROM PREVIOUS: 15 VOLTAGE DROP FROM PREVIOUS: 0.02 VOLTAGE AT DEVICE: 19.83; CM•12•N1•02 EOL SWLED STROBE, WALL, WHITE 15CD ALARM CURRENT (A): 0.018 REMAINING ALARM CURRENT (A): 0.018 DISTANCE FROM PREVIOUS: 11 VOLTAGE DROP FROM PREVIOUS: 0 VOLTAGE AT DEVICE: 19.82 | HOLD | Chain hold | |
| └Scope 88 | F12-00 [FIRE-ALARM-SYSTEM] | CM•13 devices: CM•13•N1•01 SWLED STROBE, WALL, WHITE 185CD ALARM CURRENT (A): 0.12 REMAINING ALARM CURRENT (A): 0.138 DISTANCE FROM PREVIOUS: 20 VOLTAGE DROP FROM PREVIOUS: 0.03 VOLTAGE AT DEVICE: 19.81; CM•13•N1•02 EOL SWLED STROBE, WALL, WHITE 15CD ALARM CURRENT (A): 0.018 REMAINING ALARM CURRENT (A): 0.018 DISTANCE FROM PREVIOUS: 11 VOLTAGE DROP FROM PREVIOUS: 0 VOLTAGE AT DEVICE: 19.81 | HOLD | Chain hold | |
| └Scope 89 | F12-00 [FIRE-ALARM-SYSTEM] | CM•2 devices: CM•2•N1•01 SWLED STROBE, WALL, WHITE 185CD ALARM CURRENT (A): 0.12 REMAINING ALARM CURRENT (A): 0.138 DISTANCE FROM PREVIOUS: 15 VOLTAGE DROP FROM PREVIOUS: 0.02 VOLTAGE AT DEVICE: 18.98; CM•2•N1•02 EOL SWLED STROBE, WALL, WHITE 15CD ALARM CURRENT (A): 0.018 REMAINING ALARM CURRENT (A): 0.018 DISTANCE FROM PREVIOUS: 10 VOLTAGE DROP FROM PREVIOUS: 0 VOLTAGE AT DEVICE: 18.98 | HOLD | Chain hold | |
| └Scope 90 | F13-00 [FIRE-ALARM-SYSTEM] | F13-00-FIRE-ALARM-VOLTAGE-DROPS-Rev.0.pdf: review and carry all shown system requirements, calculations, notes, and references; detailed quantity chain remains pending. | HOLD | Chain hold | |
| └Scope 91 | F14-00 [FIRE-ALARM-SYSTEM] | ADDRESSABLE LOW-PROFILE PHOTOELECTRIC DETECTOR WITH LOW-FREQUENCY SOUNDER BASE, WHITE | HOLD | Chain hold | |
| └Scope 92 | F14-00 [FIRE-ALARM-SYSTEM] | PART NO: FSP-951 W/B200S-LF-WH | HOLD | Chain hold | |
| └Scope 93 | F14-00 [FIRE-ALARM-SYSTEM] | ADDRESSABLE CONTROL MODULE W/ FLASHSCAN, 1 CLASS A OR 1 CLASS B | HOLD | Chain hold | |
| └Scope 94 | F14-00 [FIRE-ALARM-SYSTEM] | PART NO: FCM-1 | HOLD | Chain hold | |
| └Scope 95 | F14-00 [FIRE-ALARM-SYSTEM] | EOL 5.1K (end-of-line resistor) | HOLD | Chain hold | |
| └Scope 96 | F15-00 [FIRE-ALARM-SYSTEM] | Voltage drop calculations for multiple fire alarm circuits (notification appliance circuits and control module circuits). | HOLD | Chain hold | |
| └Scope 97 | F15-00 [FIRE-ALARM-SYSTEM] | End-of-line resistor usage documented: EOL 5.1K on listed circuits. | HOLD | Chain hold | |
| └Scope 98 | F15-00 [FIRE-ALARM-SYSTEM] | Calculation method formulas for resistance and voltage drop (explicitly shown). | HOLD | Chain hold | |
| └Scope 99 | F15-00 [FIRE-ALARM-SYSTEM] | Plan approval and code compliance review stamps from City of Tampa Construction Services Division. | HOLD | Chain hold | |
| └Scope 100 | F16-00 [FIRE-ALARM-SYSTEM] | Device detail illustrations and wiring for Notifier devices (640 Notifier Device Details, FDM-1, FRM-1, FMM-1, FDU-80, FCM-1, FCM-10, ISO-X) | HOLD | Chain hold | |
| └Scope 101 | F16-00 [FIRE-ALARM-SYSTEM] | Pull Station: NBG-12LX (label shown: 'PULL STATION NBG-12LX 640 Notifier Device Details:') | HOLD | Chain hold | |
| └Scope 102 | F16-00 [FIRE-ALARM-SYSTEM] | ADA Room Wiring Diagram and specific ADA wiring note: 'FCM-1 TO BE MOUNTED IN A 4S DEEP BOX MOUNTED ABOVE CEILING OF ADA UNIT' | HOLD | Chain hold | |
| └Scope 103 | F16-00 [FIRE-ALARM-SYSTEM] | Horn/Strobe device constraint: 'P2XLED HORN STROBE OR SXLED STROBE ONLY' | HOLD | Chain hold | |
| └Scope 104 | F16-00 [FIRE-ALARM-SYSTEM] | Power wiring references to specific panels: 'NFW2-100 Power Wiring to the NFW2-100', 'NFS2-640/NFS-320 Power Wiring to the NFS2-640/NFS-320' | HOLD | Chain hold | |
| └Scope 105 | F16-00 [FIRE-ALARM-SYSTEM] | Signal Line Circuit (SLC) requirement: '32 VDC MAX. SHIELDED-TWISTED PAIR IS RECOMMENDED' | HOLD | Chain hold | |
| └Scope 106 | F16-00 [FIRE-ALARM-SYSTEM] | Fault isolation strategy: 'A PAIR OF FAULT ISOLATOR MODULES WILL DISCONNECT A GROUP OF DEVICES IF A SHORT CIRCUIT OCCURS ON THE SIGNALING LINE CIRCUIT WITHIN THAT GROUP.' | HOLD | Chain hold | |
| └Scope 107 | F16-00 [FIRE-ALARM-SYSTEM] | Plan approval / review stamp: 'City of Tampa CONSTRUCTION SERVICES DIVISION PLAN APPROVAL' and 'REVIEWED FOR CODE COMPLIANCE BLD-26-0522593 2/26/2026' | HOLD | Chain hold | |
| └Scope 108 | F17-00 [FIRE-ALARM-SYSTEM] | Elevator hoistway smoke detector mounting and locations (diagramed) | HOLD | Chain hold | |
| └Scope 109 | F17-00 [FIRE-ALARM-SYSTEM] | Elevator machine room smoke detector shown | HOLD | Chain hold | |
| └Scope 110 | F17-00 [FIRE-ALARM-SYSTEM] | Elevator pit heat detector shown (label: ELEVATOR PIT HEAT DETECTOR) | HOLD | Chain hold | |
| └Scope 111 | F17-00 [FIRE-ALARM-SYSTEM] | Smoke detector and heat detector shown at hoist way side | HOLD | Chain hold | |
| └Scope 112 | F17-00 [FIRE-ALARM-SYSTEM] | Notes and procedures for elevator recall and shunt-trip interface (see text block titled 'ELEVATOR RECALL FOR FIRE FIGHTERS SERVICE AND ELEVATOR SHUNT INSTALLATION...') | HOLD | Chain hold | |
