ESTIMATING

Built Within · Hands-On Hospitality

Project Estimate

Division-based construction estimate worksheet

Direct cost$0
Active sections0
Markup5.0%
Estimate total$0

Estimate

Division-based construction estimate worksheet

35 divisions · 317 sections
IDDivision / SectionQtyUnitUnit CostTotalSection TotalDivision Total
DIV 00Procurement and Contracting Requirements13$0
Section-00-001Bid / Proposal Submitted$0
└Scope 01$0
└Scope 02$0
Section-00-002Contract Executed$0
└Scope 01$0
└Scope 02$0
Section-00-003Bonds Received$0
└Scope 01$0
└Scope 02$0
Section-00-004Insurance Received$0
└Scope 01$0
└Scope 02$0
Section-00-005Notice to Proceed$0
└Scope 01$0
└Scope 02$0
Section-00-006Permit Status$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
Section-00-007Schedule of Values$0
└Scope 01$0
└Scope 02$0
Section-00-008Pay Applications$0
└Scope 01$0
└Scope 02$0
Section-00-009RFIs / Clarifications$0
└Scope 01$0
└Scope 02$0
Section-00-010Change Orders$0
└Scope 01$0
└Scope 02$0
Section-00-011Substantial Completion$0
└Scope 01$0
└Scope 02$0
Section-00-012Final Closeout$0
└Scope 01$0
└Scope 02$0
Section-00-013Warranties$0
└Scope 01$0
└Scope 02$0
DIV 01General Requirements15$0
Section-01-001Project Summary / Scope$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
└Scope 76$0
└Scope 77$0
└Scope 78$0
└Scope 79$0
└Scope 80$0
└Scope 81$0
└Scope 82$0
└Scope 83$0
└Scope 84$0
└Scope 85$0
└Scope 86$0
└Scope 87$0
└Scope 88$0
└Scope 89$0
└Scope 90$0
└Scope 91$0
└Scope 92$0
└Scope 93$0
└Scope 94$0
└Scope 95$0
└Scope 96$0
└Scope 97$0
└Scope 98$0
└Scope 99$0
└Scope 100$0
└Scope 101$0
└Scope 102$0
└Scope 103$0
└Scope 104$0
└Scope 105$0
└Scope 106$0
└Scope 107$0
└Scope 108$0
└Scope 109$0
└Scope 110$0
└Scope 111$0
└Scope 112$0
└Scope 113$0
└Scope 114$0
└Scope 115$0
└Scope 116$0
└Scope 117$0
└Scope 118$0
└Scope 119$0
└Scope 120$0
└Scope 121$0
└Scope 122$0
└Scope 123$0
└Scope 124$0
└Scope 125$0
└Scope 126$0
└Scope 127$0
└Scope 128$0
└Scope 129$0
└Scope 130$0
└Scope 131$0
└Scope 132$0
└Scope 133$0
└Scope 134$0
└Scope 135$0
└Scope 136$0
└Scope 137$0
└Scope 138$0
└Scope 139$0
└Scope 140$0
└Scope 141$0
└Scope 142$0
└Scope 143$0
└Scope 144$0
└Scope 145$0
└Scope 146$0
└Scope 147$0
└Scope 148$0
└Scope 149$0
└Scope 150$0
└Scope 151$0
└Scope 152$0
└Scope 153$0
└Scope 154$0
└Scope 155$0
└Scope 156$0
└Scope 157$0
└Scope 158$0
└Scope 159$0
└Scope 160$0
└Scope 161$0
└Scope 162$0
└Scope 163$0
└Scope 164$0
└Scope 165$0
└Scope 166$0
└Scope 167$0
└Scope 168$0
└Scope 169$0
└Scope 170$0
└Scope 171$0
└Scope 172$0
└Scope 173$0
└Scope 174$0
└Scope 175$0
└Scope 176$0
└Scope 177$0
└Scope 178$0
└Scope 179$0
└Scope 180$0
└Scope 181$0
└Scope 182$0
└Scope 183$0
└Scope 184$0
└Scope 185$0
└Scope 186$0
└Scope 187$0
└Scope 188$0
└Scope 189$0
└Scope 190$0
└Scope 191$0
└Scope 192$0
└Scope 193$0
└Scope 194$0
└Scope 195$0
└Scope 196$0
└Scope 197$0
└Scope 198$0
└Scope 199$0
└Scope 200$0
└Scope 201$0
└Scope 202$0
└Scope 203$0
└Scope 204$0
└Scope 205$0
└Scope 206$0
└Scope 207$0
└Scope 208$0
└Scope 209$0
└Scope 210$0
└Scope 211$0
└Scope 212$0
└Scope 213$0
└Scope 214$0
└Scope 215$0
└Scope 216$0
└Scope 217$0
└Scope 218$0
└Scope 219$0
└Scope 220$0
└Scope 221$0
└Scope 222$0
└Scope 223$0
└Scope 224$0
└Scope 225$0
└Scope 226$0
└Scope 227$0
└Scope 228$0
└Scope 229$0
└Scope 230$0
└Scope 231$0
└Scope 232$0
└Scope 233$0
└Scope 234$0
└Scope 235$0
└Scope 236$0
└Scope 237$0
└Scope 238$0
└Scope 239$0
└Scope 240$0
└Scope 241$0
└Scope 242$0
└Scope 243$0
└Scope 244$0
└Scope 245$0
└Scope 246$0
└Scope 247$0
└Scope 248$0
└Scope 249$0
└Scope 250$0
└Scope 251$0
└Scope 252$0
└Scope 253$0
└Scope 254$0
└Scope 255$0
└Scope 256$0
└Scope 257$0
└Scope 258$0
└Scope 259$0
└Scope 260$0
└Scope 261$0
└Scope 262$0
└Scope 263$0
└Scope 264$0
└Scope 265$0
└Scope 266$0
└Scope 267$0
└Scope 268$0
└Scope 269$0
└Scope 270$0
└Scope 271$0
└Scope 272$0
└Scope 273$0
└Scope 274$0
└Scope 275$0
└Scope 276$0
└Scope 277$0
└Scope 278$0
└Scope 279$0
└Scope 280$0
└Scope 281$0
└Scope 282$0
└Scope 283$0
└Scope 284$0
└Scope 285$0
└Scope 286$0
└Scope 287$0
└Scope 288$0
└Scope 289$0
└Scope 290$0
└Scope 291$0
└Scope 292$0
└Scope 293$0
└Scope 294$0
└Scope 295$0
└Scope 296$0
└Scope 297$0
└Scope 298$0
└Scope 299$0
└Scope 300$0
└Scope 301$0
└Scope 302$0
└Scope 303$0
└Scope 304$0
└Scope 305$0
└Scope 306$0
└Scope 307$0
└Scope 308$0
└Scope 309$0
└Scope 310$0
└Scope 311$0
└Scope 312$0
└Scope 313$0
└Scope 314$0
└Scope 315$0
└Scope 316$0
└Scope 317$0
└Scope 318$0
└Scope 319$0
└Scope 320$0
└Scope 321$0
└Scope 322$0
└Scope 323$0
└Scope 324$0
└Scope 325$0
└Scope 326$0
└Scope 327$0
└Scope 328$0
└Scope 329$0
└Scope 330$0
└Scope 331$0
└Scope 332$0
└Scope 333$0
Section-01-002Work Restrictions / Site Rules$0
└Scope 01$0
└Scope 02$0
Section-01-003Project Meetings$0
└Scope 01$0
└Scope 02$0
Section-01-004Construction Schedule$0
└Scope 01$0
└Scope 02$0
Section-01-005Progress Photos / Documentation$0
└Scope 01$0
└Scope 02$0
Section-01-006Submittals$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
Section-01-007Quality Control$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
└Scope 76$0
└Scope 77$0
└Scope 78$0
└Scope 79$0
└Scope 80$0
└Scope 81$0
└Scope 82$0
└Scope 83$0
└Scope 84$0
Section-01-008Temporary Facilities / Utilities$0
└Scope 01$0
└Scope 02$0
Section-01-009Temporary Controls / Safety / Protection$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
└Scope 76$0
└Scope 77$0
└Scope 78$0
└Scope 79$0
└Scope 80$0
└Scope 81$0
└Scope 82$0
└Scope 83$0
└Scope 84$0
└Scope 85$0
└Scope 86$0
└Scope 87$0
└Scope 88$0
└Scope 89$0
└Scope 90$0
└Scope 91$0
└Scope 92$0
└Scope 93$0
└Scope 94$0
└Scope 95$0
└Scope 96$0
└Scope 97$0
└Scope 98$0
└Scope 99$0
└Scope 100$0
└Scope 101$0
└Scope 102$0
└Scope 103$0
└Scope 104$0
└Scope 105$0
└Scope 106$0
└Scope 107$0
└Scope 108$0
└Scope 109$0
└Scope 110$0
└Scope 111$0
└Scope 112$0
└Scope 113$0
└Scope 114$0
└Scope 115$0
└Scope 116$0
└Scope 117$0
└Scope 118$0
└Scope 119$0
└Scope 120$0
└Scope 121$0
└Scope 122$0
└Scope 123$0
└Scope 124$0
└Scope 125$0
└Scope 126$0
└Scope 127$0
└Scope 128$0
└Scope 129$0
└Scope 130$0
└Scope 131$0
└Scope 132$0
└Scope 133$0
└Scope 134$0
└Scope 135$0
└Scope 136$0
└Scope 137$0
└Scope 138$0
└Scope 139$0
└Scope 140$0
└Scope 141$0
└Scope 142$0
└Scope 143$0
└Scope 144$0
└Scope 145$0
└Scope 146$0
└Scope 147$0
└Scope 148$0
└Scope 149$0
└Scope 150$0
└Scope 151$0
└Scope 152$0
└Scope 153$0
└Scope 154$0
└Scope 155$0
└Scope 156$0
└Scope 157$0
└Scope 158$0
└Scope 159$0
└Scope 160$0
└Scope 161$0
└Scope 162$0
└Scope 163$0
└Scope 164$0
└Scope 165$0
└Scope 166$0
└Scope 167$0
└Scope 168$0
└Scope 169$0
└Scope 170$0
└Scope 171$0
└Scope 172$0
└Scope 173$0
└Scope 174$0
└Scope 175$0
└Scope 176$0
└Scope 177$0
└Scope 178$0
└Scope 179$0
└Scope 180$0
└Scope 181$0
└Scope 182$0
└Scope 183$0
└Scope 184$0
└Scope 185$0
└Scope 186$0
└Scope 187$0
└Scope 188$0
└Scope 189$0
└Scope 190$0
└Scope 191$0
└Scope 192$0
└Scope 193$0
└Scope 194$0
└Scope 195$0
└Scope 196$0
└Scope 197$0
└Scope 198$0
└Scope 199$0
└Scope 200$0
└Scope 201$0
└Scope 202$0
└Scope 203$0
└Scope 204$0
└Scope 205$0
└Scope 206$0
└Scope 207$0
└Scope 208$0
└Scope 209$0
└Scope 210$0
└Scope 211$0
└Scope 212$0
└Scope 213$0
└Scope 214$0
└Scope 215$0
└Scope 216$0
└Scope 217$0
└Scope 218$0
└Scope 219$0
└Scope 220$0
└Scope 221$0
└Scope 222$0
└Scope 223$0
└Scope 224$0
└Scope 225$0
└Scope 226$0
└Scope 227$0
└Scope 228$0
└Scope 229$0
└Scope 230$0
└Scope 231$0
└Scope 232$0
└Scope 233$0
└Scope 234$0
└Scope 235$0
└Scope 236$0
└Scope 237$0
Section-01-010Product Delivery / Storage / Handling$0
└Scope 01$0
└Scope 02$0
Section-01-011Execution / Cutting / Patching$0
└Scope 01$0
└Scope 02$0
Section-01-012Cleaning / Waste Management$0
└Scope 01$0
└Scope 02$0
Section-01-013Closeout Procedures$0
└Scope 01$0
└Scope 02$0
Section-01-014O&M Manuals / Record Docs$0
└Scope 01$0
└Scope 02$0
Section-01-015Demonstration / Training$0
└Scope 01$0
└Scope 02$0
DIV 02Existing Conditions10$0
Section-02-001Existing Conditions Assessment$0
└Scope 01$0
└Scope 02$0
Section-02-002Surveys / Documentation$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
Section-02-003Selective Demolition$0
└Scope 01$0
Section-02-004Site Demolition$0
└Scope 01$0
└Scope 02$0
Section-02-005Structure Demolition$0
└Scope 01$0
└Scope 02$0
Section-02-006Hazardous Material Testing$0
└Scope 01$0
└Scope 02$0
Section-02-007Hazardous Material Abatement$0
└Scope 01$0
└Scope 02$0
Section-02-008Asbestos / Lead / Mold Remediation$0
└Scope 01$0
└Scope 02$0
Section-02-009Facility Remediation$0
└Scope 01$0
└Scope 02$0
Section-02-010Existing Utility Locate / Protection$0
└Scope 01$0
└Scope 02$0
DIV 03Concrete14$0
Section-03-001Concrete Submittals / Mix Designs$0
└Scope 01$0
└Scope 02$0
Section-03-002Concrete Forming$0
└Scope 01$0
└Scope 02$0
Section-03-003Concrete Reinforcing / Rebar$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
Section-03-004Embeds / Anchor Bolts / Accessories$0
└Scope 01$0
└Scope 02$0
Section-03-005Vapor Retarder / Slab Prep$0
└Scope 01$0
└Scope 02$0
Section-03-006Cast-In-Place Concrete$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
Section-03-007Concrete Placement$0
└Scope 01$0
└Scope 02$0
Section-03-008Concrete Finishing$0
└Scope 01$0
└Scope 02$0
Section-03-009Curing / Protection$0
└Scope 01$0
└Scope 02$0
Section-03-010Concrete Joints / Sawcutting$0
└Scope 01$0
└Scope 02$0
Section-03-011Testing / Field Quality Control$0
└Scope 01$0
└Scope 02$0
Section-03-012Precast Concrete$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
Section-03-013Grouting$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
Section-03-014Concrete Cutting / Core Drilling$0
└Scope 01$0
└Scope 02$0
DIV 04Masonry14$0
Section-04-001Masonry Submittals / Samples$0
└Scope 01$0
└Scope 02$0
Section-04-002Mortar / Grout$0
└Scope 01$0
Section-04-003Masonry Reinforcing / Anchors$0
└Scope 01$0
└Scope 02$0
Section-04-004Masonry Accessories$0
└Scope 01$0
└Scope 02$0
Section-04-005CMU / Concrete Unit Masonry$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
Section-04-006Brick / Clay Unit Masonry$0
└Scope 01$0
└Scope 02$0
Section-04-007Masonry Veneer$0
└Scope 01$0
└Scope 02$0
Section-04-008Flashing / Weeps / Drainage$0
└Scope 01$0
└Scope 02$0
Section-04-009Lintels / Bond Beams$0
└Scope 01$0
└Scope 02$0
Section-04-010Control / Expansion Joints$0
└Scope 01$0
└Scope 02$0
Section-04-011Stone Assemblies$0
└Scope 01$0
└Scope 02$0
Section-04-012Cast Stone / Manufactured Stone$0
└Scope 01$0
└Scope 02$0
Section-04-013Masonry Cleaning / Protection$0
└Scope 01$0
└Scope 02$0
Section-04-014Masonry Restoration / Repair$0
└Scope 01$0
└Scope 02$0
DIV 05Metals10$0
Section-05-001Structural Steel$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
Section-05-002Steel Joists$0
└Scope 01$0
└Scope 02$0
Section-05-003Metal Decking$0
└Scope 01$0
└Scope 02$0
Section-05-004Cold-Formed Metal Framing$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
Section-05-005Metal Fabrications$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
Section-05-006Metal Stairs$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
Section-05-007Pipe / Tube Railings$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
Section-05-008Gratings / Floor Plates$0
└Scope 01$0
└Scope 02$0
Section-05-009Decorative Metal$0
└Scope 01$0
└Scope 02$0
Section-05-010Steel Erection / Field Welding$0
└Scope 01$0
└Scope 02$0
DIV 06Wood, Plastics, and Composites10$0
Section-06-001Rough Carpentry$0
└Scope 01$0
└Scope 02$0
Section-06-002Wood Framing$0
└Scope 01$0
└Scope 02$0
Section-06-003Sheathing$0
└Scope 01$0
└Scope 02$0
Section-06-004Blocking / Backing$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
└Scope 76$0
└Scope 77$0
└Scope 78$0
└Scope 79$0
└Scope 80$0
└Scope 81$0
└Scope 82$0
└Scope 83$0
└Scope 84$0
└Scope 85$0
└Scope 86$0
└Scope 87$0
└Scope 88$0
└Scope 89$0
└Scope 90$0
└Scope 91$0
└Scope 92$0
└Scope 93$0
└Scope 94$0
└Scope 95$0
└Scope 96$0
└Scope 97$0
└Scope 98$0
└Scope 99$0
└Scope 100$0
└Scope 101$0
└Scope 102$0
└Scope 103$0
└Scope 104$0
└Scope 105$0
└Scope 106$0
└Scope 107$0
└Scope 108$0
└Scope 109$0
└Scope 110$0
└Scope 111$0
└Scope 112$0
└Scope 113$0
└Scope 114$0
└Scope 115$0
└Scope 116$0
└Scope 117$0
└Scope 118$0
└Scope 119$0
└Scope 120$0
└Scope 121$0
└Scope 122$0
└Scope 123$0
└Scope 124$0
└Scope 125$0
└Scope 126$0
└Scope 127$0
Section-06-005Finish Carpentry$0
└Scope 01$0
└Scope 02$0
Section-06-006Millwork$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
└Scope 76$0
└Scope 77$0
└Scope 78$0
└Scope 79$0
└Scope 80$0
└Scope 81$0
└Scope 82$0
└Scope 83$0
└Scope 84$0
└Scope 85$0
└Scope 86$0
└Scope 87$0
└Scope 88$0
└Scope 89$0
└Scope 90$0
└Scope 91$0
└Scope 92$0
└Scope 93$0
└Scope 94$0
└Scope 95$0
└Scope 96$0
└Scope 97$0
└Scope 98$0
└Scope 99$0
└Scope 100$0
└Scope 101$0
└Scope 102$0
└Scope 103$0
└Scope 104$0
└Scope 105$0
└Scope 106$0
└Scope 107$0
└Scope 108$0
└Scope 109$0
└Scope 110$0
└Scope 111$0
└Scope 112$0
└Scope 113$0
└Scope 114$0
└Scope 115$0
└Scope 116$0
└Scope 117$0
└Scope 118$0
└Scope 119$0
└Scope 120$0
└Scope 121$0
└Scope 122$0
└Scope 123$0
└Scope 124$0
└Scope 125$0
└Scope 126$0
└Scope 127$0
└Scope 128$0
└Scope 129$0
└Scope 130$0
└Scope 131$0
└Scope 132$0
└Scope 133$0
└Scope 134$0
└Scope 135$0
└Scope 136$0
└Scope 137$0
└Scope 138$0
└Scope 139$0
└Scope 140$0
└Scope 141$0
└Scope 142$0
└Scope 143$0
└Scope 144$0
└Scope 145$0
└Scope 146$0
└Scope 147$0
└Scope 148$0
└Scope 149$0
└Scope 150$0
└Scope 151$0
└Scope 152$0
└Scope 153$0
└Scope 154$0
└Scope 155$0
└Scope 156$0
└Scope 157$0
└Scope 158$0
└Scope 159$0
└Scope 160$0
└Scope 161$0
└Scope 162$0
└Scope 163$0
└Scope 164$0
└Scope 165$0
└Scope 166$0
└Scope 167$0
└Scope 168$0
└Scope 169$0
└Scope 170$0
└Scope 171$0
Section-06-007Architectural Woodwork$0
└Scope 01$0
└Scope 02$0
Section-06-008Casework$0
└Scope 01$0
└Scope 02$0
Section-06-009Countertops$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
Section-06-010Composite Trim / Panels$0
└Scope 01$0
└Scope 02$0
DIV 07Thermal and Moisture Protection10$0
Section-07-001Waterproofing$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
Section-07-002Dampproofing$0
└Scope 01$0
└Scope 02$0
Section-07-003Thermal Insulation$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
Section-07-004Air / Vapor Barriers$0
└Scope 01$0
└Scope 02$0
Section-07-005Roofing$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
Section-07-006Roof / Wall Panels$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
Section-07-007Flashing / Sheet Metal$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
Section-07-008Roof Accessories$0
└Scope 01$0
└Scope 02$0
Section-07-009Firestopping$0
└Scope 01$0
└Scope 02$0
Section-07-010Joint Sealants$0
└Scope 01$0
└Scope 02$0
DIV 08Openings10$0
Section-08-001Hollow Metal Doors / Frames$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
Section-08-002Wood Doors$0
└Scope 01$0
Section-08-003Specialty Doors$0
└Scope 01$0
└Scope 02$0
Section-08-004Overhead / Coiling Doors$0
└Scope 01$0
└Scope 02$0
Section-08-005Entrances / Storefronts$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
Section-08-006Windows$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
Section-08-007Curtain Wall$0
└Scope 01$0
└Scope 02$0
Section-08-008Door Hardware$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
Section-08-009Glazing$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
Section-08-010Louvers / Vents$0
└Scope 01$0
DIV 09Finishes10$0
Section-09-001Gypsum Board Assemblies$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
Section-09-002Tile$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
Section-09-003Acoustical Ceilings$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
└Scope 76$0
└Scope 77$0
└Scope 78$0
└Scope 79$0
└Scope 80$0
└Scope 81$0
└Scope 82$0
└Scope 83$0
└Scope 84$0
└Scope 85$0
└Scope 86$0
└Scope 87$0
└Scope 88$0
└Scope 89$0
└Scope 90$0
└Scope 91$0
└Scope 92$0
└Scope 93$0
└Scope 94$0
└Scope 95$0
└Scope 96$0
└Scope 97$0
└Scope 98$0
└Scope 99$0
└Scope 100$0
└Scope 101$0
└Scope 102$0
└Scope 103$0
└Scope 104$0
└Scope 105$0
└Scope 106$0
└Scope 107$0
└Scope 108$0
└Scope 109$0
└Scope 110$0
└Scope 111$0
└Scope 112$0
└Scope 113$0
└Scope 114$0
└Scope 115$0
└Scope 116$0
└Scope 117$0
Section-09-004Resilient Flooring$0
└Scope 01$0
Section-09-005Carpet$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
Section-09-006Resinous / Specialty Flooring$0
└Scope 01$0
Section-09-007Wall Coverings$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
Section-09-008Painting$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
└Scope 76$0
└Scope 77$0
└Scope 78$0
└Scope 79$0
└Scope 80$0
└Scope 81$0
└Scope 82$0
└Scope 83$0
└Scope 84$0
└Scope 85$0
└Scope 86$0
└Scope 87$0
└Scope 88$0
└Scope 89$0
└Scope 90$0
└Scope 91$0
└Scope 92$0
└Scope 93$0
└Scope 94$0
└Scope 95$0
└Scope 96$0
└Scope 97$0
└Scope 98$0
└Scope 99$0
└Scope 100$0
└Scope 101$0
└Scope 102$0
└Scope 103$0
└Scope 104$0
└Scope 105$0
└Scope 106$0
└Scope 107$0
└Scope 108$0
└Scope 109$0
└Scope 110$0
└Scope 111$0
└Scope 112$0
└Scope 113$0
└Scope 114$0
└Scope 115$0
└Scope 116$0
└Scope 117$0
└Scope 118$0
└Scope 119$0
└Scope 120$0
└Scope 121$0
└Scope 122$0
└Scope 123$0
└Scope 124$0
└Scope 125$0
└Scope 126$0
└Scope 127$0
└Scope 128$0
└Scope 129$0
└Scope 130$0
└Scope 131$0
└Scope 132$0
└Scope 133$0
└Scope 134$0
└Scope 135$0
└Scope 136$0
└Scope 137$0
└Scope 138$0
└Scope 139$0
└Scope 140$0
└Scope 141$0
└Scope 142$0
└Scope 143$0
└Scope 144$0
└Scope 145$0
└Scope 146$0
└Scope 147$0
└Scope 148$0
└Scope 149$0
└Scope 150$0
└Scope 151$0
└Scope 152$0
└Scope 153$0
└Scope 154$0
└Scope 155$0
└Scope 156$0
└Scope 157$0
└Scope 158$0
└Scope 159$0
└Scope 160$0
└Scope 161$0
└Scope 162$0
└Scope 163$0
└Scope 164$0
└Scope 165$0
└Scope 166$0
└Scope 167$0
└Scope 168$0
└Scope 169$0
└Scope 170$0
└Scope 171$0
└Scope 172$0
└Scope 173$0
└Scope 174$0
└Scope 175$0
└Scope 176$0
└Scope 177$0
└Scope 178$0
└Scope 179$0
└Scope 180$0
└Scope 181$0
└Scope 182$0
└Scope 183$0
└Scope 184$0
└Scope 185$0
└Scope 186$0
└Scope 187$0
└Scope 188$0
└Scope 189$0
└Scope 190$0
└Scope 191$0
└Scope 192$0
└Scope 193$0
└Scope 194$0
└Scope 195$0
└Scope 196$0
└Scope 197$0
└Scope 198$0
└Scope 199$0
└Scope 200$0
└Scope 201$0
└Scope 202$0
└Scope 203$0
└Scope 204$0
└Scope 205$0
└Scope 206$0
└Scope 207$0
└Scope 208$0
└Scope 209$0
└Scope 210$0
└Scope 211$0
└Scope 212$0
└Scope 213$0
└Scope 214$0
└Scope 215$0
└Scope 216$0
└Scope 217$0
└Scope 218$0
└Scope 219$0
└Scope 220$0
└Scope 221$0
└Scope 222$0
└Scope 223$0
└Scope 224$0
└Scope 225$0
└Scope 226$0
└Scope 227$0
└Scope 228$0
└Scope 229$0
└Scope 230$0
└Scope 231$0
└Scope 232$0
└Scope 233$0
└Scope 234$0
└Scope 235$0
└Scope 236$0
└Scope 237$0
└Scope 238$0
└Scope 239$0
└Scope 240$0
└Scope 241$0
└Scope 242$0
└Scope 243$0
└Scope 244$0
└Scope 245$0
└Scope 246$0
└Scope 247$0
└Scope 248$0
└Scope 249$0
└Scope 250$0
└Scope 251$0
└Scope 252$0
└Scope 253$0
└Scope 254$0
└Scope 255$0
└Scope 256$0
└Scope 257$0
└Scope 258$0
└Scope 259$0
└Scope 260$0
└Scope 261$0
└Scope 262$0
└Scope 263$0
└Scope 264$0
└Scope 265$0
└Scope 266$0
└Scope 267$0
└Scope 268$0
└Scope 269$0
└Scope 270$0
└Scope 271$0
└Scope 272$0
└Scope 273$0
└Scope 274$0
└Scope 275$0
└Scope 276$0
└Scope 277$0
└Scope 278$0
└Scope 279$0
└Scope 280$0
Section-09-009High-Performance Coatings$0
└Scope 01$0
└Scope 02$0
Section-09-010Acoustic Treatment$0
└Scope 01$0
└Scope 02$0
DIV 10Specialties9$0
Section-10-001Visual Display Boards$0
└Scope 01$0
└Scope 02$0
Section-10-002Signage$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
Section-10-003Toilet Compartments$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
Section-10-004Lockers$0
└Scope 01$0
└Scope 02$0
Section-10-005Fire Extinguishers / Cabinets$0
└Scope 01$0
└Scope 02$0
Section-10-006Toilet / Bath Accessories$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
Section-10-007Wall / Corner Protection$0
└Scope 01$0
└Scope 02$0
Section-10-008Storage Shelving$0
└Scope 01$0
└Scope 02$0
Section-10-009Flagpoles$0
└Scope 01$0
└Scope 02$0
DIV 11Equipment9$0
Section-11-001Loading Dock Equipment$0
└Scope 01$0
└Scope 02$0
Section-11-002Vehicle Service Equipment$0
└Scope 01$0
└Scope 02$0
Section-11-003Foodservice Equipment$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
Section-11-004Residential Appliances$0
└Scope 01$0
└Scope 02$0
Section-11-005Laundry Equipment$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
Section-11-006Waste Handling Equipment$0
└Scope 01$0
└Scope 02$0
Section-11-007Athletic / Recreational Equipment$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
Section-11-008Laboratory Equipment$0
└Scope 01$0
└Scope 02$0
Section-11-009Parking Control Equipment$0
└Scope 01$0
└Scope 02$0
DIV 12Furnishings8$0
Section-12-001Window Treatments$0
└Scope 01$0
└Scope 02$0
Section-12-002Casework$0
└Scope 01$0
└Scope 02$0
Section-12-003Countertops$0
└Scope 01$0
└Scope 02$0
Section-12-004Entry Mats / Grilles$0
└Scope 01$0
└Scope 02$0
Section-12-005Furniture$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
Section-12-006Systems Furniture$0
└Scope 01$0
└Scope 02$0
Section-12-007Fixed Seating$0
└Scope 01$0
└Scope 02$0
Section-12-008Site Furnishings$0
└Scope 01$0
└Scope 02$0
DIV 13Special Construction8$0
Section-13-001Special Facility Components$0
└Scope 01$0
└Scope 02$0
Section-13-002Pools / Fountains$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
Section-13-003Controlled Environment Rooms$0
└Scope 01$0
└Scope 02$0
Section-13-004Vaults / Secure Rooms$0
└Scope 01$0
└Scope 02$0
Section-13-005Pre-Engineered Structures$0
└Scope 01$0
└Scope 02$0
Section-13-006Building Modules$0
└Scope 01$0
└Scope 02$0
Section-13-007Radiation Protection$0
└Scope 01$0
└Scope 02$0
Section-13-008Special Instrumentation$0
└Scope 01$0
└Scope 02$0
DIV 14Conveying Equipment7$0
Section-14-001Elevators$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
Section-14-002Hydraulic Elevators$0
└Scope 01$0
└Scope 02$0
Section-14-003Traction Elevators$0
└Scope 01$0
└Scope 02$0
Section-14-004Escalators / Moving Walks$0
└Scope 01$0
└Scope 02$0
Section-14-005Platform / Wheelchair Lifts$0
└Scope 01$0
└Scope 02$0
Section-14-006Material Lifts$0
└Scope 01$0
└Scope 02$0
Section-14-007Conveying Equipment Commissioning$0
└Scope 01$0
└Scope 02$0
DIV 21Fire Suppression8$0
Section-21-001Fire Suppression Submittals$0
└Scope 01$0
└Scope 02$0
Section-21-002Sprinkler Systems$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
Section-21-003Wet-Pipe Sprinklers$0
└Scope 01$0
└Scope 02$0
Section-21-004Dry / Preaction Sprinklers$0
└Scope 01$0
└Scope 02$0
Section-21-005Standpipes$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
Section-21-006Fire Pumps$0
└Scope 01$0
└Scope 02$0
Section-21-007Special Agent Suppression$0
└Scope 01$0
└Scope 02$0
Section-21-008Fire Suppression Testing$0
└Scope 01$0
└Scope 02$0
DIV 22Plumbing9$0
Section-22-001Plumbing Submittals$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
Section-22-002Domestic Water Piping$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
Section-22-003Sanitary Waste / Vent$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
Section-22-004Storm Drainage$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
Section-22-005Gas Piping$0
└Scope 01$0
└Scope 02$0
Section-22-006Plumbing Fixtures$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
Section-22-007Water Heaters / Equipment$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
Section-22-008Insulation / Supports$0
└Scope 01$0
└Scope 02$0
Section-22-009Testing / Commissioning$0
└Scope 01$0
DIV 23Heating, Ventilating, and Air Conditioning9$0
Section-23-001HVAC Submittals$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
Section-23-002HVAC Insulation$0
└Scope 01$0
└Scope 02$0
Section-23-003HVAC Piping$0
└Scope 01$0
└Scope 02$0
Section-23-004Ductwork$0
└Scope 01$0
└Scope 02$0
Section-23-005Air Distribution$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
Section-23-006Air Handling Equipment$0
└Scope 01$0
└Scope 02$0
Section-23-007Packaged HVAC Equipment$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
Section-23-008Controls$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
Section-23-009Testing / Adjusting / Balancing$0
└Scope 01$0
└Scope 02$0
DIV 25Integrated Automation8$0
Section-25-001Automation Network$0
└Scope 01$0
└Scope 02$0
Section-25-002Control / Monitoring Network$0
└Scope 01$0
└Scope 02$0
Section-25-003Local Control Units$0
└Scope 01$0
└Scope 02$0
Section-25-004Automation Software$0
└Scope 01$0
└Scope 02$0
Section-25-005Terminal Devices$0
└Scope 01$0
└Scope 02$0
Section-25-006Facility Controls$0
└Scope 01$0
└Scope 02$0
Section-25-007Control Sequences$0
└Scope 01$0
└Scope 02$0
Section-25-008Integrated Automation Commissioning$0
└Scope 01$0
└Scope 02$0
DIV 26Electrical10$0
Section-26-001Electrical Submittals$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
└Scope 76$0
└Scope 77$0
└Scope 78$0
└Scope 79$0
Section-26-002Grounding / Bonding$0
└Scope 01$0
└Scope 02$0
Section-26-003Conduit / Wire / Cable$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
Section-26-004Electrical Service$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
Section-26-005Switchboards / Panelboards$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
Section-26-006Transformers$0
└Scope 01$0
Section-26-007Wiring Devices$0
└Scope 01$0
Section-26-008Lighting$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
Section-26-009Emergency Power / Generator$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
Section-26-010Electrical Testing$0
└Scope 01$0
└Scope 02$0
DIV 27Communications9$0
Section-27-001Communications Pathways$0
└Scope 01$0
└Scope 02$0
Section-27-002Structured Cabling$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
Section-27-003Equipment Rooms / Racks$0
└Scope 01$0
└Scope 02$0
Section-27-004Backbone Cabling$0
└Scope 01$0
└Scope 02$0
Section-27-005Horizontal Cabling$0
└Scope 01$0
└Scope 02$0
Section-27-006Data Network Equipment$0
└Scope 01$0
└Scope 02$0
Section-27-007Voice Communications$0
└Scope 01$0
└Scope 02$0
Section-27-008Audio-Video Systems$0
└Scope 01$0
└Scope 02$0
Section-27-009Communications Testing$0
└Scope 01$0
└Scope 02$0
DIV 28Electronic Safety and Security8$0
Section-28-001Access Control$0
└Scope 01$0
└Scope 02$0
Section-28-002Video Surveillance$0
└Scope 01$0
└Scope 02$0
Section-28-003Intrusion Detection$0
└Scope 01$0
└Scope 02$0
Section-28-004Security Monitoring$0
└Scope 01$0
└Scope 02$0
Section-28-005Fire Alarm / Detection$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
└Scope 76$0
└Scope 77$0
└Scope 78$0
└Scope 79$0
└Scope 80$0
└Scope 81$0
└Scope 82$0
└Scope 83$0
└Scope 84$0
└Scope 85$0
└Scope 86$0
└Scope 87$0
└Scope 88$0
└Scope 89$0
└Scope 90$0
└Scope 91$0
└Scope 92$0
└Scope 93$0
└Scope 94$0
└Scope 95$0
└Scope 96$0
└Scope 97$0
└Scope 98$0
└Scope 99$0
└Scope 100$0
└Scope 101$0
└Scope 102$0
└Scope 103$0
└Scope 104$0
└Scope 105$0
└Scope 106$0
└Scope 107$0
└Scope 108$0
└Scope 109$0
└Scope 110$0
└Scope 111$0
└Scope 112$0
└Scope 113$0
└Scope 114$0
└Scope 115$0
└Scope 116$0
└Scope 117$0
└Scope 118$0
└Scope 119$0
└Scope 120$0
└Scope 121$0
└Scope 122$0
└Scope 123$0
└Scope 124$0
└Scope 125$0
Section-28-006Mass Notification$0
└Scope 01$0
Section-28-007Security Network / Integration$0
Section-28-008Security Testing / Commissioning$0
└Scope 01$0
└Scope 02$0
DIV 31Earthwork10$0
Section-31-001Site Clearing$0
└Scope 01$0
└Scope 02$0
Section-31-002Rough Grading$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
└Scope 30$0
└Scope 31$0
└Scope 32$0
└Scope 33$0
└Scope 34$0
└Scope 35$0
└Scope 36$0
└Scope 37$0
└Scope 38$0
└Scope 39$0
└Scope 40$0
└Scope 41$0
└Scope 42$0
└Scope 43$0
└Scope 44$0
└Scope 45$0
└Scope 46$0
└Scope 47$0
└Scope 48$0
└Scope 49$0
└Scope 50$0
└Scope 51$0
└Scope 52$0
└Scope 53$0
└Scope 54$0
└Scope 55$0
└Scope 56$0
└Scope 57$0
└Scope 58$0
└Scope 59$0
└Scope 60$0
└Scope 61$0
└Scope 62$0
└Scope 63$0
└Scope 64$0
└Scope 65$0
└Scope 66$0
└Scope 67$0
└Scope 68$0
└Scope 69$0
└Scope 70$0
└Scope 71$0
└Scope 72$0
└Scope 73$0
└Scope 74$0
└Scope 75$0
└Scope 76$0
└Scope 77$0
└Scope 78$0
└Scope 79$0
└Scope 80$0
└Scope 81$0
└Scope 82$0
└Scope 83$0
└Scope 84$0
└Scope 85$0
Section-31-003Excavation$0
└Scope 01$0
└Scope 02$0
Section-31-004Trenching$0
└Scope 01$0
Section-31-005Dewatering$0
└Scope 01$0
Section-31-006Fill / Backfill$0
└Scope 01$0
Section-31-007Subgrade Preparation$0
└Scope 01$0
Section-31-008Erosion / Sediment Control$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
Section-31-009Soil Stabilization$0
└Scope 01$0
└Scope 02$0
Section-31-010Shoring / Excavation Support$0
└Scope 01$0
└Scope 02$0
DIV 32Exterior Improvements10$0
Section-32-001Asphalt Paving$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
Section-32-002Concrete Paving / Walks$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
Section-32-003Curbs / Gutters$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
Section-32-004Pavement Markings$0
└Scope 01$0
Section-32-005Fences / Gates$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
Section-32-006Retaining Walls$0
└Scope 01$0
└Scope 02$0
Section-32-007Site Furnishings$0
└Scope 01$0
└Scope 02$0
Section-32-008Irrigation$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
Section-32-009Planting / Landscaping$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
└Scope 06$0
└Scope 07$0
└Scope 08$0
└Scope 09$0
└Scope 10$0
└Scope 11$0
└Scope 12$0
└Scope 13$0
└Scope 14$0
└Scope 15$0
└Scope 16$0
└Scope 17$0
└Scope 18$0
└Scope 19$0
└Scope 20$0
└Scope 21$0
└Scope 22$0
└Scope 23$0
└Scope 24$0
└Scope 25$0
└Scope 26$0
└Scope 27$0
└Scope 28$0
└Scope 29$0
Section-32-010Turf / Seeding$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
DIV 33Utilities8$0
Section-33-001Water Utilities$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
└Scope 05$0
Section-33-002Sanitary Sewerage$0
└Scope 01$0
└Scope 02$0
Section-33-003Storm Drainage$0
└Scope 01$0
└Scope 02$0
Section-33-004Utility Structures$0
└Scope 01$0
└Scope 02$0
Section-33-005Natural Gas Utilities$0
└Scope 01$0
└Scope 02$0
Section-33-006Electrical Site Utilities$0
└Scope 01$0
└Scope 02$0
Section-33-007Communications Site Utilities$0
└Scope 01$0
└Scope 02$0
Section-33-008Utility Testing / Tie-Ins$0
└Scope 01$0
└Scope 02$0
DIV 34Transportation6$0
Section-34-001Roadways$0
└Scope 01$0
└Scope 02$0
Section-34-002Railways / Guideways$0
└Scope 01$0
└Scope 02$0
Section-34-003Traffic Signals$0
└Scope 01$0
└Scope 02$0
└Scope 03$0
└Scope 04$0
Section-34-004Transportation Signage$0
└Scope 01$0
└Scope 02$0
Section-34-005Pavement Marking$0
└Scope 01$0
└Scope 02$0
Section-34-006Transportation Lighting$0
└Scope 01$0
└Scope 02$0
DIV 35Waterway and Marine Construction7$0
Section-35-001Dredging$0
└Scope 01$0
└Scope 02$0
Section-35-002Shoreline Protection$0
└Scope 01$0
└Scope 02$0
Section-35-003Waterway Bank Protection$0
└Scope 01$0
└Scope 02$0
Section-35-004Marine Construction / Docks$0
└Scope 01$0
└Scope 02$0
Section-35-005Floating Construction$0
└Scope 01$0
└Scope 02$0
Section-35-006Underwater Construction$0
└Scope 01$0
└Scope 02$0
Section-35-007Dams / Levees$0
└Scope 01$0
└Scope 02$0
DIV 40Process Interconnections8$0
Section-40-001Process Piping$0
└Scope 01$0
└Scope 02$0
Section-40-002Gas / Vapor Process Piping$0
└Scope 01$0
└Scope 02$0
Section-40-003Liquid Process Piping$0
└Scope 01$0
└Scope 02$0
Section-40-004Process Valves$0
└Scope 01$0
└Scope 02$0
Section-40-005Pipe Supports / Sleeves$0
└Scope 01$0
└Scope 02$0
Section-40-006Process Piping Insulation$0
└Scope 01$0
└Scope 02$0
Section-40-007Instrumentation$0
└Scope 01$0
└Scope 02$0
Section-40-008Process Controls$0
└Scope 01$0
└Scope 02$0
DIV 41Material Processing and Handling Equipment7$0
Section-41-001Conveyors$0
└Scope 01$0
└Scope 02$0
Section-41-002Cranes / Hoists$0
└Scope 01$0
└Scope 02$0
Section-41-003Lifting Devices$0
└Scope 01$0
└Scope 02$0
Section-41-004Feeders / Batching$0
└Scope 01$0
└Scope 02$0
Section-41-005Storage Equipment$0
└Scope 01$0
└Scope 02$0
Section-41-006Manufacturing Lines$0
└Scope 01$0
└Scope 02$0
Section-41-007Processing Equipment$0
└Scope 01$0
└Scope 02$0
DIV 42Process Heating, Cooling, and Drying Equipment6$0
Section-42-001Process Heating Equipment$0
└Scope 01$0
└Scope 02$0
Section-42-002Process Boilers$0
└Scope 01$0
└Scope 02$0
Section-42-003Furnaces / Kilns / Ovens$0
└Scope 01$0
└Scope 02$0
Section-42-004Process Cooling Equipment$0
└Scope 01$0
└Scope 02$0
Section-42-005Heat Exchangers$0
└Scope 01$0
└Scope 02$0
Section-42-006Drying Equipment$0
└Scope 01$0
└Scope 02$0
DIV 43Process Gas and Liquid Handling, Purification, and Storage Equipment7$0
Section-43-001Gas Handling Equipment$0
└Scope 01$0
└Scope 02$0
Section-43-002Compressors / Blowers$0
└Scope 01$0
└Scope 02$0
Section-43-003Liquid Pumps$0
└Scope 01$0
└Scope 02$0
Section-43-004Liquid Handling Equipment$0
└Scope 01$0
└Scope 02$0
Section-43-005Filters / Purification$0
└Scope 01$0
└Scope 02$0
Section-43-006Tanks / Storage$0
└Scope 01$0
└Scope 02$0
Section-43-007Pressurized Vessels$0
└Scope 01$0
└Scope 02$0
DIV 44Pollution and Waste Control Equipment6$0
Section-44-001Air Pollution Control$0
└Scope 01$0
└Scope 02$0
Section-44-002Noise / Vibration Control$0
└Scope 01$0
└Scope 02$0
Section-44-003Odor Control$0
└Scope 01$0
└Scope 02$0
Section-44-004Water Pollution Control$0
└Scope 01$0
└Scope 02$0
Section-44-005Solid Waste Control$0
└Scope 01$0
└Scope 02$0
Section-44-006Waste Thermal Processing$0
└Scope 01$0
└Scope 02$0
DIV 45Industry-Specific Manufacturing Equipment7$0
Section-45-001Oil / Gas Extraction Equipment$0
└Scope 01$0
└Scope 02$0
Section-45-002Mining Equipment$0
└Scope 01$0
└Scope 02$0
Section-45-003Food Manufacturing Equipment$0
└Scope 01$0
└Scope 02$0
Section-45-004Beverage Manufacturing Equipment$0
└Scope 01$0
└Scope 02$0
Section-45-005Chemical Manufacturing Equipment$0
└Scope 01$0
└Scope 02$0
Section-45-006Metal / Machinery Manufacturing Equipment$0
└Scope 01$0
└Scope 02$0
Section-45-007Manufacturing Equipment Commissioning$0
└Scope 01$0
└Scope 02$0
DIV 46Water and Wastewater Equipment9$0
Section-46-001Packaged Treatment Equipment$0
└Scope 01$0
└Scope 02$0
Section-46-002Screening Equipment$0
└Scope 01$0
└Scope 02$0
Section-46-003Grinding / Shredding Equipment$0
└Scope 01$0
└Scope 02$0
Section-46-004Oil / Grease Separation$0
└Scope 01$0
└Scope 02$0
Section-46-005Chemical Feed Equipment$0
└Scope 01$0
└Scope 02$0
Section-46-006Clarifier Equipment$0
└Scope 01$0
└Scope 02$0
Section-46-007Aeration / Secondary Treatment$0
└Scope 01$0
└Scope 02$0
Section-46-008Filtration / UV Treatment$0
└Scope 01$0
└Scope 02$0
Section-46-009Residuals / Sludge Handling$0
└Scope 01$0
└Scope 02$0
DIV 48Electrical Power Generation8$0
Section-48-001Generators$0
└Scope 01$0
└Scope 02$0
Section-48-002Solar Power Equipment$0
└Scope 01$0
└Scope 02$0
Section-48-003Wind Power Equipment$0
└Scope 01$0
└Scope 02$0
Section-48-004Battery / Energy Storage$0
└Scope 01$0
└Scope 02$0
Section-48-005Inverters / Power Controls$0
└Scope 01$0
└Scope 02$0
Section-48-006Transformers / Voltage Regulation$0
└Scope 01$0
└Scope 02$0
Section-48-007Combined Heat and Power$0
└Scope 01$0
└Scope 02$0
Section-48-008Power Generation Commissioning$0
└Scope 01$0
└Scope 02$0

Schedule Input

Read-only estimate-to-schedule preparation

25 ready scope linesMirrors estimate automatically
IDDivision / SectionQtyUnitStatus
DIV 00Procurement and Contracting Requirements13
Section-00-001Bid / Proposal SubmittedReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-002Contract ExecutedReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-003Bonds ReceivedReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-004Insurance ReceivedReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-005Notice to ProceedReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-006Permit StatusReady
└Scope 01A-001 | Maintain one City of Tampa-approved plan set on the job at all times.1SETReady
└Scope 02A-001 | Building permit record shown: BLD-20-0472570, plan approval dated 09/29/2021.1EAReady
└Scope 03A-001 | City note: changes or alterations require written City of Tampa approval. Administrative requirement; no measurable construction quantity on this sheet.LSReady
└Scope 04A-001 | Approval record: Site 09/16/2021; Building 09/16/2021; Mechanical 09/23/2021; Electrical 09/16/2021; Fire 09/01/2021; Natural Resources 09/01/2021; Plumbing 09/16/2021. Record only; no construction quantity.LSReady
Section-00-007Schedule of ValuesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-008Pay ApplicationsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-009RFIs / ClarificationsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-010Change OrdersReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-011Substantial CompletionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-012Final CloseoutReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-00-013WarrantiesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 01General Requirements15
Section-01-001Project Summary / ScopeChain hold
└Scope 01A-002 gross-building-area table | Level 1 new area.10200SFReady
└Scope 02A-002 gross-building-area table | Level 2 new area.10498SFReady
└Scope 03A-002 gross-building-area table | Level 3 new area.10498SFReady
└Scope 04A-002 gross-building-area table | Level 4 new area.10498SFReady
└Scope 05A-002 gross-building-area table | Level 5 new area.10498SFReady
└Scope 06A-002 gross-building-area table | Control total = 52,192 SF (10,200 + 10,498 + 10,498 + 10,498 + 10,498). Control only—do not price in addition to the five level-area lines.SFReady
└Scope 07A-003 room-count table | King Standard: Level 1 = 3, Level 2 = 5, Level 3 = 5, Level 4 = 5, Level 5 = 2.20ROOMReady
└Scope 08A-003 room-count table | King Suite: Level 1 = 0, Level 2 = 6, Level 3 = 6, Level 4 = 5, Level 5 = 4.21ROOMReady
└Scope 09A-003 room-count table | Queen/Queen Standard: Level 1 = 1, Level 2 = 9, Level 3 = 9, Level 4 = 9, Level 5 = 6.34ROOMReady
└Scope 10A-003 room-count table | Queen/Queen Suite: Level 1 = 0, Level 2 = 0, Level 3 = 0, Level 4 = 1, Level 5 = 2.3ROOMReady
└Scope 11A-003 room-count table | King ADA: Level 1 = 1; Levels 2-5 = 0.1ROOMReady
└Scope 12A-003 room-count table | King Suite ADA: Level 2 = 1; Levels 1 and 3-5 = 0.1ROOMReady
└Scope 13A-003 room-count table | Queen/Queen ADA: Level 4 = 1; Levels 1-3 and 5 = 0.1ROOMReady
└Scope 14A-003 room-count table | Queen/Queen Suite ADA: Level 3 = 1, Level 5 = 1; Levels 1, 2, and 4 = 0.2ROOMReady
└Scope 15A-003 room-count table | Control totals: Level 1 = 5, Level 2 = 21, Level 3 = 21, Level 4 = 21, Level 5 = 15; project total = 83 rooms. Control only—do not price this line in addition to the eight room-type lines.ROOMReady
└Scope 16A-006 | Plans / specification compliance statements relative to listed codes (FBC SIXTH edition 2017, 2014 NEC, 2015 NFPA, 6TH Edition Florida fire Prevention code as reference).HOLDChain hold
└Scope 17A-006 | Provide 6TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 18A-007 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 19A-008-A | Accessibility details: space allowance and reach rangesHOLDChain hold
└Scope 20A-008-A | Accessible route detailsHOLDChain hold
└Scope 21A-008-A | Protruding objects detailsHOLDChain hold
└Scope 22A-008-A | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 23A-008-B | WATER FOUNTAINSHOLDChain hold
└Scope 24A-008-B | DOORS and MANUVERING CLEARANCESHOLDChain hold
└Scope 25A-008-B | Accessibility/details for fixtures and clearances (as shown on sheet A008 - B)HOLDChain hold
└Scope 26A-008-B | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 27A-009 | Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 28A-030 | Room labeling for first-floor program spaces (registration, lobby, exercise room, breakfast room, mechanical, laundry, restrooms, offices, etc.).HOLDChain hold
└Scope 29A-030 | References to related sheets and details (A400, A491, A490, A492, A406, A405, A407, A809, A803, A509, S4, S1, E.1).HOLDChain hold
└Scope 30A-030 | Compliance statement referencing codes: FBC Sixth Edition 2017, 2014 NEC, 2015 NFPA, and Florida Fire Prevention Code (6th Edition).HOLDChain hold
└Scope 31A-030 | Codes referenced: "Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference."HOLDChain hold
└Scope 32A-030 | Room labels visible (exact text snippets): "EMPL", "BREAK ROOM", "MECH ROOM", "LAUNDRY", "LINEN", "WOMEN", "MEN", "EXERCISE RM", "WORK AREA", "REGISTRATION", "LOBBY", "CONNECT+PRINT", "FOOD PREP", "BREAKFAST ROOM", "WATER HEATER", "OFFICE", "VESTIBULE", "CHEM RM"HOLDChain hold
└Scope 33A-031 | Upper floors life safety plan (as labeled on sheet)HOLDChain hold
└Scope 34A-031 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 35A-031 | UPPER FLOORS LIFE SAFETY PLANHOLDChain hold
└Scope 36A-032 | Roof terrace life safety plan (as titled on sheet)HOLDChain hold
└Scope 37A-032 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 38A-032 | MAXIMUM 320 OCCUPANTS ( SIGN TO BE PROPOSED ON THE WALL )HOLDChain hold
└Scope 39A-032 | ROOF TERRACE LIFE SAFETY PLANHOLDChain hold
└Scope 40A-111 | First Floor Plan (plans/specification for Level 1)HOLDChain hold
└Scope 41A-111 | Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPAHOLDChain hold
└Scope 42A-111 | Provide 5TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 43A-111 | Codes referenced: FBC fifth edition 2014, 2011 NEC, 2014 NFPA, Provide 5TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 44A-111 | Room names and numbers visible (examples): LOBBY 001, REGISTRATION 002, THE CORNER MARKET 003, FOOD PREP 006, OFFICE 007, WORK 008, LAUNDRY 019, LINEN 010, EXERCISE ROOM 011, EMPLOYEE BREAK ROOM 020, CORRIDOR 016, CORRIDOR 017, ACCESSIBLE KING 101, KING 102, KING 103, KING 104, KING SUITE 107, KING SUITE 108, VESTIBULE 000, IT CLOSETHOLDChain hold
└Scope 45A-111 | First-floor guestroom count reconciled to 7 rooms.ROOMChain hold
└Scope 46A-112 | Second Floor Plan / Level 2 layoutHOLDChain hold
└Scope 47A-112 | Room identification and numbering (multiple KING, QUEEN, KING SUITE, ACCESSIBLE KING SUITE labels as shown)HOLDChain hold
└Scope 48A-112 | Guest laundry referenced (FD GUEST LAUNDRY 033 025.1)HOLDChain hold
└Scope 49A-112 | Mechanical and electrical rooms labeled (Mechanical 026, Elect. 027)HOLDChain hold
└Scope 50A-112 | Note: Provide 5TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 51A-112 | Drawing contains room labels such as: KING SUITE 221, KING SUITE 219, KING SUITE 217, QUEEN QUEEN 215, ACCESSIBLE KING SUITE 213, KING 209, Mechanical 026, Elect. 027, CORRIDOR 028, CHUTE 029, STORAGE 030, STAIR 1.2 033, STAIR 2.2 032, GUEST LAUNDRY 033HOLDChain hold
└Scope 52A-112 | Second-floor guestroom count reconciled to 19 rooms.ROOMChain hold
└Scope 53A-113 | Third Floor Plan (architectural layout) as indicated on sheet A113HOLDChain hold
└Scope 54A-113 | General note referencing compliance with FBC fifth edition 2014, 2011 NEC, 2014 NFPAHOLDChain hold
└Scope 55A-113 | Text: "Provide 5TH Edition Florida fire Prevention code as reference."HOLDChain hold
└Scope 56A-113 | Third-floor guestroom count reconciled to 19 rooms.ROOMChain hold
└Scope 57A-114 | Fourth Floor Plan (Level 4) layout of guest rooms and corridorsHOLDChain hold
└Scope 58A-114 | Room labeling and numbering for fourth floor (examples include KING SUITE 419, QQ SUITE 413, ACCESSIBLE QUEEN 417)HOLDChain hold
└Scope 59A-114 | Stair locations and identifiers (STAIR 1.2 053, STAIR 2.2 052)HOLDChain hold
└Scope 60A-114 | Ancillary spaces labeled (STORAGE 050, LINEN 045, Ice Machine, COMPUTER 046, Elect. 047, CORRIDOR 048, CHUTE 049)HOLDChain hold
└Scope 61A-114 | Referencing related architectural sheets (A200, A201, A300, A313, A314, A490, A491, A804)HOLDChain hold
└Scope 62A-114 | Note: "Provide 5TH Edition Florida fire Prevention code as reference."HOLDChain hold
└Scope 63A-114 | Stair labels visible: "STAIR 1.2 053", "STAIR 2.2 052"HOLDChain hold
└Scope 64A-114 | Other room/space labels visible: "STORAGE 050", "LINEN 045", "IFG COMPUTER 046", "Elect. 047", "CORRIDOR 048", "CHUTE 049"HOLDChain hold
└Scope 65A-114 | Fourth-floor guestroom count reconciled to 19 rooms.ROOMChain hold
└Scope 66A-115 | Plans/specifications to comply with: "FBC fifth edition 2014", "2011 NEC", "2014 NFPA" and: "Provide 5TH Edition Florida fire Prevention code as reference."HOLDChain hold
└Scope 67A-115 | Code/compliance note: "Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPA Provide 5TH Edition Florida fire Prevention code as reference."HOLDChain hold
└Scope 68A-115 | Multiple room/space labels and numbers visible (examples from sheet text): SUITE 513, SUITE 507, QQ520, 514 KING, 505 KING, 503 QQ501, LINEN 055, SUITE 516, SUITE 519, SUITE 510, SUITE 508HOLDChain hold
└Scope 69A-115 | Fifth-floor guestroom count reconciled to 19 rooms; total project room count remains 83.ROOMChain hold
└Scope 70A-116 | 1 ROOF A116HOLDChain hold
└Scope 71A-116 | 2" minimum slope to drain 1/4" per foot.HOLDChain hold
└Scope 72A-116 | Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPA Provide 5TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 73A-117 | Roof slope designation at 1/4" / 12"HOLDChain hold
└Scope 74A-117 | Coordination of rooftop equipment location and requirements with MEP engineerHOLDChain hold
└Scope 75A-117 | Parapet heights and decorative parapet extensions referenced to building elevations and sectionsHOLDChain hold
└Scope 76A-117 | Repeated roof slope noted: SLOPE 1/4" / 12"HOLDChain hold
└Scope 77A-117 | Reference note E: 'ADJUST OVERALL DIMENSIONS AS REQUIRED TO FIT EQUIPMENT. LOCATE PUBLIC CORRIDOR.'HOLDChain hold
└Scope 78A-117 | Elevation markers shown: +61'-4", +60'-0", +63'-0", and reference to 'CURB +60'-0' T OF ROOF +63'-0''HOLDChain hold
└Scope 79A-117 | Notes referencing codes: 'Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPA' and 'Provide 5TH Edition Florida fire Prevention code as reference.'HOLDChain hold
└Scope 80A-200 | Display of level elevations and parapet heightsHOLDChain hold
└Scope 81A-200 | Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 82A-200 | Note: THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 83A-200 | Setback / fire-rating note: THIS WALL IS 5'-3" AWAY FROM PROPERTY LINE. THEREFORE REQD 2 HR. PROVIDED 2HR.HOLDChain hold
└Scope 84A-200 | Level elevations shown: Level 1 0' - 0"; Level 2 12' - 8"; Level 3 22' - 8"; Level 4 32' - 8"; Level 5 42' - 8"; ROOF 52' - 8"; ROOF 2 60' - 8"HOLDChain hold
└Scope 85A-200 | Parapet dimensions: PARAPET ROOF 52' - 8"; Parapet 1 60' - 0 1/2"; Parapet 2 63' - 0"; ROOF 2 60' - 8"HOLDChain hold
└Scope 86A-200 | Instruction: 'PROVIDE CONTRACTOR WITH COLOR PRINTS OF ELEVATIONS FOR ADDITIONAL CLARITY.'HOLDChain hold
└Scope 87A-201 | Exterior elevations (side elevations) for the buildingHOLDChain hold
└Scope 88A-201 | Level elevations shown: Level 1 0' - 0"; Level 2 12' - 8"; Level 3 22' - 8"; Level 4 32' - 8"; Level 5 42' - 8"; ROOF 52' - 8"; Parapet 1 60' - 0 1/2"; Parapet 2 63' - 0"HOLDChain hold
└Scope 89A-201 | Additional vertical note: ROOF 2 60' - 8"HOLDChain hold
└Scope 90A-201 | Codes referenced on sheet: FBC fifth edition 2014; 2011 NEC; 2014 NFPA; Provide 5TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 91A-203 | Exterior elevation work and detailing as shown on elevation drawingsHOLDChain hold
└Scope 92A-203 | 01-GROUND FLOOR0"HOLDChain hold
└Scope 93A-203 | 02-SECOND FLOOR 12' - 8"HOLDChain hold
└Scope 94A-203 | 03-THIRD FLOOR 22' - 8"HOLDChain hold
└Scope 95A-203 | 04-FOURTH FLOOR 32' - 8"HOLDChain hold
└Scope 96A-203 | 05-ROOF 42' - 8"HOLDChain hold
└Scope 97A-203 | 04-FIFTH FLOOR 42' - 8"HOLDChain hold
└Scope 98A-203 | 05-ROOF 52' - 8"HOLDChain hold
└Scope 99A-203 | PROVIDE CONTRACTOR WITH COLOR PRINTS OF ELEVATIONS FOR ADDITIONAL CLARITY.HOLDChain hold
└Scope 100A-203 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 101A-300 | Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPAHOLDChain hold
└Scope 102A-300 | Provide 5TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 103A-300 | ROOF 52' - 8"HOLDChain hold
└Scope 104A-300 | ROOF 2 60' - 8"HOLDChain hold
└Scope 105A-300 | Room/space labels (examples as shown): SUITE 506 KING; SUITE 408 KING; SUITE 306 KING; SUITE 208; SUITE 507 KING; 407 KING; 307 KING; 207; VESTIBULE 000; LOBBY 001; CORRIDOR 016; BREAKFAST 005; Queen; Queen 314; Mechanical 026; Tele 036; Mech. 044; Mech. 054; CORRIDOR 89; CORRIDOR 028HOLDChain hold
└Scope 106A-300 | Additional room labels (examples): KING SUITE 514 ACCESSIBLE; KING 421; SUITE 321; SUITE 221; ACCESSIBLE KING 105; CORRIDOR 017; QUEEN 520; QUEEN 420; QUEEN 320; QUEEN 220; KING 106HOLDChain hold
└Scope 107A-310 | Building sections (Section 3 and Section 4 referenced)HOLDChain hold
└Scope 108A-310 | Multi-floor hotel building (levels labeled Level 1 through Level 5 and Roof)HOLDChain hold
└Scope 109A-310 | Codes / compliance notes: Plans / specification comply with the FBC fifth edition 2014 2011 NEC 2014 NFPA Provide 5TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 110A-310 | Level elevations (exact strings present): "0'-7 1/2" Level 1 0' - 0" Level 2 12' - 8" Level 3 22' - 8" Level 4 32' - 8" Level 5 42' - 8" ROOF 52' - 8""HOLDChain hold
└Scope 111A-310 | Roof/parapet elevations (exact strings present): "Parapet 1 60' - 0 1/2" Parapet 2 63' - 0" ROOF 2 60' - 8""HOLDChain hold
└Scope 112A-312 | Landscaping bed provision to avoid wicking (refer sheet 102)HOLDChain hold
└Scope 113A-312 | Text: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES"HOLDChain hold
└Scope 114A-312 | Wall sections drawn to provide information regarding specific finish systems construction and relationships (notes on sheet)HOLDChain hold
└Scope 115A-313 | Exterior wall sections and related finish/construction detailsHOLDChain hold
└Scope 116A-313 | WALL SECTIONS ARE DRAWN TO REPRESENT SPECIFIC STRUCTURAL SYSTEMS. REFER TO SHEETS 004 AND 005. ARCHITECT SHALL UPDATE OR CORRECT SECTIONS TO REPRESENT CHOSEN STRUCTURAL SYSTEMS PER STRUCTURAL ENGINEER.HOLDChain hold
└Scope 117A-313 | Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 118A-314 | EXTERIOR WALL SECTIONS 1/2" = 1'-0"HOLDChain hold
└Scope 119A-314 | WALL SECTIONS ARE DRAWN TO REPRESENT SPECIFIC STRUCTURAL SYSTEMS. REFER TO SHEETS 004 AND 005. ARCHITECT SHALL UPDATE OR CORRECT SECTIONS TO REPRESENT CHOSEN STRUCTURAL SYSTEMS PER STRUCTURAL ENGINEER.HOLDChain hold
└Scope 120A-314 | ELEVATIONS SHOWN BEYOND FOR FINISH RELATIONSHIPS ONLY.HOLDChain hold
└Scope 121A-314 | 01-GROUND FLOOR 0"HOLDChain hold
└Scope 122A-314 | 02-SECOND FLOOR 12' - 8"HOLDChain hold
└Scope 123A-314 | 03-THIRD FLOOR 22' - 8"HOLDChain hold
└Scope 124A-314 | 05-ROOF 52' - 8"HOLDChain hold
└Scope 125A-314 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 126A-400 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 127A-401 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 128A-402 | HISTORY WALLHOLDChain hold
└Scope 129A-402 | BREAKFAST ROOMHOLDChain hold
└Scope 130A-402 | LOBBYHOLDChain hold
└Scope 131A-402 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 132A-403 | RECEPTION COLUMN DETAILHOLDChain hold
└Scope 133A-403 | CORRIDOR DETAILHOLDChain hold
└Scope 134A-403 | TYPICAL PUBLIC SPACE MOUNTING HEIGHTHOLDChain hold
└Scope 135A-403 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 136A-404 | FIRST FLOOR CORRIDOR CEILING TRANSITION (detail)HOLDChain hold
└Scope 137A-404 | DRAPERY POCKET DETAIL AT CEILING (detail)HOLDChain hold
└Scope 138A-404 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 139A-405 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 140A-406 | EXERCISE ROOM drawings/specifications (multiple numbered views: -07, -05, -06, -04)HOLDChain hold
└Scope 141A-406A | Graphical and dimensional details for a hydration station (plan, elevation, section, enlarged plan, 3D view) as shown on sheet A 406AHOLDChain hold
└Scope 142A-406A | Text on sheet: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES"HOLDChain hold
└Scope 143A-407 | ENLARGED PLAN - EMPLOYEE BREAK ROOM (sheet contains enlargement of break room plan)HOLDChain hold
└Scope 144A-407 | ELEVATION - EMPLOYEE BREAK ROOM (elevation view shown)HOLDChain hold
└Scope 145A-407 | Warning on sheet: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES".HOLDChain hold
└Scope 146A-410 | TV wall elevation (LH shown)HOLDChain hold
└Scope 147A-410 | Exterior wall elevationHOLDChain hold
└Scope 148A-410 | Headboard wall elevation (LH shown)HOLDChain hold
└Scope 149A-410 | Entry wall elevation (LH shown)HOLDChain hold
└Scope 150A-410 | 5 KING GUESTROOM - TV WALL ELEVATION (LH SHOWN)HOLDChain hold
└Scope 151A-410 | 6 KING GUESTROOM - EXTERIOR WALL ELEVATIONHOLDChain hold
└Scope 152A-410 | 7 KING GUESTROOM - HEADBOARD WALL ELEVATION (LH SHOWN)HOLDChain hold
└Scope 153A-410 | 8 KING GUESTROOM - ENTRY WALL ELEVATION (LH SHOWN)HOLDChain hold
└Scope 154A-411 | Wall elevations: TV/sofa wall, exterior wall, headboard wall, entry wallHOLDChain hold
└Scope 155A-411 | Elevation titles visible include: 'TV SOFA WALL ELEVATION (LH SHOWN)', 'EXTERIOR WALL ELEVATION (LH SHOWN)', and 'HEADBOARD WALL ELEVATION (LH SHOWN)'.HOLDChain hold
└Scope 156A-411 | There are graphic plan views and multiple wall elevation views on the page.HOLDChain hold
└Scope 157A-412 | Electrical plan (sheet 3A indicated)HOLDChain hold
└Scope 158A-412 | Headboard wall elevation (right-hand shown)HOLDChain hold
└Scope 159A-412 | TV / sofa wall elevation (right-hand shown)HOLDChain hold
└Scope 160A-412 | Exterior wall elevation (right-hand)HOLDChain hold
└Scope 161A-412 | KING SUITE ADA GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN)HOLDChain hold
└Scope 162A-412 | KING SUITE ADA GUESTROOM EXTERIOR WALL (RH)HOLDChain hold
└Scope 163A-412 | KING SUITE ADA GUESTROOM - TV SOFA WALL ELEVATION (RH SHOWN)HOLDChain hold
└Scope 164A-412 | The sheets include plan views and wall elevations and are labeled with sheet numbers 1 through 6 (and 3A).HOLDChain hold
└Scope 165A-413 | Headboard wall elevation (RH shown) (sheet label: 4 KING ADA GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN))HOLDChain hold
└Scope 166A-413 | Exterior wall elevation (sheet label: 5 KING ADA GUESTROOM - EXTERIOR WALL ELEVATION)HOLDChain hold
└Scope 167A-413 | TV wall elevation (RH shown) (sheet label: 6 KING ADA GUESTROOM - TV WALL ELEVATION (RH SHOWN))HOLDChain hold
└Scope 168A-413 | Entry wall elevation (sheet label: 7 KING ADA GUESTROOM - ENTRY WALL ELEVATION)HOLDChain hold
└Scope 169A-413 | 4 KING ADA GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN)HOLDChain hold
└Scope 170A-413 | 5 KING ADA GUESTROOM - EXTERIOR WALL ELEVATIONHOLDChain hold
└Scope 171A-413 | 6 KING ADA GUESTROOM - TV WALL ELEVATION (RH SHOWN)HOLDChain hold
└Scope 172A-413 | 7 KING ADA GUESTROOM - ENTRY WALL ELEVATIONHOLDChain hold
└Scope 173A-420 | TV wall elevation (left-hand shown)HOLDChain hold
└Scope 174A-420 | Exterior wall elevation for the guestroomHOLDChain hold
└Scope 175A-420 | Headboard wall elevation (left-hand shown)HOLDChain hold
└Scope 176A-420 | Entry wall elevationHOLDChain hold
└Scope 177A-420 | QUEEN QUEEN GUESTROOM - TV WALL ELEVATION (LH SHOWN)HOLDChain hold
└Scope 178A-420 | QUEEN QUEEN GUESTROOM - EXTERIOR WALL ELEVATIONHOLDChain hold
└Scope 179A-420 | QUEEN QUEEN GUESTROOM - HEADBOARD WALL ELEVATION (LH SHOWN)HOLDChain hold
└Scope 180A-420 | QUEEN QUEEN GUESTROOM - ENTRY WALL ELEVATIONHOLDChain hold
└Scope 181A-421 | QUEEN QUEEN SUITE GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN)HOLDChain hold
└Scope 182A-421 | SUITE GUESTROOM EXTERIOR WALL (RH)HOLDChain hold
└Scope 183A-421 | QUEEN QUEEN SUITE GUESTROOM - TV SOFA WALL ELEVATION (RH SHOWN)HOLDChain hold
└Scope 184A-422 | TV wall elevation (right hand shown)HOLDChain hold
└Scope 185A-422 | Exterior wall elevation for QUEEN QUEEN ADA GUESTROOMHOLDChain hold
└Scope 186A-422 | Headboard wall elevation (right hand shown)HOLDChain hold
└Scope 187A-422 | Sheet annotation: '4 QUEEN QUEEN ADA GUESTROOM - TV WALL ELEVATION (RH SHOWN)'HOLDChain hold
└Scope 188A-422 | Sheet annotation: '5 QUEEN QUEEN ADA GUESTROOM - EXTERIOR WALL'HOLDChain hold
└Scope 189A-422 | Sheet annotation: '6 QUEEN QUEEN ADA GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN)'HOLDChain hold
└Scope 190A-422 | Note on sheet edge: 'MUST PRINT IN COLOR'HOLDChain hold
└Scope 191A-433 | Plan detail support wallsHOLDChain hold
└Scope 192A-433 | Guestroom ceiling height conditionsHOLDChain hold
└Scope 193A-433 | Guestroom base stop locationHOLDChain hold
└Scope 194A-433 | Wall trim required for tall ceilingsHOLDChain hold
└Scope 195A-433 | Condition B guestroom corniceHOLDChain hold
└Scope 196A-433 | Typical guestroom electrical device heightsHOLDChain hold
└Scope 197A-433 | Hearing impaired devicesHOLDChain hold
└Scope 198A-433 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 199A-434 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 200A-435 | Reference notes and criteria notes included on sheetHOLDChain hold
└Scope 201A-435 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 202A-435A | Accessible bathroom layouts (multiple orientations: right, front, left, back)HOLDChain hold
└Scope 203A-435A | Reference notes and criteria notes on the sheetHOLDChain hold
└Scope 204A-435A | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 205A-435B | Accessible and guestroom vanity plans and sectionsHOLDChain hold
└Scope 206A-435B | Low wall detail at vanityHOLDChain hold
└Scope 207A-435B | Text: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES"HOLDChain hold
└Scope 208A-436 | WOOD FRAME ANCHORED TO SIDE WALLS WITH 2x6 FRONT SUPPORT MEMBERHOLDChain hold
└Scope 209A-436 | ALL CLEAN-OUTS TO BE FLUSH TO FLOORS / WALLS.HOLDChain hold
└Scope 210A-436 | FLOOR DRAIN.HOLDChain hold
└Scope 211A-436 | Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 212A-438 | Work room elevations (multiple)HOLDChain hold
└Scope 213A-438 | Detail/reference callout to A312HOLDChain hold
└Scope 214A-438 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 215A-490 | Stair 1 plans and elevations for Levels 1 through RoofHOLDChain hold
└Scope 216A-490 | Steel wall mounting bracket detailHOLDChain hold
└Scope 217A-490 | Parapet elevations/detailsHOLDChain hold
└Scope 218A-490 | Steel wall mounting bracket dimensions text: 'STEEL WALL MOUNTING BRACKET 3 1/2" MAX 2 1/4" MIN 1 1/4" DIA.'HOLDChain hold
└Scope 219A-490 | Stair and tread/riser notes found on sheet (exact excerpts preserved elsewhere in this JSON)HOLDChain hold
└Scope 220A-490 | Level elevations shown: 'Level 1 0' - 0"', 'Level 2 12' - 8"', 'Level 3 22' - 8"', 'Level 4 32' - 8"', 'Level 5 42' - 8"', 'ROOF 52' - 8"', 'Parapet 1 60' - 0 1/2"', 'Parapet 2 63' - 0"', 'ROOF 2 60' - 8"'HOLDChain hold
└Scope 221A-490 | Statement on sheet: 'THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES'HOLDChain hold
└Scope 222A-491 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 223A-491 | Visible drawing label: Stair 2HOLDChain hold
└Scope 224A-492 | Section 18HOLDChain hold
└Scope 225A-492 | Roof elevation listed: ROOF 52' - 8"HOLDChain hold
└Scope 226A-492 | Additional roof/parapet note: ROOF 2 60' - 8"HOLDChain hold
└Scope 227A-492 | Notice on sheet: THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 228A-503 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 229A-504 | Sill trim detailHOLDChain hold
└Scope 230A-504 | Cove light detail (plan and elevation)HOLDChain hold
└Scope 231A-504 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 232A-505 | Registration / feature wall details (illustrated on sheet)HOLDChain hold
└Scope 233A-505 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 234A-506 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 235A-507 | PRINT & CONNECT DESK REAR ELEVATIONHOLDChain hold
└Scope 236A-507 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 237A-508 | CONNECT AND PRINT DETAILSHOLDChain hold
└Scope 238A-508 | BUSINESS DESKHOLDChain hold
└Scope 239A-508 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 240A-509 | THE CORNER MARKET PLAN - WITH BEER & WINEHOLDChain hold
└Scope 241A-509 | 3D VIEW - THE CORNER MARKET - WITH BEER & WINEHOLDChain hold
└Scope 242A-509 | THE CORNER MARKET - EQUIP. SECTION - WITH BEER & WINEHOLDChain hold
└Scope 243A-509 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 244A-509A | THE CORNER MARKET - EQUIP. SECTION - WITHOUT BEER & WINE ALT.HOLDChain hold
└Scope 245A-509A | THE CORNER MARKET - PLAN - WITHOUT BEER & WINE ALT.HOLDChain hold
└Scope 246A-509A | Various section/elevation details shown on sheet (visual; specific construction elements not fully legible)HOLDChain hold
└Scope 247A-509A | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 248A-510 | Section through reach-in unitHOLDChain hold
└Scope 249A-510 | Recessed base detailHOLDChain hold
└Scope 250A-510 | Service wall elevations/details for 'THE CORNER MARKET'HOLDChain hold
└Scope 251A-510 | Entry vestibule elevation/detail for 'THE CORNER MARKET'HOLDChain hold
└Scope 252A-510 | Document contains instruction: 'THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES'.HOLDChain hold
└Scope 253A-511 | PROVIDE J-BOX FOR HARDWIRE CONNECTION OR OUTLET FOR PLUG-IN CONNECTION ACCORDINGLY.HOLDChain hold
└Scope 254A-511 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 255A-512 | BUFFET END WALL (visible label on sheet)HOLDChain hold
└Scope 256A-512 | AXON (axonometric) BUFFET COUNTER (visible label on sheet)HOLDChain hold
└Scope 257A-512 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 258A-513 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 259A-550 | DRAIN PIPE - SEE MECH.HOLDChain hold
└Scope 260A-550 | Provide 5th Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 261A-550 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 262A-570 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES (text on sheet)HOLDChain hold
└Scope 263A-571 | Text on sheet: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES"HOLDChain hold
└Scope 264A-572 | Porte Cochere: sections and cross-sectionsHOLDChain hold
└Scope 265A-572 | Porte Cochere: enlarged planHOLDChain hold
└Scope 266A-572 | Porte Cochere: 3-D viewHOLDChain hold
└Scope 267A-572 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 268A-572A | Column enclosure at porte cochere (detail shown)HOLDChain hold
└Scope 269A-572A | Connection at bearing wall and fasciaHOLDChain hold
└Scope 270A-572A | Porte cochere column detail and entryHOLDChain hold
└Scope 271A-572A | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 272A-574 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 273A-600 | Provide fire-rating specifications for doors (multiple entries show 20 MIN, 45 MIN, 60 MIN, 90 MIN).HOLDChain hold
└Scope 274A-600 | Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 275A-600 | GENERAL NOTE: "HINGE-MOUNTED DOOR STOPS NOT ALLOWED."HOLDChain hold
└Scope 276A-600 | GENERAL NOTE: "DOOR GUARDS AT THE GUESTROOM ENTRY DOORS REQUIRE A SPACER TO CLEAR THE DOOR TRIM."HOLDChain hold
└Scope 277A-600 | "SEE ALSO SHEETS 111 OR 310 FOR AUTOMATIC ENTRY DOOR ELEVATIONS."HOLDChain hold
└Scope 278A-600 | "SEE SHEET 231 FOR DOOR TYPE \"J\" T FRAME WIDTH"HOLDChain hold
└Scope 279A-600 | "DOUBLE ACTING DOOR W/ VINYL ACRYLIC CLADDING - REFER TO SPEC" (door 27 note)HOLDChain hold
└Scope 280A-800 | Food prep (labeled as "FOOD PREP")HOLDChain hold
└Scope 281A-800 | Breakfast area (labeled as "BREAKFAST")HOLDChain hold
└Scope 282A-800 | General NotesHOLDChain hold
└Scope 283A-800 | Criteria NotesHOLDChain hold
└Scope 284A-800 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 285A-801 | BUFFETHOLDChain hold
└Scope 286A-801 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 287A-802 | Equipment plans and elevations for 'THE MARKET' / 'THE CORNER MARKET'.HOLDChain hold
└Scope 288A-802 | Two plan variants shown: without beer & wine service, and with beer & wine service.HOLDChain hold
└Scope 289A-802 | Equipment schedule for 'THE MARKET' (table present on sheet).HOLDChain hold
└Scope 290A-802 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 291A-802 | EQUIPMENT SCHEDULE - THE MARKETHOLDChain hold
└Scope 292A-804 | Partial interior elevations for guestrooms and lobbyHOLDChain hold
└Scope 293A-804 | Enlarged upper floor corridor planHOLDChain hold
└Scope 294A-804 | Symbols legendHOLDChain hold
└Scope 295A-804 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 296A-805 | Typical corridor / corridor enlargement (shown)HOLDChain hold
└Scope 297A-805 | KING SUITE (multiple)HOLDChain hold
└Scope 298A-805 | GUEST LAUNDRYHOLDChain hold
└Scope 299A-805 | Mechanical roomHOLDChain hold
└Scope 300A-805 | Electrical (Elect.) roomHOLDChain hold
└Scope 301A-805 | ChuteHOLDChain hold
└Scope 302A-805 | Ceiling legend and general/criteria/reference notesHOLDChain hold
└Scope 303A-805 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 304A-805 | CEILING LEGENDHOLDChain hold
└Scope 305A-806 | GUEST LAUNDRY FLOOR PLANHOLDChain hold
└Scope 306A-806 | GUEST LAUNDRY ELEVATIONHOLDChain hold
└Scope 307A-806 | GUEST LAUNDRY FOLDING TABLEHOLDChain hold
└Scope 308A-806 | STORAGEHOLDChain hold
└Scope 309A-806 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 310A-807 | Equipment schedule for guest laundry (label: EQUIPMENT SCHEDULE - GUEST LAUNDRY)HOLDChain hold
└Scope 311A-807 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 312A-807 | EQUIPMENT SCHEDULE - GUEST LAUNDRYHOLDChain hold
└Scope 313A-807 | GUEST LAUNDRYHOLDChain hold
└Scope 314A-808 | Stair floor finish detailHOLDChain hold
└Scope 315A-808 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 316A-809 | Reference and compliance with the design standards chapter 'LAUNDRY BACK OF HOUSE'.HOLDChain hold
└Scope 317A-809 | Architect is responsible for designing the project in accordance with the entire design standards.HOLDChain hold
└Scope 318A-809 | A competent laundry consultant should review the plan for compliance if changes are required.HOLDChain hold
└Scope 319A-809 | Top-of-sheet instruction: 'THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES'HOLDChain hold
└Scope 320A-810 | Equipment schedule (BOH laundry) header presentHOLDChain hold
└Scope 321A-810 | Room labels visible: LAUNDRY 019, LINEN 010, EMPLOYEE BREAK ROOM 016HOLDChain hold
└Scope 322A-810 | Equipment schedule header visible: 'EQUIPMENT SCHEDULE - BOH LAUND...'HOLDChain hold
└Scope 323A-810 | Note on sheet: 'THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES'HOLDChain hold
└Scope 324A-810 | Graphic elements: plan view showing equipment, doors, and room layouts (laundry area diagram)HOLDChain hold
└Scope 325A1-22 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 326A1-23 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 327A1-24 | THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 328LAUNDRY-PLAN-2026 | Placement of three units labeled T-80 (shown grouped)HOLDChain hold
└Scope 329LAUNDRY-PLAN-2026 | Placement of two units labeled T-1200 (shown grouped)HOLDChain hold
└Scope 330LAUNDRY-PLAN-2026 | Placement of one unit labeled HM-200HOLDChain hold
└Scope 331LAUNDRY-PLAN-2026 | Designation of adjacent linen room (LINEN 010) and laundry room (LAUNDRY 019)HOLDChain hold
└Scope 332LAUNDRY-PLAN-2026 | Equipment/annotation tags shown: T-1200, T-1200, HM-200, T-80, T-80, T-80HOLDChain hold
└Scope 333LAUNDRY-PLAN-2026 | Room labels shown: LINEN 010, LAUNDRY 019HOLDChain hold
Section-01-002Work Restrictions / Site RulesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-01-003Project MeetingsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-01-004Construction ScheduleReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-01-005Progress Photos / DocumentationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-01-006SubmittalsChain hold
└Scope 01C-7 [Civil] | Backfill, aggregate, and compaction to specified standards (98% AASHTO T-180), with shop drawings required for filter fabric and stoneHOLDChain hold
└Scope 02C-8 [Civil] | Manufacturer submittal requirements (3 sets: structural evaluation and manufacturer certification)HOLDChain hold
└Scope 03C-12.1 [Civil] | Manufacturer submittal information: Standard, Options, AccessoriesHOLDChain hold
└Scope 04ID001 [Interior] | Shop drawings required for all fixtures, equipment, and millwork (Note 22).HOLDChain hold
└Scope 05S003 [Structural] | Verify compliance with approved submittals Field inspection Y PeriodicHOLDChain hold
└Scope 06S003 [Structural] | 1705.2 Steel Construction: Fabricator and erector documents Submittal Review Y Each submittalHOLDChain hold
└Scope 07S003 [Structural] | 1705.2.2 Steel Construction Other Than Structural Steel: Material verification of cold-formed steel deck: a. Identification markings Field inspection Y Periodic; b. Manufacturer's certified test reports Submittal Review Y Each submittalHOLDChain hold
└Scope 08S003 [Structural] | 1705.2 Steel Construction 1. Fabricator and erector documents Submittal Review Y Each submittalHOLDChain hold
Section-01-007Quality ControlChain hold
└Scope 01A-001 | City of Tampa identifies the project as a Threshold Building. Inspection/special-inspector scope is not quantified from this cover sheet.LSChain hold
└Scope 02A-002 | New-construction hotel; Type II-B; 60'-0" building height; 5 stories shown after the one-story sprinkler increase over the Table 503 allowance. Building attributes only; no priceable quantity.LSReady
└Scope 03A-003 | Code basis includes jurisdictional requirements, IBC with state amendments, NFPA 101, NFPA 13, NFPA 70, IMC, IEC, IPC, NFPA 72, and ADA. Compliance note; no measurable quantity.LSReady
└Scope 04A-003 | Rated components: interior bearing walls 2 HR; columns 2 HR; roof assemblies 1 HR; floor/floor-ceiling assemblies 2 HR; exterior bearing walls 2 HR; exterior nonbearing walls 0 HR. Assembly areas/counts require plan/detail links and remain blank.LSChain hold
└Scope 05A-004 IT-1 | Periodic verification of soils per IBC 1704.7 and Chapter 18. Number of site visits is not established on this sheet.VISITChain hold
└Scope 06A-004 IT-2 | Periodic inspection of excavation and filling per IBC 1704.7 and Section 3304. Number of site visits is not established on this sheet.VISITChain hold
└Scope 07A-004 IT-5 | Periodic verification that the required concrete design mix is used. Inspection count requires the approved mix submittals and placement schedule.VISITChain hold
└Scope 08A-004 IT-5 | Periodic sampling of fresh concrete; slump, air content, temperature, and strength-test specimens per ASTM C172, ASTM C31, and the cited ACI/IBC provisions. Test/visit count requires concrete volumes and pour schedule.VISITChain hold
└Scope 09A-004 IT-5 | Periodic inspection of reinforcing steel, including prestressing tendons, and placement per the cited ACI/IBC provisions. Inspection count requires the concrete placement sequence.VISITChain hold
└Scope 10A-004 IT-15 | Periodic EIFS special inspection per IBC 1704.5. Inspection count requires installed-area sequencing and the approved EIFS inspection plan.VISITChain hold
└Scope 11A-004 IT-16 | Periodic verification of the required seismic quality-assurance plan in accordance with IBC Section 1705. Number of visits is not established on this sheet.VISITChain hold
└Scope 12A-004 IT-18 | Detention-basin special inspection required per IBC 1704.13. Continuous/periodic frequency and number of visits are not selected on this sheet.VISITChain hold
└Scope 13A-007 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 14A-008-A | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 15A-008-B | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 16A-031 | Plan approval / code compliance review (City of Tampa)HOLDChain hold
└Scope 17A-031 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 18A-032 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 19A-200 | Notes calling out code compliance references and plan approval requirementsHOLDChain hold
└Scope 20A-200 | Note: The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 21A-200 | Window-area calculation (first floor): 25% WINDOW AREA PERMITTED ON FF=(14.17X12.67X.25=44.88 SQ FT) PROVIDED=43 SQFT. 23.95%HOLDChain hold
└Scope 22A-200 | Window-area calculation (upper floor): 25% WINDOW AREA PERMITTED ON UPPER FL=(14.17X10X.25=35.43 SQ FT) PROVIDED=33.94 SQFT. 23.95%HOLDChain hold
└Scope 23A-201 | Stamp text: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES" and "It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division."HOLDChain hold
└Scope 24A-203 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 25A-312 | Text: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes"HOLDChain hold
└Scope 26A-314 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 27A-400 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 28A-401 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 29A-402 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 30A-403 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 31A-404 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 32A-405 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 33A-406 | Plan approval language: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES"HOLDChain hold
└Scope 34A-406 | Warning: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes"HOLDChain hold
└Scope 35A-406A | Plan approval / code compliance stamping and instructions from City of Tampa Construction Services DivisionHOLDChain hold
└Scope 36A-406A | Text on sheet: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes"HOLDChain hold
└Scope 37A-407 | Note on sheet: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes".HOLDChain hold
└Scope 38A-433 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 39A-434 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 40A-435 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 41A-435A | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 42A-435B | Text: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes"HOLDChain hold
└Scope 43A-438 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 44A-491 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 45A-492 | Text on sheet: The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 46A-503 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 47A-504 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 48A-505 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 49A-506 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 50A-507 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 51A-508 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 52A-509 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 53A-509A | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 54A-510 | Document contains statement: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes.'HOLDChain hold
└Scope 55A-511 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 56A-512 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 57A-513 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 58A-550 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 59A-570 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes (text on sheet)HOLDChain hold
└Scope 60A-571 | Text on sheet: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes"HOLDChain hold
└Scope 61A-572 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 62A-572A | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 63A-574 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 64A-610 | CONSTRUCTION SERVICES DIVISION PLAN APPROVAL THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 65A-610 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 66A-800 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 67A-801 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 68A-802 | Architectural plan approval and code compliance review by City of Tampa Construction Services Division.HOLDChain hold
└Scope 69A-802 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 70A-804 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 71A-805 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 72A-806 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 73A-807 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 74A-808 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 75A-809 | Top-of-sheet note: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes'HOLDChain hold
└Scope 76A-810 | Note on sheet: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes'HOLDChain hold
└Scope 77A1-22 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 78A1-23 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 79A1-24 | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 80ENERGY-1 [Energy-Calculations] | PROPOSE A 83 ROOM, 5-STORY FAIRFIELD INN & SUITES - MARRIOTT.HOLDChain hold
└Scope 81ENERGY-1 [Energy-Calculations] | Site consists of a 1.351 ACRE parcelHOLDChain hold
└Scope 82ENERGY-1 [Energy-Calculations] | 1.018 ACRES of impervious surfaceHOLDChain hold
└Scope 83ENERGY-1 [Energy-Calculations] | JURISDICTIONAL AGENCY: CITY OF TAMPA (SITE PLAN) BLD-20-0472570HOLDChain hold
└Scope 84S003 [Structural] | S003 SPECIAL INSPECTIONSHOLDChain hold
Section-01-008Temporary Facilities / UtilitiesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-01-009Temporary Controls / Safety / ProtectionChain hold
└Scope 01A-002 | CHAIN HOLD - base sheet states FBC 2014 Fifth Edition, while permit-review notes reference the Sixth Edition Florida Fire Prevention Code and other later code editions. Confirm the controlling permitted code set before pricing code-driven changes.HOLDChain hold
└Scope 02A-002 | CHAIN HOLD - exit table refers to A0.1.2 for detailed exit width, travel-distance, and occupancy calculations, while the sheet index/life-safety set uses A-031, A-032, and A-033. No egress construction quantity is added until that reference is reconciled.HOLDChain hold
└Scope 03A-003A | BROKEN CHAIN - General Notes and Symbol Legends is listed in the A-003 architectural index but is not present in the active Fairfield architectural drawing folder. No quantity is added.HOLDChain hold
└Scope 04A-004 IT-4 | CHAIN HOLD - periodic inspection is marked for modular retaining walls with the note 'if over 5'-0" of fill,' but the required checkbox is blank. Confirm applicability from the civil/structural retaining-wall scope before adding inspection visits.HOLDChain hold
└Scope 05A-004 | CHAIN HOLD - the Special Inspections Firm column is blank. Do not carry an inspector/vendor allowance or visit count until responsibility and firm assignment are confirmed.HOLDChain hold
└Scope 06A-006 | CHAIN HOLD - Document references multiple code/edition strings ("FBC SIXTH edition 2017", "6TH Edition Florida fire Prevention code", "2014 NEC", "2015 NFPA") which may require clarification as to the authoritative edition to be followed. | No contracting parties, permit numbers, or signatures are present on the provided page to confirm authorization.HOLDChain hold
└Scope 07A-007 | CHAIN HOLD - The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes. | It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division.HOLDChain hold
└Scope 08A-008-A | CHAIN HOLD - The document explicitly states that stamping does not permit or approve violations of City or State codes. | The document contains multiple dates (8.10.15, 01/23/2020, 9/29/2021) which may indicate different drawing/approval/review events; their relationships are not stated within the document.HOLDChain hold
└Scope 09A-008-B | CHAIN HOLD - The document contains explicit legal cautions that changes or alterations are unlawful without written approval (could impact scope changes). | Stamping does not imply approval of any violation of City or State codes (limits assumptions about compliance beyond stated review).HOLDChain hold
└Scope 10A-030 | CHAIN HOLD - The sheet includes the advisory: "It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division." (implies legal risk if alterations are made without approval). | The sheet states: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes." (limits implied approval scope).HOLDChain hold
└Scope 11A-030 | First-floor life safety plan for the Fairfield Inn & Suites (sheet A030).HOLDChain hold
└Scope 12A-032 | CHAIN HOLD - The sheet contains a large 'Not Reviewed' overlay while also containing a review notation 'REVIEWED FOR CODE COMPLIANCE BLD-20-0472570 9/29/2021' - this is a conflicting status that could cause confusion about approval/permit status. | Limited visible contact and project identification information on this sheet may impede verification of current approval status.HOLDChain hold
└Scope 13A-111 | CHAIN HOLD - No explicit contractual disputes, claims, or risk allocations are stated on the sheet. | No explicit conflicts or code non-compliance annotations are shown on the visible sheet.HOLDChain hold
└Scope 14A-112 | CHAIN HOLD - No contractor, owner, or construction-manager names are shown on this sheet to confirm responsibilities or contractual relationships. | Sheet shows multiple revision dates but does not include revision descriptions on the provided page to indicate what changed at each revision. | No explicit permit numbers, approval stamps, signatures, or dates of permit issuance are visible on this page.HOLDChain hold
└Scope 15A-113 | CHAIN HOLD - No owner, contractor, or subcontractor identified on this sheet (party information limited to architect and a vague "Engineers/ maintenance" reference). | The sheet references multiple codes/editions (FBC fifth edition 2014 and text referencing "5TH Edition Florida fire Prevention code") which should be cross-checked with project requirements; the sheet does not provide further clarification on which code edition governs. | Graphic drawing and dense text may hide additional notes or details not legible in the provided text extract or image.HOLDChain hold
└Scope 16A-115 | CHAIN HOLD - Document is a single sheet and does not contain explicit identification of owner, contractor, or commissioning/installation parties on the visible area. | Multiple abbreviations and short codes (e.g., QQ, VTAC) appear without definition on this sheet; could cause ambiguity if taken alone.HOLDChain hold
└Scope 17A-115 | Fifth Floor plan drawings for the Fairfield Inn project (sheet A115).HOLDChain hold
└Scope 18A-117 | CHAIN HOLD - Rooftop equipment is shown for architectural intent only; MEP coordination required - potential for equipment location/clearance conflicts if not coordinated (Reference note D). | Scuppers and roof drains are required to be sized based on local rainfall and codes (Reference note A); sizing not provided on sheet - risk of undersized drainage if not specified. | Detail reference 'SEE DETAIL X/XXX' is shown but the specific detail/number is not present on this sheet - missing detail could cause construction uncertainty. | Parapet heights have multiple numeric references (+61'-4", +60'-0", +63'-0") and text 'ALL PARAPET HEIGHTS NOT NOTED TO BE 56'-0'' - potential ambiguity in which parapet locations correspond to which heights without cross-reference to elevations/sections. | Sheet contains partially fragmented text and dimensions (e.g., '18'-0 5/8"', '141312') that are unclear in isolation and may lead to misinterpretation.HOLDChain hold
└Scope 19A-117 | Reference note D: 'ROOFTOP EQUIPMENT SHOWN FOR ARCHITECTUAL INTENT ONLY. COORDINATE EQUIPMENT REQUIREMENTS W/ MEP ENGINEER.'HOLDChain hold
└Scope 20A-120 Rev.0 | SUPERSEDED - not added to takeoff; A-120 Rev.01 is the controlling first-floor reflected ceiling plan.HOLDChain hold
└Scope 21A-200 | CHAIN HOLD - Note on sheet: 'BUILDING ELEVATION ARE APPROXIMATE AND WILL VARY BASED ON STRUCTURAL SYSTEM.' - indicates elevations may change once structural information is finalized. | Multiple revision dates and review stamp imply the document has been revised multiple times; latest shown revision dates 05.22.2020 and 12.30.2020 and plan approval 9/29/2021. | Document instructs to 'REFER TO EXTERIOR FINISH INDEX FOR MATERIALS AND COLORS' - finish details are not contained on this sheet and must be checked elsewhere.HOLDChain hold
└Scope 22A-200 | Exterior elevations (front and back) for the Fairfield Inn projectHOLDChain hold
└Scope 23A-200 | Exterior finish key entries visible: EF1 EF2 EF2b EF2a EF4 ST1 SP1 EF4a EF3 (and descriptive phrases such as 'DARK EIFS FINISH COLOR', 'ACCENT EIFS COLOR', 'MAIN BUILDING EIFS COLOR', 'CULTURED STONE', 'STAIR TOWER EIFS COLOR', 'EXTERIOR ACCENT FINISH -CEMENT BOARD SIDING -EXTERIOR PLAM (OPTIONAL)')HOLDChain hold