| └Scope 113 | F17-00 [FIRE-ALARM-SYSTEM] | Primary & Secondary elevator recall interface diagram (label: PRIMARY & SECONDARY ELEVATOR RECALL INTERFACE) | HOLD | Chain hold | |
| └Scope 114 | F17-00 [FIRE-ALARM-SYSTEM] | Addressable relay and relay module detail (labels: ADDRESSABLE RELAY, RELAY MODULE) | HOLD | Chain hold | |
| └Scope 115 | F17-00 [FIRE-ALARM-SYSTEM] | Elevator shunt-trip interface diagram (label: ELEVATOR SHUNT-TRIP INTERFACE) | HOLD | Chain hold | |
| └Scope 116 | F17-00 [FIRE-ALARM-SYSTEM] | Plan approval / review: REVIEWED FOR CODE COMPLIANCE BLD-26-0522593 2/26/2026 | HOLD | Chain hold | |
| └Scope 117 | F18-00 [FIRE-ALARM-SYSTEM] | General Alarm Sequence of Operations (fire alarm logic and outputs) | HOLD | Chain hold | |
| └Scope 118 | F18-00 [FIRE-ALARM-SYSTEM] | Elevator Wiring Diagram for Notifier System (elevator recall, hat light, shunt trip, monitor modules) | HOLD | Chain hold | |
| └Scope 119 | F18-00 [FIRE-ALARM-SYSTEM] | Device Mounting Elevation (visual layout of device mounting heights and relationships) | HOLD | Chain hold | |
| └Scope 120 | F18-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM | HOLD | Chain hold | |
| └Scope 121 | F18-00 [FIRE-ALARM-SYSTEM] | CONSTRUCTION SERVICES DIVISION PLAN APPROVAL | HOLD | Chain hold | |
| └Scope 122 | F18-00 [FIRE-ALARM-SYSTEM] | General Alarm Sequence of Operations (sheet content header) | HOLD | Chain hold | |
| └Scope 123 | F18-00 [FIRE-ALARM-SYSTEM] | Elevator Wiring Diagram Notifier System (sheet content header) | HOLD | Chain hold | |
| └Scope 124 | F18-00 [FIRE-ALARM-SYSTEM] | System Inputs and System Outputs are shown and numbered on the sheet (e.g., "Elevator lobby smoke detector 1st FL", "Elevator mach room/shaft smoke detector", "Shunt Elevator power 1") | HOLD | Chain hold | |
| └Scope 125 | ID500 [Interior] | Veneer facing on certain components ('303 (VENEER)') | HOLD | Chain hold | |
| Section-28-006 | Mass Notification | Ready | ||
| └Scope 01 | A-001 | Emergency-responder radio enhancement system required. | 1 | SYSTEM | Ready |
| Section-28-007 | Security Network / Integration | Ready | ||
| Section-28-008 | Security Testing / Commissioning | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 31 | Earthwork10 | |||
| Section-31-001 | Site Clearing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-31-002 | Rough Grading | Chain hold | ||
| └Scope 01 | C-3 [Civil] | Construct an 83-room, 5-story Fairfield Inn & Suites hotel on a 1.351 acre parcel. | HOLD | Chain hold | |
| └Scope 02 | C-3 [Civil] | All utilities and services installed underground (no overhead utilities). | HOLD | Chain hold | |
| └Scope 03 | C-3 [Civil] | THE APPLICANT WILL NOT BE REQUIRED TO DEDICATE RIGHT-OF-WAY TO CITY OF TAMPA, OR HILLSBOROUGH COUNTY. | HOLD | Chain hold | |
| └Scope 04 | C-3 [Civil] | THE KITCHEN WILL BE EQUIPPED WITH ANSUL FIRE SUPPRESSION SYSTEM. | HOLD | Chain hold | |
| └Scope 05 | C-3 [Civil] | ELECTRICAL UTILITY SERVICE WILL BE PROVIDED BY TAMPA ELECTRIC. | HOLD | Chain hold | |
| └Scope 06 | C-4 [Civil] | Stabilize soils and provide dust control during earthwork | HOLD | Chain hold | |
| └Scope 07 | C-5 [Civil] | YARD INLET PROTECTION | HOLD | Chain hold | |
| └Scope 08 | C-5 [Civil] | HARDWARE CLOTH INLET PROTECTION | HOLD | Chain hold | |
| └Scope 09 | C-5 [Civil] | SLOPE TRACKING DETAIL | HOLD | Chain hold | |
| └Scope 10 | C-5 [Civil] | INSTALL FILTER PRIOR TO BEGINNING CONSTRUCTION. | HOLD | Chain hold | |
| └Scope 11 | C-6 [Civil] | Building construction of Fairfield Inn & Suites 83 room, 5 story (implied by project title) | HOLD | Chain hold | |
| └Scope 12 | C-6 [Civil] | Coordination with FDOT for work in FDOT ROW (General Note 2) | HOLD | Chain hold | |
| └Scope 13 | C-6 [Civil] | Finish floor elevation: 43.30 | HOLD | Chain hold | |
| └Scope 14 | C-7 [Civil] | Installation of exfiltration piping (12" HDPE perforated and solid runs referenced with lengths and slopes in plan view) | HOLD | Chain hold | |
| └Scope 15 | C-7 [Civil] | Installation of inspection ports (2 total each isolator row) and 12"x12"x12" tees | HOLD | Chain hold | |
| └Scope 16 | C-7 [Civil] | THE MINIMUM WATER QUALITY TREATMENT VOLUME REQUIRED IS EQUAL TO 3-INCHES OF RUNOFF ... | HOLD | Chain hold | |
| └Scope 17 | C-7 [Civil] | TREATMENT VOLUME REQUIRED = 11,620 (CF) | HOLD | Chain hold | |
| └Scope 18 | C-7 [Civil] | TREATMENT VOLUME PROVIDED = 12,164 (CF) | HOLD | Chain hold | |
| └Scope 19 | C-7 [Civil] | ISOLATOR ROW SC-310 CHAMBERS (40 TOTAL) (178 TOTAL) (134 TOTAL) (counts listed in plan view for different isolator rows) | HOLD | Chain hold | |
| └Scope 20 | C-8 [Civil] | Connection detail for inspection ports and 4" schedule 40 PVC interfaces | HOLD | Chain hold | |
| └Scope 21 | C-8 [Civil] | Reference to related NYLOPLAST inline drain components and DWG numbers | HOLD | Chain hold | |