└Scope 24A-201 | CHAIN HOLD - Sheet includes note: "BUILDING ELEVATION ARE APPROXIMATE AND WILL VARY BASED ON STRUCTURAL SYSTEM." - indicates elevations may change based on structural design. | Note: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes" - indicates potential conflict if other documents or work deviate from codes. | Instruction that modifications require written approval from City of Tampa Construction Services Division - potential for legal/permit risk if changes are made without approval. | Multiple revision dates and a plan-approval date later than original drawing date (original 10.06.14 vs approval 9/29/2021) - potential for mismatches between drawing versions if full revision history is not tracked.HOLDChain hold
└Scope 25A-201 | Exterior finishes per Exterior Finish Index (EIFS, cultured stone, cement board siding, exterior PLAM (optional))HOLDChain hold
└Scope 26A-201 | Signage: optional cartouche type signage; alternate location for cartouche building signageHOLDChain hold
└Scope 27A-201 | Notes: "OPTIONAL \"CARTOUCHE\" TYPE SIGNAGE ON SIDE OF BUILDING. LOCATE AS APPROPRIATE BASED ON BUILDING ORIENTATION." and "SIDE ENTRY CANOPY. SEE ENLARGED ELEVATIONS FOR DETAILS."HOLDChain hold
└Scope 28A-203 | CHAIN HOLD - Inconsistent elevation values present in the sheet text: e.g., '05-ROOF 42' - 8"' and separately '05-ROOF 52' - 8"' (both appear in the document). | Labeling inconsistency: '04-FIFTH FLOOR 42' - 8"' appears which may conflict with other floor numbering shown. | Note: 'BUILDING ELEVATION ARE APPROXIMATE AND WILL VARY BASED ON STRUCTURAL SYSTEM.' indicates elevations are not final and may change.HOLDChain hold
└Scope 29A-203 | Wall sections and details based on preferred optional rainscreen siding (adjust to V.E. options)HOLDChain hold
└Scope 30A-203 | WALL SECTIONS AND DETAILS BASED ON PREFFERED OPTIONAL RAINSCREEN SIDING. ADJUST ACCORDINGLY TO SUIT V.E. OPTIONS.HOLDChain hold
└Scope 31A-300 | CHAIN HOLD - Document shows both 'ROOF 52' - 8"' and 'ROOF 2 60' - 8"' which are different roof elevation labels in the same sheet. | Two parapet elevations are shown: 'Parapet 1 60' - 0 1/2"' and 'Parapet 2 63' - 0"' (differences observable on sheet).HOLDChain hold
└Scope 32A-310 | CHAIN HOLD - No explicit risks or conflicts are stated on the sheet. | Potential ambiguity from multiple dates on the sheet (10.06.14, 12.31.15, 02.18.16) without clear labeling of which is issue date vs. revision date.HOLDChain hold
└Scope 33A-312 | CHAIN HOLD - Note: "ARCHITECT SHALL VERIFY THAT SECTIONS ARE DRAWN ACCURATELY FOR CHOSEN FINISH SYSTEMS." (implies potential discrepancy between drawing and selected finish systems if not verified) | Note: "ARCHITECT SHALL UPDATE OR CORRECT SECTIONS TO REPRESENT CHOSEN STRUCTURAL SYSTEMS PER STRUCTURAL ENGINEER." (requires coordination; potential conflict if not updated) | Note: "DESIGNER TO HOLD MINIMUM CEILING HEIGHTS AS INDICATED, FLOOR TO FLOOR HEIGHTS MAY NEED TO BE ADJUSTED TO ACCOMMODATE DUCTWORK." (indicates potential conflicts between mechanical routing and ceiling/floor heights) | Instruction to "OFFSET UTILITIES IN CORRIDOR TO ALLOW FOR RECESSED LIGHTING" (coordination requirement that could create schedule or build conflicts if not resolved)HOLDChain hold
└Scope 34A-312 | Foundation and structural elements to be designed/coordinated by structural engineer (foundation system, bond beams)HOLDChain hold
└Scope 35A-312 | Elevator coordination notes: "ELEVATOR DOOR, COORDINATE WITH MANUF.", "ELEVATOR SHAFT, COORDINATE WITH MANUF.", "ELEVATOR PIT, COORDINATE WITH MANUF.", "ELEVATOR OVERRUN, COORDINATE WITH MANUF."HOLDChain hold
└Scope 36A-313 | CHAIN HOLD - ARCHITECT SHALL VERIFY THAT SECTIONS ARE DRAWN ACCURATELY FOR CHOSEN FINISH SYSTEMS (coordination risk if not updated). | ARCHITECT SHALL UPDATE OR CORRECT SECTIONS TO REPRESENT CHOSEN STRUCTURAL SYSTEMS PER STRUCTURAL ENGINEER (potential for mismatch between structural and architectural sections). | DESIGNER TO HOLD MINIMUM CEILING HEIGHTS AS INDICATED, FLOOR TO FLOOR HEIGHTS MAY NEED TO BE ADJUSTED TO ACCOMMODATE DUCTWORK (possible coordination/height conflicts). | OFFSET UTILITIES IN CORRIDOR TO ALLOW FOR RECESSED LIGHTING (coordination requirement noted). | Coordinate elevator door/shaft/pit/overrun with manufacturer (coordination risk if not done). | Gutters/downspouts/overflows must be routed to daylight in areas that will not drain across walking surfaces (drainage/egress risk if not followed).HOLDChain hold
└Scope 37A-313 | Coordinate elevator components (door, shaft, pit, overrun) with manufacturerHOLDChain hold
└Scope 38A-313 | ELEVATOR DOOR, COORDINATE WITH MANUF.HOLDChain hold
└Scope 39A-313 | ELEVATOR SHAFT, COORDINATE WITH MANUF.HOLDChain hold
└Scope 40A-313 | ELEVATOR PIT, COORDINATE WITH MANUF.HOLDChain hold
└Scope 41A-313 | ELEVATOR OVERRUN, COORDINATE WITH MANUF.HOLDChain hold
└Scope 42A-313 | GYP. BD. SOFFIT, FRAME AROUND STEEL BEAM, COORDINATE WITH STRUCTUREHOLDChain hold
└Scope 43A-313 | WALL SECTIONS ARE DRAWN TO PROVIDE INFORMATION REGARDING SPECIFIC FINISH SYSTEMS CONSTRUCTION AND RELATIONSHIPS. ARCHITECT SHALL VERIFY THAT SECTIONS ARE DRAWN ACCURATELY FOR CHOSEN FINISH SYSTEMS.HOLDChain hold
└Scope 44A-314 | CHAIN HOLD - Architect is required to verify that sections are drawn accurately for chosen finish systems and to update/correct sections per structural engineer: indicates potential coordination risk between architectural and structural design. | Note to offset utilities in corridor to allow for recessed lighting: potential coordination/conflict between MEP and architectural finishes. | References to multiple sheets and disciplines (004, 005, 006, 910, 102, 940/941, 611) indicate potential for missing coordination if those referenced sheets are not reconciled with these wall sections.HOLDChain hold
└Scope 45A-314 | Coordinate elevators with manufacturer (door, shaft, pit, overrun).HOLDChain hold
└Scope 46A-314 | Coordinate wall sections with structural engineer and update per structural engineer (refer to sheets 004, 005, 940, 941).HOLDChain hold
└Scope 47A-314 | WALL SECTIONS ARE DRAWN TO PROVIDE INFORMATION REGARDING SPECIFIC FINISH SYSTEMS CONSTRUCTION AND RELATIONSHIPS. ARCHITECT SHALL VERIFY THAT SECTIONS ARE DRAWN ACCURATELY FOR CHOSEN FINISH SYSTEMS.HOLDChain hold
└Scope 48A-314 | ELEVATOR DOOR, COORDINATE WITH MANUF.HOLDChain hold
└Scope 49A-314 | ELEVATOR SHAFT, COORDINATE WITH MANUF.HOLDChain hold
└Scope 50A-314 | ELEVATOR PIT, COORDINATE WITH MANUF.HOLDChain hold
└Scope 51A-314 | ELEVATOR OVERRUN, COORDINATE WITH MANUF.HOLDChain hold
└Scope 52A-314 | GYP. BD. SOFFIT, FRAME AROUND STEEL BEAM, COORDINATE WITH STRUCTUREHOLDChain hold
└Scope 53A-314 | Fairfield Inn & Suites Plans / specification comply with the FBC SIXTH edition 2017 2014 NEC 2015 NFPA Provide 6TH Edition Florida fire Prevention code as reference.HOLDChain hold
└Scope 54A-400 / A-406 | CHAIN HOLD - prototype references to an outdoor-pool option are not added; project pool scope is carried from the indoor-pool sheets A-405 and A-571.HOLDChain hold
└Scope 55A-401 | CHAIN HOLD - Document states it is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division. | Stamping of plan 'shall not be held to permit or approve the violation of any City or State Codes' (limits implied authorization).HOLDChain hold
└Scope 56A-402 | CHAIN HOLD - Document contains an architect's statement of compliance and a separate City of Tampa review-for-code-compliance entry (BLD-20-0472570 9/29/2021); both appear on the same sheet. | The stamping includes a disclaimer that stamping 'shall not be held to permit or approve the violation of any City or State Codes' which limits reliance on the stamp for code permissiveness.HOLDChain hold
└Scope 57A-403 | CHAIN HOLD - Sheet contains explicit warning that making changes or alterations without written approval from the City of Tampa Construction Services Division is unlawful. | Sheet states that the stamping of the plan shall not be held to permit or approve the violation of any City or State Codes.HOLDChain hold
└Scope 58A-404 | CHAIN HOLD - Document explicitly states that making changes or alterations without written approval from the City of Tampa Construction Services Division is unlawful (source text on sheet). | Document explicitly states that the stamping of the plan does not permit or approve violations of any City or State Codes (source text on sheet).HOLDChain hold
└Scope 59A-405 | CHAIN HOLD - The stamping explicitly states it does not permit or approve violations of City or State Codes. | Changes or alterations without written approval from City of Tampa Construction Services Division are unlawful (risk if modified).HOLDChain hold
└Scope 60A-406 | CHAIN HOLD - The plan contains explicit warnings that changes or alterations without written approval are unlawful; any undocumented changes could create compliance risk. | The stamping explicitly states it does not permit or approve violations of City or State codes, indicating that separate compliance confirmation may be required for some items.HOLDChain hold
└Scope 61A-407 | CHAIN HOLD - Document explicitly prohibits unauthorized changes or alterations without written approval from City of Tampa Construction Services Division. | Stamping does not authorize or approve violations of City or State codes, which could indicate requirements remain to be met or verified on-site.HOLDChain hold
└Scope 62A-410 | CHAIN HOLD - No named contract parties, dates, or revision history are visible on the sheet, which limits ability to establish provenance or enforceability. | Absence of signatory, stamp, or issue date on the visible portion reduces confidence in this sheet as a stand-alone certified document. | Multiple small text callouts and dimensions are present but not fully legible in the provided image; interpretations of those could be uncertain.HOLDChain hold
└Scope 63A-412 | CHAIN HOLD - Document is labeled ADA (King Suite ADA Guestroom) indicating accessibility design requirements are relevant (fact on sheet). | No explicit risks, conflicts, or change notices are shown on the visible portion of the document.HOLDChain hold
└Scope 64A-413 | CHAIN HOLD - Inconsistent labeling observed: sheet title/header reads 'KING ACC GUESTROOM A-413' while multiple sheet references use 'KING ADA GUESTROOM'. This may indicate a labeling inconsistency or OCR/readability issue in the image. | No revision or document date shown on the visible portion of the sheet - inability to confirm currentness of the drawing.HOLDChain hold
└Scope 65A-421 / A-422 | CHAIN HOLD - the A-003 room mix includes 2 Queen/Queen Suite ADA rooms, but no separately titled accessible QQ suite sheet is present; confirm whether A-421 or A-422 governs before multiplying finishes or FF&E.HOLDChain hold
└Scope 66A-433 | CHAIN HOLD - Stamping disclaimer: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes' (implies responsibility to verify code compliance). | Warning that it is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division (risk of noncompliance if changes are made without approval).HOLDChain hold
└Scope 67A-434 | CHAIN HOLD - The stamping of the plan explicitly states it shall not be held to permit or approve violations of City or State codes. | Alterations made without written approval from the City of Tampa Construction Services Division would be unlawful per the sheet.HOLDChain hold
└Scope 68A-435 | CHAIN HOLD - Document contains the statement that changes or alterations are unlawful without written approval from the City of Tampa Construction Services Division (administrative/legal constraint).HOLDChain hold
└Scope 69A-435A | CHAIN HOLD - Sheet stamping states it does not permit or approve violations of City or State Codes (implies responsibility to ensure compliance).HOLDChain hold
└Scope 70A-436 | CHAIN HOLD - Drinking fountain is optional unless required by local jurisdiction - potential jurisdictional compliance risk if local code requires a fountain. | Requirement that water closet waste lines be located in wall chases (not in exterior walls) may conflict with existing site conditions or structural constraints. | Floor clean-out requirement to be inconspicuous and not in guestrooms may affect coordination and routing; sheet does not show all coordination outcomes. | There are multiple code and edition references in a single line ("FBC SIXTH edition 2017 2014 NEC 2015 NFPA") which could lead to ambiguity without further clarification in specifications.HOLDChain hold
└Scope 71A-436 | Provide blocking in wall for all fixtures, grab bars and accessories. Coordinate location with manufacturer's installation requirements.HOLDChain hold
└Scope 72A-436 | Drinking fountain is an optional item unless required by local jurisdiction.HOLDChain hold
└Scope 73A-436 | BOWL OPENING VERIFY DEPTH WITH FAUCET REQ'MTSHOLDChain hold
└Scope 74A-436 | COORDINATE FLOOR SLOPE TO DRAIN WITH THE TILE PATTERN.HOLDChain hold
└Scope 75A-438 | CHAIN HOLD - The sheet contains the advisory that stamping does not permit or approve code violations (observed text: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes'). | The sheet contains a notice that changes are unlawful without written approval from the City of Tampa Construction Services Division, which could indicate permit/control risks if changes are made without that approval.HOLDChain hold
└Scope 76A-490 | CHAIN HOLD - No contractor or construction firm (e.g., Mason Forge) is identified on this sheet. | No owner or general contractor listed on the sheet; responsibility for installation/acceptance not specified on this sheet. | Multiple revision lines present; full revision history context for the set is not included on this single sheet.HOLDChain hold
└Scope 77A-491 | CHAIN HOLD - Document explicitly prohibits making changes or alterations without written approval from the City of Tampa Construction Services Division. | Stamp includes statement that stamping shall not be held to permit or approve the violation of any City or State Codes (limits implied permissions).HOLDChain hold
└Scope 78A-492 | CHAIN HOLD - Multiple elevation values appear on the sheet that may require coordination: Parapet 1 60' - 0 1/2", Parapet 2 63' - 0", ROOF 52' - 8", ROOF 2 60' - 8", and a standalone '63'-0"' value. These differing numeric elevation values are present on the drawing and could require reconciliation. | The sheet contains revision entries and a City review stamp; the sheet also states that changes are unlawful without written approval - any undocumented changes could be non-compliant.HOLDChain hold
└Scope 79A-503 | CHAIN HOLD - Document explicitly states it is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division. | Stamping does not constitute permission to violate City or State codes.HOLDChain hold
└Scope 80A-504 | CHAIN HOLD - Document explicitly states it is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division (legal/contractual constraint on changes). | Stamping of the plan does not permit or approve violations of City or State codes (limits interpretation of approval).HOLDChain hold
└Scope 81A-505 | CHAIN HOLD - The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes. | It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division.HOLDChain hold
└Scope 82A-507 | CHAIN HOLD - The stamp includes the statement that stamping shall not be held to permit or approve violation of any City or State Codes (potentially indicating review limitations). | Document shows review for code compliance but does not include owner, contractor, or explicit project address on the visible sheet.HOLDChain hold
└Scope 83A-508 | CHAIN HOLD - The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes (limitation on stamp/approval). | It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division (legal constraint).HOLDChain hold
└Scope 84A-509 | CHAIN HOLD - The sheet explicitly states that the stamping shall not be held to permit or approve violations of City or State codes (limitation noted on face of sheet). | Changes or alterations without written approval from City of Tampa Construction Services Division are unlawful (regulatory compliance risk if changed).HOLDChain hold
└Scope 85A-509 / A-509A | ALTERNATE HOLD - owner selection between Corner Market with beer and wine and the without-beer-and-wine alternate is unresolved; do not add both.HOLDChain hold
└Scope 86A-509A | CHAIN HOLD - The sheet explicitly states the stamping does not permit or approve violations of any City or State Codes (limitation noted on sheet). | No explicit conflicts or outstanding code violations are stated on the visible sheet.HOLDChain hold
└Scope 87A-511 | CHAIN HOLD - Coordination required between electrical work and furniture vendor: 'NOTE: COORDINATE OUTLET REQUIREMENT W/ FURNITURE VENDOR'. Risk of miscoordination if not followed. | Banquette components are specified 'BY OTHERS' (multiple references). Responsibility and timing for supply/installation may be unclear on this sheet and could cause scope gaps if not coordinated. | Sheet carries a strict warning that changes require written approval from City of Tampa Construction Services Division; unapproved changes would be unlawful.HOLDChain hold
└Scope 88A-511 | NOTE: COORDINATE OUTLET REQUIREMENT W/ FURNITURE VENDORHOLDChain hold
└Scope 89A-512 | CHAIN HOLD - The document explicitly states that changes or alterations without written approval are unlawful - risk of noncompliance if plans are modified on-site without approval. | The stamping of the plan does not constitute approval to violate City or State codes - potential compliance risk if work deviates from codes despite stamped plans.HOLDChain hold
└Scope 90A-550 | CHAIN HOLD - Multiple repeated and overlapping text blocks and abbreviations on the sheet (duplicated notes) may create ambiguity for installers (e.g., repeated 'EXT. FINISH ABOVE 40'-0" TO BE HARD STUCCO...' blocks). | References to mechanical and structural information are present as 'SEE MECH.' and 'SEE STRUCT FOR PRECAST DETAILS' but no mechanical or structural sheet numbers are provided on this sheet, which may lead to coordination issues. | Some abbreviations and truncated words (e.g., 'FR.', 'W.P.', 'RUNN') appear in the text and could be ambiguous without a legend or glossary.HOLDChain hold
└Scope 91A-571 | CHAIN HOLD - The sheet explicitly states that stamping does not authorize violations of City or State codes, indicating that compliance remains the responsibility of project parties. | The sheet warns that changes without written approval from the City of Tampa Construction Services Division are unlawful.HOLDChain hold
└Scope 92A-572A | CHAIN HOLD - Architect's attestation is qualified: "TO THE BEST OF ARCHITECT'S KNOWLEDGE THE PLANS AND SPECIFICATIONS COMPLY WITH THE MINIMUM BUILDING CODES." (qualified language may limit absolute assurance). | Explicit statement that stamping does not permit or approve violations of city/state codes indicates the stamp is not an unconditional approval for any non-compliant items.HOLDChain hold
└Scope 93A-574 | CHAIN HOLD - Multiple dates appear on the sheet (01/23/2020, 8.10.15, 9/29/2021) without an explicit revision label tying them together. | Architect identity is not unambiguously presented in the parsed text (sheet shows 'AP ARCHITECTURE' but full firm/individual names and signatures are not fully legible in provided text). | Project address and owner/client are not present on the provided sheet, limiting attribution and contract context.HOLDChain hold
└Scope 94A-600 | CHAIN HOLD - "THRESHOLD TO MATCH FRAME WIDTH; VERIFY ACTUAL FRAME WIDTH PRIOR TO ORDERING THRESHOLD FOR DOOR TYPE REFER TO DOOR SCHEDULE" - indicates potential procurement/coordination risk if frame width is not verified prior to ordering thresholds. | "VERIFY SIZES OF DOORS LEADING INTO ROOMS HOUSING EQUIPMENT... TO ENSURE DOOR IS WIDE ENOUGH TO ALLOW FOR REMOVAL AND REPLACEMENT OF EQUIPMENT." - risk if equipment access not verified. | Notes require verification of actual frame width and tile/finish transitions (coordination risk between architect, supplier and installer). | Automatic door hardware is by supplier ("AUTOMATIC DOOR HDWR BY SUPPLIER") - coordination required between supplier and installer.HOLDChain hold
└Scope 95A-600 | Coordinate automatic door hardware for specified vestibule locations ("AUTOMATIC DOOR HDWR BY SUPPLIER").HOLDChain hold
└Scope 96A-600 | GENERAL NOTE: "VERIFY SIZES OF DOORS LEADING INTO ROOMS HOUSING EQUIPMENT, SUCH AS THE LAUNDRY ROOM OR THE MECHANICAL ROOM, TO ENSURE DOOR IS WIDE ENOUGH TO ALLOW FOR REMOVAL AND REPLACEMENT OF EQUIPMENT."HOLDChain hold
└Scope 97A-600 | "THRESHOLD TO MATCH FRAME WIDTH; VERIFY ACTUAL FRAME WIDTH PRIOR TO ORDERING THRESHOLD FOR DOOR TYPE REFER TO DOOR SCHEDULE"HOLDChain hold
└Scope 98A-610 | CHAIN HOLD - The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes (limitation noted on sheet). | It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division (constraint on changes).HOLDChain hold
└Scope 99A-610 | Various dimensioned storefront/window elevations and alternates (as depicted on sheet)HOLDChain hold
└Scope 100A-800 | CHAIN HOLD - Multiple dates appear on the sheet (8.10.15, 01/23/2020, 9/29/2021) with no explicit explanation of their meaning or sequence. | No project name or project address is shown on the visible sheet; cannot confirm the project this sheet belongs to. | No named architect, contractor, or other primary contact is legibly present on the visible sheet. | The presence of a "THRESHOLD BUILDING" stamp may have legal/code implications that are not described on this sheet. | Equipment schedule and many small-note details are present but may be only partially legible in this image; detailed verification of equipment quantities/specifications is not possible from this single sheet.HOLDChain hold
└Scope 101A-801 | CHAIN HOLD - It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division (explicit restriction). | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes (limitation on authority of stamp).HOLDChain hold
└Scope 102A-802 | CHAIN HOLD - The document states changes or alterations are unlawful without written approval from the City of Tampa Construction Services Division, which implies compliance risk if the plans are altered on site. | The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes (potential liability/interpretation risk if code conflicts exist).HOLDChain hold
└Scope 103A-804 | CHAIN HOLD - Multiple dates are present on the sheet (8.10.15, 01/23/2020, 9/29/2021); relationship between these dates is not specified on the visible text and may indicate revisions, reviews, or different document events that need clarification. | The plan stamping specifically disclaims that stamping permits or approves code violations and disallows changes without written approval; any undocumented alterations would be non-compliant per the sheet text.HOLDChain hold
└Scope 104A-804 | Upper corridor carpet plan (including an alternate Axminster option)HOLDChain hold
└Scope 105A-804 | Visible plan/details include: PARTIAL INT. ELEVATION - GUESTROOM ENTRY; PARTIAL INT. ELEVATION GUESTROOM LOBBY; PARTIAL INT. ELEVATION UPPER ELEVATOR LOBBY; UPPER CORRIDOR CARPET PLAN - ALTERNATE AXMINSTER; UPPER CORRIDOR CARPET PLAN; ENLARGED UPPER FLOOR CORRIDOR PLAN; SYMBOLSHOLDChain hold
└Scope 106A-805 | CHAIN HOLD - Key identifying information (owner/contractor names, full project address) is not legible or not present on this sheet. | Multiple dates appear (8.10.15, 01/23/2020, 9/29/2021) without an explicit revision history on this sheet, which could cause ambiguity about applicable version. | Some notes and stamps (seal and signature area) are present but not legible at the resolution provided.HOLDChain hold
└Scope 107A-806 | CHAIN HOLD - The sheet explicitly states that the stamping of the plan does not permit or approve violations of City or State codes (limitation on implied approval). | The sheet warns it is unlawful to make changes without written approval from the City of Tampa Construction Services Division (risk if changes are made without approval). | No explicit contractual disputes, claims, or conflicts involving 'Mason Forge' are present on this sheet.HOLDChain hold
└Scope 108A-807 | CHAIN HOLD - The sheet explicitly states changes or alterations are unlawful without written approval from the City of Tampa Construction Services Division; making unapproved changes would create a legal/compliance risk. | The stamping carries a disclaimer that it does not permit violations of any City or State Codes; any noncompliance cannot be justified by the stamp.HOLDChain hold
└Scope 109A-808 | CHAIN HOLD - Document contains notice that changes or alterations are unlawful without written approval (administrative/legal restriction). | Stamping does not constitute approval to violate City or State codes (limitation on granted approval).HOLDChain hold
└Scope 110A-809 | CHAIN HOLD - Sheet states: 'THIS PLAN IS A PROTOTYPE AND ALL FACTORS MAY CHANGE. SITE CONDITIONS AND/OR LOCAL CODES MAY SUPERSEDE THE DESIGN.' | Architect is instructed to have a competent laundry consultant review the plan for compliance with any changes required - implying potential for design changes or conflicts requiring consultant input | Warning that it is unlawful to make changes without written approval from City of Tampa indicates legal risk if changes are made without authorizationHOLDChain hold
└Scope 111A-809 | Plans are described as a prototype; site conditions and local codes may supersede the design.HOLDChain hold
└Scope 112A-809 | Criteria note A1 text present: 'SEE SHEET 621 FOR INFORMATION REGARDING CONSTRUCTION REQUIRED FOR LAUNDRY EQUIPMENT. REFER TO DESIGN STANDARDS "LAUNDRY BACK OF HOUSE" CHAPTER FOR MAIN REQUIREMENTS RELATED TO THIS SHEET. ARCHITECT IS RESPONSIBLE FOR DESIGNING PROJECT IN ACCORDANCE WITH THE ENTIRE DESIGN STANDARDS. THIS PLAN IS A PROTOTYPE AND ALL FACTORS MAY CHANGE. SITE CONDITIONS AND/OR LOCAL CODES MAY SUPERSEDE THE DESIGN. ARCHITECT SHOULD HAVE A COMPETENT LAUNDRY CONSULTANT REVIEW THE PLAN FOR COMPLIANCE WITH ANY CHANGES REQUIRED.'HOLDChain hold
└Scope 113A-810 | CHAIN HOLD - The sheet contains legal/administrative restrictions stating plans must not be changed without written approval from the City of Tampa Construction Services Division; any unapproved changes would be a compliance risk. | Equipment schedule table text and many small annotations on the sheet are not fully legible in the provided image, preventing verification of specific equipment models, quantities, or capacities from this source alone.HOLDChain hold
└Scope 114A-series / ID-series | CHAIN CONTROL - architectural and interior drawings overlap at finishes, ceilings, millwork, guestrooms, restrooms, pool, and public spaces. Details define scope but are not separate quantities from their governing plans/schedules.HOLDChain hold
└Scope 115A1-22 | CHAIN HOLD - Plans/specifications are stated to comply only 'TO THE BEST OF ARCHITECT'S KNOWLEDGE' - implies limited representation as printed. | Altering the plans without written approval is unlawful (conflict/risk if changes are made in the field without approval). | Stamping does not excuse violation of City or State codes (possible compliance risk if stamped plans contain code violations).HOLDChain hold
└Scope 116A1-23 | CHAIN HOLD - Document explicitly prohibits changes without written approval from the City of Tampa Construction Services Division (potential compliance risk if changes are made without approval).HOLDChain hold
└Scope 117A1-24 | CHAIN HOLD - The sheet includes the statement that the stamping of the plan does not permit or approve violations of any City or State Codes (potentially relevant if discrepancies are found between stamped approval and code-compliant work).HOLDChain hold
└Scope 118C-1A [Civil] | CHAIN HOLD - Existing 'BROKEN ASPHALT' noted on site (as shown on plan) - potential site condition requiring remediation | A 'RETENTION POND' is located on the property (as shown on plan) - potential constraint for development or grading | Chain link fence and other existing site improvements are shown which may affect access or constructionHOLDChain hold
└Scope 119C-3 [Civil] | CHAIN HOLD - Existing underground utility lines within the construction area must be located prior to construction to avoid damage and subsurface erosion; if underground pipes are not properly removed or plugged, they may serve as conduits for subsurface erosion which may lead to excessive settlement. | Contractor responsible for notifying and coordinating with utilities at least 48 hours in advance; failure to coordinate could cause conflicts or delays. | Soils may require removal/backfill if 'muck-like' material is discovered; potential for additional work and testing. | Compliance/testing requirements (compaction, asphalt cores, concrete cylinders, etc.) place responsibility and risk on contractor for nonconforming work. | Document notes that there may be deficiencies or discrepancies among drawings and specifications and that these must be reported prior to bid date; unresolved discrepancies could create scope conflicts. | Some tabular site coverage and parking presentation in the page is formatted ambiguously (e.g., parking breakdown rows), which could lead to misinterpretation if relied upon without full plan set.HOLDChain hold
└Scope 120C-4 [Civil] | CHAIN HOLD - Risk of contact with existing underground utilities, gas mains and overhead electric in the right-of-way (explicit WARNING). | Potential requirement for dewatering permit if dewatering thresholds are exceeded; contractor responsibility to ensure dewatering activity is below specified threshold or obtain permit at contractor expense. | No construction within public ROW without ROW permit from City of Tampa (regulatory constraint). | No work on City wastewater infrastructure until approved by City of Tampa Wastewater Department's engineering staff (approval constraint). | Erosion/sediment leaving site - notes emphasize contractor responsibility to prevent soil sediment from leaving the site.HOLDChain hold
└Scope 121C-5 [Civil] | CHAIN HOLD - NO DISCHARGE IS PERMITTED INTO WETLAND AREAS. IF TURBID WATER IS RELEASED, STOP DISCHARGE IMMEDIATELY AND CORRECT THE PROBLEM. | PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.HOLDChain hold
└Scope 122C-6 [Civil] | CHAIN HOLD - General Note 5: THE CONTRACTOR SHALL COORDINATE WITH THE EXISTING ADJACENT BUSINESSES TO ENSURE THERE IS NO DISRUPTION TO THEIR RESPECTIVE OPERATIONS. (indicates potential coordination/risk) | General Note 6: THE CONTRACTOR AT ITS OWN DISCRETION SHALL MAINTAIN THE CONSTRUCTION SITE SECURE FROM TRESPASS. (site security risk acknowledged) | Pylon sign requires separate building permit (potential permit/approval conflict if not obtained) | Multiple owners/parcel ownership (TAMPA BUSCH HOTEL, LLC and CITY OF TAMPA) shown - property ownership boundaries may present coordination needs (fact present on sheet)HOLDChain hold
└Scope 123C-7 [Civil] | CHAIN HOLD - NOTES: THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO DRAINAGE SYSTEM AND SHALL RESTORE ANY DAMAGED STRUCTURES (risk of contractor liability). | TRENCH TO BE CONSTRUCTED AND ADHERED TO OSHA'S TRENCH SAFETY CODE (safety compliance risk if not followed). | CALCAREOUS MATERIAL IS PROHIBITED (material availability/compatibility risk if encountered). | FILTER FABRIC SHALL REMAIN IN PLACE UNTIL PAVING IS COMPLETE (sequence risk for paving). | REQUIREMENT: CONTRACTOR SHALL BE CERTIFIED TO INSTALL HDPE PIPE FROM MANUFACTURER (qualification risk if contractor is not certified). | MAINTENANCE REQUIREMENTS (quarterly first year, annual thereafter); failure to perform may risk system performance.HOLDChain hold
└Scope 124C-8 [Civil] | CHAIN HOLD - Document contains two different values for 'MINIMUM INSTALLED STORAGE': "31.0 CUBIC FEET" (in one table) and "35.0 CUBIC FEET" (in a repeated summary block). | Multiple dates and revision entries are present (11-7-08; 1/3/16; APRIL 2015; 3/22/21) without a single explicit revision history field; potential ambiguity about the controlling version. | General note: 'STORMTECH DETAILS DO NOT SUPERSEDE ANY STATE OR LOCAL REGULATORY SPECIFICATIONS' - responsibility placed on consulting/design engineer to ensure compliance (risk of nonconformance if engineer does not verify). | Requirement that contractor must prevent vehicles that exceed Stormtech's requirements from traveling across or parking over the stormwater system - operational/construction coordination risk if not enforced. | Document prohibits substitutions: 'NO SUBSTITUTION OF ALTERNATE MATERIAL IS PERMITTED.' - risk if specified products are unavailable.HOLDChain hold
└Scope 125C-9 [Civil] | CHAIN HOLD - No contractor, construction manager, or cost/contract documents are shown on this page (unable to confirm responsible construction party from this sheet). | Signature/seal is shown as digital but the exact date/time of signature is not fully visible on the provided page. | Project number, permit stamp(s), and permit approval status are not clearly provided on this page (there is 'PROJECT No:' with no value shown). | No direct reference to 'Mason Forge' on the provided page; cannot verify any relationship to Mason Forge from this document alone.HOLDChain hold
└Scope 126C-10 [Civil] | CHAIN HOLD - Multiple dates/revisions present (APRIL 2015; 1/3/16; 3/22/21; C 2013) without a single clear 'issued' date on this page. | Two different street addresses appear on the sheet: '9306 N 30TH STREET' and '9301 N 29TH STREET' - potential ambiguity about which parcel this sheet refers to. | Sheet annotations show 'NOT TO SCALE' in multiple places, which limits use for scaling measurements. | No contract/owner or contractor names explicitly identified on this page (only engineering firm).HOLDChain hold
└Scope 127C-12 [Civil] | CHAIN HOLD - UTILITY CONFLICT DETAIL: conflict point where 12" HDPE storm pipe and 6" PVC fire service and 4" PE water service intersect (shown on drawing). | NOTATION: "UTILITY CONFLICT (SEE DETAILS THIS SHEET)" indicating identified utility spatial conflicts on the plan. | VALVES ON EXISTING CITY OF TAMPA WATER MAINS ARE TO BE OPERATED BY CITY PERSONNEL ONLY (operational coordination risk/delay if not scheduled). | REQUIREMENTS FOR COORDINATION WITH MULTIPLE CITY DEPARTMENTS AND INSPECTORS (CEI, Planning Division, Wastewater Department) introduce potential schedule/risk if notifications/submittals are not made in required timeframes.HOLDChain hold
└Scope 128C-12.1 [Civil] | CHAIN HOLD - SPECIAL PRECAUTIONS (warnings and installation constraints are included on the sheet) | DO NOT COMPACT BACKFILL MECHANICALLY (installation warning shown) | High Temperature Kitchen Water (special precaution heading present) | Hydrostatic/Pressureable Inlets/Outlets (installation constraint shown) | Below Grade Installation Slab Requirements (installation constraint shown) | Secure Cover Adapters (installation note shown) | Corrugated Riser Pipe Requirements (installation requirement shown)HOLDChain hold
└Scope 129C-13 [Civil] | CHAIN HOLD - SCOPE: NO SUBSTITUTIONS - NO ALTERNATES (may restrict procurement options) | Oil filled motors are not considered equal to air filled motors and therefore will not be considered an equal to the HOMA PUMPS. | Contractor shall verify power source prior to ordering equipment (risk if not verified). | Concrete grout as required by engineer to prevent flotation (requires coordination with structural/earthwork). | PUMP CONTROL PANEL SHALL BE LOCATED 3 FEET FROM WETWELL PERIMETER AT POINT "A" (site location constraint)HOLDChain hold
└Scope 130C-14 [Civil] | CHAIN HOLD - If connection to the water main results in depressurization below 20 PSI, precautionary boil water notices or advisories must be issued as described in the notes (public health risk). | Groundwater presence requires wrapping Class I-A material with non-woven geo-textile (note 12); unsuitable or wet soils must be replaced as directed by geotechnical engineer or owner (note 11). | Separation and crossing requirements with other utilities are strict (3 ft, 6 ft, 10 ft horizontal separations; vertical offsets of 6 inches to 12 inches depending on pipe types) - nonconformance could create conflicts at utility crossings. | Deflection testing requirement (no greater than 5% deflection) and leakage limits (200 gallons per inch per mile per day) impose potential rework risk if tests fail. | Contractor is required to comply with OSHA trench safety regulations; failure to do so is a safety/legal risk.HOLDChain hold
└Scope 131C-15 [Civil] | CHAIN HOLD - Multiple expansion/joint spacing requirements appear: sidewalks: 1/2" expansion joints at a maximum of 50' o.c.; curbs: 1/2" pre-molded expansion joint required every 500' and construction joint required every 10' maximum (4' minimum). These differing spacings will require coordination in areas where curb and sidewalk interfaces occur. | Sheet references slab thickness as TS = SLAB THICKNESS (SEE PLAN) but slab thickness value is not provided on this sheet and requires plan reference. | Dowel installation refers to 'PNA RECOMMENDATION' but the PNA installation document/specification is not included on this sheet.HOLDChain hold
└Scope 132C-16 [Civil] | CHAIN HOLD - Sign note: 'CONFIRM WITH BUILDING DEPT, IF HIGHER FINE, THEN USE LOCAL JURISDICTIONAL SIGNAGE' - indicates potential conflict between shown sign fine and local jurisdiction requirements | Multiple revision dates (APRIL 2015; 1/3/16; 3/22/21) without explicit revision summary on this extract could create ambiguity about controlling/latest detail set | OCR/parsing shows typographical errors such as 'MUSH' instead of 'MUST' in several material notes - original intent likely 'MUST' and should be verified on original sealed drawingHOLDChain hold
└Scope 133C-18 [Civil] | CHAIN HOLD - Multiple 'PER CITY COMMENTS' revision dates over several years (APRIL 2015; 1/3/16; 3/22/21; 4/5/22) indicating the sheet was revised multiple times (no further detail on nature of revisions is provided on this page). | Note on sheet: 'PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.' - legal/authentication constraint for non-electronic copies.HOLDChain hold
└Scope 134C-19 [Civil] | CHAIN HOLD - Multiple 'PER CITY COMMENTS' revisions (1/3/16 and 3/22/21) indicate the city requested changes; the nature of those changes is not legible in the provided excerpt. | The drawing states printed copies are not considered signed and sealed - legal acceptance may depend on verifying the electronic signature. | No contractor, owner contact, or explicit permit numbers (other than FDOT standard-plan references and Newkirk's credentials) are visible in the provided image; that absence can impede direct contract/permit interpretation.HOLDChain hold
└Scope 135C-19 / C-20 | CHAIN HOLD - maintenance-of-traffic and lane/sidewalk closure requirements are carried as potential scope only until jurisdictional applicability and phasing are confirmed.HOLDChain hold
└Scope 136C-21 [Civil] | CHAIN HOLD - NO SUBSTITUTIONS OR CHANGES OF ANY KIND WILL BE ALLOWED AT THE TIME OF BIDDING (note may restrict procurement flexibility). | ANY EXISTING TREES CREDITED TOWARDS REQUIRED BUFFERS OR LANDSCAPE REQUIREMENTS REMOVED FOR ANY REASON SHALL BE REPLACED WITH TREES MEETING CITY APPROVAL (risk/condition related to tree removal and replacement). | THE CONTRACTOR SHALL VERIFY EXISTENCE AND LOCATION OF ALL EXISTING UTILITIES AND UNDERGROUND CONDITIONS PRIOR TO HIS COMMENCEMENT OF THE ANY WORK (utility conflict risk noted). | EQUIPMENT SHALL BE OPERATED IN A MANNER AS NOT TO INJURE OR DESTROY ANY TREES SHOWN TO REMAIN (risk of damage liability to existing trees). | ALL PLANT MATERIAL SHALL BE GUARANTEED ONE YEAR AFTER ACCEPTANCE BY OWNER (performance warranty obligation).HOLDChain hold
└Scope 137C-22 [Civil] | CHAIN HOLD - Plan is schematic only (note: THE PLAN IS SCHEMATIC ONLY) - potential for coordination issues if not field-verified. | Quantities for irrigation materials are not given (note: QUANTITIES FOR IRRIGATION MATERIALS ARE NOT GIVEN). Contractor must compute quantities from plan. | Contractor must verify existence/location of existing utilities prior to work - risk if utilities are not correctly located. | Electrical to controller is to be provided by the electrical contractor (coordination required between trades). | Irrigation lines are shown under pavement 'for clarity only' - actual installation under pavement requires sleeving and minimization of piping under pavement; potential conflict if installed differently. | All trenching shall be kept out of the drip line of existing trees (field constraints may limit routing).HOLDChain hold
└Scope 138C-23 [Civil] | CHAIN HOLD - Multiple 'PER CITY COMMENTS' revision entries (1/3/16 and 3/22/21) indicate the sheet was revised in response to city comments; specific city approvals or outstanding comments are not shown on this sheet. | The sheet includes the note that printed copies are not considered signed and sealed which affects legal validity of non-electronic reproductions.HOLDChain hold
└Scope 139E1.0 [Electrical] | CHAIN HOLD - No owner or contractor names shown on this sheet - lack of identified contracting parties may impede assignment or responsibility determinations. | Project street address is not provided (only 'Tampa, FL' and project name); this may cause ambiguity for permitting or site coordination. | CAD FILE and SHEET NUMBER fields appear blank on the parsed header; missing metadata could complicate drawing management. | Only one page (page 1/1) provided; other coordinating discipline sheets and details are not present for cross-checking.HOLDChain hold
└Scope 140E1.1 [Electrical] | CHAIN HOLD - No contractor/owner/permit number explicitly identified on this sheet (field(s) such as SHEET NUMBER and CAD FILE appear present but not populated in the parsed text). | Full plan notes and many small annotations on the sheet are not fully legible in the provided image; cannot confirm details that may affect scope or code compliance from this single sheet alone.HOLDChain hold
└Scope 141E1.3 [Electrical] | CHAIN HOLD - No contractor, owner, or construction manager is named on this sheet (absence of party identification on-sheet). | No explicit mention of 'Mason Forge' appears in the visible document text (no positive evidence linking this sheet to Mason Forge). | Revision block shows a date ('12.05.2025') but no revision description or multiple revision entries are visible on this sheet image.HOLDChain hold
└Scope 142E1.4 [Electrical] | CHAIN HOLD - No contractor, owner, or other contracting party identified on this sheet; responsibility and contractual relationships are not shown on this page. | Sheet-level information alone does not show permit status, approvals, or signatures. | CAD FILE and SHEET NUMBER fields appear present but no CAD filename or a specific sheet number beyond E1.4 is provided in the parsed text.HOLDChain hold
└Scope 143E2.1 [Electrical] | CHAIN HOLD - No explicit contractual parties (owner, contractor) or signatures visible on the sheet to confirm authorization or responsibility. | No permit numbers or issuance stamps visible on the provided sheet. | Potential ambiguity between 'REVISIONS: 12.05.2025 DATE:' and the printed '12.5.25' (both present).HOLDChain hold
└Scope 144E2.3 [Electrical] | CHAIN HOLD - No explicit risks, conflicts, contractor information, or permit numbers are stated on this sheet.HOLDChain hold
└Scope 145E2.4 [Electrical] | CHAIN HOLD - Sheet as provided does not show owner, contractor, or construction manager names on this page. | CAD FILE field is present but has no visible value on this page. | Full project address (street number and specific Tampa address) is not shown on this sheet. | No explicit contract numbers, permit numbers, or signature/stamp visible on this page.HOLDChain hold
└Scope 146E2.5 [Electrical] | CHAIN HOLD - Two different date formats/entries are present: "REVISIONS: 12.05.2025" and separately "12.5.25" which could cause ambiguity as to the effective document date. | Only a single sheet is provided; lack of adjacent sheets or index may hide related notes, legends, or panel schedules referenced elsewhere. | No signatures, stamp, permit numbers, or explicit approval blocks are visible on the provided page.HOLDChain hold
└Scope 147E3.1 [Electrical] | CHAIN HOLD - Potential inconsistency/ambiguity in date format: sheet shows both "REVISIONS: 12.05.2025" and elsewhere "12.5.25" which may refer to the same revision/date but are formatted differently. | No owner, contractor, or permit authority identified on this page; responsibility and approvals are not shown here.HOLDChain hold
└Scope 148E3.3 [Electrical] | CHAIN HOLD - No contractor, owner, or permit authority identified on this sheet excerpt (risk: responsibility and permitting status not shown). | Sheet label 'SHEET NUMBER:' and 'CAD FILE:' are present but no values are extracted from parsed text (possible missing indexing or incomplete metadata). | Compliance statement is declarative but no referenced approval stamp, signature, permit number, or issuing authority is present on the parsed text.HOLDChain hold
└Scope 149E3.5 [Electrical] | CHAIN HOLD - The drawing shows a 'REVISIONS:' label and both '12.05.2025 DATE:' and '12.5.25' on the sheet; formats differ which could lead to confusion about official revision labeling. | No owner, contractor, permit numbers, or issuing authority are identified on the provided sheet, which limits confirmation of approval or permitting status. | The 'SHEET NUMBER:' and 'CAD FILE:' fields appear on the sheet header but are not populated in the parsed text, which could indicate missing metadata.HOLDChain hold
└Scope 150E3-series / F-series | CHAIN CONTROL - electrical fire-alarm design drawings and fire-alarm-system shop/permit drawings overlap. Carry each device, pathway, interface, calculation, and sequence once after reconciliation; do not double-add.HOLDChain hold
└Scope 151E4.0 [Electrical] | CHAIN HOLD - Sheet-level metadata fields (SHEET NUMBER, CAD FILE) are shown but not populated on this page; this may hamper cross-referencing. | Only a single title sheet / cover is provided here - scope, contractors, signatures, and other contract documents are not present, limiting ability to confirm responsibilities. | Small/low-resolution text in the sheet image (right side) may contain additional notes that are not legible in this extract.HOLDChain hold
└Scope 152E4.1 [Electrical] | CHAIN HOLD - No party named 'Mason Forge' appears on this sheet (no reference to Mason Forge in the visible text). | SHEET NUMBER: and CAD FILE: fields appear on the sheet header but are blank / not populated in the parsed text (possible missing metadata). | Some legend and keyed-note text on the sheet (lower-right and lower-center) is not fully transcribed and may contain contractually relevant notes that are not available from the provided text.HOLDChain hold
└Scope 153E4.2 [Electrical] | CHAIN HOLD - No owner, general contractor, electrical engineer, or other project party is identified on this sheet (only the architect block is present) - risk: missing responsible parties for construction or permit coordination. | Some notes and the circuit legend on the sheet are small/partially illegible in the provided extract; this may cause ambiguity in circuit assignments or fixture types if used without other sheets. | The sheet includes a note: 'UPDATED DIMENSIONS ACCORDING TO LATEST HOTEL/OWNER CHANGES.' This indicates dimensions on the sheet may have been recently changed and may not match other documentation if not coordinated.HOLDChain hold
└Scope 154E5.1 [Electrical] | CHAIN HOLD - Sheet does not identify project owner or general contractor on this page; only the architecture/preparer is shown. | Header fields 'SHEET NUMBER:' and 'CAD FILE:' appear in the form but are not populated in the parsed header text (potentially incomplete metadata). | Some small-print notes on the sheet are low-resolution/illegible in the provided image which may hide additional requirements or specifications.HOLDChain hold
└Scope 155E5.2 [Electrical] | CHAIN HOLD - No contractor or owner identified on the sheet; party information limited to the architect. | Several table cells and entries appear incomplete or truncated (e.g., some circuit rows lack full descriptions, some breaker/phase columns partially blank) which may cause ambiguity when used as sole source of truth. | Manufacturer and model fields in panel headers appear blank ('MANUFAC. MDL #' column is empty) - makes verification of specified equipment impossible from this sheet alone. | Some numeric/text formatting appears inconsistent or garbled (example: a circuit shows 'R #123' which may be OCR/artifact; verify against original drawings).HOLDChain hold
└Scope 156E5.3 [Electrical] | CHAIN HOLD - Several typographic/OCR anomalies in the schedules: occurrences of '#123' in place of '#12' in some rows and a '#REF!' token in one heat-pump row (e.g. in 4C/3C blocks) which may indicate data corruption or drawing annotation errors. | Some panel schedule numeric columns appear duplicated or misaligned (e.g., 'CONNECTED TOTAL (VA) 78000 44000' - it's not explicit which value corresponds to which field without the original layout context). | Sheet number and CAD file fields are blank in the title block (text: 'SHEET NUMBER: CAD FILE:' with no value), which may impede tracking. | Manufacturer and model fields have limited or unclear entries (text shows '22K' in header area but no consistent manufacturer/model data for each panel). | Project-level parties beyond the architect (owner, general contractor, electrical contractor, MEP engineer) are not present on this sheet, which may cause responsibility ambiguity if used alone.HOLDChain hold
└Scope 157E5.4 [Electrical] | CHAIN HOLD - Several spreadsheet/print artifacts and error tokens present in schedules (e.g., '#N/A', '#REF!') which may indicate data or formula errors in source file | Some circuit rows appear truncated or misaligned (example: '10 11 20A 1 C 1200 1 20A 3/4" #12 R Guest room' missing clear separators in text extraction) | Manufacturer and model fields show '-' or are blank for panel MFG/MDL values | Sheet header shows 'DATE: SHEET NUMBER: CAD FILE:' with no values filled, indicating missing metadata on this print | Potential inconsistencies between 'CONNECTED TOTAL (VA)' and subsequent 'SIZING TOTAL (VA)' blocks in text extraction that may be due to layout/OCR issues rather than actual calculation errorsHOLDChain hold
└Scope 158ENERGY-1 | CHAIN CONTROL - energy calculations establish envelope, lighting, and HVAC performance criteria; they modify corresponding construction scopes and are not a separate duplicate installation quantity.HOLDChain hold
└Scope 159ENERGY-1 [Energy-Calculations] | CHAIN HOLD - FLOOD ZONE "X" is indicated on the Flood Zone Map (documented on cover). | Soil type is (9) CANDLER-URBAN LAND COMPLEX, 0 TO 5 PERCENT SLOPES (documented on cover). | Geotechnical services provided by BAY AREA SINKHOLE INVESTIGATION & CIVIL ENGINEERING (presence of sinkhole investigation as a contracted service is documented). | Legal descriptions reference vacated/closed streets: Parcel 1 references portion of Norwood Street vacated and abandoned by the City of Tampa; Parcel 2 references closed street halves abutting parcels (documented in legal description).HOLDChain hold
└Scope 160F1-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Multiple contractors share responsibilities (electrical, mechanical, sprinkler, hardware, elevator contractor, system supplier). The document repeatedly requires coordination (e.g., elevator recall, conduit run deviations require system supplier approval) which creates potential coordination risk if unclear. | Conduit run deviations are explicitly prohibited without prior approval from the system supplier; deviations resulting in excessive voltage drop, additional parts, engineering, etc., are the sole responsibility of the electrical contractor-this places execution risk on the electrical contractor for field routing changes. | Division of responsibilities for mounting and provisioning some devices (e.g., door holders: hardware and/or electrical contractor; duct detectors: mechanical contractor; flow switches: sprinkler contractor) could lead to scope overlap or dispute if not explicitly assigned in contracts.HOLDChain hold
└Scope 161F2-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - FIELD TO VERIFY LOCATION OF RISER (UP) - note indicates riser location not final | FIELD TO VERIFY LOCATION OF BACK-FLOW AND PIV SWITCHES. (PRIOR TO INSTALL) - note indicates these device locations must be confirmed prior to installation | The stamping note warns that stamped plan does not permit or approve violations of City/State codes (potential compliance risk if deviations occur).HOLDChain hold
└Scope 162F3-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Riser location not confirmed on drawings: "FIELD TO VERIFY LOCATION OF RISER (UP/DN) JB" - indicates a site verification required before certain installations. | Sheet appears to be part of a set but shows "SHEET 03 OF" with the total number not provided on this extract (possibility of missing coordination info on other sheets).HOLDChain hold
└Scope 163F4-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Field note on drawing: NAC PS•2 FIELD TO VERIFY LOCATION OF RISER (UP/DN) - indicates a field verification is required and potential risk if riser location (up/down) is not confirmed. | Plan contains the statement that changes or alterations are unlawful without written City approval - potential legal/compliance risk if modifications are made without approval.HOLDChain hold
└Scope 164F5-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Riser location not finalized on plan: 'FIELD TO VERIFY LOCATION OF RISER (UP/DN)' (potential coordination risk) | Plans contain the warning that changes or alterations without written approval from City of Tampa are unlawful (risk if work deviates without approval) | The stamping of the plan explicitly states it does not permit or approve violations of City or State Codes (potential for unresolved code interpretation)HOLDChain hold
└Scope 165F6-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - "FIELD TO VERIFY LOCATION OF ELEVATOR MODULES" - indicates elevator module locations are unresolved on this sheet | "FIELD TO VERIFY LOCATION OF RISER (DN) 1A,3B" - indicates riser location(s) need verification | The sheet contains many device tags and short-hand notations (e.g., PS•2•N3•01, FP•1•L2 .3•D034) that require the project legend/symbol schedule (not present on this single sheet) to interpret fullyHOLDChain hold
└Scope 166F7-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Multiple notes require field verification of device locations and determination of circuit pathways (uncertainty remains until field verification is completed). | The plan explicitly states changes/alterations are unlawful without written approval from the City of Tampa Construction Services Division (regulatory / approval risk if altered).HOLDChain hold
└Scope 167F8-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Sheet shows 'SHEET 08 OF' but total sheet count is not present on this sheet (possible document completeness issue). | Document header and some lines appear truncated in the provided parsed text (see sheet bottom and right), which may hide information or notes.HOLDChain hold
└Scope 168F9-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Plan states it is unlawful to make changes/alterations without written approval from the City of Tampa Construction Services Division (administrative/legal restriction) | Stamping note: stamping does not permit or approve violations of City or State codes (limitation on implied approval)HOLDChain hold
└Scope 169F10-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Sheet contains the warning: 'It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division.' | Sheet notes: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes.'HOLDChain hold
└Scope 170F11-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - *BATTERY BOX SIZE CAPACITY NOT SPECIFIED. REFER TO MANUFACTURER DOCUMENTATION. (explicitly noted on sheet - risk of selecting incorrect enclosure/battery box). | Plans include a stamping and code compliance review note that changes or alterations without written approval from City of Tampa are unlawful - constraint for modifications to the design.HOLDChain hold
└Scope 171F14-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Observed circuit voltage drop percentages (as printed): PS•1 N1 VOLTAGE DROP %: 1.21 % | PS•1 N2 VOLTAGE DROP %: 10.06 % | PS•1 N4 VOLTAGE DROP %: 10.63 % | PS•1 N5 VOLTAGE DROP %: 7.60 % | PS•1 N6 VOLTAGE DROP %: 3.47 % | Minimum operational voltage printed on sheets: MIN. OPERATIONAL VOLTAGE: 16 (volts) - end-of-line voltages listed and vary per circuit (e.g., PS•1 N2 END OF LINE VOLTAGE: 18.35; PS•1 N4 END OF LINE VOLTAGE: 18.23; PS•1 N5 END OF LINE VOLTAGE: 18.85; PS•1 N6 END OF LINE VOLTAGE: 19.69; PS•1 N1 END OF LINE VOLTAGE: 20.15)HOLDChain hold
└Scope 172F15-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Document shows several circuits with voltage drop percentages and values that are explicitly recorded (examples include Voltage Drop %: 10.33 % for PS•1 N3, 10.96 % for PS•2 N4, 8.89 % for PS•2 N6). These values are present in the report as data points. | Some circuits have maximum voltage drop values listed (e.g., MAX. VOLTAGE DROP: 2.11 for PS•1 N3; 2.24 for PS•2 N4). These are recorded facts in the document. | End-of-line voltages vary by circuit and are recorded (examples: PS•1 N3 END OF LINE VOLTAGE: 18.29; PS•2 N4 END OF LINE VOLTAGE: 18.16).HOLDChain hold
└Scope 173F17-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - The sheet contains the statement: 'It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division.' | The sheet contains the statement: 'The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes.' | No explicit contractor or owner is identified on this sheet (potential coordination gap if relied on alone).HOLDChain hold
└Scope 174F18-00 [FIRE-ALARM-SYSTEM] | CHAIN HOLD - Note on sheet: "COORDINATE WITH AHJ/ELEVATOR CONTRACTOR FOR FINAL REQUIREMENTS." (coordination required with authority having jurisdiction and elevator contractor) | Sheet contains requirements and conditional statements that impose dependencies (e.g., heater/heat detector requirements depend on presence/spacing of sprinkler heads). | The plan stamping includes a warning that changes or alterations are unlawful without written approval from the City of Tampa Construction Services Division.HOLDChain hold
└Scope 175ID000 [Interior] | CHAIN HOLD - Document contains the explicit limitation: 'THIS DRAWING IS FOR INTERIOR DESIGN PURPOSES ONLY. ALL MEASUREMENTS ARE TO BE FIELD VERIFIED.' - indicates measurements on the drawing are not guaranteed. | Multiple revisions and revision dates (including 12/20/2022) appear; risk of differing versions across sets. | Cover/index page alone does not include technical construction or MEP/structural details; scope limited to interior design sheets referenced.HOLDChain hold
└Scope 176ID001 [Interior] | CHAIN HOLD - NO ALLOWANCES WILL BE SUBSEQUENTLY MADE ON BEHALF OF THE CONTRACTOR BY REASON OF ANY OMISSION ON HIS PART TO INCLUDE THE COST OF ALL ITEMS OF WORK OR MATERIAL WHETHER OR NOT THEY ARE SPECIFICALLY REQUIRED TO ATTAIN THE COMPLETED CONDITIONS PROPOSED IN THE DRAWINGS. (Note 2) | CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FACTS, OMISSIONS OR ERRORS OF SUBCONTRACTORS AND OF PERSONS DIRECTLY OR INDIRECTLY EMPLOYED BY THEM. (Note 6) | NO WORK DEFECTIVE IN WORKMANSHIP OR QUALITY OR DEFICIENT IN ANY REQUIREMENTS OF THE CONTRACT DOCUMENTS WILL BE ACCEPTABLE DESPITE ANY FAILURE ON THE PART OF THE DESIGNER TO DISCOVER OR POINT OUT SUCH DEFICIENCIES DURING CONSTRUCTION. (Note 11) | THERE SHALL BE NO SUBSTITUTION OF MATERIALS WHERE A MANUFACTURER HAS BEEN SPECIFIED. WHERE THE TERM "OR EQUAL" IS USED, THE DESIGNER ALONE SHALL DETERMINE THE EQUALITY BASED UPON INFORMATION SUBMITTED BY THE CONTRACTOR. (Note 17)HOLDChain hold
└Scope 177ID121 [Interior] | CHAIN HOLD - Multiple coordination responsibilities noted (GC, AOR, DAI designers, Owner, Purchasing Agent) which present potential coordination risks (electrical, fire, blocking, millwork, equipment fit). | Note: 'ALL MEASUREMENTS ARE TO BE FIELD VERIFIED.' indicates risk if as-built dimensions are not checked prior to work or procurement. | Decorative wall graphic electrical/fire/safety coordination required to ensure no interference with overall design intent (note 8) - potential for conflict with MEP/fire systems. | Responsibilities are split among parties (Owner provides equipment, Purchasing Agent provides fixtures, GC installs) which can cause procurement/installation schedule or compatibility issues if not coordinated.HOLDChain hold
└Scope 178ID122 [Interior] | CHAIN HOLD - Owner-supplied equipment and fixtures require verification in writing and coordination (notes 2, 7, 10, 14) - potential for fit/coordination issues if not confirmed. | G.C. responsibilities for blocking, millwork, plumbing fixtures, and electrical coordination (notes 3, 4, 11, 13, 18) - risk if G.C. and AOR/DAI are not coordinated. | G.C. must coordinate electrical/fire/safety elements and build-outs for decorative wall graphic with DAI designers (note 8) - potential safety/code conflict if not coordinated. | Purchasing agent is "wholly responsible for site verification of wall to wall FF&E prior to purchasing" (note 16) - risk of procurement errors otherwise. | Reference to details on other sheets (ID402, ID510) - risk if those sheets are not available/consistent.HOLDChain hold
└Scope 179ID123 [Interior] | CHAIN HOLD - Coordination requirement: "G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT." (risk if not coordinated) | Coordination requirement: "G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR." (risk if not coordinated) | Purchasing risk: "PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING." (risk of procurement errors if not verified) | Potential fit risk: "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK."HOLDChain hold
└Scope 180ID124 [Interior] | CHAIN HOLD - Sheet notes indicate coordination requirements that, if not met, could result in conflicts: 'G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT.' | Purchasing agent is 'WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING' (risk if not performed). | Notes emphasize field verification of all measurements: '*ALL MEASUREMENTS ARE TO BE FIELD VERIFIED.*' (risk of discrepancies if not verified). | GC to confirm equipment sizes provided by Owner for fit within casegoods/millwork (a coordination risk if sizes are not confirmed).HOLDChain hold
└Scope 181ID125 [Interior] | CHAIN HOLD - Multiple notes require coordination between G.C., AOR, OWNER, PURCHASING AGENT and DAI designers (e.g., electrical/fire/safety elements at elevator lobby walls), indicating potential coordination risk if not executed as noted (Note 8, Note 15). | Equipment provided by Owner requires G.C. verification of sizes to fit within millwork (Note 7) - coordination risk if sizes are not confirmed in writing. | Purchasing Agent is stated as 'WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING' (Note 16) - potential procurement/fit risk if site verification is not completed.HOLDChain hold
└Scope 182ID131 [Interior] | CHAIN HOLD - Multiple coordination items requiring verification by G.C., AOR and Purchasing Agent (e.g., blocking, equipment sizes, electrical/fire/safety elements) introduce risk if not coordinated. | Notes repeatedly require 'VERIFY SPECIFICATIONS IN WRITING FROM OWNER' and 'G.C. TO CONFIRM SIZES' - risk of mismatch between owner-supplied equipment and constructed millwork/casegoods if not confirmed. | References to AOR for mounting heights and lighting locations imply reliance on another discipline's drawings (potential for conflicts if not reconciled). | Some fields on the sheet header are blank (e.g., 'DRAWN BY', 'ISSUE', 'PROJECT #') which may impede traceability.HOLDChain hold
└Scope 183ID132 [Interior] | CHAIN HOLD - 8. DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | 15. REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C. | 16. DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | 18. G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 184ID133 [Interior] | CHAIN HOLD - THIS DRAWING IS FOR INTERIOR DESIGN PURPOSES ONLY. ALL MEASUREMENTS ARE TO BE FIELD VERIFIED. | G.C. / PURCHASING AGENT responsible for site verification of wall-to-wall FF&E prior to purchasing (note 16). | Coordination required: electrical/fire/safety and build-outs at elevator lobby walls with DAI designers to avoid interference with design intent (note 8). | G.C. to coordinate all electrical requirements at millwork with AOR (note 18). | Potential ambiguity: multiple "HEIGHT: FINISH: VARIES" and repeated typical notes (e.g., PG-407 TYP.) indicate field verification/coordination required.HOLDChain hold
└Scope 185ID200 [Interior] | CHAIN HOLD - Note 8: 'DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT.' | Note 7: 'EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.' | Note 2: 'TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.' | Note 18: 'G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.' | Potential coordination items implicit in notes: owner-provided equipment, signage blocking, electrical/fire/safety penetrations, and millwork/equipment fit require verification and coordination (as stated in notes).HOLDChain hold
└Scope 186ID400 [Interior] | CHAIN HOLD - G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | ALL MEASUREMENTS ARE TO BE FIELD VERIFIED (risk if not verified). | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK (risk if sizes not confirmed).HOLDChain hold
└Scope 187ID400.1 [Interior] | CHAIN HOLD - Multiple coordination items require verification: 'VERIFY SPECIFICATIONS IN WRITING FROM OWNER.' | G.C. responsibilities repeatedly noted (blocking, plumbing fixtures, millwork, electrical coordination) indicating potential coordination risk if not executed. | Purchasing agent is 'WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING.' (potential single-point risk for FF&E verification). | Note 8: G.C. to coordinate electrical/fire/safety elements with DAI designers to ensure no interference with design intent - indicates potential conflict if not coordinated.HOLDChain hold
└Scope 188ID401 [Interior] | CHAIN HOLD - G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. (coordination risk noted on sheet) | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. (potential fit/conflict risk) | PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. (risk of incorrect purchasing if not verified) | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR. (coordination requirement)HOLDChain hold
└Scope 189ID402 [Interior] | CHAIN HOLD - "G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT." | "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK." (risk of fit conflict) | "PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING." (risk allocation / verification requirement) | Sheet repeatedly states measurements must be field verified (potential risk if not verified). | Coordination required with AOR for accessory locations & specs (possible coordination conflicts)HOLDChain hold
└Scope 190ID403 [Interior] | CHAIN HOLD - Multiple notes require coordination between G.C., AOR, PURCHASING AGENT and DAI DESIGNERS (e.g. electrical/fire/safety elements and millwork coordination) - indicates potential coordination risk if not executed. | Note that many items are 'per the owner' or 'per the purchasing agent' (TVs, fixtures, fitness equipment) and require verification by G.C.; risk exists if owner/purchasing agent specs are not provided in writing. | Repeated instruction that all measurements are to be field verified implies risk if site verification is not completed prior to fabrication/installation.HOLDChain hold
└Scope 191ID404 [Interior] | CHAIN HOLD - G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT. | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK. | PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING. | ALL MEASUREMENTS ARE TO BE FIELD VERIFIED. | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 192ID420 [Interior] | CHAIN HOLD - Notes indicate conditions requiring contact with DAI: "12'-6" MIN. IF NARROWER CONTACT DAI" and "MIN.; IF SHORTER CONTACT DAI", which imply potential scope changes if field conditions differ. | Multiple notes specify blocking required and equipment provided by owner; if owner equipment differs from interior design specification manual, confirmation is required (note D). | The drawing states "ITEMS NOT LISTED ARE THE SAME AS SHOWN ON THE LEFT HAND ROOM" which could cause ambiguity if rooms differ and are not separately documented.HOLDChain hold
└Scope 193ID422 [Interior] | CHAIN HOLD - ALL MEASUREMENTS ARE TO BE FIELD VERIFIED. | IF NARROWER CONTACT DAI (note on plan: "12'-6" MIN. IF NARROWER CONTACT DAI") | IF SHORTER CONTACT DAI (note: "' MIN.; IF SHORTER CONTACT DAI") | VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT. | ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING | L. INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION. (coordination caution) | MOTORIZED SHADE CONTROLS: NOTE: "OUTLET BEHIND CORNICE FOR MOTORIZED SHADE (MUST BE CONCEALED)" (coordination/installation constraint)HOLDChain hold
└Scope 194ID423 [Interior] | CHAIN HOLD - Drawing is for interior design purposes only and measurements must be field verified (potential risk if used for construction without verification). | Multiple notes require verification or confirmation by Purchasing Agent (e.g., note D and J) which could delay procurement or result in wrong items if not confirmed. | Owner-provided equipment (TV, other equipment) may differ from interior design specification; note D requires confirmation that selected equipment will fit within casegoods. | Some outlets are required to be placed to avoid same cavity within partition (note L) - coordination risk between trades if not followed. | Specific ADA condition: low wall to be 34 1/2" to top of stone cap to allow room for ADA grab bar above (note H) - requires verification to meet accessibility code.HOLDChain hold
└Scope 195ID424 [Interior] | CHAIN HOLD - Equipment provided by owner; note requires confirmation if equipment differs from interior design specification manual to ensure fit within casegoods (potential mismatch risk). | Notes instruct field verification of all measurements ('ALL MEASUREMENTS ARE TO BE FIELD VERIFIED') indicating potential discrepancies between drawing and field conditions. | Several dimensional notes: '25'-8" MIN.; IF SHORTER CONTACT DAI', '12'-6" MIN. IF NARROWER CONTACT DAI', '14'-11 1/4" MIN.; IF SHORTER CONTACT DAI' indicate critical dimensional constraints and need to consult DAI if dimensions differ. | Outlet location note L indicates outlets should avoid occurring in same cavity within partition-coordination required to avoid conflict. | Motorized shade outlet must be concealed behind cornice per detail 1/ID520 - coordination required between millwork and electrical trades.HOLDChain hold
└Scope 196ID430 [Interior] | CHAIN HOLD - CEILING HEIGHT callout indicates a difference for first floor guestrooms: "CEILING HEIGHT AT THE FIRST FLOOR GUESTROOMS IS 11'-4\"" and "**USE (X-407-AC) ON FIRST FLOOR IN LIEU OF (X-407)**" - this is a conditional change that must be coordinated for first-floor rooms. | Multiple conditional dimension notes: "12'-6\" MIN. IF NARROWER CONTACT DAI", "IF SHORTER CONTACT DAI" - dimensions depend on field conditions and require confirmation. | Notes indicate Owner-supplied equipment and requirement to confirm fit within casegoods (Note D) and purchasing agent confirmation for left/right versions (Note J) - potential procurement/fit risk if not coordinated.HOLDChain hold
└Scope 197ID431 [Interior] | CHAIN HOLD - Note D warns equipment provided by owner may differ from interior design specification manual and requires confirmation that selected equipment will fit within casegoods - potential coordination risk. | Dimension constraints: '12'-6" MIN. IF NARROWER CONTACT DAI' and '19'-4" MIN.; IF SHORTER CONTACT DAI' indicate minimum dimensional requirements that may trigger design changes if not met. | Multiple references to providing blocking and concealed outlets require coordination with trades (electrical, millwork, furniture vendor) to ensure installations do not conflict. | Instruction 'OUTLET BEHIND CORNICE FOR MOTORIZED SHADE (MUST BE CONCEALED)' creates installation coordination requirement and risk if cornice detail (1/ID520) is not followed.HOLDChain hold
└Scope 198ID432 [Interior] | CHAIN HOLD - Multiple notes require field verification of dimensions: 'ALL MEASUREMENTS ARE TO BE FIELD VERIFIED.' | Notes indicating possible dimensional conflicts and requirement to contact DAI: examples include 'MIN.; IF SHORTER CONTACT DAI' and '12'-6" MIN. IF NARROWER CONTACT DAI' (text appears truncated in places) | Items require coordination with Purchasing Agent (potential procurement risk): 'ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING' | Potential coordination required for owner-supplied equipment and TV: 'TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.' and 'EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.' | Note N requires coordination/verification of mirror opening height: 'VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.'HOLDChain hold
└Scope 199ID433 [Interior] | CHAIN HOLD - NOTE D: 'EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.' (risk of mismatch) | NOTE J: 'ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING' (procurement risk if not confirmed) | DIMENSION NOTE: '16'-23 4" MIN.; IF SHORTER CONTACT DAI 12'-6" MIN. IF NARROWER CONTACT DAI' (indicates potential nonconformance and requirement to contact DAI) | Multiple device heights and outlet placements require coordination between electrical and millwork/FF&E (implied coordination risk).HOLDChain hold
└Scope 200ID440 [Interior] | CHAIN HOLD - Document states all measurements are to be field verified (indicates risk of relying on sheet dimensions without site verification). | Note D advises owner-provided equipment may differ from interior design specification and requires confirmation that selected equipment will fit within casegoods (coordination risk if not confirmed). | Multiple parties/roles are referenced (owner, purchasing agent, G.C., furniture vendor) but specific responsible parties or contact names (other than checked-by initials) are not provided on this sheet, which may create coordination ambiguity.HOLDChain hold
└Scope 201ID441 [Interior] | CHAIN HOLD - EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS. | PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT. | INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION (coordination risk between trades). | NOTE: 'ARCHITECTURAL LIGHT BY G.C.' implies coordination responsibility between design and general contractor.HOLDChain hold
└Scope 202ID442 [Interior] | CHAIN HOLD - "ALL MEASUREMENTS ARE TO BE FIELD VERIFIED." - implies that built conditions may differ and dimensions on sheet are not guaranteed. | Notes indicating: "IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS." - potential risk of equipment size mismatch. | Multiple instructions to PROVIDE BLOCKING in walls for various items; lack of verified blocking in field could cause installation issues. | Some items noted as 'NOT USED' (P, 8, 16) which may require clarification. | Sheet is for interior design purposes only; not a full construction/permitting drawing set (possible scope/conflict if used as sole construction document).HOLDChain hold
└Scope 203ID500 [Interior] | CHAIN HOLD - The drawing explicitly requires field verification of all measurements ('ALL MEASUREMENTS ARE TO BE FIELD VERIFIED'), indicating risk if dimensions on the sheet are used without site verification. | Final specifications and final sizes of cabinets/drawers/cubbies are to be determined with the owner by the G.C.; lack of final sizes on this sheet could lead to coordination conflicts. | Multiple references to external Marriott detail sheets (e.g., 'SEE MARRIOTT 1/B321', 'SEE MARRIOTT 2/B320', etc.) indicate dependency on those referenced sheets for full detail; missing or inconsistent referenced sheets could create conflicts.HOLDChain hold
└Scope 204ID501 [Interior] | CHAIN HOLD - Sheet instructs: "ALL MEASUREMENTS ARE TO BE FIELD VERIFIED." Potential risk that dimensions on the drawing may not match field conditions. | Safe deposit box: "VERIFY CLEAR DIMENSION REQUIREMENTS WITH EQUIPMENT." Indicates risk/need to coordinate equipment dimensions with cabinet clearances. | Clock outlet / surveillance monitor: "COORD. LOCATION W/ SURVEILLANCE MONITOR & MONITOR MOUNT INSTALLATION." Potential coordination conflict between electrical and AV mounting. | Multiple references to "REFER TO MARRIOTT PROTOTYPE" indicate reliance on prototype documents not included on this sheet; missing prototype detail could cause ambiguity.HOLDChain hold
└Scope 205ID502 [Interior] | CHAIN HOLD - All measurements are to be field verified (sheet note) - potential risk if dimensions are assumed without field verification. | Coordination required with AOR (architect of record) for structural column wrap (sheet references AOR's set). | Requirement to provide outlet on table side per brand standards implies coordination with electrical scope - potential coordination risk. | Multiple notes to provide blocking to secure lounge screen to ceiling/wall/column - implies field coordination to verify framing and blocking availability.HOLDChain hold
└Scope 206ID503 [Interior] | CHAIN HOLD - EQUIPMENT IS PER THE OWNER. G.C. TO VERIFY FINAL SIZES AND SPECIFICATIONS PRIOR TO FABRICATION AND INSTALLATION. | ALL MEASUREMENTS ARE TO BE FIELD VERIFIED. (field verification required) | DIMENSIONS MARKED "V.I.F." indicate field verification required and potential for changes. | NOTE: "VERIFY DEPTH WITH FAUCET REQ'MTS" (possible conflict between bowl opening depth and faucet requirements) | CUT SKIRT TOP TO MATCH BOWL PROFILE W/ CLEARANCE TO REMOVE SKIRT (installation/maintenance clearance consideration)HOLDChain hold
└Scope 207ID504 [Interior] | CHAIN HOLD - TV AND MOUNTING BRACKET ARE PER THE OWNER. G.C. TO VERIFY SPECIFICATION AND BLOCKING REQUIREMENTS PRIOR TO INSTALLATION. (risk if GC does not verify/blocking not provided) | TRASH BIN BY OWNER (coordination risk if owner does not provide bin to match shown details) | All measurements are to be field verified (indicates potential discrepancy risk between drawing and field conditions)HOLDChain hold
└Scope 208ID505 [Interior] | CHAIN HOLD - ALL MEASUREMENTS ARE TO BE FIELD VERIFIED (potential for discrepancies between drawing dimensions and field conditions). | THIS DRAWING IS FOR INTERIOR DESIGN PURPOSES ONLY (may lack construction-level/structural details or approvals).HOLDChain hold
└Scope 209ID506 [Interior] | CHAIN HOLD - Measurements on the drawing must be field verified (sheet note), indicating potential risk if used without verification. | Some typical contract/permit information and signatures are not present on this sheet (e.g., no contractor, no permit stamps), which may conflict with use as a construction-only drawing.HOLDChain hold
└Scope 210ID507 [Interior] | CHAIN HOLD - Multiple notes require field verification: "ALL MEASUREMENTS ARE TO BE FIELD VERIFIED." and "VERIFY CLEAR OPENING DIMENSION IN FIELD." - potential for discrepancy between drawing dimensions and site conditions. | Electrical requirements referenced to sheet 720 (SEE 720 FOR ELECTRICAL REQUIREMENTS.) - if sheet 720 is not available, electrical installation specifics are not present on this sheet. | Reference to Marriott details on 3/B341 for ceiling soffit - potential for coordination issues if 3/B341 is not reviewed.HOLDChain hold
└Scope 211ID508 [Interior] | CHAIN HOLD - Equipment coordination: JUICE MACHINE (BY OTHERS) - indicates equipment provided by others and requires coordination (sheet notes direct to see sheets 411 and 412 for equipment specifics). | Field verification required: ALL MEASUREMENTS ARE TO BE FIELD VERIFIED - potential for on-site dimensional conflicts. | Ventilation constraint: 'VENT INTO FOOD PREP ROOM ONLY.' - requires routing/coordination with food prep room systems as shown. | Optional items: 'PULL CABINET LOCK (OPTIONAL)' - scope/selection ambiguity unless clarified.HOLDChain hold
└Scope 212ID509 [Interior] | CHAIN HOLD - NOTE: ADJUST DETAIL IF REMOTE COMPRESSORS ARE USED. (require coordination/adjustment) | PROVIDE CLEARANCE AROUND EQUIPMENT: 2" PREFERRED; 1" MINIMUM (potential site-fit conflict if not provided) | EQUIPMENT CABINETS TO PROVIDE ADEQUATE VENTALATION THROUGH BACK PANELS AS REQ'D. (coordination risk with equipment manufacturer) | Inconsistent spelling/format of vendor references (TRAVADO / TRADAVO / TRAVADO.COM) which may require clarificationHOLDChain hold
└Scope 213ID510 [Interior] | CHAIN HOLD - Multiple notes require field verification: "ALL MEASUREMENTS ARE TO BE FIELD VERIFIED." | Note to "VERIFY PANEL THICKNESS." (indicates potential for variation or mismatch if not confirmed) | Numerous 'AS REQ'D' and 'AS SCHEDULED' instructions (e.g., 'STEEL FRAMING AS REQ'D', 'BASE AS SCHEDULED') which may lead to scope ambiguity without referenced schedules/specifications. | Drawing references IFI for manufacturer for wood panel system ("SEE ALSO IFI FOR MANUFACTURER") but specific manufacturer/specification not provided on this sheet.HOLDChain hold
└Scope 214ID512 [Interior] | CHAIN HOLD - Installation requires verification of manufacturer requirements and verification of specification with owner and brand (risk if not verified). | Measurements are to be field verified (risk of discrepancy between drawing dimensions and field conditions). | Access panel location/requirements to be coordinated with GC (GC recommendations referenced). | Waste bin is the owner's responsibility (coordination/risk if owner does not supply).HOLDChain hold
└Scope 215ID520 [Interior] | CHAIN HOLD - ALL MEASUREMENTS ARE TO BE FIELD VERIFIED (note on sheet). | Sheet calls for coordination with wall and window construction for mounting of sheer roller shade and track locations (coordination requirement). | CORNICE PROVIDED BY G.C. (possible coordination/ responsibility note between interior design and general contractor). | Coordinate base stop location with furniture; blocking required (coordination risk if not provided).HOLDChain hold
└Scope 216ID600 [Interior] | CHAIN HOLD - Measurements must be field verified - as noted on the sheet ('ALL MEASUREMENTS ARE TO BE FIELD VERIFIED'). Unverified measurements present a verification risk. | Guestroom finish information is not on this sheet and is referenced to other sheets (ID420-ID442); missing guestroom details on this sheet could cause incomplete scope if those sheets are not reviewed.HOLDChain hold
└Scope 217LAUNDRY-PLAN-2026 | Graphic/layout of proposed laundry area for Fairfield Inn (equipment placement and room labeling)HOLDChain hold
└Scope 218LAUNDRY-PLAN-2026 | Title text: Proposed laundry area plan for FAIRFIELD INN 9301 N 29th Street - Tampa FLHOLDChain hold