| └Scope 22 | C-8 [Civil] | Requirements that design engineer must review and approve prior to construction | HOLD | Chain hold | |
| └Scope 23 | C-9 [Civil] | Grading and earthwork including removal of muck or muck-like material and backfilling as required; testing per AASHTO T-180 modified Proctor. | HOLD | Chain hold | |
| └Scope 24 | C-9 [Civil] | ADA-related slope and landing requirements per FACBC (sections called out: Section 502.4 and Section 406). | HOLD | Chain hold | |
| └Scope 25 | C-9 [Civil] | Stakeout of improvements for construction by digital coordinates or geodetic total station. | HOLD | Chain hold | |
| └Scope 26 | C-9 [Civil] | FINISH FLOOR ELEVATION 43.30 | HOLD | Chain hold | |
| └Scope 27 | C-9 [Civil] | GENERAL EARTHWORK NOTE 4: SOILS ARE TO BE STABILIZED BY WATER OR OTHER MEANS DURING CONSTRUCTION. | HOLD | Chain hold | |
| └Scope 28 | C-9 [Civil] | GENERAL EARTHWORK NOTE 5: ONCE AN AREA IS SEEDED OR SODDED, IT MUST BE MAINTAINED TO ALLOW THE GRASS TO GROW. | HOLD | Chain hold | |
| └Scope 29 | C-10 [Civil] | Elevation and grade callouts including finish floor elevation (EL 43.30) and P.V.I. elevations | HOLD | Chain hold | |
| └Scope 30 | C-10 [Civil] | FINISH FLOOR EL 43.30 | HOLD | Chain hold | |
| └Scope 31 | C-10 [Civil] | GRADE 8" BELOW FINISH FLOOR (EL 42.6) | HOLD | Chain hold | |
| └Scope 32 | C-12 [Civil] | Install firelines: 8" PVC Class 200 (DR 14) fireline and 6" PVC Class 200 fireline to FDC | HOLD | Chain hold | |
| └Scope 33 | C-12 [Civil] | Install force main (4" green PVC DR 18 and 4" green PVC force main with 36" min cover; additional 24 LF 4" green PVC DR 18 noted) | HOLD | Chain hold | |
| └Scope 34 | C-12 [Civil] | Directional drilling per City standards (minimum 48" cover, entry/exit angle requirements provided) | HOLD | Chain hold | |
| └Scope 35 | C-12 [Civil] | PROVIDE WATERTIGHT SEAL PER CITY DETAIL SHEET No. 18 | HOLD | Chain hold | |
| └Scope 36 | C-12.1 [Civil] | Installation special precautions and installation diagrams | HOLD | Chain hold | |
| └Scope 37 | C-12.1 [Civil] | PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. | HOLD | Chain hold | |
| └Scope 38 | C-13 [Civil] | SCOPE: NO SUBSTITUTIONS - NO ALTERNATES | HOLD | Chain hold | |
| └Scope 39 | C-14 [Civil] | Use of restrained joints or thrust blocks for tees, bends, plugs, hydrants | HOLD | Chain hold | |
| └Scope 40 | C-14 [Civil] | ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL CONTAIN NO MORE THAN 8.0% LEAD, AND ANY SOLDER OR FLUX USED IN THIS PROJECT WILL CONTAIN NO MORE THAN 0.2% LEAD. | HOLD | Chain hold | |
| └Scope 41 | C-15 [Civil] | Saw joints per schedule; first saw cut 1/8", second saw cut 1/4" (if required) | HOLD | Chain hold | |
| └Scope 42 | C-15 [Civil] | Diamond dowel installation: 1/4" x 4.5" DIAMOND DOWEL BY PNA SPACED AT 24" O.C. | HOLD | Chain hold | |
| └Scope 43 | C-15 [Civil] | Crack control joints at 5' centers | HOLD | Chain hold | |
| └Scope 44 | C-15 [Civil] | DIAMOND DOWEL 1/4" x 4.5" DIAMOND DOWEL BY PNA SPACED AT 24" O.C. DO NOT GREASE DOWEL. INSTALL PER PNA RECOMMENDATION | HOLD | Chain hold | |
| └Scope 45 | C-15 [Civil] | 1/4" SECOND SAW CUT (IF REQUIRED) | HOLD | Chain hold | |
| └Scope 46 | C-15 [Civil] | SAW JOINTS PER SCHEDULE SAME DAY AS POUR | HOLD | Chain hold | |
| └Scope 47 | C-16 [Civil] | Design and construct walls to meet 2020 Florida Building Code exposure and wind-load requirements as noted | HOLD | Chain hold | |
| └Scope 48 | C-16 [Civil] | STOP SIGN DETAIL: HIGH INTENSITY R1-1 REFLECTIVE ALUMINUM 36" AT INTERSECTION WITH RIGHT-OF-WAY 30" INTERIOR | HOLD | Chain hold | |
| └Scope 49 | C-16 [Civil] | HANDICAP PARKING SIGN: TOP PORTION OF SIGN SHALL HAVE REFLECTORIZED (ENGINEERING GRADE) BLUE BACKGROUND WITH WHITE REFLECTORIZED LEGEND AND BORDER; BOTTOM PORTION OF SIGN SHALL HAVE REFLECTORIZED (ENGINEERING GRADE) WHITE BACKGROUND WITH BLACK OPAQUE LEGEND AND BORDER | HOLD | Chain hold | |
| └Scope 50 | C-16 [Civil] | FINE NOTIFICATION SIGN SHALL HAVE A REFLECTORIZED (ENGINEERING GRADE) WHITE BACKGROUND WITH BLACK OPAQUE LEGEND AND BORDER | HOLD | Chain hold | |
| └Scope 51 | C-16 [Civil] | FINE $250.00 F.S. 318.14 (shown on sign detail) | HOLD | Chain hold | |
| └Scope 52 | C-18 [Civil] | Standard civil/utility details for the project | HOLD | Chain hold | |
| └Scope 53 | C-18 [Civil] | Bollard post details | HOLD | Chain hold | |
| └Scope 54 | C-18 [Civil] | Above-ground double detector check valve assembly detail | HOLD | Chain hold | |
| └Scope 55 | C-18 [Civil] | New lateral connections detail | HOLD | Chain hold | |
| └Scope 56 | C-18 [Civil] | Miscellaneous PM details | HOLD | Chain hold | |
| └Scope 57 | C-18 [Civil] | Document or sheet labeled: CITY OF TAMPA STANDARD DETAILS | HOLD | Chain hold | |
| └Scope 58 | C-18 [Civil] | Text (on face): THIS DRAWING IS THE PROPERTY OF NEWKIRK ENGINEERING ANY USE OR REPRODUCTION IN WHOLE OR PART IS PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF NEWKIRK ENGINEERING | HOLD | Chain hold | |