└Scope 219LAUNDRY-PLAN-2026 | Title/caption repeated at bottom: PROPOSED LAUNDRY AREA PLAN FOR FAIRFIELD INN 9301 N 29TH STREET - TAMPA FL LAUNDRY PRO OF FLORIDA SCALE 3/16 IN = 1 FT 27FEB2026HOLDChain hold
└Scope 220LAUNDRY-PLAN-2026 / A-809 / A-810 | CHAIN NOTE - latest 2026 laundry sketch controls listed equipment counts; reconcile final equipment models, utilities, and permitted-room layout before pricing.HOLDChain hold
└Scope 221M/P/E coordination | CHAIN CONTROL - sleeves, penetrations, firestopping, equipment power, controls, drains, condensate, and access requirements must be reconciled across disciplines before quantities are released.HOLDChain hold
└Scope 222M1.1 [Mechanical] | CHAIN HOLD - Administrative header fields DATE, SHEET NUMBER, and CAD FILE appear blank in the parsed text; lack of explicit signed/dated professional stamp or seal visible in provided text. | Project 'Tampa, FL - Fairfield Inn' appears but no owner, contractor, or permit authority is named on this page. | Multiple similar labels (e.g., 'STANDPIPE' and 'Stand pipe') may indicate OCR variability; plan-level coordination items may be present elsewhere. | Possible ambiguity between revision date formats ('12.05.2025' vs '12.5.25') in the extracted text.HOLDChain hold
└Scope 223M1.2 [Mechanical] | CHAIN HOLD - No owner, contractor, or other project party names are present on the provided sheet beyond the architect; potential ambiguity on responsible parties for construction/permits. | Key administrative fields shown on the sheet (DATE, SHEET NUMBER, CAD FILE) have no extracted values in the provided text. | Only a single sheet image is provided; coordination or conflicts with other disciplines/sheets cannot be assessed from this page alone.HOLDChain hold
└Scope 224M1.3 [Mechanical] | CHAIN HOLD - No owner, contractor, or other project party names are present on the provided sheet - limits ability to attribute responsibility or contracting party. | The document shows a code compliance statement prefaced by "TO THE BEST OF MY KNOWLEDGE," which is a declarative statement but no formal seal, signature, or issuing authority is visible on this sheet. | Key fields in header are empty or not populated in the provided extract: "SHEET NUMBER:" and "CAD FILE:" have no values following them in the header area.HOLDChain hold
└Scope 225M1.6 [Mechanical] | CHAIN HOLD - No contractor, owner, or other project party names are shown on the provided page. | No permit numbers, approval stamps, signatures, or explicit authorization are visible on the provided page. | No explicit mention of Mason Forge appears on the provided page.HOLDChain hold
└Scope 226M2.1 [Mechanical] | CHAIN HOLD - The sheet header fields 'DATE:', 'SHEET NUMBER:', and 'CAD FILE:' are present but blank on the provided copy; missing values may complicate identification/version control. | Only a city/state (Tampa, FL) is given as the project location; a full project address is not provided on this sheet. | No owner, contractor, or engineer parties are identified on this sheet in the provided parsed text.HOLDChain hold
└Scope 227P1.0 [Plumbing] | CHAIN HOLD - DATE: field in header is blank (no explicit document date provided) | SHEET NUMBER and CAD FILE fields in header appear blank/are not filled in on this sheet image | No owner, contractor, or permit number is shown on this cover sheet image | Many table entries are small and not legible at this image resolution, so critical fixture counts, sizes, and connection details are not verifiable from this image aloneHOLDChain hold
└Scope 228P1.2 [Plumbing] | CHAIN HOLD - Sheet header fields 'SHEET NUMBER:' and 'CAD FILE:' are present but have no values shown on this page (potential missing metadata). | Date strings appear in two formats on the sheet: 'REVISIONS: 12.05.2025' and 'DATE: 12.5.25' (possible ambiguity in date formatting). | Owner, contractor, and other project team parties are not identified on this sheet (lack of contact/contractor info may impede coordination).HOLDChain hold
└Scope 229P1.3 [Plumbing] | CHAIN HOLD - The sheet does not identify a contractor or construction party (no mention of Mason Forge on this sheet). | No permit numbers or authority having jurisdiction approvals are shown on this sheet.HOLDChain hold
└Scope 230P1.5 [Plumbing] | CHAIN HOLD - No permit numbers, approval stamps, or signatures are visible in the parsed text. | No design consultants or engineers (mechanical/plumbing/structural) are explicitly identified in the parsed text, which may complicate responsibility tracing. | The sheet references enlarged guestroom piping to another sheet (P3.1); isolated use of this single sheet without P3.1 could omit critical piping details.HOLDChain hold
└Scope 231P1.6 [Plumbing] | CHAIN HOLD - This sheet does not identify the owner, general contractor, subcontractors or permit numbers. | No mention of Mason Forge is present on the provided sheet. | Sheet-level information only; cannot confirm coordination with other disciplines or full permit status from this page alone.HOLDChain hold
└Scope 232P2.1 [Plumbing] | CHAIN HOLD - No owner, contractor, or permit/authority having jurisdiction is identified on the visible portion of the sheet. | Sheet shows a general compliance statement but does not display specific permit numbers, approvals, or signatures on the visible area. | Graphic plan content is dense; some annotation/labels in the plan image are too small to read clearly which may hide further scope, notes, or constraints.HOLDChain hold
└Scope 233P3.1 [Plumbing] | CHAIN HOLD - Document displays a certification of code compliance but does not show a visible signature, stamp, or approving authority on the provided image. | Key project parties (owner, contractor) are not identified on the visible sheet.HOLDChain hold
└Scope 234P5.1 [Plumbing] | CHAIN HOLD - Electrical continuation to GFIC and to alarm panel is referenced to electrical drawings ("REFER TO ELECTRICAL DRAWINGS FOR CONTINUATION TO GFIC. REFER TO ELECTRICAL DRAWINGS FOR CONT. TO ALARM PANEL."), indicating coordination required between plumbing and electrical disciplines. | Manufacturer installation instructions required ("FOLLOW MANUFACTURERS INSTALLATION IINSTRUCTIONS"), so deviation could create non-compliance if not followed. | Document text contains typographical errors (e.g., "SYTEM", "IINSTRUCTIONS", "OFSCREEN") which could introduce ambiguity in interpretation.HOLDChain hold
└Scope 235P5.2 [Plumbing] | CHAIN HOLD - Sheet header fields for DATE:, SHEET NUMBER:, CAD FILE: appear blank in the provided image/text. | No owner, contractor, permit numbers or signature blocks are visible on this sheet.HOLDChain hold
└Scope 236S003 [Structural] | CHAIN HOLD - Conflict-of-interest requirement: inspection/testing agent must be engaged by Owner or Owner's Agent; must disclose any conflicts to the Building Official (per Notes). | Special inspections may be waived for approved fabricators per IBC 1704.2.5.2 - possible ambiguity on whether fabricator approvals apply to this project (not stated). | Agent list entries are blank on the sheet (INSPECTION AGENTS FIRM ADDRESS TELEPHONE NO. 1. 3. 4.), which could indicate missing assignment of inspectors/agents.HOLDChain hold
└Scope 237S202 [Structural] | CHAIN HOLD - Document contains the word 'FORTH' (spelled F-O-R-T-H) instead of the more common 'FOURTH' in the sheet title - this typographical discrepancy could cause minor confusion in references or indexing. | No contractor, subcontractor, or Mason Forge reference is present on the sheet; absence of contracting information could complicate attribution or responsibility if this sheet is used as sole evidence.HOLDChain hold
Section-01-010Product Delivery / Storage / HandlingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-01-011Execution / Cutting / PatchingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-01-012Cleaning / Waste ManagementReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-01-013Closeout ProceduresReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-01-014O&M Manuals / Record DocsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-01-015Demonstration / TrainingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 02Existing Conditions10
Section-02-001Existing Conditions AssessmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-02-002Surveys / DocumentationChain hold
└Scope 01C-1A [Civil] | Depiction of parcel boundary lines with bearings and distancesHOLDChain hold
└Scope 02C-1A [Civil] | Numerical annotations and dimensions along property linesHOLDChain hold
└Scope 03C-1A [Civil] | Multiple boundary bearings and distances shown (examples visible on plan): "S89'43'31"E 139.63", "S89'43'31"E 136.28", "N89'43'31"W 139.62"HOLDChain hold
└Scope 04C-1A [Civil] | North arrow/survey orientation symbol visible (top-left area of plan)HOLDChain hold
└Scope 05C-4 [Civil] | SILT FENCE ALONG PROPERTY LINE (SEE DETAIL, SHEET No. 5)HOLDChain hold
└Scope 06C-10 [Civil] | Existing condition tie-ins: match existing grade at property line, existing retaining wall, existing retention pondHOLDChain hold
└Scope 07ENERGY-1 [Energy-Calculations] | Drawings set includes: COVER; BOUNDARY AND TOPOGRAPHIC SURVEY; DEVELOPMENT INFORMATION; DEMOLITION AND SWPPP PLAN; SWPPP DETAILS AND NOTES; SITE LAYOUT PLAN; DRAINAGE PLAN; STORMTECH DETAILS; GRADING PLAN; CROSS SECTIONS; UTILITY PLAN; GREASE TRAP DETAILS; LIFT STATION PLAN; UTILITY DETAILS AND NOTES; MISCELLANEOUS DETAILS AND NOTES; CITY OF TAMPA STANDARD DETAILS; MAINTENANCE OF TRAFFIC DETAILS; LANDSCAPE PLAN; IRRIGATION PLAN; LANDSCAPE AND IRRIGATION DETAILSHOLDChain hold
Section-02-003Selective DemolitionChain hold
└Scope 01C-4 [Civil] | DEMOLITION AND SWPPP PLANHOLDChain hold
Section-02-004Site DemolitionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-02-005Structure DemolitionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-02-006Hazardous Material TestingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-02-007Hazardous Material AbatementReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-02-008Asbestos / Lead / Mold RemediationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-02-009Facility RemediationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-02-010Existing Utility Locate / ProtectionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 03Concrete14
Section-03-001Concrete Submittals / Mix DesignsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-03-002Concrete FormingChain hold
└Scope 01C-12 [Civil] | Provide as-built drawings (hard copy and PDF) conforming to City of Tampa Water Department Water Pipe Network As Built Requirements ManualHOLDChain hold
└Scope 02S003 [Structural] | Inspection of formwork for shape, lines, location and dimensions Field inspection Y PeriodicHOLDChain hold
Section-03-003Concrete Reinforcing / RebarChain hold
└Scope 01C-16 [Civil] | Provide/construct dumpster enclosure with 8" CMU walls, 6" monolithic slab, concrete-filled CMU cells with rebar and grout per detailsHOLDChain hold
└Scope 02C-16 [Civil] | Provide vertical/horizontal reinforcement, control and expansion joints per specified intervalsHOLDChain hold
└Scope 03C-16 [Civil] | Conform masonry and concrete materials and mixes to ASTM C90, ASTM C270, ASTM C476, ACI practices, and A615-85 Grade 60 rebarHOLDChain hold
└Scope 04S003 [Structural] | Verify grade, type, and size of reinforcement and anchor bolts, and prestressing tendons and anchorages Field Inspection Y PeriodicHOLDChain hold
└Scope 05S003 [Structural] | 1705.3 Concrete Construction: Inspection of reinforcing steel installation Shop (3) and field inspection Y PeriodicHOLDChain hold
Section-03-004Embeds / Anchor Bolts / AccessoriesChain hold
└Scope 01C-8 [Civil] | Installation notes and requirements for stone embedment, foundation, and overfillHOLDChain hold
└Scope 02S003 [Structural] | 1705.2 Steel Construction: Embedments Field inspection Y PeriodicHOLDChain hold
Section-03-005Vapor Retarder / Slab PrepReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-03-006Cast-In-Place ConcreteChain hold
└Scope 01A-116 | Provision of 6'x8' concrete platform 6" high with 1:12 ramp (location shown on plan).HOLDChain hold
└Scope 02A-116 | 6'x8' CONCRETE PLATFORM 6" HIGH 1:12 RAMPHOLDChain hold
└Scope 03A-116 | One 6-ft x 8-ft concrete roof platform, 6 inches high, with 1:12 ramp.EAChain hold
└Scope 04A-117 | Concrete platform (6'x6') and 1:12 ramp on roofHOLDChain hold
└Scope 05A-117 | Noted dimensions on sheet: '6'x6' CONCRETE PLATFORM', '1:12 RAMP', '31'-6" PAINTED WOOD ROOF SHADE CANOPY.', '31'-3 3/8"', '18'-0 5/8"', '42'-0"'HOLDChain hold
└Scope 06A-117 | One 6-ft x 6-ft concrete roof platform with 1:12 ramp.EAChain hold
└Scope 07A-313 | CONCRETE WALL FILLED WITH FOAM INSULATIONHOLDChain hold
└Scope 08A-314 | Concrete wall filled with foam insulation; bond beams per structural engineer.HOLDChain hold
└Scope 09A-314 | CONCRETE WALL FILLED WITH FOAM INSULATIONHOLDChain hold
└Scope 10A-492 | Noted: TOP OF CONCRETE PLATFORMHOLDChain hold
└Scope 11A-570 | Exterior walk-off mat to concrete sidewalk detailHOLDChain hold
└Scope 12A-572A | Reinforced bearing wall footing (detail shown)HOLDChain hold
└Scope 13C-3 [Civil] | Provide concrete sidewalks, curb, gutter, paving, landscape areas, and required testing and compaction per notes and referenced standards.HOLDChain hold
└Scope 14C-4 [Civil] | Concrete sidewalk removal (984 SF total)HOLDChain hold
└Scope 15C-6 [Civil] | Sidewalks and curb type installations (TYPE 'D' and TYPE 'F' curbs, curb ramps per FACBC, 5' wide concrete sidewalk references)HOLDChain hold
└Scope 16C-6 [Civil] | PAVING: 6" CONCRETE (4,000 P.S.I. @ 28 DAYS)HOLDChain hold
└Scope 17C-6 [Civil] | CONCRETE PAVEMENT: 4" THICK CONCRETE (3,000 P.S.I. @ 28 DAYS), CLASS IHOLDChain hold
└Scope 18C-6 [Civil] | Crushed concrete base examples: 6" CRUSHED CONCRETE (LBR=130) and 8" CRUSHED CONCRETE (LBR=130) (as shown)HOLDChain hold
└Scope 19C-6 [Civil] | * ALTERNATE 12" STABILIZED SUBBASE: 6" CRUSHED CONCRETE (LBR=130) MIN OF 98% MODIFIED PROCTOR MAX DENSITY PER AASHTO T-180 (4" MAX LIFTS) (text exact)HOLDChain hold
└Scope 20C-7 [Civil] | Construction of control structure CS-01 including 3' wide concrete weir and aluminum skimmerHOLDChain hold
└Scope 21C-10 [Civil] | Details for foundation planters and thickened-edge sidewalksHOLDChain hold
└Scope 22C-10 [Civil] | 4.3' FOUNDATION PLANTERHOLDChain hold
└Scope 23C-10 [Civil] | 4' FOUNDATION PLANTERHOLDChain hold
└Scope 24C-10 [Civil] | 8.2' FOUNDATION PLANTERHOLDChain hold
└Scope 25C-12.1 [Civil] | Below Grade Installation Slab RequirementsHOLDChain hold
└Scope 26C-14 [Civil] | Installation of fire hydrants and FDC (free-standing) and related concrete shear pad and anchorage detailsHOLDChain hold
└Scope 27C-15 [Civil] | Provide isolation joint where concrete pavement abuts a rigid structureHOLDChain hold
└Scope 28C-15 [Civil] | Concrete walks: 4" thick, 3,000 PSI; 8" thick across drivewaysHOLDChain hold
└Scope 29C-15 [Civil] | Curbs: 28 day, 3000 P.S.I. concreteHOLDChain hold
└Scope 30C-15 [Civil] | TS = SLAB THICKNESS (SEE PLAN)HOLDChain hold
└Scope 31C-15 [Civil] | CONCRETE WALKS SHALL BE 4 INCHES THICK HAVING A 3,000 PSI STRENGTH, POURED OVER PROPERLY PREPARED SUBGRADE.HOLDChain hold
└Scope 32C-15 [Civil] | ALL CONCRETE SIDEWALKS SHALL BE 8 INCHES THICK ACROSS DRIVEWAYS.HOLDChain hold
└Scope 33C-16 [Civil] | Install 8" diameter schedule 40 steel bollards filled with concrete and painted traffic yellow at indicated locationsHOLDChain hold
└Scope 34C-16 [Civil] | BOLLARD DETAIL: 8" DIAMETER SCHEDULE 40 (0.258" WALL THICKNESS) FILLED WITH CONCRETE AND PAINTED TRAFFIC YELLOWHOLDChain hold
└Scope 35C-21 [Civil] | 27. REMOVAL OF ALL CONSTRUCTION DEBRIS, LIMEROCK, EXCESS OF BUILDERS SAND, CONCRETE AND MORTAR DEBRIS, EXISTING WEEDS AND GRASS, AND ALL FOREIGN MATERIALS IN THE PLANTING BED AND SOD AREAS SHALL BE REMOVED AND A MINIMUM OF 3' OF CLEAN SAND WITH A pH 5.5-6.5 SHALL BE INSTALLED PRIOR TO ANY INSTALLATION OF PLANTS OR TREES.HOLDChain hold
└Scope 36S003 [Structural] | Fresh concrete sampling, perform slump and air content tests and determine temperature of concrete Shop (3) and field inspection Y ContinuousHOLDChain hold
└Scope 37S003 [Structural] | Concrete strength testing and verification of compliance with construction documents Field testing and review of laboratory reports Y PeriodicHOLDChain hold
└Scope 38S003 [Structural] | 1705.6 Soils: Verify materials below shallow foundations are adequate to achieve the design bearing capacity. Field inspection Y PeriodicHOLDChain hold
└Scope 39S003 [Structural] | 1705.6 Soils 1. Verify materials below shallow foundations are adequate to achieve the design bearing capacity. Field inspection Y PeriodicHOLDChain hold
└Scope 40S101 [Structural] | FOUNDATION PLAN (sheet S101)HOLDChain hold
└Scope 41S101 [Structural] | S101 FOUNDATION PLANHOLDChain hold
└Scope 42S301 [Structural] | FOUNDATION SECTIONS (sheet S301)HOLDChain hold
└Scope 43S301 [Structural] | S301 FOUNDATION SECTIONSHOLDChain hold
└Scope 44S302 [Structural] | Foundation sections (as indicated by title 'FOUNDATION SECTIONS' on sheet S302)HOLDChain hold
└Scope 45S302 [Structural] | S302 FOUNDATION SECTIONSHOLDChain hold
└Scope 46S303 [Structural] | Foundation sections (sheet S303) - indicated by sheet title; detailed section drawings not legible in provided imageHOLDChain hold
└Scope 47S303 [Structural] | Document title: S303 FOUNDATION SECTIONSHOLDChain hold
Section-03-007Concrete PlacementReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-03-008Concrete FinishingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-03-009Curing / ProtectionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-03-010Concrete Joints / SawcuttingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-03-011Testing / Field Quality ControlReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-03-012Precast ConcreteChain hold
└Scope 01A-005 Detail 5 | Upper-level floor assembly: precast 8-inch concrete slab with 1-inch gypcrete; UL J-994, 2 HR, STC 62. Area/location link pending.SFChain hold
└Scope 02A-116 | Roof construction: 1- Glue R40 rigid insulation to bottom of roof slab. 2- Suspend gwb ceiling to bottom of insulation. 3- Install 2" structural concrete topping on precast slab. 2" minimum slope to drain 1/4" per foot. 4- waterproof top of topping with liquid W.P. 5- SET TILE ON TOP OF MORTAR OVER w.p.HOLDChain hold
└Scope 03A-203 | CMU knee wall with precast bench top (see guestroom plans for typical window locations)HOLDChain hold
└Scope 04A-203 | CMU KNEE WALL WITH PRECAST BENCH TOP SEE GUESTROOM PLANS FOR TYP. WINDOW LOCATIONSHOLDChain hold
└Scope 05A-550 | Construct hollow core roof deck with sloped poured concrete (2" min.) and thinset tile (12"x12") waterproofing.HOLDChain hold
└Scope 06A-550 | HOLLOW CORE ROOF DECKHOLDChain hold
└Scope 07A-572A | Porte cochere precast bench detailHOLDChain hold
└Scope 08A-572A | Visible detail titles: "COLUMN ENCLOSURE @ PORTE COCHERE", "REINFORCED BEARING WALL FOOTING", "PORTE COCHERE PRECAST BENCH DETAIL", "BEAM CONNECTION @ STONE ENTRY WALL", "LIGHT COVE @ STOREFRONT", "BEAM CONNECTION & LIGHT COVE", "CONNECTION @ BEARING WALL & FASCIA", "BEAM CONNECTION AT BEARING WALL", "PORTE COCHERE COLUMN DETAIL & ENTRY", "PORTE COCHERE COLUMN DETAIL"HOLDChain hold
└Scope 09C-7 [Civil] | Precast drainage structures per FDOT specifications (various diameters shown: 4' dia, 5' dia, etc.)HOLDChain hold
Section-03-013GroutingChain hold
└Scope 01S003 [Structural] | Verification of proportions of materials in premixed or preblended mortar, prestressing grout, and grout other than self-consolidating grout, as delivered to the project site Field inspection Y ContinuousHOLDChain hold
└Scope 02S003 [Structural] | (D) Levels B and C Quality Assurance: Verification of Slump Flow and Visual Stability Index (VSI) of self-consolidating grout as delivered to the project Field testing Y ContinuousHOLDChain hold
└Scope 03S003 [Structural] | Verify proportions of site-mixed mortar, grout and prestressing grout for bonded tendons Field Inspection Y PeriodicHOLDChain hold
└Scope 04S003 [Structural] | Verify placement of grout and prestressing grout for bonded tendons Field Inspection Y ContinuousHOLDChain hold
└Scope 05S003 [Structural] | (D) Levels B and C Quality Assurance: 1. Verification of Slump Flow and Visual Stability Index (VSI) of self-consolidating grout as delivered to the project Field testing Y ContinuousHOLDChain hold
Section-03-014Concrete Cutting / Core DrillingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 04Masonry14
Section-04-001Masonry Submittals / SamplesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-002Mortar / GroutChain hold
└Scope 01S003 [Structural] | Verify construction of mortar joints Field Inspection Y PeriodicHOLDChain hold
Section-04-003Masonry Reinforcing / AnchorsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-004Masonry AccessoriesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-005CMU / Concrete Unit MasonryChain hold
└Scope 01A-005 Detail 1 | Exterior wall: 8-inch CMU wall; refer structural drawings. Location and area link pending.SFChain hold
└Scope 02A-005 Detail 2 | Corridor wall: 8-inch CMU wall with 1-1/2-inch furring channel and 5/8-inch gypsum board; UL U-905, 2 HR, STC 62. Location and area link pending.SFChain hold
└Scope 03A-201 | Cultured stone indicated (ST1)HOLDChain hold
└Scope 04A-312 | Specify exterior finish systems: EIFS (drainable), phenolic resin panels or cement board siding on rainscreen, cultured stone veneer over CMUHOLDChain hold
└Scope 05A-312 | Exterior finish systems as scheduled: "EIFS SYSTEM (ALL EIFS TO BE DRAINABLE)", "PHENOLIC RESIN PANELS OR CEMENT BOARD SIDING ON RAINSCREEN SYSTEM", "CULTURED STONE VENEER OVER CMU", "EDPM ROOFING" (exact phrasing preserved)HOLDChain hold
└Scope 06A-313 | Provide cultured stone veneer over CMU where indicatedHOLDChain hold
└Scope 07A-314 | Provide cultured stone veneer over CMU.HOLDChain hold
└Scope 08A-314 | EXT. FINISH ABOVE 40'-0" TO BE HARD STUCCO ON 1/2" EXT PLYWD ON 2X4 FRAMING ON CMU (TYP) ALL WOOD TO BE FR.HOLDChain hold
└Scope 09A-490 | CMU wall anchor requirement to support 250 LB lateral loadHOLDChain hold
└Scope 10A-490 | Handrail detail: '8" CMU WALL ANCHOR TO SUPPORT 250 LB LAT LOAD'HOLDChain hold
└Scope 11A-550 | Install hard stucco above 40'-0" on 12" exterior plywood on 2x4 framing on CMU (typ).HOLDChain hold
└Scope 12A-550 | EXT. FINISH ABOVE 40'-0" TO BE HARD STUCCO ON 12" EXT PLYWD ON 2X4 FRAMING ON CMU (TYP) ALL WOOD TO BE FR.HOLDChain hold
└Scope 13S003 [Structural] | Verify placement of masonry units Field Inspection Y PeriodicHOLDChain hold
└Scope 14S003 [Structural] | Verify size and location of structural masonry elements Field Inspection Y PeriodicHOLDChain hold
Section-04-006Brick / Clay Unit MasonryReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-007Masonry VeneerReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-008Flashing / Weeps / DrainageReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-009Lintels / Bond BeamsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-010Control / Expansion JointsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-011Stone AssembliesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-012Cast Stone / Manufactured StoneReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-013Masonry Cleaning / ProtectionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-04-014Masonry Restoration / RepairReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 05Metals10
Section-05-001Structural SteelChain hold
└Scope 01A-572A | Beam connection at stone entry wall (detail shown)HOLDChain hold
└Scope 02A-572A | Beam connection and light cove detailsHOLDChain hold
└Scope 03A-572A | Beam connection at bearing wallHOLDChain hold
└Scope 04ID502 [Interior] | Panel secure to floor with steel framingHOLDChain hold
└Scope 05ID502 [Interior] | Annotation: PANEL SECURE TO FLOOR WITH STEEL FRAMINGHOLDChain hold
└Scope 06ID505 [Interior] | PROVIDE STEEL FRAMING AS REQ'D: (3) POSTS AT EACH END SUPPORTING STEEL MEMBERS RUNNING END TO END SUPPORTING TOP.HOLDChain hold
└Scope 07ID505 [Interior] | PROVIDE STEEL FRAMING AS REQ'D: (3) POSTS AT EACH END SUPPORTING STEEL MEMBERS RUNNING END TO END SUPPORTING TOP. RETURN STONE DOWN FACE AT OUTSIDE END OF TABLE. HARDWOOD VENEER PLANKS ON PLYWOOD PANELING ON INSIDE FACE. HARDWOOD SILL PIECE AT BASE, TYP.HOLDChain hold
└Scope 08ID505 [Interior] | 306 STEEL FRAMING AS REQ'DHOLDChain hold
└Scope 09ID510 [Interior] | STEEL FRAMING AS REQUIRED TO SUPPORT STEEL PLATES AT HEARTH AND ALSO HEARTH CANTILEVERHOLDChain hold
└Scope 10S001 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 11S001 [Structural] | GENERAL NOTESHOLDChain hold
└Scope 12S002 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 13S002 [Structural] | S002 GENERAL NOTESHOLDChain hold
└Scope 14S003 [Structural] | (C) Level C Quality Assurance: Verification of f'm and f'AAC prior to construction and for every 5,000 SF during construction Testing by unit strength method or prism test method Y PeriodicHOLDChain hold
└Scope 15S003 [Structural] | Verify use of approved design mix Shop (3) and field inspection Y PeriodicHOLDChain hold
└Scope 16S003 [Structural] | MStruct Engineering, PLLC Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 17S003 [Structural] | (C) Level C Quality Assurance: 1. Verification of f'm and f'AAC prior to construction and for every 5,000 SF during construction Testing by unit strength method or prism test method Y PeriodicHOLDChain hold
└Scope 18S101 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 19S201 [Structural] | Second floor framing plan (as indicated by sheet title 'SECOND FLOOR FRAMING PLAN' and sheet number S201).HOLDChain hold
└Scope 20S201 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 21S201 [Structural] | S201 SECOND FLOOR FRAMING PLANHOLDChain hold
└Scope 22S202 [Structural] | Third, Forth, and Fifth floor framing plan (structural framing layout)HOLDChain hold
└Scope 23S202 [Structural] | THIRD, FORTH, AND FIFTH FLOOR FRAMING PLANHOLDChain hold
└Scope 24S202 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 25S203 [Structural] | Roof framing plan (as depicted on sheet S203)HOLDChain hold
└Scope 26S203 [Structural] | Structural Design (as stated in company header)HOLDChain hold
└Scope 27S203 [Structural] | Inspection (as stated in company header)HOLDChain hold
└Scope 28S203 [Structural] | Testing (as stated in company header)HOLDChain hold
└Scope 29S203 [Structural] | S203 ROOF FRAMING PLANHOLDChain hold
└Scope 30S203 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 31S301 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 32S302 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 33S401 [Structural] | FRAMING SECTIONSHOLDChain hold
└Scope 34S401 [Structural] | Structural DesignHOLDChain hold
└Scope 35S401 [Structural] | InspectionHOLDChain hold
└Scope 36S401 [Structural] | TestingHOLDChain hold
└Scope 37S401 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 38S402 [Structural] | Framing sections (sheet title: 'FRAMING SECTIONS' - sheet number S402). Note: detailed framing section content is not legible in the provided image.HOLDChain hold
└Scope 39S402 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 40S403 [Structural] | FRAMING SECTIONSHOLDChain hold
└Scope 41S403 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 42S404 [Structural] | Framing sections (sheet S404)HOLDChain hold
└Scope 43S404 [Structural] | Structural Design ● Inspection ● TestingHOLDChain hold
└Scope 44S405 [Structural] | Framing sections (sheet title indicates content is framing sections)HOLDChain hold
└Scope 45S405 [Structural] | Header text: Structural Design ● Inspection ● TestingHOLDChain hold
Section-05-002Steel JoistsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-05-003Metal DeckingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-05-004Cold-Formed Metal FramingChain hold
└Scope 01A-005 Detail 3 | Interior shaft framing: steel J-track and C-H shaped studs at 24 inches O.C.; sizes per structural drawings and plans. Link pending.LFChain hold
└Scope 02A-005 Detail 4 | Nonrated interior partition framing: 4-inch metal studs at 16 inches O.C. Location and length link pending.LFChain hold
└Scope 03A-005 Details 6-7 | Load-bearing interior/exterior stud framing: 8-inch metal studs at 16 inches O.C.; refer structural drawings. Link pending.LFChain hold
└Scope 04A-112 | Suspended aluminum plank ceiling system (pre-finished 8"X96" aluminum planks attached to galvanized metal runners suspended from joists)HOLDChain hold
└Scope 05A-112 | Ceiling system note: SUSPENDED ALUMINUM PLANK CEILING SYSTEM W/ PRE FINISHED 8"X96" ALUMINUM PLANKS ATTACHED TO GALVANIZED METAL RUNNERS SUSPENDED FROM JOISTS.HOLDChain hold
└Scope 06A-113 | Suspended aluminum plank ceiling system: "PRE FINISHED 8"X96" ALUMINUM PLANKS ATTACHED TO GALVANIZED METAL RUNNERS SUSPENDED FROM JOISTS."HOLDChain hold
└Scope 07A-113 | SUSPENDED ALUMINUM PLANK CEILING SYSTEM W/ PRE FINISHED 8"X96" ALUMINUM PLANKS ATTACHED TO GALVANIZED METAL RUNNERS SUSPENDED FROM JOISTS.HOLDChain hold
└Scope 08A-120 | Install GWB on metal stud walls/ceilings (notations: "GWB on Mtl. Stud")HOLDChain hold
└Scope 09S003 [Structural] | 1705.2.2 Connection of cold-formed steel deck to supporting structure: Welding Y Periodic; Other fasteners verify conformance Y PeriodicHOLDChain hold
Section-05-005Metal FabricationsChain hold
└Scope 01A-117 | Painted wood roof shade canopy as shownHOLDChain hold
└Scope 02A-117 | Noted rooftop items: 'Area of refuge', 'Stand pipe', 'Chute', 'PAINTED WOOD ROOF SHADE CANOPY.'HOLDChain hold
└Scope 03A-201 | Louvered sunshadeHOLDChain hold
└Scope 04A-201 | Side entry canopy (see enlarged elevations for details)HOLDChain hold
└Scope 05A-201 | Notes for exterior elements: "LOUVERED SUNSHADE"; "PTAC LOUVER INTEGRAL W/ WINDOW FRAME. FINISH TO MATCH WINDOW FRAME"; "WINDOW WILL BE FROSTED TO CREATED VISUAL SCREEN TO LAUNDRY ROOM"HOLDChain hold
└Scope 06A-203 | Aluminum roof shade canopyHOLDChain hold
└Scope 07A-203 | REFER TO EXTERIOR FINISH INDEX FOR TYPICAL FINISHES FOR EXTERIOR ELEMENTS SUCH AS TYPICAL LOUVER COLOR, DOOR FRAMES, CANOPY STRUCTURES, ETC.HOLDChain hold
└Scope 08A-203 | ALUMINUM ROOF SHADE CANOPY.HOLDChain hold
└Scope 09A-570 | Light bollard detailHOLDChain hold
└Scope 10A-570 | Dumpster enclosure sectionHOLDChain hold
└Scope 11A-570 | Dumpster enclosure elevationHOLDChain hold
└Scope 12A-570 | Dumpster enclosure gate elevationHOLDChain hold
└Scope 13A-570 | Dumpster enclosure planHOLDChain hold
└Scope 14A-572 | One porte cochere assembly; details continue on A-572A.EAChain hold
└Scope 15A-574 | Roof shade canopy details (plan, cross section, long section, 3D view) as shown on sheet A 574HOLDChain hold
└Scope 16A-574 | ROOF SHADE CANOPY DETAILSHOLDChain hold
└Scope 17A-574 | One roof shade canopy assembly with plan, long section, cross section, and 3D view.EAChain hold
Section-05-006Metal StairsChain hold
└Scope 01A-490 | Stair sections for Level 1, Level 2, Roof, and Levels 3,4,5 (as listed)HOLDChain hold
└Scope 02A-490 | Stair 1 assembly serving Level 1 through roof.EAChain hold
└Scope 03A-491 | Stair 2 - stair section/details (shown on sheet A491)HOLDChain hold
└Scope 04A-491 | Stair 2 assembly serving Level 1 through roof.EAChain hold
└Scope 05A-808 | Stair landing elevation detailHOLDChain hold
└Scope 06A-808 | Detail labels shown: STAIR LANDING ELEVATION; STAIR FLOOR FINISH DETAILHOLDChain hold
Section-05-007Pipe / Tube RailingsChain hold
└Scope 01A-008-B | HANDRAILS and GRAB BARSHOLDChain hold
└Scope 02A-490 | Handrail wall-mounted detail (wood handrail with return to wall)HOLDChain hold
└Scope 03A-490 | Handrail detail text: 'WD WALL MOUNTED HANDRAIL WITH RETURN TO WALL AT EACH END.'HOLDChain hold
Section-05-008Gratings / Floor PlatesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-05-009Decorative MetalReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-05-010Steel Erection / Field WeldingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 06Wood, Plastics, and Composites10
Section-06-001Rough CarpentryChain hold
└Scope 01A-313 | ROOFING MEMBRANE OVER CEMENT BOARD AND PLYWOOD SHEATHINGHOLDChain hold
└Scope 02A-314 | ROOFING MEMBRANE OVER CEMENT BOARD AND PLYWOOD SHEATHING TRIM AND FLASHINGHOLDChain hold
Section-06-002Wood FramingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-06-003SheathingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-06-004Blocking / BackingChain hold
└Scope 01A-435B | Grab bar blocking examplesHOLDChain hold
└Scope 02A-435B | Transfer bathtub/shower seat blocking exampleHOLDChain hold
└Scope 03A-435B | Visible detail labels: "ACCESSIBLE SHOWER - UPPER LEVELS - EXAMPLE", "ACCESSIBLE SHOWER - GROUND LEVEL - EXAMPLE", "PLAN STANDARD SHOWER", "SHOWER CORNER DETAIL", "GRAB BAR BLOCKING - EXAMPLE", "TRANSFER BATHTUB/SHOWER SEAT BLOCKING - EXAMPLE", "ACCESSIBLE VANITY PLAN - EXAMPLE", "GUESTROOM BATH VANITY PLAN", "TUB SURROUND EDGE", "TUB AT NON RATED WALL", "TUB/SHOWER AT 1HR WALL", "LOW WALL DETAIL @ VANITY"HOLDChain hold
└Scope 04A-436 | BLOCKINGHOLDChain hold
└Scope 05A-550 | Provide blocking at strap fastener locations (typ).HOLDChain hold
└Scope 06A-550 | PROVIDE BLOCKING AT STRAP FASTENER- TYP.HOLDChain hold
└Scope 07ID001 [Interior] | Provide wood blocking in walls for millwork and accessories as required (Note 30).HOLDChain hold
└Scope 08ID121 [Interior] | TV and mounting hardware are the Owner's responsibility; GC to provide blocking as required (note 2).HOLDChain hold
└Scope 09ID121 [Interior] | G.C. is to provide blocking as required (note 4).HOLDChain hold
└Scope 10ID121 [Interior] | Surface mounted signage for fitness is per the Owner; refer to brand interior signage specification for blocking requirements (note 14).HOLDChain hold
└Scope 11ID121 [Interior] | Multiple responsibility notes as shown (examples): 'TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.'; 'RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION.'; 'G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.'; 'EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.'; 'FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.'; 'MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.'; 'PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510.'HOLDChain hold
└Scope 12ID122 [Interior] | Provide blocking where required for owner-supplied items (note 2, note 4).HOLDChain hold
└Scope 13ID122 [Interior] | Surface mounted signage for fitness by owner; refer to brand interior signage specification for blocking (note 14).HOLDChain hold
└Scope 14ID122 [Interior] | Exact note 2: "TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED."HOLDChain hold
└Scope 15ID122 [Interior] | Exact note 4: "G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM."HOLDChain hold
└Scope 16ID123 [Interior] | TV and mounting hardware are provided by owner; contractor to provide blocking as required.HOLDChain hold
└Scope 17ID123 [Interior] | G.C. to provide blocking where required.HOLDChain hold
└Scope 18ID123 [Interior] | Surface mounted signage for fitness provided by owner; refer to brand interior signage specification for blocking requirements.HOLDChain hold
└Scope 19ID123 [Interior] | Note 2: "TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED."HOLDChain hold
└Scope 20ID124 [Interior] | TV and mounting hardware are by Owner; blocking to be provided as required (per note 2).HOLDChain hold
└Scope 21ID124 [Interior] | GC to provide blocking as required (per note 4).HOLDChain hold
└Scope 22ID124 [Interior] | Surface mounted signage for fitness is by Owner; refer to brand interior signage specification for blocking (per note 14).HOLDChain hold
└Scope 23ID124 [Interior] | NOTE (from sheet notes): "TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED."HOLDChain hold
└Scope 24ID124 [Interior] | NOTE: "G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM."HOLDChain hold
└Scope 25ID125 [Interior] | TV mounting hardware is provided by the owner; provide blocking as required (Note 2).HOLDChain hold
└Scope 26ID125 [Interior] | G.C. to provide blocking as required for items referenced (Note 4 and multiple notes referring to blocking).HOLDChain hold
└Scope 27ID125 [Interior] | Surface mounted signage for fitness is per Owner; refer to brand interior signage specification for blocking requirements (Note 14).HOLDChain hold
└Scope 28ID125 [Interior] | "2. TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED."HOLDChain hold
└Scope 29ID131 [Interior] | TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 30ID131 [Interior] | G.C. TO PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 31ID131 [Interior] | NOTE (COMMON AREAS #2): 'TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.'HOLDChain hold
└Scope 32ID132 [Interior] | 2. TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 33ID132 [Interior] | 4. G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.HOLDChain hold
└Scope 34ID133 [Interior] | 2. TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 35ID133 [Interior] | 4. G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.HOLDChain hold
└Scope 36ID133 [Interior] | 14. SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION.HOLDChain hold
└Scope 37ID200 [Interior] | TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 38ID200 [Interior] | G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.HOLDChain hold
└Scope 39ID200 [Interior] | SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION.HOLDChain hold
└Scope 40ID400 [Interior] | TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 41ID400 [Interior] | G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.HOLDChain hold
└Scope 42ID400 [Interior] | SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION.HOLDChain hold
└Scope 43ID400.1 [Interior] | 2. TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 44ID400.1 [Interior] | 4. G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.HOLDChain hold
└Scope 45ID400.1 [Interior] | 14. SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION.HOLDChain hold
└Scope 46ID401 [Interior] | 2. TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 47ID401 [Interior] | 4. G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.HOLDChain hold
└Scope 48ID401 [Interior] | 14. SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION.HOLDChain hold
└Scope 49ID402 [Interior] | TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 50ID402 [Interior] | G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.HOLDChain hold
└Scope 51ID402 [Interior] | SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION.HOLDChain hold
└Scope 52ID403 [Interior] | Note 2: "TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED."HOLDChain hold
└Scope 53ID403 [Interior] | Note 4: "G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM."HOLDChain hold
└Scope 54ID403 [Interior] | Notes (numbered) include specific responsibility instructions such as: "TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.", "RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C.", "G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.", "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.", "FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.", "MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.", "PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING."HOLDChain hold
└Scope 55ID404 [Interior] | TV AND MOUNTING HARDWARE ARE PER THE OWNER. VERIFY SPECIFICATIONS IN WRITING FROM OWNER. PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 56ID404 [Interior] | G.C. TO PROVIDE BLOCKING AS REQUIRED FOR THIS ITEM.HOLDChain hold
└Scope 57ID404 [Interior] | SURFACE MOUNTED SIGNAGE FOR FITNESS IS PER THE OWNER. REFER TO BRAND INTERIOR SIGNAGE SPECIFICAITON FOR BLOCKING REQUIREMENTS AND MORE INFORMATION.HOLDChain hold
└Scope 58ID420 [Interior] | Multiple installation notes labeled A through S (e.g., "A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.") are included verbatim.HOLDChain hold
└Scope 59ID422 [Interior] | A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 60ID422 [Interior] | C. TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 61ID422 [Interior] | F. RESTROOM ACCESSORY PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 62ID422 [Interior] | K. PROVIDE BLOCKING AT HEADBOARD AS REQUIRED.HOLDChain hold
└Scope 63ID422 [Interior] | N. PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.HOLDChain hold
└Scope 64ID422 [Interior] | R. PROVIDE BLOCKING AT VALET HOOKS AS REQUIRED.HOLDChain hold
└Scope 65ID423 [Interior] | Blocking provisions (headboard, robe hooks, restroom accessories, millwork, TV blocking)HOLDChain hold
└Scope 66ID423 [Interior] | Provision for TV (TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.)HOLDChain hold
└Scope 67ID423 [Interior] | NOTES A THROUGH S are provided; examples include: A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.; B. ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.; C. TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.; D. EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.; E. FIXTURE PER PLUMBING FIXTURE MATRIX IN DESIGN GUIDE PROJECT MANUAL.; F. RESTROOM ACCESSORY PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.; G. ARCHITECTURAL LIGHT BY G.C.; H. IN THIS ROOM ONLY, LOW WALL TO BE 34 1/2" TO TOP OF STONE CAP TO ALLOW ROOM FOR ADA GRAB BAR ABOVE.; I. 12" X 12" CUT-OUT AT SIDE OF CABINET FOR ACCESS TO REFRIGERATOR OUTLET; J. ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING; K. PROVIDE BLOCKING AT HEADBOARD AS REQUIRED.; L. INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION. HATCHED AREA INDICATES SPACE WHERE OUTLETS SHOULD OCCUR.; M. SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET.; N. PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.; O. DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP.; P. NOT USED; Q. THERMOSTAT. ALIGN WITH OUTLET BELOW WHERE OCCURS. SEE ELEVATION FOR ADDITIONAL INFORMATION. ALIGN DEVICES VERTICALLY 6" FROM EDGE OF WALL.; R. PROVIDE BLOCKING AT VALET HOOKS AS REQUIRED.; S. EXPOSED PARTITIONS ABOVE BACK AND SIDES OF WARDROBE TO BE FINISHEDHOLDChain hold
└Scope 68ID424 [Interior] | Provide blocking at headboard as required (Note K).HOLDChain hold
└Scope 69ID424 [Interior] | Robe hook per toilet & bath accessory matrix in the design guide project manual; provide blocking as required (Note A).HOLDChain hold
└Scope 70ID424 [Interior] | TV provided by owner; provide blocking as required (Note C).HOLDChain hold
└Scope 71ID424 [Interior] | Provide electrical and blocking at wall for a hardwired lit-mirror at vanity; mirror requires a switch at the wall; verify height of opening at back of mirror with purchasing agent (Note N).HOLDChain hold
└Scope 72ID424 [Interior] | Provide blocking at valet hooks as required (Note R).HOLDChain hold
└Scope 73ID424 [Interior] | Restroom accessory per toilet & bath accessory matrix in design guide project manual; provide blocking as required (Note F).HOLDChain hold
└Scope 74ID424 [Interior] | Note: 'TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.'HOLDChain hold
└Scope 75ID424 [Interior] | Note: 'PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.'HOLDChain hold
└Scope 76ID430 [Interior] | Notes A through S describing blocking, outlets, fixtures and vendor responsibilitiesHOLDChain hold
└Scope 77ID430 [Interior] | NOTES A THROUGH S are present and include specific instructions such as: "A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.", "B. ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.", "C. TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.", "D. EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.", "H. IN THIS ROOM ONLY, LOW WALL TO BE 34 1/2\" TO TOP OF STONE CAP TO ALLOW ROOM FOR ADA GRAB BAR ABOVE.", "J. ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASING", "N. PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY.", "Q. THERMOSTAT. ALIGN WITH OUTLET BELOW WHERE OCCURS. SEE ELEVATION FOR ADDITIONAL INFORMATION. ALIGN DEVICES VERTICALLY 6\" FROM EDGE OF WALL.", etc.HOLDChain hold
└Scope 78ID431 [Interior] | Provide blocking for TV, robe hooks, headboard, valet hooks, and other accessories as notedHOLDChain hold
└Scope 79ID431 [Interior] | Provide electrical and blocking for a hardwired lit-mirror at vanity and a switch at the wallHOLDChain hold
└Scope 80ID431 [Interior] | Note A: 'ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.'HOLDChain hold
└Scope 81ID431 [Interior] | Note C: 'TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.'HOLDChain hold
└Scope 82ID432 [Interior] | Notes for blocking, appliance cut-outs, and fixture provisions (Notes A through S)HOLDChain hold
└Scope 83ID432 [Interior] | Notes A through S appear in full (e.g., 'A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.' through 'S. EXPOSED PARTITIONS ABOVE BACK AND SIDES OF WARDROBE TO BE FINISHED')HOLDChain hold
└Scope 84ID432 [Interior] | Specific note text: 'N. PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.'HOLDChain hold
└Scope 85ID433 [Interior] | PROVIDE BLOCKING AS REQUIRED (multiple notes reference blocking at headboard, robe hook, restroom accessories, wardrobes, valet hooks, and cabinet walls).HOLDChain hold
└Scope 86ID433 [Interior] | TV PROVIDED BY OWNER; PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 87ID433 [Interior] | PROVIDE ELECTRICAL AND BLOCKING FOR HARDWIRED LIT-MIRROR AT VANITY; MIRROR REQUIRES A SWITCH AT THE WALL.HOLDChain hold
└Scope 88ID433 [Interior] | NOTE C: TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 89ID433 [Interior] | NOTE K: PROVIDE BLOCKING AT HEADBOARD AS REQUIRED.HOLDChain hold
└Scope 90ID433 [Interior] | NOTE N: PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.HOLDChain hold
└Scope 91ID440 [Interior] | A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 92ID440 [Interior] | C. TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 93ID440 [Interior] | F. RESTROOM ACCESSORY PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 94ID440 [Interior] | K. PROVIDE BLOCKING AT HEADBOARD AS REQUIRED.HOLDChain hold
└Scope 95ID440 [Interior] | N. PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY. MIRROR REQUIRES A SWITCH AT THE WALL. VERIFY HEIGHT OF OPENING AT BACK OF MIRROR WITH PURCHASING AGENT.HOLDChain hold
└Scope 96ID440 [Interior] | R. PROVIDE BLOCKING AT VALET HOOKS AS REQUIRED.HOLDChain hold
└Scope 97ID441 [Interior] | ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 98ID441 [Interior] | TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 99ID441 [Interior] | RESTROOM ACCESSORY PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 100ID441 [Interior] | PROVIDE BLOCKING AT HEADBOARD AS REQUIRED.HOLDChain hold
└Scope 101ID441 [Interior] | PROVIDE ELECTRICAL AND BLOCKING AT THIS WALL FOR A HARDWIRED LIT-MIRROR AT VANITY (MIRROR REQUIRES A SWITCH AT THE WALL).HOLDChain hold
└Scope 102ID441 [Interior] | PROVIDE BLOCKING AT VALET HOOKS AS REQUIRED.HOLDChain hold
└Scope 103ID441 [Interior] | Text on sheet: 'PROVIDE BLOCKING IN WALL FOR ROD'HOLDChain hold
└Scope 104ID441 [Interior] | Text on sheet: 'PROVIDE BLOCKING IN WALL FOR ROD FX-701ADA' (appears in plan callouts)HOLDChain hold
└Scope 105ID441 [Interior] | Note A: 'ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.'HOLDChain hold
└Scope 106ID442 [Interior] | Blocking locations for wall-mounted items and equipmentHOLDChain hold
└Scope 107ID442 [Interior] | A. ROBE HOOK PER TOILET & BATH ACCESSORY MATRIX IN THE DESIGN GUIDE PROJECT MANUAL, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 108ID442 [Interior] | C. TV PROVIDED BY OWNER, PROVIDE BLOCKING AS REQUIRED.HOLDChain hold
└Scope 109ID501 [Interior] | Installation of wood plank wall finish system (3/8" and 8" planks referenced) secured on linear clips to blockingHOLDChain hold
└Scope 110ID501 [Interior] | Provide blocking in wall and ceiling as required for monitor, monitor mount, safe deposit box and wood baseHOLDChain hold
└Scope 111ID501 [Interior] | Recessed surveillance monitor provision and coordination of outlet and blockingHOLDChain hold
└Scope 112ID502 [Interior] | Provide blocking to secure lounge screen to wall and ceiling as req'dHOLDChain hold
└Scope 113ID502 [Interior] | Provide blocking to secure lounge screen to ceiling as req'dHOLDChain hold
└Scope 114ID502 [Interior] | Repeated annotation: PROVIDE BLOCKING TO SECURE LOUNGE SCREEN TO WALL AND CEILING AS REQ'DHOLDChain hold
└Scope 115ID502 [Interior] | Annotation: LOUNGE SCREEN SECURED TO COLUMN AS REQUIRED. BLOCKING AS REQ'DHOLDChain hold
└Scope 116ID503 [Interior] | 2x4 WOOD FRAME AND 2x6 FRONT SUPPORT MEMBER BLOCKINGHOLDChain hold
└Scope 117ID504 [Interior] | TV and mounting (note: provided by owner; G.C. to verify blocking/specification)HOLDChain hold
└Scope 118ID504 [Interior] | Note on TV: TV AND MOUNTING BRACKET ARE PER THE OWNER. G.C. TO VERIFY SPECIFICATION AND BLOCKING REQUIREMENTS PRIOR TO INSTALLATION.HOLDChain hold
└Scope 119ID505 [Interior] | HARDWOOD VENEER PLANKS LAMINATED TO 3/4" PLYWOOD BACKING; PANELS SECURED BACK-TO-BACK ALONG CENTER OF TABLE.HOLDChain hold
└Scope 120ID505 [Interior] | 14" HARDWOOD VENEER PLANKS LAMINATED TO 34" PLYWOOD BACKING; PANELS SECURED TOGETHER BACK- TO - BACK ALONG CENTER OF TABLE. ALL EXPOSED REVEALS TO BE STAINED TO MATCH VENEER PLANKS, TYP.HOLDChain hold
└Scope 121ID506 [Interior] | Enclose column with WOOD VENEER (303) PANELS on shims or blocking as required.HOLDChain hold
└Scope 122ID506 [Interior] | Construction notes: PANELS TO ENCLOSE COLUMN ON SHIMS OR BLOCKING AS REQUIREDHOLDChain hold
└Scope 123ID510 [Interior] | Provide blocking at wood panel supports.HOLDChain hold
└Scope 124ID510 [Interior] | Elevator wall construction: provide blocking at wood panel supports; elevator door jamb detail referenced.HOLDChain hold
└Scope 125ID520 [Interior] | Provide blocking in ceiling or wall for 96" wide ceiling mounted drapery track.HOLDChain hold
└Scope 126ID520 [Interior] | Provide base stop mounted 6" AFF; coordinate location with furniture and provide blocking in wall.HOLDChain hold
└Scope 127ID520 [Interior] | CEILING MOUNTED DRAPERY TRACK IS 96" WIDE, PROVIDE BLOCKING IN CEILING OR WALL AS REQUIRED.HOLDChain hold
Section-06-005Finish CarpentryReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-06-006MillworkChain hold
└Scope 01A-030 | Typical life-safety legend entries visible: 1/2-HOUR RATED WALL, 1-HOUR RATED WALL, 2-HOUR RATED WALL, TRAVEL DISTANCE, 2-HOUR RATED SHAFT, FIRE EXTINGUISHER, FIRE EXTINGUISHER & CABINET, TOTAL OCCUPANTS, EXISTING AVAILABLE CAPACITY, REQUIRED EXIT WIDTH, PROVIDED EXIT WIDTH, SYMBOL KEYHOLDChain hold
└Scope 02A-310 | Interior spaces shown/identified on sheet including: Lobby (001), Registration (002), Connect & Print (004), Meeting Room (102), Employee Break Room (020), Laundry (019), Water Heater (007), IT Closet (013 A), multiple Linen rooms (010, 035, 045, 055), Ice Machines, multiple Queen rooms and King Suite rooms (various room numbers)HOLDChain hold
└Scope 03A-310 | Rooms and room numbers explicitly shown (partial list, exact strings preserved): "LOBBY 001", "REGISTRATION 002", "CONNECT & PRINT 004", "MEETING ROOM 102", "EMPLOYEE BREAK ROOM 020", "LAUNDRY 019", "WATER HEATER 007", "IT CLOSET 013 A", "LINEN M 010", "LINEN 035", "LINEN 045", "LINEN 055", "ICE MACHINE" (multiple), and many guest room labels such as "QUEEN QUEEN 220", "KING SUITE 506", etc.HOLDChain hold
└Scope 04A-402 | BREAKFAST BUFFET & LOBBYHOLDChain hold
└Scope 05A-402 | LOBBY - RECEPTION WALL & BANQUETTEHOLDChain hold
└Scope 06A-403 | COLUMN ENCLOSURE & CABINETRYHOLDChain hold
└Scope 07A-403 | CORNER TRIM DETAIL AT BANQUETTEHOLDChain hold
└Scope 08A-404 | SOFFIT @ FARM TABLE (detail)HOLDChain hold
└Scope 09A-433 | Pre-packaged wood soffit note/detailHOLDChain hold
└Scope 10A-503 | Detailed drawings and elevations of welcome desk assemblies (multiple views, 3D view shown).HOLDChain hold
└Scope 11A-503 | Transaction wall and transaction ledge details associated with the welcome desk.HOLDChain hold
└Scope 12A-503 | Hardware dimensions table (incl. ventilation & clearance) for equipment adjacent to or in the welcome desk.HOLDChain hold
└Scope 13A-504 | Detailing and construction/installation details for welcome desk components including CPU cabinetHOLDChain hold
└Scope 14A-504 | Trash cabinet detailHOLDChain hold
└Scope 15A-504 | ADA transaction surface detail for welcome deskHOLDChain hold
└Scope 16A-504 | Keyboard and printer cabinet detailHOLDChain hold
└Scope 17A-504 | Transaction ledge detailHOLDChain hold
└Scope 18A-505 | WELCOME DESK DETAILSHOLDChain hold
└Scope 19A-506 | Coffee bar detailsHOLDChain hold
└Scope 20A-506 | Farm table / farmtable screen wall detailsHOLDChain hold
└Scope 21A-507 | CONNECT & PRINT DESK LEFT ELEVATIONHOLDChain hold
└Scope 22A-507 | CONNECT & PRINT DESK RIGHT ELEVATIONHOLDChain hold
└Scope 23A-507 | CONNECT & PRINT DESK FRONT ELEVATIONHOLDChain hold
└Scope 24A-507 | CONNECT & PRINT WALL ELEVATIONHOLDChain hold
└Scope 25A-507 | CONNECT & PRINT LIVING ROOM PLANHOLDChain hold
└Scope 26A-508 | CONNECT & PRINT & PRINTERHOLDChain hold
└Scope 27A-509 | THE CORNER MARKET CABINETS - WITH BEER & WINEHOLDChain hold
└Scope 28A-509 | THE CORNER MARKET - CABINET SECTION - WITH BEER & WINEHOLDChain hold
└Scope 29A-509A | THE CORNER MARKET - CABINET SECTION - WITHOUT BEER & WINE ALT.HOLDChain hold
└Scope 30A-510 | Interior cabinet details for 'THE CORNER MARKET' (amenities cabinet detail)HOLDChain hold
└Scope 31A-510 | Inside corner detail at market cabinetHOLDChain hold
└Scope 32A-511 | Banquette seating details (elevations, sections, end/knee wall details) as shown on detail group 508.HOLDChain hold
└Scope 33A-511 | Provision and coordination of electrical outlet/J-box for banquette seating per note: 'PROVIDE J-BOX FOR HARDWIRE CONNECTION OR OUTLET FOR PLUG-IN CONNECTION ACCORDINGLY.'HOLDChain hold
└Scope 34A-511 | Millwork surround and millwork details (e.g., 3/4" PLAM PANEL, 4 1/4" MILLWORK SURROUND).HOLDChain hold
└Scope 35A-511 | Coordination with furniture vendor and 'by others' suppliers for banquette components and outlets.HOLDChain hold
└Scope 36A-511 | 508 - BANQUETTE KNEE WALLHOLDChain hold
└Scope 37A-512 | BREAKFAST BUFFET DETAILS (sheet content)HOLDChain hold
└Scope 38A-512 | BREAKFAST BUFFET CABINET & JUICE MACHINE (visible label on sheet)HOLDChain hold
└Scope 39A-512 | BREAKFAST BUFFET COUNTER (visible label on sheet)HOLDChain hold
└Scope 40E2.1 [Electrical] | THE CORNER MARKET 003HOLDChain hold
└Scope 41F1-00 [FIRE-ALARM-SYSTEM] | Electrical contractor to furnish 120VAC power, conduit, junction boxes, backboxes, terminal cabinets, gutters, wirepath riser, junction boxes, and access panels as specified.HOLDChain hold
└Scope 42ID000 [Interior] | Details for welcome desk, feature wall, lounge screen, quick print, communal table/coffee bar, recycle cabinet, banquette seating, buffet, corner market, lounge, hydration station, guestroom details (ID500 - ID520 series)HOLDChain hold
└Scope 43ID121 [Interior] | Equipment provided by Owner; G.C. to confirm sizes to confirm fit within casegoods/millwork (note 7).HOLDChain hold
└Scope 44ID121 [Interior] | Millwork by G.C.; ensure style & finishes per brand standards (note 11).HOLDChain hold
└Scope 45ID121 [Interior] | Guest laundry counter millwork is per the G.C.; coordinate drawing for counter with AOR; finish in 304 laminate per brand standards (note 13).HOLDChain hold
└Scope 46ID121 [Interior] | GC to coordinate all electrical requirements at millwork with AOR (note 18).HOLDChain hold
└Scope 47ID122 [Interior] | G.C. to provide millwork; ensure style & finishes per brand standards (note 11).HOLDChain hold
└Scope 48ID122 [Interior] | Equipment provided by owner; G.C. to confirm sizes to confirm fit within casegoods/millwork (note 7).HOLDChain hold
└Scope 49ID122 [Interior] | Guest laundry counter millwork by G.C.; coordinate with AOR; finish in 304 laminate per brand standards (note 13).HOLDChain hold
└Scope 50ID122 [Interior] | G.C. to coordinate all electrical requirements at millwork with AOR (note 18).HOLDChain hold
└Scope 51ID122 [Interior] | Exact note 7: "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK."HOLDChain hold
└Scope 52ID123 [Interior] | Millwork by G.C.; ensure style & finishes are per the brand standards.HOLDChain hold
└Scope 53ID123 [Interior] | Guest laundry counter millwork by G.C.; finish in 304 laminate per brand standards.HOLDChain hold
└Scope 54ID123 [Interior] | G.C. to coordinate electrical requirements at millwork with AOR.HOLDChain hold
└Scope 55ID124 [Interior] | Equipment provided by Owner; GC to confirm equipment sizes for fit within millwork (per note 7).HOLDChain hold
└Scope 56ID124 [Interior] | Millwork by G.C.; ensure style & finishes per brand standards (per note 11).HOLDChain hold
└Scope 57ID124 [Interior] | Guest laundry counter millwork per G.C.; coordinate with AOR; finish in 304 laminate per brand standards (per note 13).HOLDChain hold
└Scope 58ID124 [Interior] | GC to coordinate electrical requirements at millwork with AOR (per note 18).HOLDChain hold
└Scope 59ID124 [Interior] | NOTE: "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK."HOLDChain hold
└Scope 60ID125 [Interior] | Equipment provided by Owner; G.C. to confirm sizes to confirm fit within casegoods/millwork (Note 7).HOLDChain hold
└Scope 61ID125 [Interior] | Millwork by G.C.; ensure style & finishes per brand standards (Note 11).HOLDChain hold
└Scope 62ID125 [Interior] | Guest laundry counter millwork by G.C.; coordinate with AOR; finish in 304 laminate per brand standards (Note 13).HOLDChain hold
└Scope 63ID131 [Interior] | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.HOLDChain hold
└Scope 64ID131 [Interior] | MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 65ID131 [Interior] | GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 66ID131 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 67ID132 [Interior] | 7. EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.HOLDChain hold
└Scope 68ID132 [Interior] | 11. MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 69ID132 [Interior] | 13. GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 70ID132 [Interior] | 18. G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 71ID133 [Interior] | 7. EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.HOLDChain hold
└Scope 72ID133 [Interior] | 11. MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 73ID133 [Interior] | 13. GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 74ID133 [Interior] | 18. G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 75ID200 [Interior] | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.HOLDChain hold
└Scope 76ID200 [Interior] | MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 77ID200 [Interior] | GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 78ID200 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 79ID400 [Interior] | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.HOLDChain hold
└Scope 80ID400 [Interior] | MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 81ID400 [Interior] | GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 82ID400 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 83ID400 [Interior] | Specific instruction: SEE SHEET ID501, DETAIL 1 FOR FEATURE WALL DETAILSHOLDChain hold
└Scope 84ID400.1 [Interior] | 7. EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.HOLDChain hold
└Scope 85ID400.1 [Interior] | 11. MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 86ID400.1 [Interior] | 13. GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 87ID400.1 [Interior] | 18. G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 88ID401 [Interior] | 7. EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.HOLDChain hold
└Scope 89ID401 [Interior] | 11. MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 90ID401 [Interior] | 13. GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 91ID401 [Interior] | 18. G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 92ID402 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 93ID402 [Interior] | MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 94ID402 [Interior] | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.HOLDChain hold
└Scope 95ID403 [Interior] | Note 7: "EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK."HOLDChain hold
└Scope 96ID403 [Interior] | Note 11: "MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS."HOLDChain hold
└Scope 97ID403 [Interior] | Note 13: "GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS."HOLDChain hold
└Scope 98ID404 [Interior] | EQUIPMENT PROVIDED BY OWNER, G.C. TO CONFIRM SIZES OF EQUIPMENT TO CONFIRM FIT WITHIN CASEGOODS/MILLWORK.HOLDChain hold
└Scope 99ID404 [Interior] | MILLWORK BY G.C.; ENSURE STYLE & FINISHES ARE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 100ID404 [Interior] | GUEST LAUNDRY COUNTER MILLWORK IS PER THE G.C.; COORDINATE DRAWING FOR COUNTER WITH AOR; FINISH IN 304 LAMINATE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 101ID404 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL REQUIREMENTS AT MILLWORK WITH AOR.HOLDChain hold
└Scope 102ID422 [Interior] | B. ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.HOLDChain hold
└Scope 103ID422 [Interior] | I. 12" X 12" CUT-OUT AT SIDE OF CABINET FOR ACCESS TO REFRIGERATOR OUTLETHOLDChain hold
└Scope 104ID422 [Interior] | M. SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET.HOLDChain hold
└Scope 105ID424 [Interior] | Electrical outlet behind millwork for equipment (Note B).HOLDChain hold
└Scope 106ID424 [Interior] | Switched outlet for cabinet lights; cabinet light provided by furniture vendor; wardrobe includes plug-in light under shelf; optional uplight (X-270LTOPT) also plug into this switched outlet (Note M).HOLDChain hold
└Scope 107ID424 [Interior] | 12" x 12" cut-out at side of cabinet for access to refrigerator outlet (Note I).HOLDChain hold
└Scope 108ID430 [Interior] | FF&E note: "CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET."HOLDChain hold
└Scope 109ID431 [Interior] | Provide electrical outlet behind millwork and outlet behind cornice for motorized shade (must be concealed)HOLDChain hold
└Scope 110ID431 [Interior] | Provide duplex outlet for microwave and power strip and switched outlet for cabinet lightsHOLDChain hold
└Scope 111ID431 [Interior] | Note B: 'ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.'HOLDChain hold
└Scope 112ID432 [Interior] | Specific note text: 'M. SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET.'HOLDChain hold
└Scope 113ID433 [Interior] | PROVIDE ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.HOLDChain hold
└Scope 114ID433 [Interior] | SWITCHED OUTLET FOR CABINET LIGHTS; CABINET LIGHT PROVIDED BY FURNITURE VENDOR. (WARDROBE PLUG-IN LIGHT UNDER SHELF, OPTIONAL UPLIGHT X-270LTOPT).HOLDChain hold
└Scope 115ID433 [Interior] | NOTE B: ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.HOLDChain hold
└Scope 116ID433 [Interior] | NOTE M: SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET.HOLDChain hold
└Scope 117ID440 [Interior] | B. ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.HOLDChain hold
└Scope 118ID440 [Interior] | I. 12" X 12" CUT-OUT AT SIDE OF CABINET FOR ACCESS TO REFRIGERATOR OUTLETHOLDChain hold
└Scope 119ID440 [Interior] | M. SWITCHED OUTLET FOR CABINET LIGHTS. CABINET LIGHT PROVIDED BY FURNITURE VENDOR. WARDROBE INCLUDES PLUG-IN LIGHT UNDER SHELF. OPTIONAL UPLIGHT (X-270LTOPT) ALSO PLUG INTO THIS SWITCHED OUTLET.HOLDChain hold
└Scope 120ID441 [Interior] | ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.HOLDChain hold
└Scope 121ID441 [Interior] | 12" X 12" CUT-OUT AT SIDE OF CABINET FOR ACCESS TO REFRIGERATOR OUTLETHOLDChain hold
└Scope 122ID441 [Interior] | SWITCHED OUTLET FOR CABINET LIGHTS (CABINET LIGHT PROVIDED BY FURNITURE VENDOR).HOLDChain hold
└Scope 123ID442 [Interior] | B. ELECTRICAL OUTLET BEHIND MILLWORK FOR EQUIPMENT.HOLDChain hold
└Scope 124ID500 [Interior] | Welcome desk millwork details (plan, front/back/side elevations, sections)HOLDChain hold
└Scope 125ID500 [Interior] | Black melamine interiors for cabinets/drawers/open boxes (referred to repeatedly as 'BLACK MELAMINE INTERIOR', 'BLACK MELAMIINE INTERIOR')HOLDChain hold
└Scope 126ID500 [Interior] | Cabinet doors and drawers: references to (303), (304A), (308), (216) componentsHOLDChain hold
└Scope 127ID500 [Interior] | Instructional note: 'PRINTER & EQUIPMENT IS PER THE OWNER. G.C. TO WORK WITH THE OWNER TO VERIFY FINAL SPECS AND DETERMINE FINAL SIZES OF CABINETS, DRAWERS AND CUBBYS. TYPICAL.'HOLDChain hold
└Scope 128ID501 [Interior] | Installation of steel outer frame and millwork frame box for art pieceHOLDChain hold
└Scope 129ID501 [Interior] | Safe deposit box cabinet installation with melamine interior and adjustable shelving per detailsHOLDChain hold
└Scope 130ID501 [Interior] | Referenced detail/parts: "1/2\" MILLWORK FRAME BOX FOR ART PIECE."HOLDChain hold
└Scope 131ID502 [Interior] | Secure lounge screen to structural column as required; structural column wrapped with wood panels (refer to AOR's set)HOLDChain hold
└Scope 132ID503 [Interior] | CABINET (313) WITH BLACK MELAMINE INTERIORHOLDChain hold
└Scope 133ID504 [Interior] | Communal table (plan, elevations and details)HOLDChain hold
└Scope 134ID504 [Interior] | Coffee bar (plan, elevations and sections)HOLDChain hold
└Scope 135ID504 [Interior] | Lighting group above communal table (lighting group detail referenced)HOLDChain hold
└Scope 136ID504 [Interior] | Cabinetry with black melamine interiorHOLDChain hold
└Scope 137ID505 [Interior] | COMMUNAL TABLE TO BE SUPPLIED BY G.C.HOLDChain hold
└Scope 138ID505 [Interior] | RECEPTACLE FOR POWER/USB PROVIDED BY MILLWORKER AND INSTALLED IN TABLE APRON; ROUTE PLUG AND CORD THROUGH CHASE BEHIND APRON.HOLDChain hold
└Scope 139ID505 [Interior] | RECEPTACLE TO BE "MINI-TAP" AS MANUF. BY BYRNE; 12' CORD THROUGH MILLWORK TO OUTLET AT WALL; COLOR TO BE BLACK; (2) EACH SIDE, OR SIMILAR.HOLDChain hold
└Scope 140ID505 [Interior] | RECEPTACLE FOR POWER/USB PROVIDED BY MILLWORKER AND INSTALLED IN TABLE APRON. ROUTE PLUG AND CORD THROUGH CHASE BEHIND APRON; RECEPTACLE TO BE "MINI-TAP" AS MANUF. BY BYRNE; 12' CORD THROUGH MILLWORK TO OUTLET AT WALL; COLOR TO BE BLACK; (2) EACH SIDE, OR SIMILARHOLDChain hold
└Scope 141ID506 [Interior] | Recycling cabinet plan, elevations, and sections (ID506).HOLDChain hold
└Scope 142ID506 [Interior] | Provide CABINET WITH BLACK MELAMINE INTERIOR (material references 214, 302, 303).HOLDChain hold
└Scope 143ID506 [Interior] | Material callouts: CABINET WITH BLACK MELAMINE INTERIOR 214302303HOLDChain hold
└Scope 144ID507 [Interior] | Banquette isometric, section, elevation, plan and knee wall detailHOLDChain hold
└Scope 145ID507 [Interior] | Metal elements at banquette (metal divider elements, steel plate detail)HOLDChain hold
└Scope 146ID507 [Interior] | Millwork cap and surround at back of banquette and endsHOLDChain hold
└Scope 147ID507 [Interior] | Specification and location of pop-up duplex receptacles in millworkHOLDChain hold
└Scope 148ID507 [Interior] | Pop-up receptacle location: INSTALLED INTO TOP OF MILLWORK WALL; RECEPTACLE TO BE CENTERED ON METAL DIVIDERS.HOLDChain hold
└Scope 149ID507 [Interior] | Graphic/text note: CORNER PIECES AT EACH END TO BE PART OF BANQUETTE CONSTRUCTION (repeated callouts appear)HOLDChain hold
└Scope 150ID508 [Interior] | BUFFET - MILLWORK ELEVATIONHOLDChain hold
└Scope 151ID508 [Interior] | BUFFET - ISOMETRICHOLDChain hold
└Scope 152ID508 [Interior] | BUFFET - SECTION @ JUICE MACHINEHOLDChain hold
└Scope 153ID508 [Interior] | BUFFET - SECTION @ PASTRIESHOLDChain hold
└Scope 154ID508 [Interior] | METAL EDGE TRIM @ BUFFETHOLDChain hold
└Scope 155ID508 [Interior] | Black melamine cabinet frame and interiorHOLDChain hold
└Scope 156ID508 [Interior] | Tile finish on rear wall at buffetHOLDChain hold
└Scope 157ID508 [Interior] | Ventilation fans, top and bottom of cabinet w/ thermostat (vent into food prep room only)HOLDChain hold
└Scope 158ID508 [Interior] | Juicer cabinet ventilation details (including 3" filter fan @ top edge)HOLDChain hold
└Scope 159ID508 [Interior] | Equipment / element labels: VENTILATION FANS, TOP AND BOTTOM OF CABINET W/ THERMOSTAT. VENT INTO FOOD PREP ROOM ONLY.HOLDChain hold
└Scope 160ID509 [Interior] | PLAM drawer fronts and PLAM panels to match cabinetsHOLDChain hold
└Scope 161ID509 [Interior] | Black melamine interior for cabinetsHOLDChain hold
└Scope 162ID509 [Interior] | Plywood cabinet frame with PLAM finishHOLDChain hold
└Scope 163ID509 [Interior] | PLAM casework to enclose and support equipment (verify with equipment manufacturer)HOLDChain hold
└Scope 164ID509 [Interior] | Provide clearance and ventilation for refrigeration/equipment cabinets (2" preferred; 1" minimum)HOLDChain hold
└Scope 165ID509 [Interior] | OUTLET PLYWOOD CABINET FRAME W/ PLAM FINISHHOLDChain hold
└Scope 166ID509 [Interior] | PLAM CASEWORK TO ENCLOSE AND SUPPORT EQUIPMENT. VERIFY REQUIREMENTS WITH EQUIP. MANUFACTURERHOLDChain hold
└Scope 167ID512 [Interior] | Provide adjustable shelves in millwork surround for towel storage.HOLDChain hold
└Scope 168ID512 [Interior] | Provide cabinet with black melamine interior.HOLDChain hold
└Scope 169ID520 [Interior] | PTAC unit room cabinet to be installed on manufacturer's provided metal subbase.HOLDChain hold
└Scope 170ID520 [Interior] | PTAC UNIT ROOM CABINET INSTALLED ON MANUFACTURER'S PROVIDED METAL SUBBASEHOLDChain hold
└Scope 171P1.1 [Plumbing] | Multiple room labels visible on the plan (examples as shown): WATER HEATER 007, STAIR 2.1 022, FOOD PREP 006, LOBBY 001, REGISTRATION 002, WORK 008, LAUNDRY 019, LINEN010, EXERCISE ROOM 011, EMPLOYEE BREAK ROOM 020, CORRIDOR 016, ELEVATOR 3500 lbs, THE CORNER MARKET 003, BREAKFAST 005, KING SUITE 108, KING SUITE 107, KING 102, KING 103, KING 104, KING 101, KING 105, Women's 013a, Men's 012a, STORAGEHOLDChain hold
Section-06-007Architectural WoodworkReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-06-008CaseworkReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-06-009CountertopsChain hold
└Scope 01ID503 [Interior] | SOLID SURFACE (308) COUNTERTOPS (INCLUDING WATERFALL TRANSITION)HOLDChain hold
└Scope 02ID503 [Interior] | STONE COUNTER TOP & BACKSPLASHHOLDChain hold
└Scope 03ID508 [Interior] | Installation of stone countertop w/ eased edge 3/4"HOLDChain hold
Section-06-010Composite Trim / PanelsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 07Thermal and Moisture Protection10
Section-07-001WaterproofingChain hold
└Scope 01A-005 Detail 1 | Waterproofing on CMU exterior wall. Product, location, and area links pending.SFChain hold
└Scope 02A-120 | Provide waterproof paint to 12' - 0" A.F.F. and elsewhere as noted (note: "All paint to be waterproof (typical).", "Waterproof paint 12' - 0" A.F.F.")HOLDChain hold
└Scope 03A-120 | Note: All paint to be waterproof (typical).HOLDChain hold
└Scope 04A1-22 | Note on sheet: All paint to be waterproof (typical).HOLDChain hold
└Scope 05A1-23 | Typical note: 'All paint to be waterproof (typical).'HOLDChain hold
└Scope 06A1-23 | Note: All paint to be waterproof (typical).HOLDChain hold
└Scope 07A1-24 | Note: All paint to be waterproof (typical).HOLDChain hold
Section-07-002DampproofingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-07-003Thermal InsulationChain hold
└Scope 01A-005 Detail 1 | Install 1-inch rigid insulation and fill CMU cells with foam insulation. Location and area links pending.SFChain hold
└Scope 02A-005 Details 6-7 | Batt insulation in load-bearing interior and exterior stud walls. Location and area links pending.SFChain hold
└Scope 03A-300 | Shade insulationHOLDChain hold
└Scope 04A-300 | R40 insulationHOLDChain hold
└Scope 05A-300 | Note: Shade insulationHOLDChain hold
└Scope 06A-300 | Note: R40 insulationHOLDChain hold
└Scope 07A-313 | Provide R-5 and R-40 rigid insulation as notedHOLDChain hold
└Scope 08A-313 | R-40 RIGID INSULATION 8"HOLDChain hold
└Scope 09A-314 | R-40 RIGID INSULATIONHOLDChain hold
└Scope 10A-490 | Single ply membrane roof over rigid insulation noteHOLDChain hold
└Scope 11A-490 | Roof note: 'Single ply membrane roof over rigid insulation'HOLDChain hold
└Scope 12A-492 | Materials and components noted: R-40 RIGID INSULATION 8"HOLDChain hold
└Scope 13A-550 | Provide R-40 rigid insulation at roof assembly.HOLDChain hold
└Scope 14A-550 | R-40 RIGID INSULATIONHOLDChain hold
└Scope 15C-13 [Civil] | Stator winding shall be open type with Class F insulation and shall be heat-shrink fitted into the stator housing.HOLDChain hold
Section-07-004Air / Vapor BarriersReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-07-005RoofingChain hold
└Scope 01A-116 | Roof plan layout and roof drainage (scuppers) as shown on A116.HOLDChain hold
└Scope 02A-116 | Roof construction sequence/requirements as listed in the roof construction note 1-5 (exact text present on sheet).HOLDChain hold
└Scope 03A-117 | Flashing and roof penetration details to be provided per roof membrane manufacturer to maintain warrantyHOLDChain hold
└Scope 04A-117 | Reference note B: 'PROVIDE ACCESSORIES & DETAIL FLASHING, ROOF PENETRATION, CORNER DETAILS, ETC AS RECOMMENDED BY ROOF MEMBRANE MANUFACTURER AND AS REQ'D TO MAINTAIN WARRANTY.'HOLDChain hold
└Scope 05A-312 | Roofing: EPDM roofing (text shows "EDPM ROOFING"), roofing membrane details, roof drains, gutters, downspouts, and overflowsHOLDChain hold
└Scope 06A-312 | Roofing notes: "ROOFING MEMBRANE OVER CANT STRIP AND LAPPED WITH FLASHING"HOLDChain hold
└Scope 07A-313 | Provide roofing membrane over cant strip and lapped flashing; EDPM roofingHOLDChain hold
└Scope 08A-313 | EDPM ROOFINGHOLDChain hold
└Scope 09A-313 | ROOFING MEMBRANE OVER CANT STRIP AND LAPPED WITH FLASHINGHOLDChain hold
└Scope 10A-314 | Provide EDPM roofing.HOLDChain hold
└Scope 11A-314 | Provide roofing membrane over cant strip and lapped with flashing.HOLDChain hold
└Scope 12A-314 | EDPM ROOFINGHOLDChain hold
└Scope 13A-314 | ROOFING MEMBRANE OVER CANT STRIP AND LAPPED WITH FLASHINGHOLDChain hold
└Scope 14A-550 | Provide continuous metal coping and single ply membrane roofing turned up on walls and parapets (typ).HOLDChain hold
└Scope 15A-550 | SINGLE PLY MEMBRANE ROOFING TURN UP ON WALLHOLDChain hold
└Scope 16A-550 | RUN ROOFING UP ON PARAPET (TYP)HOLDChain hold
└Scope 17A-550 | ROOFING SYSTEM-SLOPE TO DRAINHOLDChain hold
Section-07-006Roof / Wall PanelsChain hold
└Scope 01A-005 Details 1 and 7 | Exterior finish is referenced to elevations; material, locations, and quantities are not added until that chain is verified.HOLDChain hold
└Scope 02A-200 | Exterior finish key (EF1, EF2, EF2b, EF2a, EF4, ST1, SP1, EF4a, EF3) with finish namingHOLDChain hold
└Scope 03A-200 | Reference to additional documentation (Exterior Finish Index, color prints)HOLDChain hold
└Scope 04A-200 | Reference note: REFER TO EXTERIOR FINISH INDEX FOR MATERIALS AND COLORS.HOLDChain hold
└Scope 05A-201 | EIFS finish color notes: DARK EIFS FINISH COLOR - TEXTURED; PEARLESCENT ACCENT EIFS FINISH COLOR; ACCENT EIFS COLOR; MAIN BUILDING EIFS COLORHOLDChain hold
└Scope 06A-201 | Stair tower EIFS color notedHOLDChain hold
└Scope 07A-201 | Exterior finish key items exactly as shown: EF1 EF2 EF2b EF2a EF4 ST1 SP1 EF4a EF3HOLDChain hold
└Scope 08A-203 | Exterior finish instructions (refer to Exterior Finish Index for materials and colors)HOLDChain hold
└Scope 09A-203 | 1" EFIS reveal (see 550 series for details)HOLDChain hold
└Scope 10A-203 | REFER TO EXTERIOR FINISH INDEX FOR MATERIALS AND COLORS.HOLDChain hold
└Scope 11A-203 | ALIGN RUSTICATION ACROSS BUILDING, MAINTAIN CONSISTENCY BETWEEN DARK AND LIGHT EFIS FINISHES.HOLDChain hold
└Scope 12A-312 | Landscaping: "LANDSCAPING BEDS PROVIDED TO AVOID WICKING AT EXTERIOR FINISH SYSTEM, RE: SHEET 102 FOR PLANTING TYPES."HOLDChain hold
└Scope 13A-313 | Installation of drainable EIFS systems and flashing at window heads per EIFS manufacturer and window shop instructionsHOLDChain hold
└Scope 14A-313 | Provide phenolic resin panels or cement board siding on rainscreenHOLDChain hold
└Scope 15A-313 | Provide landscaping beds to avoid wicking at exterior finish system (see sheet 102)HOLDChain hold
└Scope 16A-313 | EXTERIOR FINISH SYSTEMS AS SCHEDULED: EFIS SYSTEM ( ALL EIFS TO BE DRAINABLE)HOLDChain hold
└Scope 17A-313 | FLASHING AT ALL WINDOW HEADS AS REQUIRED BY EIFS MANU AND WINDOW SHOPS INSTRUCTIONS. (TYP)HOLDChain hold
└Scope 18A-313 | LANDSCAPING BEDS PROVIDED TO AVOID WICKING AT EXTERIOR FINISH SYSTEM, RE: SHEET 102 FOR PLANTING TYPES.HOLDChain hold
└Scope 19A-314 | Provide EIFS system (all EIFS to be drainable).HOLDChain hold
└Scope 20A-314 | Provide phenolic resin panels or cement board siding on rainscreen system.HOLDChain hold
└Scope 21A-314 | Provide landscaping beds to avoid wicking at exterior finish system (ref: sheet 102).HOLDChain hold
└Scope 22A-314 | TYP. EFIS WALL SECTIONHOLDChain hold
└Scope 23A-314 | TYP. RAINSCREEN WALL SECTIONHOLDChain hold
└Scope 24A-314 | EXTERIOR FINISH SYSTEMS AS SCHEDULED: EFIS SYSTEM (ALL EIFS TO BE DRAINABLE)HOLDChain hold
└Scope 25A-314 | LANDSCAPING BEDS PROVIDED TO AVOID WICKING AT EXTERIOR FINISH SYSTEM, RE: SHEET 102 FOR PLANTING TYPES.HOLDChain hold
Section-07-007Flashing / Sheet MetalChain hold
└Scope 01A-112 | Roof drains (typ.) shownHOLDChain hold
└Scope 02A-112 | Roof drain noted: ROOF DRAIN (TYP)HOLDChain hold
└Scope 03A-116 | ScupperHOLDChain hold
└Scope 04A-117 | Roof drainage layout including scuppers and roof drainsHOLDChain hold
└Scope 05A-117 | Provision of thru-wall scuppers and roof drains sized per local rainfall and codesHOLDChain hold
└Scope 06A-117 | Downspout connections to tie into sewer/storm water system per design & construction standardsHOLDChain hold
└Scope 07A-117 | Scuppers are shown and labeled 'Scupper' multiple timesHOLDChain hold
└Scope 08A-117 | Roof drains labeled 'RD' and 'ROOF DRAIN' on sheetHOLDChain hold
└Scope 09A-117 | Reference note A: 'THRU WALL SCUPPERS AND ROOF DRAINS SHALL BE SIZED BASED ON LOCAL RAINFALL AND AS REQUIRED PER LOCAL CODES.'HOLDChain hold
└Scope 10A-117 | Symbols legend entries include: ROOF TOP ACCESS HATCH & ACCESS HATCH CURB; DECORATIVE EXTENSION OF PARAPET FROM ADJACENT WALL; OVERFLOW THRU WALL SCUPPER; DOWNSPOUT & OVERFLOW SCUPPER; DOWNSPOUT TO TIE INTO SEWER / STORM WATER SYSTEM PER DESIGN & CONSTRUCTION STANDARDS.HOLDChain hold
└Scope 11A-312 | Provide metal coping cap at parapetsHOLDChain hold
└Scope 12A-312 | Provide gutters, downspouts, roof drains and overflows as required for local rainfall. "OVERFLOWS TO DAYLIGHT IN AREAS THAT WILL NOT DRAIN ACROSS WALKING SURFACES"HOLDChain hold
└Scope 13A-313 | Provide metal coping cap at parapetsHOLDChain hold
└Scope 14A-313 | Provide gutters, downspouts, roof drains and overflows; route overflows to daylight where requiredHOLDChain hold
└Scope 15A-313 | GUTTERS, DOWNSPOUTS, ROOF DRAINS AND OVERFLOWS AS REQUIRED FOR LOCAL RAINFALL. OVERFLOWS TO DAYLIGHT IN AREAS THAT WILL NOT DRAIN ACROSS WALKING SURFACESHOLDChain hold
└Scope 16A-314 | Provide gutters, downspouts, roof drains and overflows as required for local rainfall; overflows to daylight in areas that will not drain across walking surfaces.HOLDChain hold
└Scope 17A-314 | Provide metal coping cap at parapets.HOLDChain hold
└Scope 18A-314 | GUTTERS, DOWNSPOUTS, ROOF DRAINS AND OVERFLOWS AS REQUIRED FOR LOCAL RAINFALL. OVERFLOWS TO DAYLIGHT IN AREAS THAT WILL NOT DRAIN ACROSS WALKING SURFACESHOLDChain hold
└Scope 19A-314 | PROVIDE METAL COPING CAP AT PARAPETSHOLDChain hold
└Scope 20A-550 | Provide prefabricated membrane flashing at plumbing vent stacks and other round penetrations.HOLDChain hold
└Scope 21A-550 | Provide roof scupper in 4" flange set in full bed of mastic and fastened at 3" o.c.; provide min 8" wide downspout.HOLDChain hold
└Scope 22A-550 | 3'-4"MIN CONT METAL COPINGHOLDChain hold
└Scope 23A-550 | ROOF DRAIN/OVERFLOW - SEE MECH.HOLDChain hold
└Scope 24A-550 | FLASHING PLIES DRIP EDGE SET IN FULL BED OF SEALANT.HOLDChain hold
└Scope 25A-550 | PREFIN. MET. FLASHING WITH CLEAT ATTACHMENT- SEAL SHOP SOLDERED 20 OZ.HOLDChain hold
└Scope 26A-550 | SCUPPER SET IN 4" FLANGE IN FULL BED OF MASTIC AND FASTEN AT 3" O.C.HOLDChain hold
└Scope 27A-550 | MIN 8" WIDE DOWNSPOUTHOLDChain hold
└Scope 28A-550 | PLUMBING VENT STACK OR OTHER ROUND TYPE PENETRATION PREFABRICATED MEMBRANE FLASHINGHOLDChain hold
└Scope 29A-571 | Pool coping detailHOLDChain hold
Section-07-008Roof AccessoriesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-07-009FirestoppingChain hold
└Scope 01A-005 Detail 9 | Firestop PVC wall penetration through 1 HR/2 HR gypsum-board stud wall; UL W-L-2110. Penetration count link pending.EAChain hold
└Scope 02P5.2 [Plumbing] | USE PROSET FIRESTOP PENETRATORS, OR EQUAL FOR ALL PIPE PENETRATIONS AND FIXTURE OPENINGS THROUGH FIRE RATED FLOORS AND WALLS. BUILDING CODE REQUIRED SYSTEM NUMBERS ARE LISTED & DETAILED BELOW.HOLDChain hold
Section-07-010Joint SealantsChain hold
└Scope 01A-005 Details 1-2 | Acoustic sealant at wall base where indicated. Wall-length link pending.LFChain hold
└Scope 02ID503 [Interior] | SEALANT AROUND ENTIRE BOWLHOLDChain hold
DIV 08Openings10
Section-08-001Hollow Metal Doors / FramesChain hold
└Scope 01A-600 | Provide door schedule information: door types, widths, heights, thicknesses, elevations, materials, finishes, thresholds, hardware and frame materials.HOLDChain hold
└Scope 02A-600 | GENERAL NOTE: "ALL HOLLOW METAL DOORS AND FRAMES TO BE PAINTED."HOLDChain hold
└Scope 03A-600 | Door schedule entry: "01 GUEST ENTRY 3'-0" 6'-8" 1 3/4" C SCWD PLAM T1B HM 20 MIN"HOLDChain hold
└Scope 04A-600 | Door schedule entry: "01A GUEST ENTRY ACCESSIBLE 3'-0" 6'-8" 1 3/4" C SCWD PLAM IFI T1C HM 20 MIN"HOLDChain hold
└Scope 05A-600 | Door schedule entry: "02 GUEST BATH 3'-0" 6'-8" 1 3/4" B SCWD PLAM"HOLDChain hold
└Scope 06A-600 | Door schedule entry: "03 ACCESSIBLE GUEST BATH 3'-0" 6'-8" 1 3/4" B SCWD PLAM IFI T2E HM"HOLDChain hold
└Scope 07A-600 | Door schedule entry: "15 A, B POOL / PATIO VESTIBULE 3'-0" 7'-5" 1 3/4" A.1 ALUM CLR. ANOD T15 ALUM FINISH TO MATCH TYP STOREFRONT"HOLDChain hold
└Scope 08A-600 | Door schedule entry: "26 VESTIBULE (INTERIOR) 6'-0" 7'-5" 1 3/4" J ALUM CLR. ANOD MFR T15C ALUM TILE TRANSITION AT THRESHOLD; AUTOMATIC DOOR HDWR BY SUPPLIER"HOLDChain hold
└Scope 09A-600 | Door schedule entry: "21A-21.1A POOL EQ & CHEM ST RM. 3'-0*/2'-0\"" 6'-8" 1 3/4" B HM PTD T18 HM 45 MIN"HOLDChain hold
└Scope 10A-600 | Door schedule entry: "50 STAIR (INTERIOR) 3'-0" 6'-8" 1 3/4" G SCWD PLAM T10A HM 90 MIN"HOLDChain hold
└Scope 11A-600 | Door schedule entry: "51 STAIR (EXTERIOR) 3'-0" 6'-8" 1 3/4" B HM PTD T11A HM 90 MIN"HOLDChain hold
Section-08-002Wood DoorsChain hold
└Scope 01ID508 [Interior] | Frame wood door and base wood door as called outHOLDChain hold
Section-08-003Specialty DoorsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-08-004Overhead / Coiling DoorsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-08-005Entrances / StorefrontsChain hold
└Scope 01A-203 | Finish aluminum cladding at cove to match storefrontHOLDChain hold
└Scope 02A-203 | FINISH ALUMINUM CLADDING AT COVE TO MATCH STOREFRONT.HOLDChain hold
└Scope 03A-572A | Light cove at storefront (detail shown)HOLDChain hold
└Scope 04A-610 | VESTIBULE STOREFRONT & DOOR TYPE 1HOLDChain hold
└Scope 05A-610 | 3-D VIEWS OF STOREFRONTHOLDChain hold
└Scope 06A-610 | Sheet contains the caption: VESTIBULE STOREFRONT & DOOR TYPE 1HOLDChain hold
└Scope 07A-610 | Sheet contains the caption: 3-D VIEWS OF STOREFRONTHOLDChain hold
└Scope 08C-4 [Civil] | Install temporary gravel construction entrance (20' x 50' min.) and maintain dailyHOLDChain hold