| └Scope 59 | C-19 [Civil] | TWO-LANE AND MULTILANE, WORK ON SHOULDER | HOLD | Chain hold | |
| └Scope 60 | C-19 [Civil] | TWO-LANE, TWO-WAY WORK WITHIN THE TRAVEL WAY | HOLD | Chain hold | |
| └Scope 61 | C-19 [Civil] | SPECIAL CONDITIONS | HOLD | Chain hold | |
| └Scope 62 | C-19 [Civil] | TEMPORARY RAILROAD CROSSING BUFFER SPACE EXTENSION | HOLD | Chain hold | |
| └Scope 63 | C-19 [Civil] | TEMPORARY LANE SHIFT TO SHOULDER WHEN WORK AREA ENCROACHES ON THE CENTERLINE | HOLD | Chain hold | |
| └Scope 64 | C-19 [Civil] | FDOT standard-plan captions visible: 'FY 2021-22 STANDARD PLANS' and sheet identifiers '102-602' and '102-603' | HOLD | Chain hold | |
| └Scope 65 | C-19 [Civil] | Visible plan detail captions: 'TWO-LANE AND MULTILANE, WORK ON SHOULDER', 'TWO-LANE, TWO-WAY WORK WITHIN THE TRAVEL WAY', 'SPECIAL CONDITIONS' | HOLD | Chain hold | |
| └Scope 66 | C-19 [Civil] | Examples of detail labels visible: 'TEMPORARY RAILROAD CROSSING BUFFER SPACE EXTENSION', 'TEMPORARY LANE SHIFT TO SHOULDER WHEN WORK AREA ENCROACHES ON THE CENTERLINE' | HOLD | Chain hold | |
| └Scope 67 | C-20 [Civil] | THIS DRAWING IS THE PROPERTY OF NEWKIRK ENGINEERING ANY USE OR REPRODUCTION IN WHOLE OR PART IS PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF NEWKIRK ENGINEERING COPYRIGHT 2013 ALL RIGHTS RESERVED | HOLD | Chain hold | |
| └Scope 68 | C-20 [Civil] | FY 2021-22 STANDARD PLANS | HOLD | Chain hold | |
| └Scope 69 | C-21 [Civil] | 2. ALL MULCH SHALL BE ALL NATURAL WOOD (NO CYPRESS). | HOLD | Chain hold | |
| └Scope 70 | C-21 [Civil] | 9. NO SUBSTITUTIONS OR CHANGES OF ANY KIND WILL BE ALLOWED AT THE TIME OF BIDDING SO AS TO PROVIDE FOR FAIR COMPARISON. | HOLD | Chain hold | |
| └Scope 71 | C-21 [Civil] | 12. ALL BUILDING MATERIALS AND LABOR SHALL CONFORM TO THE SOUTHERN BUILDING CODE AND ALSO TO ALL LOCAL CODES THAT HAVE JURISDICTION. | HOLD | Chain hold | |
| └Scope 72 | C-21 [Civil] | 22. ALL PLANT MATERIAL SHALL BE GUARANTEED ONE YEAR AFTER ACCEPTANCE BY OWNER. | HOLD | Chain hold | |
| └Scope 73 | C-21 [Civil] | 28. FOR ALL NEW DEVELOPMENT, OR REDEVELOPMENT OF EXISTING PROPERTY, THE APPLICANT SHALL BE REQUIRED TO REMOVE ALL INVASIVE NONNATIVE PLANT SPECIES FROM THE PROPERTY PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. | HOLD | Chain hold | |
| └Scope 74 | C-21 [Civil] | PLANT LIST - GROUND COVER: DT 95, MC 94, ZI 235 | HOLD | Chain hold | |
| └Scope 75 | C-21 [Civil] | ALL MULCH SHALL BE ALL NATURAL WOOD (NO CYPRESS). | HOLD | Chain hold | |
| └Scope 76 | C-22 [Civil] | INSTALL SLEEVE PIPING WHERE SHOWN ON THE DRAWINGS AT THE PROPER DEPTH. | HOLD | Chain hold | |
| └Scope 77 | C-22 [Civil] | ALL SLEEVE PIPE SHALL BE SCHEDULE 40 PVC PIPE INSTALLED A MINIMUM OF 20" BELOW FINISHED PAVING GRADES. | HOLD | Chain hold | |
| └Scope 78 | C-22 [Civil] | ALL SLEEVES WHEN PLACED IN FIELD ARE TO BE LOCATED BY A METAL PIPE AT EACH END AND LOCATED FROM TWO STATIONARY POINTS BY TAPE MEASUREMENTS. | HOLD | Chain hold | |
| └Scope 79 | C-22 [Civil] | ALL PIPE SHALL BE INSTALLED A MINIMUM OF 20" BELOW GRADE. | HOLD | Chain hold | |
| └Scope 80 | C-22 [Civil] | ALL PIPE EXPOSED ABOVE GRADE AND TO VIEW SHALL BE SCHEDULE 40 GALVANIZED STEEL PIPE OF THE NOTED SIZE. | HOLD | Chain hold | |
| └Scope 81 | C-22 [Civil] | ALL PIPE 1/2" TO 2 1/2" IN SIZE SHALL BE PRESSURE RATED 160 PVC (EXCEPT MAIN). | HOLD | Chain hold | |
| └Scope 82 | C-22 [Civil] | ALL FITTINGS SHALL BE SCHEDULE 40 PVC. | HOLD | Chain hold | |
| └Scope 83 | C-22 [Civil] | Finish floor elevation 43.30 | HOLD | Chain hold | |
| └Scope 84 | C-23 [Civil] | Palm Batten system and installation detail | HOLD | Chain hold | |
| └Scope 85 | C-23 [Civil] | SAUCER - 3" DEEP (appears in multi-trunk and other details) | HOLD | Chain hold | |
| Section-31-003 | Excavation | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-31-004 | Trenching | Chain hold | ||
| └Scope 01 | C-22 [Civil] | ALL TRENCHING SHALL BE KEPT OUT OF THE DRIP LINE AREA OF ALL EXISTING TREES. USE RADIAL LINES OR TUNNELING WHEN NECESSARY TO ENCROACH INTO THE DRIP LINE AREA OF TREES. | HOLD | Chain hold | |
| Section-31-005 | Dewatering | Chain hold | ||
| └Scope 01 | C-5 [Civil] | TYPICAL DEWATERING DISCHARGE DETAIL | HOLD | Chain hold | |
| Section-31-006 | Fill / Backfill | Chain hold | ||
| └Scope 01 | C-9 [Civil] | Prohibition on temporary fill stockpiling in lifts greater than six feet. | HOLD | Chain hold | |
| Section-31-007 | Subgrade Preparation | Chain hold | ||
| └Scope 01 | A-002 | Provide termite treatment per FBC Section 1816. Treatment limits/area are not defined on this sheet; quantity remains blank. | SF | Chain hold | |
| Section-31-008 | Erosion / Sediment Control | Chain hold | ||
| └Scope 01 | C-4 [Civil] | Install proposed silt fence (see detail, sheet No. 5) | HOLD | Chain hold | |
| └Scope 02 | C-4 [Civil] | PROPOSED SILT FENCE (SEE DETAIL, SHEET No. 5) | HOLD | Chain hold | |
| └Scope 03 | C-5 [Civil] | SEDIMENT FENCE DETAIL | HOLD | Chain hold | |
| └Scope 04 | C-5 [Civil] | TEMPORARY SEDIMENT POND DETAIL | HOLD | Chain hold | |
| └Scope 05 | C-5 [Civil] | SEDIMENT CONTROL STONE SHALL BE 3/4" WASHED STONE. | HOLD | Chain hold | |
| └Scope 06 | C-9 [Civil] | Soil stabilization during construction to reduce erosion. | HOLD | Chain hold | |
| Section-31-009 | Soil Stabilization | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-31-010 | Shoring / Excavation Support | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 32 | Exterior Improvements10 | |||
| Section-32-001 | Asphalt Paving | Chain hold | ||
| └Scope 01 | C-1A [Civil] | Existing site features indicated (broken asphalt, retention pond, asphalt parking) | HOLD | Chain hold | |
| └Scope 02 | C-4 [Civil] | Asphalt pavement removal (13,414 SF total) | HOLD | Chain hold | |
| └Scope 03 | C-4 [Civil] | Saw cut and remove 13,716± SF asphalt pavement (alternate/as-annotated line) | HOLD | Chain hold | |
| └Scope 04 | C-4 [Civil] | Open cut asphalt pavement as required for 4" force main connection (see Utility Plan, Sheet No. 12) | HOLD | Chain hold | |
| └Scope 05 | C-6 [Civil] | ASPHALT PAVEMENT (typical): 1.5" SP-9.5 WITH TACK COAT PER FDOT SPECIFICATIONS | HOLD | Chain hold | |
| └Scope 06 | C-10 [Civil] | Asphalt pavement and overlay dimensions and locations | HOLD | Chain hold | |
| └Scope 07 | C-12 [Civil] | Roadway restoration per corresponding jurisdictions latest standards and City detail (mill & overlay where asphalt open cuts are within City R/W) | HOLD | Chain hold | |
| └Scope 08 | C-15 [Civil] | Imprinted asphalt to be installed with 1/4" max imprint depth and specified thermoplastic edge markings | HOLD | Chain hold | |
| Section-32-002 | Concrete Paving / Walks | Chain hold | ||
| └Scope 01 | A-570 | Sidewalk detail | HOLD | Chain hold | |
| └Scope 02 | C-3 [Civil] | 4 HANDICAP PARKING SPACES ARE PROVIDED WITH A SIDEWALK CONNECTION TO THE 9301 N 29TH STREET RIGHT-OF-WAY. | HOLD | Chain hold | |
| └Scope 03 | C-4 [Civil] | Saw cut and remove various sidewalks and curbs (examples: 168±LF sidewalk, 47±LF sidewalk, 40 LF Type 'F' curb, 73 LF drop curb, 41 LF Type 'F' curb) | HOLD | Chain hold | |
| └Scope 04 | C-9 [Civil] | Sidewalk and curb/curb ramp construction per typical details (including saw cut and match existing pavement with butt joint and transition to thickened edge sidewalk). | HOLD | Chain hold | |
| └Scope 05 | C-10 [Civil] | Site cross-sections for building, sidewalks, curb, pavement and landscaping | HOLD | Chain hold | |
| └Scope 06 | C-10 [Civil] | Handicap parking and sidewalk crossing configuration | HOLD | Chain hold | |
| └Scope 07 | C-15 [Civil] | Place 1/2" expansion joints at maximum 50' o.c. for sidewalks | HOLD | Chain hold | |
| └Scope 08 | C-20 [Civil] | Sidewalk closure (standard plan) | HOLD | Chain hold | |
| Section-32-003 | Curbs / Gutters | Chain hold | ||
| └Scope 01 | C-5 [Civil] | CURB INLET PROTECTION (WITH AND WITHOUT GRATE) | HOLD | Chain hold | |
| └Scope 02 | C-5 [Civil] | FOR CURB INLET PROTECTION AN ADDITIONAL 18" OF FABRIC IS WRAPPED AROUND THE WOOD AND SECURED WITH STAPLES. THE WOOD SHALL NOT BLOCK THE ENTIRE HEIGHT OF THE CURB BOX OPENING. | HOLD | Chain hold | |
| └Scope 03 | C-15 [Civil] | 1/2" pre-molded expansion joint required every 500' for curbs; construction joint required every 10' maximum (4' minimum) | HOLD | Chain hold | |
| └Scope 04 | C-15 [Civil] | Expansion joint material must cover entire cross section of curb | HOLD | Chain hold | |
| └Scope 05 | C-22 [Civil] | WHEN INSTALLING IRRIGATION PIPING IN ISLAND AND OTHER NARROW PLANTING AREAS RUN PIPING CLOSE TO CURB AND NOT DOWN THE MIDDLE OF THE PLANTING AREA. | HOLD | Chain hold | |
| Section-32-004 | Pavement Markings | Chain hold | ||
| └Scope 01 | C-6 [Civil] | Paving and pavement marking shown for parking and drives (as detailed in PAVING LEGEND and PAVEMENT MARKING NOTES) | HOLD | Chain hold | |
| Section-32-005 | Fences / Gates | Chain hold | ||
| └Scope 01 | C-1A [Civil] | Fence line shown: '6' CHAIN LINK FENCE' | HOLD | Chain hold | |
| └Scope 02 | C-4 [Civil] | Remove chain link fence along 29th Street right-of-way | HOLD | Chain hold | |
| └Scope 03 | C-16 [Civil] | Provide/construct corrugated metal gate with drop pin holes and locking mechanism as detailed | HOLD | Chain hold | |
| └Scope 04 | P5.1 [Plumbing] | GATE VALVE UNION STAINLESS STEEL | HOLD | Chain hold | |
| Section-32-006 | Retaining Walls | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-32-007 | Site Furnishings | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-32-008 | Irrigation | Chain hold | ||
| └Scope 01 | C-21 [Civil] | 10. EXISTING IRRIGATION SYSTEM SHALL BE REVAMPED TO PROVIDE 100% COVERAGE. | HOLD | Chain hold | |
| └Scope 02 | C-22 [Civil] | LOCATE ALL VALVES AND OTHER IRRIGATION EQUIPMENT IN PLANT BED AREAS WITHIN THE PROJECT LIMITS FOR CONCEALMENT PURPOSES. | HOLD | Chain hold | |