└Scope 09C-4 [Civil] | PROPOSED CONSTRUCTION ENTRANCE (SEE DETAIL, SHEET No. 5)HOLDChain hold
└Scope 10C-4 [Civil] | TEMPORARY GRAVEL CONSTRUCTION ENTRANCE TO BE CONSTRUCTED AFTER EXISTING PAVEMENT REMOVAL (20' x 50' MIN.) (SEE DETAIL, SHEET No. 5)HOLDChain hold
└Scope 11C-5 [Civil] | CONSTRUCTION ENTRANCE DETAILHOLDChain hold
└Scope 12E4.2 [Electrical] | Note (legible) about specific guestrooms: 'GUESTROOMS 208, 211, 214, 306, 311, 314, 408, 411, 414, 508, 511, AND 514 SHALL HAVE (2) DECORATIVE SCONCE AT ENTRANCE.'HOLDChain hold
Section-08-006WindowsChain hold
└Scope 01A-200 | Window area calculations for first and upper floors and percent providedHOLDChain hold
└Scope 02A-201 | Windows: typical guestroom windows (ground and upper floors); PTAC louver integral with window frameHOLDChain hold
└Scope 03A-201 | Typical notes present: "TYPICAL GUESTROOM WINDOW @ GROUND FLOOR" and "TYPICAL GUESTROOM WINDOW FOR UPPER FLOOR"HOLDChain hold
└Scope 04A-203 | Align windows at head across building (typ.)HOLDChain hold
└Scope 05A-203 | Aluminum jamb and header extension with accent finish to match window (see window schedule)HOLDChain hold
└Scope 06A-203 | ALIGN WINDOWS AT HEAD ACCROSS BUILDING (TYP.)HOLDChain hold
└Scope 07A-203 | ALUMINUM JAMB AND HEADER EXTENSION. FINISH ACCENT COLOR TO MATCH WINDOW. SEE WINDOW SCHED TO FINISH.HOLDChain hold
└Scope 08A-312 | Window type coordination per sheet 611 (aluminum panel window)HOLDChain hold
└Scope 09A-312 | Windows note: "ALUMINUM PANEL WINDOW, RE: 611 FOR TYPE"HOLDChain hold
└Scope 10A-313 | ALUMINUM PANEL WINDOW, RE: 611 FOR TYPEHOLDChain hold
└Scope 11A-314 | ALUMINUM PANEL WINDOW, RE: 611 FOR TYPEHOLDChain hold
└Scope 12A-610 | WINDOW TYPE ELEVATIONSHOLDChain hold
└Scope 13A-610 | Sheet contains the caption: WINDOW TYPE ELEVATIONSHOLDChain hold
└Scope 14ID422 [Interior] | Legend entries visible include: CEILING LT FIXTURE, WALL MTD LT FIXTURE, TV, GFI OUTLET & SWITCH FOR MOTORIZED WINDOW TREATMENTS, RACEWAY & WIRING JUNCTION BOX, LIGHT SWITCH, TELEPHONE OUTLET, TV OUTLET, GROUND FAULT INTERRUPTER, DUPLEX RECEPTACLE, THERMOSTAT, MASTER SWITCHHOLDChain hold
└Scope 15ID520 [Interior] | Provide (1) track system for window treatment: traversing blackout side drapery and a sheer roller shade mounted inside wall opening where possible.HOLDChain hold
└Scope 16ID520 [Interior] | WINDOW TREATMENT CONSISTS OF A (1) TRACK SYSTEM FOR ALL CEILING HEIGHTS: - TRAVERSING BLACKOUT SIDE DRAPERY. - A SHEER ROLLER SHADE MOUNTED INSIDE WALL OPENING FOR WINDOW AS POSSIBLE, COORDINATE WITH WALL AND WINDOW CONSTRUCTION.HOLDChain hold
Section-08-007Curtain WallReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-08-008Door HardwareChain hold
└Scope 01A-600 | Provide threshold details for guest bathroom and guestroom entry doors.HOLDChain hold
└Scope 02A-600 | GENERAL NOTE: "DOOR HARDWARE TO BE CENTERED ON RAIL OF PANEL DOORS."HOLDChain hold
└Scope 03A-600 | Threshold detail labels shown: "GUEST BATHROOM DOOR THRESHOLD" and "GUESTROOM ENTRY DOOR THRESHOLD"HOLDChain hold
Section-08-009GlazingChain hold
└Scope 01A-008-B | LAVATORIES and MIRRORSHOLDChain hold
└Scope 02A-600 | Provide glazing requirements ("PROVIDE SAFETY GLAZING AT ALL GLAZING"; "T = TEMPERED GLAZING CLEAR TEMPERED GLASS").HOLDChain hold
└Scope 03A-600 | GENERAL NOTE: "PROVIDE SAFETY GLAZING AT ALL GLAZING."HOLDChain hold
└Scope 04ID423 [Interior] | Provision for hardwired lit-mirror at vanity (note N)HOLDChain hold
└Scope 05ID432 [Interior] | Coordination with Purchasing Agent for items and mirror opening verificationHOLDChain hold
└Scope 06ID503 [Interior] | MIRRORS (SEE ELEVATIONS)HOLDChain hold
└Scope 07ID509 [Interior] | Veneer frame with tempered glass doorHOLDChain hold
Section-08-010Louvers / VentsChain hold
└Scope 01A-203 | Blank louver to match guestroom louverHOLDChain hold
DIV 09Finishes10
Section-09-001Gypsum Board AssembliesChain hold
└Scope 01A-005 Detail 3 | Interior shaft wall: 1-inch Gold Bond Fire-Shield shaftliner on shaft side and two layers 5/8-inch Gold Bond Type X gypsum board on room side; water-resistant products; UL U-438, 2 HR, STC 59. Link pending.SFChain hold
└Scope 02A-005 Detail 4 | Nonrated interior wall: one layer 5/8-inch gypsum board each side; STC 49. Link pending.SFChain hold
└Scope 03A-005 Detail 6 | Load-bearing interior stud wall: one layer 5/8-inch Type X gypsum board each side; UL 423, 1 HR, STC 58. Link pending.SFChain hold
└Scope 04A-005 Detail 7 | Load-bearing exterior stud wall: one layer 5/8-inch Type X DensGlass exterior sheathing and one layer 5/8-inch Type X gypsum board interior; UL 423, 1 HR, STC 58. Link pending.SFChain hold
└Scope 05A-005 Detail 8 | One-hour steel-column fire-resistive enclosure with two layers 5/8-inch gypsum board; UL X-526. Column count link pending.EAChain hold
└Scope 06A-005 Detail 10 | One-hour steel-beam fire-resistive enclosure with two layers 5/8-inch gypsum board below precast floor; UL N-505. Beam-length link pending.LFChain hold
└Scope 07A-120 | Construct GWB bulkheads with indicated depths (e.g., "GWB Bulkhead 8" Deep", "GWB Bulkhead 10" Deep", "GWB Bulkhead 14" Deep")HOLDChain hold
└Scope 08A-120 | Multiple ceiling/finish notes present such as "2' x 2' ACT", "GWB on Mtl. Stud", "GWB Bulkhead 8" Deep", and elevations noted as "8' - 0", "8' - 6", "9' - 2"", etc.HOLDChain hold
└Scope 09A-312 | Dropped ceiling types noted: "(2) LAYERS TYPE \"X\" GWB ACOUSTICAL CEILING TILE SYSTEM", "(1) LAYER GWB"HOLDChain hold
└Scope 10A-313 | Provide gypsum board soffits, aluminum clad soffits with scheduled cove lightingHOLDChain hold
└Scope 11A-313 | Interior dropped ceiling types as indicated (2-layer Type X GWB acoustical tile, 1-layer GWB)HOLDChain hold
└Scope 12A-313 | DROPPED CEILING, SUSPENDED OR FRAMED, (2) LAYERS TYPE "X" GWB ACOUSTICAL CEILING TILE SYSTEMHOLDChain hold
└Scope 13A-313 | DROPPED CEILING, SUSPENDED OR FRAMED, (1) LAYER GWBHOLDChain hold
└Scope 14A-313 | ALUMINUM CLAD SOFFIT WITH SCHED. COVE LIGHT FIXTUREHOLDChain hold
└Scope 15A-314 | Provide dropped ceilings as specified (two layers Type X GWB acoustical tile system or one layer GWB as noted).HOLDChain hold
└Scope 16A-314 | DROPPED CEILING, SUSPENDED OR FRAMED, (2) LAYERS TYPE "X" GWB ACOUSTICAL CEILING TILE SYSTEMHOLDChain hold
└Scope 17A-314 | DROPPED CEILING, SUSPENDED OR FRAMED, (1) LAYER GWBHOLDChain hold
└Scope 18A-314 | ALUMINUM CLAD SOFFIT WITH SCHED. COVE LIGHT FIXTUREHOLDChain hold
└Scope 19A-404 | SOFFIT DETAIL @ GYP. BD. CEILINGS (detail)HOLDChain hold
└Scope 20A-404 | CEILING DETAIL @ RECEPTION (detail)HOLDChain hold
└Scope 21A-404 | SOFFIT DETAIL (general)HOLDChain hold
└Scope 22A-404 | TYPICAL CORRIDOR CEILING DETAIL (detail)HOLDChain hold
└Scope 23A-404 | SOFFIT @ ELEVATOR LOBBY (detail)HOLDChain hold
└Scope 24A-404 | LIGHT COVE SOFFIT AT ELEVATOR (detail)HOLDChain hold
└Scope 25A-404 | Visible sheet title: CEILING DETAILSHOLDChain hold
└Scope 26A-433 | Floating soffit details at guest suites (plan, section, and 3D views)HOLDChain hold
└Scope 27A-433 | Plan detail of soffitHOLDChain hold
└Scope 28A-433 | Floating soffit detailHOLDChain hold
└Scope 29A-433 | 3D view - wing wall & soffit detailHOLDChain hold
└Scope 30A-433 | Interior elevation of soffit wall from bedroom sideHOLDChain hold
└Scope 31A-550 | Provide 5/8" gypsum wall board (GWB) suspended on metal grid where indicated.HOLDChain hold
└Scope 32C-15 [Civil] | Apply curing compound to pavement vertical edge at a coverage rate of 300 SF max per gallon immediately after removing bulkheadHOLDChain hold
└Scope 33ID501 [Interior] | Provide 2x wall construction with 5/8" gypsum board where required to support art piece and finishHOLDChain hold
└Scope 34ID507 [Interior] | Reference to ceiling soffit detail on 3/B341HOLDChain hold
└Scope 35ID508 [Interior] | Wood plank ceiling system finish on bottom and face of bulkheadHOLDChain hold
└Scope 36ID510 [Interior] | GYPSUM BOARD ON 2X FRAMING BASE AS SCHEDULEDHOLDChain hold
└Scope 37ID512 [Interior] | Wrap bulkhead and side walls with wallcovering.HOLDChain hold
Section-09-002TileChain hold
└Scope 01A-120 | Install 2' x 2' ACT (acoustic ceiling tile) at various areas (notations: "2' x 2' ACT")HOLDChain hold
└Scope 02A-403 | INTERIOR WALL OF MAT TO FLOOR TILEHOLDChain hold
└Scope 03A-436 | ORIENT VALLEY PERPENDICULAR TO WALLS AND SCRIBE TILE BASE TO FLOOR.HOLDChain hold
└Scope 04A-571 | Pool depth marker tile detailHOLDChain hold
└Scope 05C-5 [Civil] | GEOTEXTILE FABRIC INLET PROTECTIONHOLDChain hold
└Scope 06C-8 [Civil] | Geotextile type and strip width requirements (AASHTO M288 Class 1 and Class 2)HOLDChain hold
└Scope 07C-14 [Civil] | POTABLE WATER PIPES SHALL BE HYDROSTATICALLY TESTED FOR PRESSURE AND LEAKAGE IN ACCORDANCE WITH AWWA STANDARD C600 FOR DUCTILE IRON PIPES AND C605 FOR PVC PIPES, RESPECTIVELY.HOLDChain hold
└Scope 08C-14 [Civil] | POTABLE WATER PIPES MUST BE MANUFACTURED IN ACCORDANCE WITH THE FOLLOWING AWWA SPECIFICATIONS: DUCTILE IRON PIPE (3 INCHES TO 54 INCHES) - AWWA C150 AND AWWA C151; PVC PIPE: (1) AWWA C900/ASTM 1784 (1 INCH TO 12 INCHES) WITH CL200 MINIMUM; (2) AWWA C905 (14 INCHES TO 48 INCHES).HOLDChain hold
Section-09-003Acoustical CeilingsChain hold
└Scope 01A-405 | Visible sheet labels and callouts: POOL 015; POOL DECK; INDOOR POOL FLOOR PLAN; INDOOR POOL RCPHOLDChain hold
└Scope 02A-407 | ENLARGED RCP - EMPLOYEE BREAK ROOM (reflected ceiling plan for break room)HOLDChain hold
└Scope 03A-410 | King Guestroom reflected ceiling plan (RCP)HOLDChain hold
└Scope 04A-411 | Reflected ceiling plan (RCP) for KING SUITE GUESTROOMHOLDChain hold
└Scope 05A-411 | Multiple sheet/figure references appear on the sheet including: 'KING SUITE GUESTROOM FF&E PLAN LEFT FACING', 'PLAN RIGHT FACING', 'FINISH PLAN', and 'RCP PLAN'.HOLDChain hold
└Scope 06A-412 | Reflected ceiling plan (RCP) for King Suite ADA GuestroomHOLDChain hold
└Scope 07A-413 | Reflected ceiling plan (RCP) for King ADA guestroom (sheet label: 3 KING ADA GUESTROOM RCP PLAN)HOLDChain hold
└Scope 08A-420 | Reflected Ceiling Plan (RCP)HOLDChain hold
└Scope 09A-422 | Reflected ceiling plan (RCP) for QUEEN QUEEN ADA GUESTROOMHOLDChain hold
└Scope 10A-511 | SEE 400 SERIES ENLARGED LOBBY RCP FOR FIXTURE TYPE & PLAN CONFIGURATIONHOLDChain hold
└Scope 11A1-22 | Third Reflected Ceiling Plan (sheet A122) - reflected ceiling plan information for the referenced level/sheet.HOLDChain hold
└Scope 12A1-23 | Fourth Reflected Ceiling Plan (sheet title indicates reflected ceiling plan for the fourth level)HOLDChain hold
└Scope 13A1-23 | Fourth Reflected Ceiling PlanHOLDChain hold
└Scope 14A1-24 | Fifth Reflected Ceiling Plan (as shown on sheet A124)HOLDChain hold
└Scope 15A1-24 | Fifth Reflected Ceiling PlanHOLDChain hold
└Scope 16C-4 [Civil] | TOTAL DISTURBED AREA DUE TO CONSTRUCTION ACTIVITY IS 2.1 ± ACRESHOLDChain hold
└Scope 17C-5 [Civil] | THE CONTRACTOR SHALL DEMONSTRATE A METHOD OF MAINTENANCE, USING A SEWN FLAP, HAND HOLDS, OR OTHER METHOD TO PREVENT ACCUMULATED SEDIMENT FROM ENTERING THE INLET.HOLDChain hold
└Scope 18C-7 [Civil] | Installation of 15" RCP outfall (INV 37.00) and connections to existing inlet with watertight sealsHOLDChain hold
└Scope 19C-7 [Civil] | SUMMARY OF DRAINAGE: 5 YEAR, 24 HOUR (FDOT) PRE: 7.44 (INCHES) POST: 10.56 (INCHES) ... (document shows table; exact numbers visible elsewhere on sheet)HOLDChain hold
└Scope 20C-8 [Civil] | Compaction and construction equipment limits and compaction densities (95% Standard Proctor / AASHTO T-180 guidance)HOLDChain hold
└Scope 21C-8 [Civil] | THE STRUCTURAL DESIGN ... SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12 ARE MET.HOLDChain hold
└Scope 22C-8 [Civil] | ONLY CHAMBERS THAT ARE APPROVED BY THE ENGINEER WILL BE ALLOWED. THE CONTRACTOR SHALL SUBMIT (3 SETS) OF THE FOLLOWING TO THE ENGINEER FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE: a. A STRUCTURAL EVALUATION BY A REGISTERED STRUCTURAL ENGINEER ... b. A CERTIFICATION BY THE MANUFACTURER THAT THE CHAMBERS ARE IN ACCORDANCE WITH ASTM F2418-05.HOLDChain hold
└Scope 23C-8 [Civil] | CHAMBERS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY.HOLDChain hold
└Scope 24C-8 [Civil] | INSTALLATION OF CHAMBERS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S LATEST INSTALLATION INSTRUCTIONS.HOLDChain hold
└Scope 25C-9 [Civil] | Placement of fill in one-foot lifts; compaction 98% for paved areas and 95% for unpaved areas per AASHTO T-180 modified Proctor.HOLDChain hold
└Scope 26C-9 [Civil] | GENERAL EARTHWORK NOTE 1: IF ANY MUCK OR MUCK-LIKE MATERIAL IS DISCOVERED, IT WILL BE REQUIRED TO BE REMOVED, BACKFILLED WITH APPROPRIATE FILL, COMPACTED, AND TESTED USING AASHTO T-180 MODIFIED PROCTOR METHOD.HOLDChain hold
└Scope 27C-9 [Civil] | GENERAL EARTHWORK NOTE 2: ALL FILLING IS TO BE PERFORMED IN ONE-FOOT LIFTS. THE COMPACTION REQUIREMENT IS 98% FOR PAVED AREAS AND 95% FOR UNPAVED AREAS PER AASHTO T-180 MODIFIED PROCTOR TEST.HOLDChain hold
└Scope 28C-12 [Civil] | Pressure testing, chlorination/disinfection and bacteriological testing per City and F.A.C. requirementsHOLDChain hold
└Scope 29C-12.1 [Civil] | DO NOT COMPACT BACKFILL MECHANICALLYHOLDChain hold
└Scope 30C-13 [Civil] | Installation shall be in strict accordance with the manufacturer's recommendations in the locations shown on the drawing.HOLDChain hold
└Scope 31C-13 [Civil] | A factory representative shall be provide for a one (1) time start-up.HOLDChain hold
└Scope 32C-13 [Civil] | INSPECTION & TESTING: A factory representative shall be provide for a one (1) time start-up and shall have complete knowledge of the proper operation and maintenance of complete system.HOLDChain hold
└Scope 33C-14 [Civil] | Flushing, disinfection and bacteriological clearance per AWWA C-651 and FDEP requirementsHOLDChain hold
└Scope 34C-14 [Civil] | Trench excavation, bedding, haunching, initial and final backfill per specified material classes and compaction requirements (ASTM standards referenced)HOLDChain hold
└Scope 35C-14 [Civil] | Bacteriological sampling (sample valve, corp. stop) as shown on detailHOLDChain hold
└Scope 36C-14 [Civil] | ALL PUBLIC WATER SYSTEM COMPONENTS, EXCLUDING FIRE HYDRANTS, THAT WILL BE INSTALLED UNDER THIS PROJECT AND THAT WILL COME INTO CONTACT WITH DRINKING WATER WILL CONFORM TO NSF INTERNATIONAL STANDARD 61.HOLDChain hold
└Scope 37C-14 [Civil] | ALL PROPOSED WATER MAINS SHALL BE FLUSHED, DISINFECTED AND BACTERIOLOGICALLY CLEARED FOR SERVICE IN ACCORDANCE WITH AWWA SPECIFICATIONS C-651 AND THE FDEP PROTECTION REQUIREMENTS.HOLDChain hold
└Scope 38C-15 [Civil] | Provide 6" subbase compacted and tested to 98% density per AASHTO T-180 modified proctor and stabilized to minimum L.B.R. 40HOLDChain hold
└Scope 39C-21 [Civil] | 8. ALL PLANTING BEDS SHALL BE TREATED WITH 'ROUND-UP' AND 'RONSTAR'. USE AS DIRECTED BY MANUFACTURERS.HOLDChain hold
└Scope 40C-21 [Civil] | 11. THE CONTRACTOR SHALL VERIFY EXISTENCE AND LOCATION OF ALL EXISTING UTILITIES AND UNDERGROUND CONDITIONS PRIOR TO HIS COMMENCEMENT OF THE ANY WORK.HOLDChain hold
└Scope 41C-21 [Civil] | 13. ALL PERMIT AND VARIANCE APPLICATIONS SHALL BE MADE BY THE CONTRACTOR.HOLDChain hold
└Scope 42C-21 [Civil] | 14. PRIOR TO CONSTRUCTION OF PLANTING BEDS, ALL AREAS ARE TO HAVE SOIL TESTS CONDUCTED TO DETERMINE pH AND SOIL FERTILITY. IT IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO AMEND THE SOIL...HOLDChain hold
└Scope 43C-21 [Civil] | 15. EQUIPMENT SHALL BE OPERATED IN A MANNER AS NOT TO INJURE OR DESTROY ANY TREES SHOWN TO REMAIN. CONTRACTOR SHALL NOT CAUSE OR ALLOW THE CLEANING OF EQUIPMENT OR MATERIAL WITHIN THE DRIP LINE OF ANY TREE...HOLDChain hold
└Scope 44C-22 [Civil] | THE CONTRACTOR SHALL VERIFY THE EXISTENCE AND LOCATION OF ALL EXISTING UTILITIES AND CONDITIONS PRIOR TO ITS COMMENCEMENT OF THE IRRIGATION WORK.HOLDChain hold
└Scope 45C-22 [Civil] | THE PLAN IS SCHEMATIC ONLY. THE CONTRACTOR SHALL INSTALL PIPING IN A MINIMUM NUMBER OF TRENCHES AND SHALL INSTALL PIPE IN A MINIMUM LENGTH.HOLDChain hold
└Scope 46C-22 [Civil] | QUANTITIES FOR IRRIGATION MATERIALS ARE NOT GIVEN. THE CONTRACTOR SHALL DETERMINE THIS FROM THE PLAN.HOLDChain hold
└Scope 47C-22 [Civil] | ELECTRICAL TO CONTROLLER SHALL BE SUPPLIED BY ELECTRICAL CONTRACTOR (NOT IRRIGATION CONTRACTOR).HOLDChain hold
└Scope 48C-23 [Civil] | Tree anchoring details (manufacturer-provided, froganchor reference)HOLDChain hold
└Scope 49C-23 [Civil] | No mulch shall be placed within 6" of TREE TRUNK (exact phrase appears multiple times)HOLDChain hold
└Scope 50C-23 [Civil] | PLANTING PIT IS TO BE 1.5 TIMES THE ROOT BALL (exact phrase appears)HOLDChain hold
└Scope 51E1.2 [Electrical] | Code compliance statement text (exact as shown): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 52E2.6 [Electrical] | Exact compliance statement on sheet: "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 53E3.3 [Electrical] | Compliance statement text (exact phrases preserved where shown): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 54E4.0 [Electrical] | Plans and specifications intended to comply with the listed codes (see verifiedFacts for exact code list)HOLDChain hold
└Scope 55E4.1 [Electrical] | Compliance / certification statement transcribed exactly as shown: "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 56E4.2 [Electrical] | General notes and a guestroom circuit legend (legend present on sheet but contents not fully legible in provided extract)HOLDChain hold
└Scope 57ENERGY-1 [Energy-Calculations] | CONTACT NUMBERS: CONSTRUCTION SERVICES CENTER - CITY OF TAMPA (813) 274-3100, OPTION 1; WATER - TAMPA WATER DEPARTMENT (813) 274-8121; WASTEWATER - TAMPA WASTEWATER DEPARTMENT (813) 274-8078; GAS - TECO PEOPLES GAS (813) 299-7342; ELECTRIC - TAMPA ELECTRIC 813-635-1500; TELEPHONE - VERIZON (800) 837-4966; CABLE - BRIGHTHOUSE NETWORKS (813) 684-6400HOLDChain hold
└Scope 58F1-00 [FIRE-ALARM-SYSTEM] | Installation to be done in accordance with listed codes and statutes (see verifiedFacts).HOLDChain hold
└Scope 59F1-00 [FIRE-ALARM-SYSTEM] | Provide a point-addressable fire alarm system with Contact I.D. monitoring to remote supervising station via the Digital Alarm Communicator built into the FACP.HOLDChain hold
└Scope 60F1-00 [FIRE-ALARM-SYSTEM] | Mechanical contractor to perform fan shutdown functions, damper closures, mount duct smoke detectors, weather-protect duct detectors exposed to weather, and perform air velocity testing.HOLDChain hold
└Scope 61F1-00 [FIRE-ALARM-SYSTEM] | Sprinkler contractor to provide waterflow switches and valve tamper supervisory switches (listed as "PROVIDED BY SPRINKLER CONTRACTOR").HOLDChain hold
└Scope 62F1-00 [FIRE-ALARM-SYSTEM] | Provide connections/interface modules for elevator recall, coordinated with elevator contractor.HOLDChain hold
└Scope 63F1-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SHALL POINT ADDRESSABLE & FIRE ALARM MONITORING SHALL BE CONTACT I.D. POINT ADDRESSABLE TO THE REMOTE SUPERVISING STATION VIA THE DIGITAL ALARM COMMUNICATOR BUILT IN THE FIRE ALARM CONTROL PANEL.HOLDChain hold
└Scope 64F3-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DRAWN BY: [REDACTED]HOLDChain hold
└Scope 65F10-00 [FIRE-ALARM-SYSTEM] | End-of-line resistor locations indicated: EOL 47k and EOL 5.1k (exact callouts as shown on sheet)HOLDChain hold
└Scope 66F11-00 [FIRE-ALARM-SYSTEM] | FP•1 panel calculation lines (as shown): SECONDARY STANDBY LOAD (A) 0.747 24 17.92; SECONDARY ALARM LOAD (A) 2.53 0.083 0.211; STANDBY AND ALARM SUBTOTAL (AMP HOURS) 18.13; DERATING FACTOR 1.25; SECONDARY LOAD REQUIREMENTS (AMP HOURS) 22.67; PROVIDE (2) 12V 26AH BATTERIES.HOLDChain hold
└Scope 67F11-00 [FIRE-ALARM-SYSTEM] | FP•1•ACS panel calculation lines (as shown): SECONDARY STANDBY LOAD (A) 0.025 24 0.60; SECONDARY ALARM LOAD (A) 0.0643 0.083 0.005; STANDBY AND ALARM SUBTOTAL (AMP HOURS) 0.605; DERATING FACTOR 1.25; SECONDARY LOAD REQUIREMENTS (AMP HOURS) 0.757; PROVIDE (2) 12V 7AH BATTERIES.HOLDChain hold
└Scope 68F11-00 [FIRE-ALARM-SYSTEM] | PS•1 panel calculation lines (as shown): SECONDARY STANDBY LOAD (A) 0.1219 24 2.93; SECONDARY ALARM LOAD (A) 2.84 0.083 0.237; STANDBY AND ALARM SUBTOTAL (AMP HOURS) 3.16; DERATING FACTOR 1.25; SECONDARY LOAD REQUIREMENTS (AMP HOURS) 3.95; PROVIDE (2) 12V 7AH BATTERIES.HOLDChain hold
└Scope 69F15-00 [FIRE-ALARM-SYSTEM] | Device listings including detectors (FSP-951 W/B200S-LF-WH), horn strobes (P2WLED), compact horn strobe (P2GWKLED), and control modules (FCM-1).HOLDChain hold
└Scope 70F16-00 [FIRE-ALARM-SYSTEM] | Wiring sizes and notes present exactly as shown: '14/2 AWG CABLE', '16/2 AWG CABLE', 'EOL (47K)', 'SIGNAL LINE CIRCUIT (SLC) 32 VDC MAX. SHIELDED-TWISTED PAIR IS RECOMMENDED'HOLDChain hold
└Scope 71ID000 [Interior] | Reflected Ceiling Plans for levels 1-5 (ID131, ID132, ID133)HOLDChain hold
└Scope 72ID001 [Interior] | Contractor to check contract documents, field conditions and dimensions for accuracy and confirm that work is buildable (Note 2).HOLDChain hold
└Scope 73ID001 [Interior] | Contractor to submit written RFIs to designer and obtain written clarifications prior to proceeding (Note 2, Note 32).HOLDChain hold
└Scope 74ID001 [Interior] | Contractor to provide a complete job; omissions in notes do not relieve contractor of responsibilities unless specifically noted (Note 3).HOLDChain hold
└Scope 75ID001 [Interior] | General contractor responsible for distribution of drawings to trades and coordination of subcontractors (Note 5, Note 6).HOLDChain hold
└Scope 76ID001 [Interior] | General contractor responsible for permits applicable to trades/subcontractors (Note 8).HOLDChain hold
└Scope 77ID001 [Interior] | Contractor to submit a detailed construction schedule showing phasing and interruptions to MEP/plumbing services to owner for approval (Note 9).HOLDChain hold
└Scope 78ID001 [Interior] | Contractor to assume sole responsibility for job site conditions and safety for the duration of the project (Note 10).HOLDChain hold
└Scope 79ID001 [Interior] | Verify that fixtures/equipment will fit through doors, elevators, stairs and access corridors prior to manufacture (Note 23).HOLDChain hold
└Scope 80ID001 [Interior] | Submit samples of all finish materials and products for designer approval prior to manufacture or purchase (Note 27).HOLDChain hold
└Scope 81ID001 [Interior] | 2. CONTRACTOR IS RESPONSIBLE FOR CHECKING CONTRACT DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS FOR ACCURACY AND CONFIRMATION THAT WORK IS BUILDABLE AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION. IF THERE ARE ANY QUESTIONS REGARDING THESE OR OTHER COORDINATION ISSUES THE CONTRACTOR SHALL SUBMIT THEM IN WRITING TO THE DESIGNER AND IS RESPONSIBLE FOR OBTAINING A WRITTEN CLARIFICATION FROM THE DESIGNER PRIOR TO PROCEEDING WITH WORK IN QUESTION, OR RELATED WORK. NO ALLOWANCES WILL BE SUBSEQUENTLY MADE ON BEHALF OF THE CONTRACTOR BY REASON OF ANY OMISSION ON HIS PART TO INCLUDE THE COST OF ALL ITEMS OF WORK OR MATERIAL WHETHER OR NOT THEY ARE SPECIFICALLY REQUIRED TO ATTAIN THE COMPLETED CONDITIONS PROPOSED IN THE DRAWINGS.HOLDChain hold
└Scope 82ID001 [Interior] | 3. IT IS INTENDED THAT THE CONTRACTOR PROVIDE A COMPLETE JOB AND ANY OMISSIONS IN THESE NOTES OR IN THE OUTLINE OF THE WORK SHALL NOT BE CONSTRUED AS RELIEVING THE CONTRACTOR OF SUCH RESPONSIBILITIES IMPLIED BY THE SCOPE OF WORK EXCEPT FOR ITEMS SPECIFICALLY NOTED.HOLDChain hold
└Scope 83ID001 [Interior] | 8. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PERMITS APPLICABLE TO SPECIFIC TRADES OR SUBCONTRACTORS' WORK.HOLDChain hold
└Scope 84ID122 [Interior] | Exact note 3: "RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR."HOLDChain hold
└Scope 85ID122 [Interior] | Exact note 8: "DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT."HOLDChain hold
└Scope 86ID122 [Interior] | Exact note 10: "FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY."HOLDChain hold
└Scope 87ID123 [Interior] | Room labels visible (examples preserved exactly): "KING SUITE 321", "KING SUITE 319", "KING SUITE 317", "QUEEN QUEEN 315", "QUEEN QUEEN 320", "ICE MACHINE CHUTE 039", "LINEN 035", "ENGINEERS/ MECHANICAL ROOM 040", "ACCESSIBLE QUEEN QUEEN SUITE 313", "TELEPHONE 036", "ELEC. 037" and many others shown on planHOLDChain hold
└Scope 88ID131 [Interior] | LEVEL 1 REFLECTED CEILING PLANHOLDChain hold
└Scope 89ID132 [Interior] | Document contains reflected ceiling plans for Level 2 and Level 3 (LEVEL 2 & 3 REFLECTED CEILING PLAN).HOLDChain hold
└Scope 90ID133 [Interior] | LEVEL 4 & 5 REFLECTED CEILING PLANHOLDChain hold
└Scope 91ID133 [Interior] | Examples of room-specific finish height callouts as shown on sheet exactly as printed: "402 HEIGHT: FINISH: 8'-0'"HOLDChain hold
└Scope 92ID402 [Interior] | Multiple finish height callouts shown, for example: "HEIGHT: FINISH: 8'-6" 415", "HEIGHT: FINISH: 9'-0" 404", "HEIGHT: FINISH: 8'-0" 400" (exact strings as shown)HOLDChain hold
└Scope 93ID403 [Interior] | Finish heights shown (exact text as shown): "HEIGHT: FINISH: 8'-0\"", "HEIGHT: FINISH: 8'-9\"", "HEIGHT: FINISH: 12'-0\"", "TYP. HEIGHT: FINISH: 8'-0\""HOLDChain hold
└Scope 94ID420 [Interior] | Reflected Ceiling Plan (RCP) for King guestroomHOLDChain hold
└Scope 95ID420 [Interior] | Document contains text: "KING GUESTROOM FF&E PLAN", "KING GUESTROOM FINISH PLAN", "KING GUESTROOM RCP PLAN" and multiple wall elevation titles.HOLDChain hold
└Scope 96ID420 [Interior] | Ceiling/finish heights exactly as shown: "HEIGHT: FINISH: 9'-4" A.F.F." and note "*CEILING HEIGHT AT THE FIRST FLOOR GUESTROOMS IS 11'-4"* **USE (X-407-AC) ON FIRST FLOOR IN LIEU OF (X-407)**".HOLDChain hold
└Scope 97ID420 [Interior] | Electrical and fixture legend items exactly as shown: "CEILING LT FIXTURE", "WALL MTD LT FIXTURE", "TV OUTLET", "GFI", "DUPLEX RECEPTACLE", "THERMOSTAT", "MASTER SWITCH", "DATA DUPLEX" and annotations for AFF heights such as "@ 60" AFF", "TYP. @ 18" AFF", "@ 12" AFF".HOLDChain hold
└Scope 98ID422 [Interior] | KING ADA GUESTROOM RCP PLANHOLDChain hold
└Scope 99ID423 [Interior] | Reflected ceiling plan (RCP)HOLDChain hold
└Scope 100ID424 [Interior] | Architectural light by general contractor (Note G).HOLDChain hold
└Scope 101ID424 [Interior] | Document contains sheets/captions: FF&E PLAN; FINISH PLAN; RCP PLAN; ELECTRICAL PLAN; HEADBOARD WALL ELEVATION (RH SHOWN); TV | SOFA WALL ELEVATION (RH SHOWN); EXTERIOR WALL (RH); WING WALL (RH)HOLDChain hold
└Scope 102ID430 [Interior] | Reflected ceiling plan (RCP)HOLDChain hold
└Scope 103ID431 [Interior] | Reflected ceiling plan (RCP) for Queen Queen ADA GuestroomHOLDChain hold
└Scope 104ID432 [Interior] | Reflected ceiling plan (RCP)HOLDChain hold
└Scope 105ID432 [Interior] | Multiple plan/elevation labels present: 'FF&E PLAN', 'FINISH PLAN', 'RCP', 'HEADBOARD WALL ELEVATION (RH SHOWN)', 'TV | SOFA WALL ELEVATION (RH SHOWN)', 'EXTERIOR WALL (RH)', 'WING WALL (RH SHOWN)'HOLDChain hold
└Scope 106ID442 [Interior] | Reflected ceiling plans (RCP)HOLDChain hold
└Scope 107ID500 [Interior] | Engineered stone transaction ledge with eased edge (called out as '34" ENGINEERED STONE TRANSACTION LEDGE W/EASED EDGE. (308)')HOLDChain hold
└Scope 108ID500 [Interior] | Multiple material/component callouts exist including exact text: 'BLACK MELAMINE INTERIOR', 'ENGINEERED STONE TRANSACTION LEDGE W/EASED EDGE. (308)', 'VENEER', 'REVEAL METAL EDGE', 'EDGE PULL LOCKABLE DRAWER (303) WITH BLACK MELAMIINE INTERIOR', 'KEYBOARD DRAWER (303)', '4" HOLE FOR WIRE MANAGING', 'OPEN BOX (303) WITH BLACK MELAMIINE INTERIOR'HOLDChain hold
└Scope 109ID501 [Interior] | Install 1/4" impact wall covering piece installed direct to back of boxHOLDChain hold
└Scope 110ID501 [Interior] | Referenced detail/parts: "1/4\" IMPACT WALL COVERING PIECE INSTALLED DIRECT TO BACK OF BOX."HOLDChain hold
└Scope 111ID503 [Interior] | DIMENSIONS/NOTES SHOWN: (examples extracted exactly as shown) "4'-0" V.I.F.", "6'-2" V.I.F.", "2'-5" MIN. CLEAR", "3'-6"", "2'-10"", "1'-4 1/2\"", "1' - 10\" MIN. BOWL OPENING VERIFY DEPTH WITH FAUCET REQ'MTS"HOLDChain hold
└Scope 112ID512 [Interior] | Verify installation requirements with equipment manufacturer and owner/brand.HOLDChain hold
└Scope 113ID600 [Interior] | Room schedule row examples (text preserved exactly as shown):HOLDChain hold
└Scope 114M1.6 [Mechanical] | Compliance statement text (exact as shown): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 115P1.4 [Plumbing] | Code compliance statement exactly as printed: "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 116P5.1 [Plumbing] | Follow manufacturer's installation instructions.HOLDChain hold
└Scope 117P5.1 [Plumbing] | FOLLOW MANUFACTURERS INSTALLATION IINSTRUCTIONS.HOLDChain hold
Section-09-004Resilient FlooringChain hold
└Scope 01A-005 Details 1, 2, 4, 6, and 7 | Wall base required/as scheduled. Type, locations, and lengths await finish-schedule chain.LFChain hold
Section-09-005CarpetChain hold
└Scope 01A-436 | Locate floor clean-outs in inconspicuous locations, and not in guestrooms. Floor clean-outs located in carpet areas to be fitted with carpet inserts.HOLDChain hold
└Scope 02A-436 | FLOOR CLEAN-OUTS LOCATED IN CARPET AREAS TO BE FITTED WITH CARPET INSERTS.HOLDChain hold
└Scope 03ID122 [Interior] | Refer to seaming diagrams per brand standards for carpet installation (note 17).HOLDChain hold
└Scope 04ID124 [Interior] | Refer to seaming diagrams per brand standards for proper carpet installation (per note 17).HOLDChain hold
└Scope 05ID131 [Interior] | REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET.HOLDChain hold
└Scope 06ID133 [Interior] | 17. REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET.HOLDChain hold
└Scope 07ID400 [Interior] | REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET.HOLDChain hold
└Scope 08ID400.1 [Interior] | 17. REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET.HOLDChain hold
└Scope 09ID401 [Interior] | 17. REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET.HOLDChain hold
└Scope 10ID404 [Interior] | REFER TO SEAMING DIAGRAMS (PER BRAND STANDARDS) FOR PROPER INSTALLATION OF CARPET.HOLDChain hold
Section-09-006Resinous / Specialty FlooringChain hold
└Scope 01A-005 Details 1 and 5 | One-inch gypcrete over upper-level precast concrete floor. Area link pending.SFChain hold
Section-09-007Wall CoveringsChain hold
└Scope 01A-511 | Wall finishes and coverings: 'WALL COVERING ON SCHEDULED PARTITION', 'TEXTURED PANEL WALL COVERING', 'VINYL WALLCOVERING', 'PAINT WALL BELOW & INSIDE OF COVE TO MATCH WALL COVER'.HOLDChain hold
└Scope 02A-511 | HARDWOOD BASE, TERMINATE WALL COVERING UNDER BASEHOLDChain hold
└Scope 03ID507 [Interior] | Wall covering on scheduled partition referenced on sheetHOLDChain hold
Section-09-008PaintingChain hold
└Scope 01A-120 | Apply spray paint in noted areas (notations: "Spray paint")HOLDChain hold
└Scope 02A-410 | King Guestroom finish planHOLDChain hold
└Scope 03A-410 | 3 KING GUESTROOM FINISH PLANHOLDChain hold
└Scope 04A-411 | Finish plan for KING SUITE GUESTROOMHOLDChain hold
└Scope 05A-412 | Finish plan for King Suite ADA GuestroomHOLDChain hold
└Scope 06A-412 | KING SUITE ADA GUESTROOM FINISH PLANHOLDChain hold
└Scope 07A-413 | Finish plan for King ADA guestroom (sheet label: 2 KING ADA GUESTROOM FINISH PLAN)HOLDChain hold
└Scope 08A-413 | 2 KING ADA GUESTROOM FINISH PLANHOLDChain hold
└Scope 09A-420 | Finish plan for the guestroomHOLDChain hold
└Scope 10A-420 | QUEEN QUEEN GUESTROOM - FINISH PLANHOLDChain hold
└Scope 11A-421 | QUEEN QUEEN SUITE GUESTROOM FINISH PLANHOLDChain hold
└Scope 12A-422 | Finish plan for QUEEN QUEEN ADA GUESTROOMHOLDChain hold
└Scope 13A-422 | Sheet annotation: '2 QUEEN QUEEN ADA GUESTROOM FINISH PLAN'HOLDChain hold
└Scope 14A-600 | Match exterior paint and finishes ("EXTERIOR PAINT COLOR TO MATCH ADJACENT EXTERIOR MATERIALS.")HOLDChain hold
└Scope 15A-806 | Spray paint areasHOLDChain hold
└Scope 16C-12 [Civil] | PRIVATE 8" DOUBLE DETECTOR CHECK ASSEMBLY WITH BYPASS METER AMES 3000SS (PAINTED RED) (SEE CITY DETAIL, SHEET No. 18)HOLDChain hold
└Scope 17C-22 [Civil] | RISERS ARE TO BE HIDDEN COMPLETELY IN SHRUBBERY OR PAINTED BLACK AND IN NO CASE BE HIGHER THAN THE SHRUBBERY INSTALLED.HOLDChain hold
└Scope 18C-22 [Civil] | ALL SPRAY HEADS ARE TO BE A MINIMUM OF 6" POP-UP AND ALL HEADS IN PLANTING AREAS TO BE 12" POP-UP OR RISERS. RISERS SHALL BE PAINTED GREEN OR BLACK.HOLDChain hold
└Scope 19ID000 [Interior] | Level 1 Furniture/Finish Plan (ID121)HOLDChain hold
└Scope 20ID000 [Interior] | Level 2 Furniture/Finish Plan & Typical Corridor Elevations (ID122)HOLDChain hold
└Scope 21ID000 [Interior] | Level 3 Furniture/Finish Plan (ID123)HOLDChain hold
└Scope 22ID000 [Interior] | Level 4 Furniture/Finish Plan (ID124)HOLDChain hold
└Scope 23ID000 [Interior] | Level 5 Furniture/Finish Plan (ID125)HOLDChain hold
└Scope 24ID000 [Interior] | Elevations - first floor corridor (ID200) and lobby/market/enlarged elevations (ID400, ID400.1)HOLDChain hold
└Scope 25ID000 [Interior] | Guestroom plan sheets and restroom details (ID420 - ID444 series as listed)HOLDChain hold
└Scope 26ID000 [Interior] | Finish schedule for guestrooms across 5 stories (ID600 and finish schedule block)HOLDChain hold
└Scope 27ID000 [Interior] | Finish schedule indicates TOTAL 88 ROOMSHOLDChain hold
└Scope 28ID000 [Interior] | Finish schedule lists room counts and room numbers for ID420, ID422, ID423, ID424, ID430, ID431, ID432, ID433HOLDChain hold
└Scope 29ID000 [Interior] | Copyright/ownership statement: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 30ID001 [Interior] | GENERAL NOTES AND LEGEND - ID001 05.11.2018 90% TO MARRIOTT 06.29.2018 BID SET 07.19.2018 100% TO MARRIOTT 11.02.2022 GEN 4.5 REVISIONS 12.20.2022 REVISION 1HOLDChain hold
└Scope 31ID001 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 32ID121 [Interior] | Alternate title on sheet: LEVEL 1 FURNITURE/FINISH PLANHOLDChain hold
└Scope 33ID121 [Interior] | Print instruction: MUST PRINT IN COLORHOLDChain hold
└Scope 34ID121 [Interior] | Copyright/usage note: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 35ID121 [Interior] | Reference: 'SEE DETAILS ON SHEET ID510.'HOLDChain hold
└Scope 36ID121 [Interior] | Reference: 'REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.'HOLDChain hold
└Scope 37ID122 [Interior] | Interior design documentation for Level 2 furniture/finish plan and typical corridor elevations (sheet ID122).HOLDChain hold
└Scope 38ID122 [Interior] | TV and mounting hardware are per the owner; verify specifications in writing from owner (note 2).HOLDChain hold
└Scope 39ID123 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 40ID123 [Interior] | Referenced sheets/details: DRAWING 6 ON ID402, DETAILS ON SHEET ID510HOLDChain hold
└Scope 41ID123 [Interior] | Plan label(s): LEVEL 3 FINISH PLAN; LEVEL 3 FURNITURE/FINISH PLANHOLDChain hold
└Scope 42ID123 [Interior] | Plan contains PG sheet callouts: PG-001, PG-002, PG-101C, PG-102CHOLDChain hold
└Scope 43ID124 [Interior] | Exterior finishes per Architect (per note 5).HOLDChain hold
└Scope 44ID124 [Interior] | Refer to drawing 6 on ID402 for typical bathroom vanity wall elevation with detailed finish information (per note 6).HOLDChain hold
└Scope 45ID124 [Interior] | PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLORHOLDChain hold
└Scope 46ID124 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 47ID125 [Interior] | Refer to Drawing 6 on ID402 for typical bathroom vanity wall elevation and detailed finish information (Note 6).HOLDChain hold
└Scope 48ID125 [Interior] | Alternate sheet title text: LEVEL 5 FURNITURE/FINISH PLAN 1/8" = 1'-0"HOLDChain hold
└Scope 49ID125 [Interior] | Print instruction: PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLORHOLDChain hold
└Scope 50ID125 [Interior] | Property notice: "THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT."HOLDChain hold
└Scope 51ID125 [Interior] | "6. REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION."HOLDChain hold
└Scope 52ID131 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 53ID131 [Interior] | CEILING HEIGHT/FINISH CALL-OUTS PRESENT: examples include 'HEIGHT: FINISH: 8'-0"', 'HEIGHT: FINISH: 7'-8"', 'HEIGHT: FINISH: VARIES', 'HEIGHT: FINISH: PER THE AOR'.HOLDChain hold
└Scope 54ID131 [Interior] | REFERENCE: 'SEE ENLARGED PLANS FOR MORE INFORMATION.' (NOTES - COMMON AREAS #1)HOLDChain hold
└Scope 55ID132 [Interior] | 6. REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.HOLDChain hold
└Scope 56ID132 [Interior] | CEILING PLAN 18" = 1'-0"HOLDChain hold
└Scope 57ID132 [Interior] | Copyright/usage notice: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 58ID132 [Interior] | Typical ceiling/finish heights called out in plan text: 'HEIGHT: FINISH: VARIES', 'HEIGHT: FINISH: 8'-0"', 'HEIGHT: FINISH: 7'-8"', 'HEIGHT: FINISH: 7'-8" 400' (as shown in various callouts).HOLDChain hold
└Scope 59ID132 [Interior] | Typical note on guestroom door drops: '*TYPICAL AT GUESTROOM DOOR DROPS'.HOLDChain hold
└Scope 60ID133 [Interior] | 1. SEE ENLARGED PLANS FOR MORE INFORMATION.HOLDChain hold
└Scope 61ID133 [Interior] | 5. EXTERIOR FINISHES ARE PER THE ARCHITECT.HOLDChain hold
└Scope 62ID133 [Interior] | 6. REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.HOLDChain hold
└Scope 63ID133 [Interior] | 9. NOT USED.HOLDChain hold
└Scope 64ID133 [Interior] | 12. BE AWARE OF WALL BASE TRANSITION AT THIS LOCATION.HOLDChain hold
└Scope 65ID133 [Interior] | CEILING PLAN 18" = 1'-0"HOLDChain hold
└Scope 66ID133 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 67ID133 [Interior] | "404 HEIGHT: FINISH: 8'-0'"HOLDChain hold
└Scope 68ID133 [Interior] | "400 HEIGHT: FINISH: 7'-8'"HOLDChain hold
└Scope 69ID200 [Interior] | EXTERIOR FINISHES ARE PER THE ARCHITECT.HOLDChain hold
└Scope 70ID200 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 71ID200 [Interior] | References to other sheets: 'REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.'HOLDChain hold
└Scope 72ID400 [Interior] | Print size requirement: PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLORHOLDChain hold
└Scope 73ID400 [Interior] | Copyright/reproduction notice: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 74ID400 [Interior] | Finish heights noted in several locations (examples): HEIGHT: FINISH: 9'-2" 400; HEIGHT: FINISH: 8'-6" 405; HEIGHT: FINISH: 8'-0" 404; HEIGHT: FINISH: 7'-4" 400HOLDChain hold
└Scope 75ID400 [Interior] | Specific instruction: REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATIONHOLDChain hold
└Scope 76ID400.1 [Interior] | 1. SEE ENLARGED PLANS FOR MORE INFORMATION.HOLDChain hold
└Scope 77ID400.1 [Interior] | 5. EXTERIOR FINISHES ARE PER THE ARCHITECT.HOLDChain hold
└Scope 78ID400.1 [Interior] | 6. REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.HOLDChain hold
└Scope 79ID400.1 [Interior] | 12. BE AWARE OF WALL BASE TRANSITION AT THIS LOCATION.HOLDChain hold
└Scope 80ID400.1 [Interior] | Referenced sheets/details: 'DRAWING 6 ON ID402', 'DETAILS ON SHEET ID510'.HOLDChain hold
└Scope 81ID400.1 [Interior] | Copyright/ownership statement: 'THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.'HOLDChain hold
└Scope 82ID401 [Interior] | 1. SEE ENLARGED PLANS FOR MORE INFORMATION.HOLDChain hold
└Scope 83ID401 [Interior] | 5. EXTERIOR FINISHES ARE PER THE ARCHITECT.HOLDChain hold
└Scope 84ID401 [Interior] | 6. REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.HOLDChain hold
└Scope 85ID401 [Interior] | 9. NOT USED.HOLDChain hold
└Scope 86ID401 [Interior] | 12. BE AWARE OF WALL BASE TRANSITION AT THIS LOCATION.HOLDChain hold
└Scope 87ID401 [Interior] | MUST PRINT IN COLORHOLDChain hold
└Scope 88ID401 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 89ID401 [Interior] | HEIGHT: FINISH: 9'-4"HOLDChain hold
└Scope 90ID401 [Interior] | EXERCISE ROOM HEIGHT: FINISH: 9'-4"HOLDChain hold
└Scope 91ID401 [Interior] | HEIGHT: FINISH: 8'-0"HOLDChain hold
└Scope 92ID401 [Interior] | HEIGHT: FINISH: 8'-2"HOLDChain hold
└Scope 93ID402 [Interior] | REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.HOLDChain hold
└Scope 94ID402 [Interior] | Copyright/ownership note: "THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT."HOLDChain hold
└Scope 95ID402 [Interior] | Equipment note: "HYDRATION EQUIPMENT CHILLER. INSTALL AS REQ'D AND PROVIDE ALL CONNECTIONS REQUIRED FOR POWER AND WATER."HOLDChain hold
└Scope 96ID402 [Interior] | Accessory/elevation note repeated: "ELEVATIONS FOR FINISHES ONLY, REFER TO O.A.R. FOR ACCESSORY LOCATIONS & SPECS."HOLDChain hold
└Scope 97ID402 [Interior] | Callouts for many tags/details including: V-300, V-309AC, V-309BC, V-380, V-382, PR-401, PR-505, RE-200, RE-700, RE-101, etc.HOLDChain hold
└Scope 98ID403 [Interior] | Note 6: "REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION."HOLDChain hold
└Scope 99ID403 [Interior] | Copyright/ownership text: "THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT."HOLDChain hold
└Scope 100ID403 [Interior] | Printed instruction: "PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR"HOLDChain hold
└Scope 101ID404 [Interior] | EXTERIOR FINISHES ARE PER THE ARCHITECT.HOLDChain hold
└Scope 102ID404 [Interior] | REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.HOLDChain hold
└Scope 103ID404 [Interior] | BE AWARE OF WALL BASE TRANSITION AT THIS LOCATION.HOLDChain hold
└Scope 104ID404 [Interior] | Document title on sheet: ENLARGED FLOOR PLANS & ELEVATIONS B.O.H.HOLDChain hold
└Scope 105ID404 [Interior] | Firm name and proprietary notice: 'THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.'HOLDChain hold
└Scope 106ID404 [Interior] | Note on printing: 'PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR.'HOLDChain hold
└Scope 107ID404 [Interior] | Explicit cross-references to other drawings: 'REFER TO DRAWING 6 ON ID402 TO TYPICAL BATHROOM VANITY WALL ELEVATION WITH DETAILED FINISH INFORMATION.'HOLDChain hold
└Scope 108ID404 [Interior] | Detail reference: 'SEE DETAILS ON SHEET ID510.'HOLDChain hold
└Scope 109ID404 [Interior] | Multiple ED/ID references on plan: ED-200, ED-202/ED-202A, ED-500A-C, ED-500B-C, ED-101, ID404HOLDChain hold