| └Scope 03 | C-22 [Civil] | PURPLE IRRIGATION EQUIPMENT MUST BE USED FOR ALL IRRIGATION IF REUSE WATER IS BEING USED. | HOLD | Chain hold | |
| └Scope 04 | C-22 [Civil] | IRRIGATION LINES ARE SHOWN DIAGRAMMATICALLY AND ARE INTENDED TO SHOW DISTRIBUTION ZONES ONLY. ALL VALVES SHALL BE LOCATED WITHIN PLANTING AREAS (NOT WITHIN PAVEMENT). LINES LOCATED UNDER PAVEMENT SHALL BE KEPT TO A MINIMUM AND ALL PIPING UNDER PAVED AREAS SHALL BE SLEEVED. | HOLD | Chain hold | |
| └Scope 05 | C-22 [Civil] | NO SIGNIFICANT IRRIGATION OVERTHROW SHALL BE ALLOWED ONTO IMPERVIOUS SURFACES. | HOLD | Chain hold | |
| └Scope 06 | C-22 [Civil] | IRRIGATION PLAN scale: 1" = 20' | HOLD | Chain hold | |
| └Scope 07 | C-22 [Civil] | Controller specified: RACHIO 16 ZONE IRO (SMART IRRIGATION) OR EQUAL | HOLD | Chain hold | |
| └Scope 08 | C-22 [Civil] | 1-1/2" LOOPED IRRIGATION MAIN (MUST BE SCH 40 PIPE) is shown | HOLD | Chain hold | |
| └Scope 09 | C-22 [Civil] | Plan note: 25% OF IRRIGATION IS LOW VOLUME | HOLD | Chain hold | |
| └Scope 10 | C-23 [Civil] | Irrigation techline/center feed layout and Netafim detail | HOLD | Chain hold | |
| └Scope 11 | C-23 [Civil] | Document title: LANDSCAPE AND IRRIGATION DETAILS | HOLD | Chain hold | |
| Section-32-009 | Planting / Landscaping | Chain hold | ||
| └Scope 01 | C-1A [Civil] | Relationships to adjacent public streets: 29th STREET NORTH and 30th STREET NORTH | HOLD | Chain hold | |
| └Scope 02 | C-3 [Civil] | Provide two (2) right-in and right-out driveway connections on N 30TH STREET. | HOLD | Chain hold | |
| └Scope 03 | C-3 [Civil] | Connect potable water to a 12" water main within the N. 30TH STREET ROW. | HOLD | Chain hold | |
| └Scope 04 | C-3 [Civil] | SITE ACCESS WILL BE PROVIDED TWO (2) RIGHT-IN AND RIGHT-OUT DRIVEWAY CONNECTION ON N 30TH STREET. | HOLD | Chain hold | |
| └Scope 05 | C-4 [Civil] | Tree removal (typical 20 places) and tree protection barriers (typical 23 places) | HOLD | Chain hold | |
| └Scope 06 | C-5 [Civil] | TREE PROTECTION BARRIER | HOLD | Chain hold | |
| └Scope 07 | C-6 [Civil] | Landscape/restore disturbed right-of-way areas with BAHIA SOD (General Note 7) | HOLD | Chain hold | |
| └Scope 08 | C-9 [Civil] | Seeding/sodding and maintenance until grass establishes; planting/grass/mulch of all non-paved areas. | HOLD | Chain hold | |
| └Scope 09 | C-10 [Civil] | 4' LANDSCAPE AREA | HOLD | Chain hold | |
| └Scope 10 | C-17 [Civil] | Civil Engineering, Transportation, CEI & Landscape Architecture | HOLD | Chain hold | |
| └Scope 11 | C-20 [Civil] | Civil Engineering, Transportation, CEI & Landscape Architecture 1230 North US1, Suite 3 Ormond Beach, Florida 32174 Phone (386) 872-7794 www.Newkirk-Engineering.com C.A. # 30209 L.C. # 26000584 | HOLD | Chain hold | |
| └Scope 12 | C-21 [Civil] | 1. ALL PLANT MATERIAL SHALL CONFORM TO THE STANDARDS FOR FLORIDA #1 OR BETTER AS DESCRIBED IN THE CURRENT "GRADES AND STANDARDS FOR NURSERY PLANTS", STATE OF FLORIDA, DEPARTMENT OF AGRICULTURE, TALLAHASSEE, OR THEIR EQUAL AS DETERMINED BY THE LANDSCAPE ARCHITECT. | HOLD | Chain hold | |
| └Scope 13 | C-21 [Civil] | 16. ANY EXISTING TREES CREDITED TOWARDS REQUIRED BUFFERS OR LANDSCAPE REQUIREMENTS REMOVED FOR ANY REASON SHALL BE REPLACED WITH TREES MEETING CITY APPROVAL WITH REGARDS TO SPECIES AND SIZE. | HOLD | Chain hold | |
| └Scope 14 | C-21 [Civil] | 18. ALL SHADE TREES AND SINGLE TRUNK UNDERSTORY TREES SHALL BE STAKED USING ARBORGUY STAKING SYSTEM FOR SINGLE STEM TREE AND ALL MULTI-TRUNK UNDERSTORY TREES SHALL BE STAKED WITH ARBORGUY MULTI-TRUNK SYSTEM. | HOLD | Chain hold | |
| └Scope 15 | C-21 [Civil] | PLANT LIST - TREES: AR 4, CC 9, IN 6, JV 3, LI 11, LIG 3, MGB 7, SP 17, TD 4 | HOLD | Chain hold | |
| └Scope 16 | C-21 [Civil] | PLANT LIST - SHRUBS: IVS 35, LJF 46, POM 104, PR 6, PS 28, RI 24, ROSA 50, VW 375, VS 25 | HOLD | Chain hold | |
| └Scope 17 | C-21 [Civil] | PLANT LIST TOTAL 1181 (64 trees + 693 shrubs + 424 ground cover) | HOLD | Chain hold | |
| └Scope 18 | C-22 [Civil] | CHECK PRESSURE AND GPM OF WATER SUPPLY BEFORE BEGINNING JOB AND REPORT FINDINGS TO LANDSCAPE ARCHITECT. LANDSCAPE ARCHITECT WILL MAKE ANY ADJUSTMENT NECESSARY TO MAKE SYSTEM WORK AT ITS BEST. | HOLD | Chain hold | |
| └Scope 19 | C-23 [Civil] | Island planting detail | HOLD | Chain hold | |
| └Scope 20 | C-23 [Civil] | Tree planting detail | HOLD | Chain hold | |
| └Scope 21 | C-23 [Civil] | Palm tree planting detail | HOLD | Chain hold | |
| └Scope 22 | C-23 [Civil] | Shrub planting detail | HOLD | Chain hold | |
| └Scope 23 | C-23 [Civil] | Multi-trunk planting detail | HOLD | Chain hold | |
| └Scope 24 | C-23 [Civil] | Tree anchoring/guying details (Tree Frog PRO/BIO systems) | HOLD | Chain hold | |
| └Scope 25 | C-23 [Civil] | General planting/soil/mulch/fertilizer notes | HOLD | Chain hold | |
| └Scope 26 | C-23 [Civil] | Landscape Architect: RICHARD L. POORE, L.A. # LA533 | HOLD | Chain hold | |
| └Scope 27 | C-23 [Civil] | PLANTING PIT IS TO BE 1.5 TIMES THE ROOT BALL / also 'PLANT PIT TWICE SIZE OF ROOTBALL' appears in other details | HOLD | Chain hold | |
| └Scope 28 | ENERGY-1 [Energy-Calculations] | Two (2) right-in and right-out driveway connections on N 30TH STREET | HOLD | Chain hold | |
| └Scope 29 | ENERGY-1 [Energy-Calculations] | SITE ACCESS WILL BE PROVIDED TWO (2) RIGHT-IN AND RIGHT-OUT DRIVEWAY CONNECTIONS ON N 30TH STREET. | HOLD | Chain hold | |
| Section-32-010 | Turf / Seeding | Chain hold | ||
| └Scope 01 | C-5 [Civil] | TEMPORARY SEEDING SPECIFICATION AND MULCHING | HOLD | Chain hold | |
| └Scope 02 | C-21 [Civil] | 3. SOD SPECIFIED AS ST. AUGUSTINE "FLORITAM" SHALL BE 95% WEED-FREE. SOD SPECIFIED AS BAHIA SHALL BE 85% WEED-FREE. ALL SOD SHALL BE INSTALLED WITH TIGHT JOINTS, ROLLED AND FERTILIZED. | HOLD | Chain hold | |
| └Scope 03 | C-21 [Civil] | SOD SPECIFIED AS ST. AUGUSTINE "FLORITAM" SHALL BE 95% WEED-FREE. SOD SPECIFIED AS BAHIA SHALL BE 85% WEED-FREE. ALL SOD SHALL BE INSTALLED WITH TIGHT JOINTS, ROLLED AND FERTILIZED. | HOLD | Chain hold | |
| DIV 33 | Utilities8 | |||
| Section-33-001 | Water Utilities | Chain hold | ||
| └Scope 01 | C-12 [Civil] | Install 4" PVC (DR 18) water service to building (36" min. cover) | HOLD | Chain hold | |
| └Scope 02 | C-12 [Civil] | Perform wet taps to existing 8" DIP water main (various tap sizes referenced: 8"x8" MJ saddle, 8"x4" tapping sleeve, 8"x2" double strap tapping saddle) | HOLD | Chain hold | |
| └Scope 03 | C-12 [Civil] | WET TAP EXISTING 8" DIP WATER MAIN WITH 8"x8" MJ SADDLE, VALVE AND VALVE BOX FOR FIRE SERVICE. SEE CITY DETAIL, SHEET No. 18 | HOLD | Chain hold | |
| └Scope 04 | C-12 [Civil] | WET TAP EXISTING 8" WATER MAIN WITH 8"x4" TAPPING SLEEVE, VALVE AND VALVE BOX FOR POTABLE WATER SERVICE. SEE CITY DETAIL 6.01A, SHEET No. 18 | HOLD | Chain hold | |
| └Scope 05 | C-14 [Civil] | Installation of potable water mains and appurtenances to AWWA standards | HOLD | Chain hold | |
| Section-33-002 | Sanitary Sewerage | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-33-003 | Storm Drainage | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-33-004 | Utility Structures | Chain hold | ||
| └Scope 01 | C-12 [Civil] | Provide traffic-bearing adjustments for manhole tops and cleanouts | HOLD | Chain hold | |
| └Scope 02 | C-18 [Civil] | Force main connection to existing manhole detail | HOLD | Chain hold | |
| Section-33-005 | Natural Gas Utilities | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-33-006 | Electrical Site Utilities | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-33-007 | Communications Site Utilities | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-33-008 | Utility Testing / Tie-Ins | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 34 | Transportation6 | |||
| Section-34-001 | Roadways | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-34-002 | Railways / Guideways | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-34-003 | Traffic Signals | Chain hold | ||
| └Scope 01 | C-4 [Civil] | Provide traffic control measures and MOT plan; maintain driveways in-service | HOLD | Chain hold | |
| └Scope 02 | C-19 [Civil] | MAINTENANCE OF TRAFFIC | HOLD | Chain hold | |
| └Scope 03 | C-20 [Civil] | Maintenance of Traffic | HOLD | Chain hold | |
| └Scope 04 | C-20 [Civil] | Multilane roadway lane closures (standard plan) | HOLD | Chain hold | |
| Section-34-004 | Transportation Signage | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-34-005 | Pavement Marking | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-34-006 | Transportation Lighting | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 35 | Waterway and Marine Construction7 | |||
| Section-35-001 | Dredging | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-35-002 | Shoreline Protection | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-35-003 | Waterway Bank Protection | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-35-004 | Marine Construction / Docks | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-35-005 | Floating Construction | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-35-006 | Underwater Construction | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-35-007 | Dams / Levees | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 40 | Process Interconnections8 | |||
| Section-40-001 | Process Piping | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-40-002 | Gas / Vapor Process Piping | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-40-003 | Liquid Process Piping | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-40-004 | Process Valves | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-40-005 | Pipe Supports / Sleeves | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-40-006 | Process Piping Insulation | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-40-007 | Instrumentation | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-40-008 | Process Controls | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 41 | Material Processing and Handling Equipment7 | |||
| Section-41-001 | Conveyors | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-41-002 | Cranes / Hoists | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-41-003 | Lifting Devices | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-41-004 | Feeders / Batching | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-41-005 | Storage Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-41-006 | Manufacturing Lines | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-41-007 | Processing Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 42 | Process Heating, Cooling, and Drying Equipment6 | |||
| Section-42-001 | Process Heating Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-42-002 | Process Boilers | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-42-003 | Furnaces / Kilns / Ovens | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-42-004 | Process Cooling Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-42-005 | Heat Exchangers | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-42-006 | Drying Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 43 | Process Gas and Liquid Handling, Purification, and Storage Equipment7 | |||
| Section-43-001 | Gas Handling Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-43-002 | Compressors / Blowers | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-43-003 | Liquid Pumps | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-43-004 | Liquid Handling Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-43-005 | Filters / Purification | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-43-006 | Tanks / Storage | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-43-007 | Pressurized Vessels | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 44 | Pollution and Waste Control Equipment6 | |||
| Section-44-001 | Air Pollution Control | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-44-002 | Noise / Vibration Control | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-44-003 | Odor Control | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-44-004 | Water Pollution Control | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-44-005 | Solid Waste Control | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-44-006 | Waste Thermal Processing | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 45 | Industry-Specific Manufacturing Equipment7 | |||
| Section-45-001 | Oil / Gas Extraction Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-45-002 | Mining Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-45-003 | Food Manufacturing Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-45-004 | Beverage Manufacturing Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-45-005 | Chemical Manufacturing Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-45-006 | Metal / Machinery Manufacturing Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-45-007 | Manufacturing Equipment Commissioning | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 46 | Water and Wastewater Equipment9 | |||
| Section-46-001 | Packaged Treatment Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-46-002 | Screening Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-46-003 | Grinding / Shredding Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-46-004 | Oil / Grease Separation | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-46-005 | Chemical Feed Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-46-006 | Clarifier Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-46-007 | Aeration / Secondary Treatment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-46-008 | Filtration / UV Treatment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-46-009 | Residuals / Sludge Handling | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| DIV 48 | Electrical Power Generation8 | |||
| Section-48-001 | Generators | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-48-002 | Solar Power Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-48-003 | Wind Power Equipment | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-48-004 | Battery / Energy Storage | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-48-005 | Inverters / Power Controls | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-48-006 | Transformers / Voltage Regulation | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-48-007 | Combined Heat and Power | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
| Section-48-008 | Power Generation Commissioning | Ready | ||
| └Scope 01 | Enter scope description | LS | Needs description | |
| └Scope 02 | Enter scope description | LS | Needs description | |
Direct construction cost$0