└Scope 110ID420 [Interior] | Finish plan for King guestroomHOLDChain hold
└Scope 111ID420 [Interior] | TV wall elevation (LH shown)HOLDChain hold
└Scope 112ID420 [Interior] | Headboard wall elevation (LH shown)HOLDChain hold
└Scope 113ID420 [Interior] | Entry wall elevation (LH shown)HOLDChain hold
└Scope 114ID420 [Interior] | Exterior wall elevation (LH shown)HOLDChain hold
└Scope 115ID420 [Interior] | Electrical legend and outlet locations for guestroomHOLDChain hold
└Scope 116ID420 [Interior] | Printed instructions: "PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR".HOLDChain hold
└Scope 117ID422 [Interior] | KING ADA GUESTROOM FINISH PLANHOLDChain hold
└Scope 118ID422 [Interior] | KING ADA GUESTROOM - HEADBOARD WALL ELEVATION (RH SHOWN)HOLDChain hold
└Scope 119ID422 [Interior] | KING ADA GUESTROOM - TV WALL ELEVATION (RH SHOWN)HOLDChain hold
└Scope 120ID422 [Interior] | KING ADA GUESTROOM - ENTRY WALL ELEVATION (RH SHOWN)HOLDChain hold
└Scope 121ID422 [Interior] | D. EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.HOLDChain hold
└Scope 122ID422 [Interior] | G. ARCHITECTURAL LIGHT BY G.C.HOLDChain hold
└Scope 123ID422 [Interior] | J. ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASINGHOLDChain hold
└Scope 124ID422 [Interior] | L. INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION. HATCHED AREA INDICATES SPACE WHERE OUTLETS SHOULD OCCUR.HOLDChain hold
└Scope 125ID422 [Interior] | O. DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP.HOLDChain hold
└Scope 126ID422 [Interior] | S. EXPOSED PARTITIONS ABOVE BACK AND SIDES OF WARDROBE TO BE FINISHED (RIGHT)HOLDChain hold
└Scope 127ID422 [Interior] | Printed requirement: PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLORHOLDChain hold
└Scope 128ID423 [Interior] | Finish plan for King Suite GuestroomHOLDChain hold
└Scope 129ID423 [Interior] | Electrical plan / electrical legend and outlet locationsHOLDChain hold
└Scope 130ID423 [Interior] | Elevations: TV/sofa wall elevation, exterior wall elevation, headboard wall elevation, entry wall, wing wallHOLDChain hold
└Scope 131ID423 [Interior] | Architectural light by G.C. (note G)HOLDChain hold
└Scope 132ID423 [Interior] | PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLORHOLDChain hold
└Scope 133ID423 [Interior] | LEGAL / COPYRIGHT: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 134ID423 [Interior] | REFERENCE DETAIL: SEE 4/ID520 FOR CORNICE DETAIL and REFER TO DETAIL 1/ID520 FOR CORNICE DETAIL are present on sheet.HOLDChain hold
└Scope 135ID424 [Interior] | Provide electrical outlet for microwave and power strip (Note O).HOLDChain hold
└Scope 136ID424 [Interior] | Outlet behind cornice for motorized shade (must be concealed); motorized shade controls X-100 (sheet reference near cornice detail).HOLDChain hold
└Scope 137ID424 [Interior] | Copyright / reproduction note: 'THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.'HOLDChain hold
└Scope 138ID424 [Interior] | Detail reference: 'REFER TO DETAIL 1/ID520 FOR CORNICE DETAIL OUTLET BEHIND CORNICE FOR MOTORIZED SHADE (MUST BE CONCEALED)'HOLDChain hold
└Scope 139ID424 [Interior] | Note: 'EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.'HOLDChain hold
└Scope 140ID430 [Interior] | Interior finish plan for typical Queen-Queen guestroomsHOLDChain hold
└Scope 141ID430 [Interior] | Finish planHOLDChain hold
└Scope 142ID430 [Interior] | Electrical planHOLDChain hold
└Scope 143ID430 [Interior] | TV wall elevationHOLDChain hold
└Scope 144ID430 [Interior] | Exterior wall elevationHOLDChain hold
└Scope 145ID430 [Interior] | Headboard wall elevationHOLDChain hold
└Scope 146ID430 [Interior] | Entry wall elevationHOLDChain hold
└Scope 147ID430 [Interior] | CEILING/FINISH HEIGHTS: HEIGHT: FINISH: 9'-4" A.F.F.; NOTE: "CEILING HEIGHT AT THE FIRST FLOOR GUESTROOMS IS 11'-4""HOLDChain hold
└Scope 148ID430 [Interior] | REPEATED INSTRUCTION: "CENTER TV ON CENTER OF HEADBOARD" (appears on plan)HOLDChain hold
└Scope 149ID430 [Interior] | INSTRUCTION: "MUST PRINT IN COLOR" and "PRINTS TO SCALE ON: 24 X 36 PAPER."HOLDChain hold
└Scope 150ID431 [Interior] | Finish plan for Queen Queen ADA GuestroomHOLDChain hold
└Scope 151ID431 [Interior] | Electrical plan for Queen Queen ADA Guestroom (includes electrical legend and device locations)HOLDChain hold
└Scope 152ID431 [Interior] | TV wall elevation, headboard wall elevation, exterior wall elevation, restroom wall elevation for the guestroomHOLDChain hold
└Scope 153ID431 [Interior] | Note: 'THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.'HOLDChain hold
└Scope 154ID431 [Interior] | Note D: 'EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.'HOLDChain hold
└Scope 155ID432 [Interior] | Finish planHOLDChain hold
└Scope 156ID432 [Interior] | Headboard wall elevation (RH shown)HOLDChain hold
└Scope 157ID432 [Interior] | TV / sofa wall elevation (RH shown)HOLDChain hold
└Scope 158ID432 [Interior] | Exterior wall (RH)HOLDChain hold
└Scope 159ID432 [Interior] | Wing wall (RH shown)HOLDChain hold
└Scope 160ID432 [Interior] | Electrical plan for Queen Queen Suite guestroomHOLDChain hold
└Scope 161ID432 [Interior] | Specific detail reference: 'REFER TO DETAIL 1/ID520 FOR CORNICE DETAIL'HOLDChain hold
└Scope 162ID433 [Interior] | OUTLET BEHIND CORNICE FOR MOTORIZED SHADE (MUST BE CONCEALED); MOTORIZED SHADE CONTROLS.HOLDChain hold
└Scope 163ID433 [Interior] | DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP.HOLDChain hold
└Scope 164ID433 [Interior] | HEIGHT: FINISH: 9'-4" A.F.F.HOLDChain hold
└Scope 165ID440 [Interior] | D. EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.HOLDChain hold
└Scope 166ID440 [Interior] | G. ARCHITECTURAL LIGHT BY G.C.HOLDChain hold
└Scope 167ID440 [Interior] | J. ITEM MAY REQUIRE A LEFT/RIGHT VERSION. PURCHASING AGENT TO CONFIRM PRIOR TO PURCHASINGHOLDChain hold
└Scope 168ID440 [Interior] | L. INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION. HATCHED AREA INDICATES SPACE WHERE OUTLETS SHOULD OCCUR.HOLDChain hold
└Scope 169ID440 [Interior] | O. DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP.HOLDChain hold
└Scope 170ID440 [Interior] | P. NOT USEDHOLDChain hold
└Scope 171ID440 [Interior] | S. EXPOSED PARTITIONS ABOVE BACK AND SIDES OF WARDROBE TO BE FINISHEDHOLDChain hold
└Scope 172ID440 [Interior] | Print requirement: PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLORHOLDChain hold
└Scope 173ID440 [Interior] | Intellectual property notice: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 174ID441 [Interior] | EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.HOLDChain hold
└Scope 175ID441 [Interior] | ARCHITECTURAL LIGHT BY G.C.HOLDChain hold
└Scope 176ID441 [Interior] | INDICATES OUTLET LOCATION WITHIN WALL CONSTRUCTION TO AVOID OUTLETS OCCURRING IN SAME CAVITY WITHIN PARTITION.HOLDChain hold
└Scope 177ID441 [Interior] | DUPLEX OUTLET FOR MICROWAVE AND POWER STRIP.HOLDChain hold
└Scope 178ID441 [Interior] | EXPOSED PARTITIONS ABOVE BACK AND SIDES OF WARDROBE TO BE FINISHEDHOLDChain hold
└Scope 179ID441 [Interior] | Note printed: THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 180ID441 [Interior] | Instruction printed: MUST PRINT IN COLORHOLDChain hold
└Scope 181ID441 [Interior] | Height callout on plan: 'HEIGHT: FINISH: 8'-0" A.F.F.'HOLDChain hold
└Scope 182ID442 [Interior] | ElevationsHOLDChain hold
└Scope 183ID442 [Interior] | Finish plans (ELEVFINISH PLAN)HOLDChain hold
└Scope 184ID442 [Interior] | Copyright/legal statement: "THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT."HOLDChain hold
└Scope 185ID442 [Interior] | Print instruction: "PRINTS TO SCALE ON: 24 X 36 PAPER. MUST PRINT IN COLOR" and "MUST PRINT IN COLOR"HOLDChain hold
└Scope 186ID442 [Interior] | D. EQUIPMENT PROVIDED BY OWNER, IF EQUIPMENT IS DIFFERENT FROM WHAT IS IN THE INTERIOR DESIGN SPECIFICATION MANUAL, CONFIRM SELECTED EQUIPMENT WILL FIT WITHIN CASEGOODS.HOLDChain hold
└Scope 187ID500 [Interior] | Edge pull lockable drawer (303)HOLDChain hold
└Scope 188ID500 [Interior] | Keyboard drawer (303)HOLDChain hold
└Scope 189ID500 [Interior] | Metal edge reveals and corner trim: 'REVEAL METAL EDGE', 'REVEAL METAL CORNER TRIM'HOLDChain hold
└Scope 190ID500 [Interior] | Partition cap to match veneer and rounded edge details ('PARTITION CAP TO MATCH VENEER ROUNDED EDGE')HOLDChain hold
└Scope 191ID500 [Interior] | Ownership/copyright note: 'THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.'HOLDChain hold
└Scope 192ID501 [Interior] | Copyright/proprietary text: "THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT."HOLDChain hold
└Scope 193ID501 [Interior] | Referenced detail/parts: "3\" STEEL OUTER FRAME"HOLDChain hold
└Scope 194ID501 [Interior] | Referenced detail/parts: "2X WALL CONST. WITH 5/8\" GYP. BD. AS REQ'D TO SUPPORT ART PIECE ABOVE AND WOOD PLANK FINISH SYSTEM"HOLDChain hold
└Scope 195ID502 [Interior] | Install WOOD PANEL (303)HOLDChain hold
└Scope 196ID502 [Interior] | Install TRANSLUCENT PANEL (330)HOLDChain hold
└Scope 197ID502 [Interior] | Provide WOOD FRAME (303)HOLDChain hold
└Scope 198ID502 [Interior] | Provide WOOD TRAY SHELVES (303); TYP. WOOD STOPS (303)HOLDChain hold
└Scope 199ID502 [Interior] | Provide wood veneer (303) on framing as req'd for head, sill and postsHOLDChain hold
└Scope 200ID502 [Interior] | Ensure an outlet is provided on table side per the brand standardsHOLDChain hold
└Scope 201ID502 [Interior] | Material labels on sheet: WOOD PANEL (303)HOLDChain hold
└Scope 202ID502 [Interior] | Material labels on sheet: TRANSLUCENT PANEL (330)HOLDChain hold
└Scope 203ID502 [Interior] | Annotation: ENSURE AN OUTLET IS PROVIDED ON TABLE SIDE PER THE BRAND STANDARDS.HOLDChain hold
└Scope 204ID503 [Interior] | STONE SKIRT (CONTINUOUS ON EXPOSED SIDES)HOLDChain hold
└Scope 205ID503 [Interior] | DEMOUNTABLE PLAM SKIRT WITH FIXED SIDESHOLDChain hold
└Scope 206ID503 [Interior] | VITREOUS CHINA BOWL AND ASSOCIATED SUPPORTSHOLDChain hold
└Scope 207ID503 [Interior] | STEEL SUPPORT BRACKETS (PAINT WHITE)HOLDChain hold
└Scope 208ID503 [Interior] | STEEL SUPPORT BRACKETS PER SPECIFICATIONS, PAINT WHITEHOLDChain hold
└Scope 209ID503 [Interior] | EQUIPMENT IS PER THE OWNER. G.C. TO VERIFY FINAL SIZES AND SPECIFICATIONS PRIOR TO FABRICATION AND INSTALLATION.HOLDChain hold
└Scope 210ID503 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 211ID504 [Interior] | 1/2" adjustable melamine shelfHOLDChain hold
└Scope 212ID504 [Interior] | Stainless steel grommet (∅ 8") at trash dropHOLDChain hold
└Scope 213ID504 [Interior] | Trash drop (trash bin by owner)HOLDChain hold
└Scope 214ID504 [Interior] | Top & side splash (302) indicated on elevationsHOLDChain hold
└Scope 215ID504 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 216ID504 [Interior] | Material note: BLACK MELAMINE INTERIORHOLDChain hold
└Scope 217ID504 [Interior] | Grommet note: ∅ 8" STAINLESS STEEL GROMMET AT TRASH DROPHOLDChain hold
└Scope 218ID505 [Interior] | RETURN STONE DOWN FACE AT OUTSIDE END OF TABLE.HOLDChain hold
└Scope 219ID505 [Interior] | STONE TOP (306) WITH STONE WATERFALL EDGE (306).HOLDChain hold
└Scope 220ID505 [Interior] | ALL EXPOSED REVEALS TO BE STAINED TO MATCH VENEER PLANKS, TYP.HOLDChain hold
└Scope 221ID505 [Interior] | HARDWOOD SILL PIECE AT BASE, TYP.HOLDChain hold
└Scope 222ID505 [Interior] | HARDWOOD VENEER PLANKS ON PLYWOOD PANELING ON INSIDE FACE.HOLDChain hold
└Scope 223ID505 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 224ID506 [Interior] | Provide WOOD FRAME STOP and STEEL BASE PLATE with bolts below wood frame stop.HOLDChain hold
└Scope 225ID506 [Interior] | Provide ∅ 8" STAINLESS STEEL GROMMET FOR TRASH (330).HOLDChain hold
└Scope 226ID506 [Interior] | Views shown: PLAN, ELEVATION, SECTION (labels 1, 2, 3, 4, 5 as shown)HOLDChain hold
└Scope 227ID506 [Interior] | Material callouts: WOOD VENEER (303)HOLDChain hold
└Scope 228ID506 [Interior] | Material/callout: ∅ 8" STAINLESS STEEL GROMMET FOR TRASH 330HOLDChain hold
└Scope 229ID506 [Interior] | Construction notes: STEEL BASE PLATE AS BOLTS BELOW WOOD FRAME STOP WOOD FRAME STOPHOLDChain hold
└Scope 230ID507 [Interior] | Metal divider plate material: HOT ROLLED STEEL, ASTM A 36, SEALED WITH PERMALAC.HOLDChain hold
└Scope 231ID507 [Interior] | Finish/material codes referenced on sheet: BR-401, BR-200/BR-200B, BR-208, BR-207, BR-501C, BR-502C, BR-503C, BR-504C, BR-505C, BR-200/BR-200B, BR-401 (as shown in text)HOLDChain hold
└Scope 232ID508 [Interior] | Installation of adjustable melamine shelf(s)HOLDChain hold
└Scope 233ID508 [Interior] | Built-in induction range and induction unit control box (as shown)HOLDChain hold
└Scope 234ID508 [Interior] | Sneeze guard frameHOLDChain hold
└Scope 235ID508 [Interior] | Metal channel as partition capHOLDChain hold
└Scope 236ID508 [Interior] | Steel plate end cap details (1/16" steel plate laminated to plywood backer board; ASTM A 36, sealed with Permalac)HOLDChain hold
└Scope 237ID508 [Interior] | Reproduction notice: IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 238ID508 [Interior] | Finish references / finish numbers shown: 326, 320, 302, 325HOLDChain hold
└Scope 239ID508 [Interior] | Equipment / element labels on sheet: JUICE MACHINE (BY OTHERS)HOLDChain hold
└Scope 240ID508 [Interior] | Equipment / element labels: 3" FILTER FAN @ TOP EDGEHOLDChain hold
└Scope 241ID509 [Interior] | Routed shelving on recessed pins and bushings (32MM OC)HOLDChain hold
└Scope 242ID509 [Interior] | Barrister drawer slides (Rockler #1847)HOLDChain hold
└Scope 243ID509 [Interior] | Custom wood wine shelfHOLDChain hold
└Scope 244ID509 [Interior] | Aluminum slatwall megawall system (313 ALUM. SLATWALL MEGAWALL; 1" OC, 18" X 52 1/2") with powder coat finish, color blackHOLDChain hold
└Scope 245ID509 [Interior] | FINISH EXPOSED SURFACES TO MATCH FRONTHOLDChain hold
└Scope 246ID509 [Interior] | NOTE: ADJUST DETAIL IF REMOTE COMPRESSORS ARE USED.HOLDChain hold
└Scope 247ID509 [Interior] | EQUIPMENT HEIGHT - SEE EQUIPMENT SPECIFICATIONSHOLDChain hold
└Scope 248ID510 [Interior] | THIS DRAWING IS FOR INTERIOR DESIGN PURPOSES ONLY.HOLDChain hold
└Scope 249ID510 [Interior] | ALL MEASUREMENTS ARE TO BE FIELD VERIFIED.HOLDChain hold
└Scope 250ID510 [Interior] | Wood wall panel system installation and wood edge closure by wood panel system supplier, coordinate as required.HOLDChain hold
└Scope 251ID510 [Interior] | REMOVABLE PANEL ON 1X FRAMING TO CONCEAL WIRINGHOLDChain hold
└Scope 252ID510 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 253ID512 [Interior] | Provide hydration equipment with chiller (install as required).HOLDChain hold
└Scope 254ID512 [Interior] | Provide all connections required for power and water for hydration equipment.HOLDChain hold
└Scope 255ID512 [Interior] | Provide suggested chiller line routing (grommet for chiller line).HOLDChain hold
└Scope 256ID512 [Interior] | Provide suggested plumbing line routing.HOLDChain hold
└Scope 257ID512 [Interior] | Add access panel per GC recommendations.HOLDChain hold
└Scope 258ID512 [Interior] | Provide 8" hole for towel drop.HOLDChain hold
└Scope 259ID512 [Interior] | Removable access panel in black melamine.HOLDChain hold
└Scope 260ID512 [Interior] | HYDRATION EQUIPMENT; PROVIDE WITH CHILLER; VERIFY ALL REQUIREMENTS FOR INSTALLATION PER MANUF. RECOMMENDATIONS.HOLDChain hold
└Scope 261ID512 [Interior] | VERIFY SPECIFICATION WITH OWNER AND BRAND.HOLDChain hold
└Scope 262ID512 [Interior] | PROVIDE ALL CONNECTIONS REQ'D FOR POWER AND WATER.HOLDChain hold
└Scope 263ID512 [Interior] | REFER TO MARRIOTT PROTOTYPE DETAIL 4/B421HOLDChain hold
└Scope 264ID512 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 265ID520 [Interior] | Install wall-mounted cornice at 8'-3" A.F.F. with dust cap to support track drapery system and extend cornice to side walls.HOLDChain hold
└Scope 266ID520 [Interior] | Install blackout drapery track at 8'-8" A.F.F. to dust cap in top of cornice.HOLDChain hold
└Scope 267ID520 [Interior] | Provide adequate angle iron support for cornice and framing support within wall.HOLDChain hold
└Scope 268ID520 [Interior] | Mount drapery rod to underside of cornice (dust cap) at 8'-8" AFF.HOLDChain hold
└Scope 269ID520 [Interior] | Provide painted hardwood (3/4 plywood painted) valance and 9" metal angle brackets to support plywood where shown.HOLDChain hold
└Scope 270ID520 [Interior] | GUESTROOM CEILING HEIGHTS HIGHER THAN 9'-0" A.F.F.: INSTALL WALL-MOUNTED CORNICE, AT 8'-3" A.F.F. WITH AN APPROPRIATE DUST CAP TO SUPPORT TRACK DRAPERY SYSTEM AND EXTEND CORNICE TO SIDE WALLS.HOLDChain hold
└Scope 271ID520 [Interior] | BLACKOUT DRAPERY TRACK TO BE INSTALLED AT 8'-8" A.F.F. TO DUST CAP IN TOP OF CORNICE.HOLDChain hold
└Scope 272ID520 [Interior] | *CORNICE PROVIDED BY G.C.*HOLDChain hold
└Scope 273ID600 [Interior] | Interior finish identification for rooms listed on the sheet (room numbers and names with finish codes for floor/base/walls/ceiling).HOLDChain hold
└Scope 274ID600 [Interior] | Reference to plans & elevations for finish details (remarks column frequently states 'REFER TO PLANS & ELEVATIONS FOR FINISH DETAILS').HOLDChain hold
└Scope 275ID600 [Interior] | Guestroom finishes excluded from this sheet and referenced to separate sheets: ID420-ID442.HOLDChain hold
└Scope 276ID600 [Interior] | THE CONTENT ON THIS SHEET IS PROPERTY OF DYNAMIC ARCHITECTURAL INTERIORS, LLC. IT IS PROHIBITED TO REPRODUCE THE MATERIAL CONTAINED HEREIN WITHOUT CONSENT.HOLDChain hold
└Scope 277ID600 [Interior] | 000 VESTIBULE 101, 117 200 - - - 317 400, 404 REFER TO PLANS & ELEVATIONS FOR FINISH DETAILSHOLDChain hold
└Scope 278ID600 [Interior] | 001 LOBBY 101, LM101 200 - V-300, V-319, 331 - - 400, 405 REFER TO PLANS & ELEVATIONS FOR FINISH DETAILSHOLDChain hold
└Scope 279ID600 [Interior] | 002 REGISTRATION 101 200,405 V-300 - V-317, V-300 V-300, 405 400, 405 REFER TO PLANS & ELEVATIONS FOR FINISH DETAILSHOLDChain hold
└Scope 280ID600 [Interior] | 005 BREAKFAST 103 214, 215 V-300 V-300, 325, 326, 320 V-300, 326, 301 V-300, 325 405, 406, 407 REFER TO PLANS & ELEVATIONS FOR FINISH DETAILSHOLDChain hold
Section-09-009High-Performance CoatingsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-09-010Acoustic TreatmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 10Specialties9
Section-10-001Visual Display BoardsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-10-002SignageChain hold
└Scope 01A-002 | Signs are by others and separately permitted. Excluded from quantity takeoff unless the project responsibility chain is revised.HOLDChain hold
└Scope 02A-032 | Occupant signage: 'MAXIMUM 320 OCCUPANTS ( SIGN TO BE PROPOSED ON THE WALL )'HOLDChain hold
└Scope 03C-6 [Civil] | Signage and pylon sign (pylon sign requires separate building permit)HOLDChain hold
└Scope 04C-16 [Civil] | Install pedestrian/vehicle signage including STOP SIGN and HANDICAP PARKING SIGN per sign detail and MUTCD letteringHOLDChain hold
└Scope 05E4.1 [Electrical] | Circuit tags visible on sheet: R1, R2, B (as shown in plan graphics)HOLDChain hold
Section-10-003Toilet CompartmentsChain hold
└Scope 01A-312 | Interior partitions per sheet 004HOLDChain hold
└Scope 02A-312 | Interior partition notes: "INTERIOR PARTITION, RE: 004 FOR PARTITION TYPE", "ELEVATOR SHAFT PARTITION, RE: 004 FOR PARTITION TYPE"HOLDChain hold
└Scope 03A-313 | ELEVATOR SHAFT PARTITION, RE: 004 FOR PARTITION TYPEHOLDChain hold
└Scope 04A-313 | REFER TO FLOOR PLANS, SHEET 006 FOR WALL PARTITION BUGS.HOLDChain hold
└Scope 05A-314 | REFER TO FLOOR PLANS, SHEET 006 FOR WALL PARTITION BUGS.HOLDChain hold
└Scope 06A-314 | ELEVATOR SHAFT PARTITION, RE: 004 FOR PARTITION TYPEHOLDChain hold
└Scope 07A-511 | Hardwood components: 'HDWD. PARTITION CAP', 'HARDWOOD BASE', 'RABETED HDWD PARTITION CAP.'HOLDChain hold
Section-10-004LockersReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-10-005Fire Extinguishers / CabinetsChain hold
└Scope 01A-030 | Graphic/plan showing locations of rated walls, travel distances, shafts, fire extinguishers, exits, and occupant information.HOLDChain hold
└Scope 02C-3 [Civil] | Provide automatic fire sprinkler system, smoke detectors, fire extinguishers, and ANSUL kitchen suppression.HOLDChain hold
Section-10-006Toilet / Bath AccessoriesChain hold
└Scope 01ID422 [Interior] | H. IN THIS ROOM ONLY, LOW WALL TO BE 34 1/2" TO TOP OF STONE CAP TO ALLOW ROOM FOR ADA GRAB BAR ABOVE.HOLDChain hold
└Scope 02ID431 [Interior] | Coordinate fixture locations with plumbing fixture matrix and toilet & bath accessory matrix in Design Guide Project ManualHOLDChain hold
└Scope 03ID440 [Interior] | H. IN THIS ROOM ONLY, LOW WALL TO BE 34 1/2" TO TOP OF STONE CAP TO ALLOW ROOM FOR ADA GRAB BAR ABOVE.HOLDChain hold
└Scope 04ID441 [Interior] | LOW WALL TO BE 34 1/2" TO TOP OF STONE CAP TO ALLOW ROOM FOR ADA GRAB BAR ABOVE (IN THIS ROOM ONLY).HOLDChain hold
Section-10-007Wall / Corner ProtectionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-10-008Storage ShelvingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-10-009FlagpolesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 11Equipment9
Section-11-001Loading Dock EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-11-002Vehicle Service EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-11-003Foodservice EquipmentChain hold
└Scope 01A-800 | Food service equipment planHOLDChain hold
└Scope 02A-800 | Equipment schedule - foodserviceHOLDChain hold
└Scope 03A-800 | Coffee station (labeled as "COFFEE STATION")HOLDChain hold
└Scope 04A-801 | Foodservice equipment elevationsHOLDChain hold
└Scope 05A-801 | COFFEE STATIONHOLDChain hold
└Scope 06A-801 | PREP ROOMHOLDChain hold
└Scope 07A-802 | NOTE - Not in Kitchen Equipment ContractHOLDChain hold
└Scope 08A-802 | THE MARKET EQUIPMENT PLAN - WITHOUT BEER & WINE SERVICEHOLDChain hold
└Scope 09A-802 | THE MARKET EQUIPMENT PLAN - WITH BEER & WINE SERVICEHOLDChain hold
└Scope 10A-802 | THE MARKET EQUIPMENT ELEVATION - WITHOUT BEER & WINE SERVICEHOLDChain hold
└Scope 11A-802 | THE MARKET EQUIPMENT ELEVATION - WITH BEER & WINE SERVICEHOLDChain hold
└Scope 12E2.1 [Electrical] | EQUIPMENT SCHEDULE - FOODSERVICEHOLDChain hold
└Scope 13ID001 [Interior] | Coordinate all A/V, security, MEP, BOH, kitchen equipment with appropriate consultants (Note 21).HOLDChain hold
Section-11-004Residential AppliancesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-11-005Laundry EquipmentChain hold
└Scope 01A-806 | ENLARGED REC - ICE DISPENSER AREA - UPPER FLOORSHOLDChain hold
└Scope 02A-806 | ENLARGED REC - ICE DISPENSER AREA - FIRST FLOORHOLDChain hold
└Scope 03A-807 | Guest laundry equipment layout as shown on sheet (label: GUEST LAUNDRY EQUIPMENT PLAN)HOLDChain hold
└Scope 04A-807 | Typical floor ice dispenser equipment plan as shown on sheet (label: TYPICAL FLOOR ICE DISPENSER EQUIPMENT PLAN)HOLDChain hold
└Scope 05A-807 | TYPICAL FLOOR ICE DISPENSER EQUIPMENT PLANHOLDChain hold
└Scope 06A-809 | Design and construction information for laundry equipment indicated to be on sheet 621 (see SHEET 621).HOLDChain hold
└Scope 07A-809 | Legend entries and sizes preserved exactly: '361 20"x36" ROLLING RACK', '362 24"x48" ROLLING RACK', '371 CLOTHES HANGING ROD ON FOLDING TABLE', '372 FOLDING TABLE', '382 WASHER AREA CART', '392 SOIL CLOTHES LAUNDRY CART'HOLDChain hold
└Scope 08A-810 | Layout of laundry equipment and related rooms for the back-of-house laundry areaHOLDChain hold
└Scope 09A-810 | Title on sheet: LAUNDRY EQUIPMENT PLANHOLDChain hold
└Scope 10LAUNDRY-PLAN-2026 | Proposed laundry equipment: HM-200 unit.EAChain hold
└Scope 11LAUNDRY-PLAN-2026 | Proposed laundry equipment: T-80 units.EAChain hold
└Scope 12LAUNDRY-PLAN-2026 | Proposed laundry equipment: T-1200 units.EAChain hold
Section-11-006Waste Handling EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-11-007Athletic / Recreational EquipmentChain hold
└Scope 01ID121 [Interior] | Fitness equipment by Owner; layout shown for reference only (note 10).HOLDChain hold
└Scope 02ID122 [Interior] | Fitness equipment provided by owner; layout for reference only (note 10).HOLDChain hold
└Scope 03ID123 [Interior] | Fitness equipment provided by owner (layout for reference only).HOLDChain hold
└Scope 04ID124 [Interior] | Fitness equipment by Owner; layout is for reference only (per note 10).HOLDChain hold
└Scope 05ID125 [Interior] | Fitness equipment provided by Owner; layout for reference only (Note 10).HOLDChain hold
└Scope 06ID131 [Interior] | FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.HOLDChain hold
└Scope 07ID133 [Interior] | 10. FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.HOLDChain hold
└Scope 08ID200 [Interior] | FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.HOLDChain hold
└Scope 09ID400 [Interior] | FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.HOLDChain hold
└Scope 10ID400.1 [Interior] | 10. FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.HOLDChain hold
└Scope 11ID401 [Interior] | 10. FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.HOLDChain hold
└Scope 12ID402 [Interior] | FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.HOLDChain hold
└Scope 13ID403 [Interior] | Note 10: "FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY."HOLDChain hold
└Scope 14ID404 [Interior] | FITNESS EQUIPMENT BY OWNER, LAYOUT IS FOR REFERENCE ONLY.HOLDChain hold
Section-11-008Laboratory EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-11-009Parking Control EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 12Furnishings8
Section-12-001Window TreatmentsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-12-002CaseworkReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-12-003CountertopsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-12-004Entry Mats / GrillesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-12-005FurnitureChain hold
└Scope 01A-400 | ENLARGED PUBLIC SPACE FURNITURE + MINOR PLAN - OUTDOOR POOLHOLDChain hold
└Scope 02A-410 | FF&E plan for King Guestroom (left facing)HOLDChain hold
└Scope 03A-410 | FF&E plan for King Guestroom (right facing)HOLDChain hold
└Scope 04A-410 | King standard guestroom FF&E/finish/RCP/elevation package applies to 20 rooms per A-003 room mix.ROOMChain hold
└Scope 05A-411 | FF&E plan for KING SUITE GUESTROOM (left and right facing)HOLDChain hold
└Scope 06A-411 | King suite guestroom FF&E/finish/RCP/elevation package applies to 21 rooms per A-003 room mix.ROOMChain hold
└Scope 07A-412 | FF&E plan for King Suite ADA GuestroomHOLDChain hold
└Scope 08A-412 | Accessible King suite guestroom package applies to 1 room per A-003 room mix.ROOMChain hold
└Scope 09A-413 | FF&E plan for King ADA/ACC guestroom (sheet label: 1 KING ADA GUESTROOM FF&E PLAN)HOLDChain hold
└Scope 10A-413 | Accessible King standard guestroom package applies to 1 room per A-003 room mix.ROOMChain hold
└Scope 11A-420 | FF&E plan (left and right facing) for a Queen/Queen guestroomHOLDChain hold
└Scope 12A-420 | Queen/Queen standard guestroom FF&E/finish/RCP/elevation package applies to 34 rooms per A-003 room mix.ROOMChain hold
└Scope 13A-421 | Queen/Queen suite guestroom package applies to 3 rooms per A-003 room mix.ROOMChain hold
└Scope 14A-422 | FF&E plan for QUEEN QUEEN ADA GUESTROOMHOLDChain hold
└Scope 15A-422 | Accessible Queen/Queen standard guestroom package applies to 1 room per A-003 room mix.ROOMChain hold
└Scope 16ID122 [Interior] | Purchasing agent responsible for site verification of wall-to-wall FF&E prior to purchasing (note 16).HOLDChain hold
└Scope 17ID123 [Interior] | Interior design: furniture and finish layout for Level 3 (sheet is for interior design purposes only).HOLDChain hold
└Scope 18ID123 [Interior] | Purchasing agent responsible for site verification of wall-to-wall FF&E prior to purchasing.HOLDChain hold
└Scope 19ID124 [Interior] | Level 4 furniture/finish layout for the project (interior design drawing).HOLDChain hold
└Scope 20ID124 [Interior] | Purchasing Agent responsible for site verification of wall-to-wall FF&E prior to purchasing (per note 16).HOLDChain hold
└Scope 21ID125 [Interior] | Purchasing Agent responsible for site verification of wall-to-wall FF&E prior to purchasing (Note 16).HOLDChain hold
└Scope 22ID131 [Interior] | PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING.HOLDChain hold
└Scope 23ID133 [Interior] | 16. DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING.HOLDChain hold
└Scope 24ID400 [Interior] | DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING.HOLDChain hold
└Scope 25ID400.1 [Interior] | 16. DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING.HOLDChain hold
└Scope 26ID401 [Interior] | 16. DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING.HOLDChain hold
└Scope 27ID402 [Interior] | PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING.HOLDChain hold
└Scope 28ID404 [Interior] | DAI SUGGESTS ALIGNING THESE WALLS. REFER TO AOR'S DRAWINGS FOR DETAILS. PURCHASING AGENT WHOLLY RESPONSIBLE FOR SITE VERIFICATION OF WALL TO WALL FF&E PRIOR TO PURCHASING.HOLDChain hold
└Scope 29ID420 [Interior] | FF&E layout for King guestroom (left and right facing)HOLDChain hold
└Scope 30ID422 [Interior] | KING ADA GUESTROOM FF&E PLAN (scale and plan shown)HOLDChain hold
└Scope 31ID423 [Interior] | FF&E plan for King Suite GuestroomHOLDChain hold
└Scope 32ID430 [Interior] | FF&E plan (left and right facing)HOLDChain hold
└Scope 33ID431 [Interior] | FF&E plan for Queen Queen ADA Guestroom (FF&E plan sheet referenced)HOLDChain hold
└Scope 34ID432 [Interior] | FF&E plan (right)HOLDChain hold
└Scope 35ID442 [Interior] | FF&E plansHOLDChain hold
└Scope 36ID442 [Interior] | Notes for coordination with Purchasing Agent and Furniture VendorHOLDChain hold
Section-12-006Systems FurnitureReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-12-007Fixed SeatingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-12-008Site FurnishingsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 13Special Construction8
Section-13-001Special Facility ComponentsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-13-002Pools / FountainsChain hold
└Scope 01A-120 | Provide locations/coordination for underwater pool light fixtures per indoor pool plan (note referencing indoor pool plan)HOLDChain hold
└Scope 02A-120 | Reference: SEE INDOOR POOL PLAN BELOW FOR LOCATION OF UNDERWATER POOL LIGHT FIXTURES.HOLDChain hold
└Scope 03A-312 | Exterior wall sections and related details for guest corridors, elevator shaft, lobby wall, and indoor pool wallHOLDChain hold
└Scope 04A-405 | INDOOR POOL (labeled POOL 015)HOLDChain hold
└Scope 05A-405 | POOL DECKHOLDChain hold
└Scope 06A-405 | Interior elevations and wall sections for indoor poolHOLDChain hold
└Scope 07A-405 | Pool cover light detailHOLDChain hold
└Scope 08A-405 | Pool equipment/adjacent rooms shown on planHOLDChain hold
└Scope 09A-406 | ENLARGED EXERCISE ROOM PLAN - OUTDOOR POOLHOLDChain hold
└Scope 10A-406 | 3D VIEW EXERCISE ENTRY - OUTDOOR POOLHOLDChain hold
└Scope 11A-406 | Sheet contains labels and drawings including: "EXERCISE ROOM -07", "EXERCISE ROOM -05", "EXERCISE ROOM -06", "EXERCISE ROOM -04", "ENLARGED EXERCISE ROOM PLAN - OUTDOOR POOL", "3D VIEW EXERCISE ENTRY - OUTDOOR POOL"HOLDChain hold
└Scope 12A-571 | Pool plans and details (sheet A571)HOLDChain hold
└Scope 13A-571 | Pool section details (Section A, Section B visible on sheet)HOLDChain hold
└Scope 14A-571 | Indoor pool detail planHOLDChain hold
└Scope 15A-571 | One indoor pool assembly with plans, coping, depth-marker, and section details.EAChain hold
└Scope 16ID000 [Interior] | Enlarged floor plans & elevations for Breakfast Room, Exercise Room & Public Restrooms, Pool, B.O.H. (ID401, ID402, ID403, ID404)HOLDChain hold
Section-13-003Controlled Environment RoomsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-13-004Vaults / Secure RoomsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-13-005Pre-Engineered StructuresReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-13-006Building ModulesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-13-007Radiation ProtectionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-13-008Special InstrumentationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 14Conveying Equipment7
Section-14-001ElevatorsChain hold
└Scope 01A-111 | Elevator noted with capacity: ELEVATOR 3500 lbsHOLDChain hold
└Scope 02A-117 | Reference note C: 'REFER TO BUILDING ELEVATORS & SECTIONS FOR PARAPET HEIGHTS & FINISHES.'HOLDChain hold
└Scope 03A-310 | Elevators (two instances labeled ELEVATOR 3500 lbs)HOLDChain hold
└Scope 04A-310 | Elevator capacity text: "ELEVATOR 3500 lbs" (appears twice)HOLDChain hold
└Scope 05A-312 | Coordination for elevator components with manufacturerHOLDChain hold
└Scope 06A-402 | ELEVATOR LOBBY WALLHOLDChain hold
└Scope 07A-438 | Enlarged plan of administration area (labels observed: OFFICE, WORK, ELEVATOR, CLOSET)HOLDChain hold
└Scope 08A-438 | ELEVATORHOLDChain hold
└Scope 09A-492 | Elevator section and detailsHOLDChain hold
└Scope 10A-492 | Elevator plan - Level 1 (scale 1/4" = 1'-0")HOLDChain hold
└Scope 11A-492 | Elevator plan - Levels 2, 3, 4, 5 (scale 1/4" = 1'-0")HOLDChain hold
└Scope 12A-492 | Elevator plan - Roof (scale 1/4" = 1'-0")HOLDChain hold
└Scope 13A-492 | Sheet items: 1 Elevator plan - Level 1 1/4" = 1'-0"HOLDChain hold
└Scope 14A-492 | Sheet items: 2 Elevator plan - Level 2, 3, 4, 5 1/4" = 1'-0"HOLDChain hold
└Scope 15A-492 | Sheet items: 3 Elevator plan - ROOF 1/4" = 1'-0"HOLDChain hold
└Scope 16A-492 | Elevator capacity: ELEVATOR 3500 lbsHOLDChain hold
└Scope 17A-492 | Two 3,500-lb elevators shown and coordinated across Levels 1-5 and roof.EAChain hold
└Scope 18A-804 | Partial interior elevation - upper elevator lobbyHOLDChain hold
└Scope 19A-809 | Sheet text: 'LAUNDRY 019 LINEN 010 016 ELEVATOR 3500 lbs' (elevator capacity shown as 3500 lbs)HOLDChain hold
└Scope 20A-810 | Elevator callout visible: ELEVATOR 3500 lbsHOLDChain hold
└Scope 21E2.1 [Electrical] | ELEVATORHOLDChain hold
└Scope 22ID121 [Interior] | Decorative wall graphic required at all elevator lobby walls; G.C. to coordinate all electrical/fire/safety elements and/or build outs along this wall with DAI designers (note 8).HOLDChain hold
└Scope 23ID121 [Interior] | Provide 2" wood trim at exposed edges of wood panels at elevator doors; see sheet ID510 (note 19).HOLDChain hold
└Scope 24ID122 [Interior] | Decorative wall graphic required at all elevator lobby walls; G.C. to coordinate electrical/fire/safety elements and build-outs with DAI designers (note 8).HOLDChain hold
└Scope 25ID122 [Interior] | Provide 2" wood trim at exposed edges of wood panels at elevator doors; see sheet ID510; wood trim to be stained to match baseboard 215 in the IFI (note 19).HOLDChain hold
└Scope 26ID123 [Interior] | Decorative wall graphic required at all elevator lobby walls; G.C. to coordinate electrical/fire/safety with DAI designers.HOLDChain hold
└Scope 27ID124 [Interior] | Decorative wall graphic required at all elevator lobby walls; GC to coordinate electrical/fire/safety with DAI designers (per note 8).HOLDChain hold
└Scope 28ID124 [Interior] | Provide 2" wood trim at exposed edges of wood panels at elevator doors; stain to match baseboard 215 in IFI (per note 19).HOLDChain hold
└Scope 29ID125 [Interior] | Decorative wall graphic required at all elevator lobby walls; G.C. to coordinate electrical/fire/safety/build-outs with DAI designers (Note 8).HOLDChain hold
└Scope 30ID125 [Interior] | Provide 2" wood trim at exposed edges of wood panels at elevator doors; see details on sheet ID510; stain to match baseboard 215 (Note 19 / last note mentions ID510 item).HOLDChain hold
└Scope 31ID131 [Interior] | G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS (ELEVATOR LOBBY GRAPHIC).HOLDChain hold
└Scope 32ID131 [Interior] | PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.HOLDChain hold
└Scope 33ID132 [Interior] | 8. DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT.HOLDChain hold
└Scope 34ID132 [Interior] | 19. PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.HOLDChain hold
└Scope 35ID133 [Interior] | 8. DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT.HOLDChain hold
└Scope 36ID133 [Interior] | 19. PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.HOLDChain hold
└Scope 37ID200 [Interior] | PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510.HOLDChain hold
└Scope 38ID200 [Interior] | Note 19: 'PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.'HOLDChain hold
└Scope 39ID400 [Interior] | PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.HOLDChain hold
└Scope 40ID400 [Interior] | Text excerpt (note 19): PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.HOLDChain hold
└Scope 41ID400.1 [Interior] | 8. DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT.HOLDChain hold
└Scope 42ID400.1 [Interior] | 19. PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.HOLDChain hold
└Scope 43ID401 [Interior] | 8. DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT.HOLDChain hold
└Scope 44ID401 [Interior] | 19. PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.HOLDChain hold
└Scope 45ID402 [Interior] | PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.HOLDChain hold
└Scope 46ID403 [Interior] | Note 8: "DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT."HOLDChain hold
└Scope 47ID403 [Interior] | Note 19: "PROVIDE 2\" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI."HOLDChain hold
└Scope 48ID404 [Interior] | DECORATIVE WALL GRAPHIC IS REQUIRED AT ALL ELEVATOR LOBBY WALLS. G.C. TO COORDINATE ALL ELECTRICAL/FIRE/SAFETY ELEMENTS AND OR BUILD OUTS ALONG THIS WALL WITH DAI DESIGNERS TO ENSURE THERE IS NO INTERFERENCE WITH THE OVERALL DESIGN INTENT.HOLDChain hold
└Scope 49ID404 [Interior] | PROVIDE 2" WOOD TRIM AT EXPOSED EDGES OF WOOD PANELS AT ELEVATOR DOORS. SEE DETAILS ON SHEET ID510. WOOD TRIM TO BE STAINED TO MATCH BASEBOARD 215 IN THE IFI.HOLDChain hold
└Scope 50M1.1 [Mechanical] | Elevator(s) annotated 'ELEVATOR 3500 lbs'HOLDChain hold
└Scope 51P1.1 [Plumbing] | The sheet displays room identifications and plumbing-related equipment labels (e.g., WATER HEATER 007, STANDPIPE, ELEVATOR 3500 lbs).HOLDChain hold
└Scope 52P5.1 [Plumbing] | ELEVATOR SHAFT BOTTOM OFSCREEN GRATE "OIL SMART" SWITCH AND ALARM PANEL.HOLDChain hold
└Scope 53P5.1 [Plumbing] | REFER TO ARCHITECTURAL SECTION 2.2.2.5, "IN ELEVATORS PROVIDED WITH FIREFIGHTERS EMERGENCY COMPLIANCE PER ASME 17.1 SAFETY CODE FOR ELEVATORS AND ESCALATORS OPERATION, A DRAIN OR SUMP PUMP SHALL BE PROVIDED".HOLDChain hold
Section-14-002Hydraulic ElevatorsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-14-003Traction ElevatorsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-14-004Escalators / Moving WalksReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-14-005Platform / Wheelchair LiftsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-14-006Material LiftsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-14-007Conveying Equipment CommissioningReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 21Fire Suppression8
Section-21-001Fire Suppression SubmittalsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-21-002Sprinkler SystemsChain hold
└Scope 01A-001 | Separate fire-extinguishing-system permit required by City of Tampa Fire Marshal.1EAReady
└Scope 02A-001 | Separate below-ground fire-protection-system permit required by City of Tampa Fire Marshal.1EAReady
└Scope 03A-002 | Sprinklers = YES; NFPA 13 is checked. Sprinkler head, piping, valve, and equipment quantities are not shown on this sheet and remain blank.LSChain hold
Section-21-003Wet-Pipe SprinklersReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-21-004Dry / Preaction SprinklersReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-21-005StandpipesChain hold
└Scope 01A-002 | Standpipes = YES; Class I is checked. Standpipe component and hose-valve quantities are not shown on this sheet and remain blank.LSChain hold
└Scope 02A-111 | Standpipe noted on sheet: STANDPIPEHOLDChain hold
└Scope 03A-112 | Stand pipe and Area of refuge indicatedHOLDChain hold
└Scope 04A-114 | Room/label examples visible on drawing: "KING SUITE 419", "ACCESSIBLE QUEEN 417", "QQ SUITE 413", "Ice Machine", "Stand pipe", "Area of refuge"HOLDChain hold
└Scope 05A-116 | Area of refugeHOLDChain hold
└Scope 06A-490 | Area of refuge / Standpipe indicated on sheetHOLDChain hold
└Scope 07A-491 | Area of refuge (noted adjacent to stair)HOLDChain hold
└Scope 08A-491 | Standpipe (noted adjacent to stair)HOLDChain hold
└Scope 09A-491 | Visible detail/label: Area of refuge StandpipeHOLDChain hold
└Scope 10C-3 [Civil] | THE BUILDING IS REQUIRED TO HAVE A AUTOMATIC FIRE SPRINKLER SYSTEM.HOLDChain hold
└Scope 11F17-00 [FIRE-ALARM-SYSTEM] | Sprinkler head locations shown in relation to detectors (label: SPRINKLER HEAD)HOLDChain hold
└Scope 12M1.1 [Mechanical] | Standpipe locations/annotationHOLDChain hold
└Scope 13P5.2 [Plumbing] | Mechanical - Fire Protection (COPPER - STEEL - CPVC SPRINKLER)HOLDChain hold
└Scope 14P5.2 [Plumbing] | Sprinkler zone control valve assembly detailHOLDChain hold
Section-21-006Fire PumpsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-21-007Special Agent SuppressionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-21-008Fire Suppression TestingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 22Plumbing9
Section-22-001Plumbing SubmittalsChain hold
└Scope 01P1.0 [Plumbing] | Shock arrestor scheduleHOLDChain hold
└Scope 02P1.0 [Plumbing] | Plumbing legend (graphic symbols and abbreviations)HOLDChain hold
└Scope 03P1.0 [Plumbing] | General plumbing notes (appears as block text)HOLDChain hold
└Scope 04P1.0 [Plumbing] | Cover sheet functions: index/schedules/legends for plumbing tradesHOLDChain hold
└Scope 05P1.1 [Plumbing] | Reference for piping within guestroom units provided: sheet P3.1 (enlarged guestroom plans).HOLDChain hold
└Scope 06P1.1 [Plumbing] | Intended compliance with the listed building and fire/electrical/plumbing codes (per the compliance statement).HOLDChain hold
└Scope 07P1.2 [Plumbing] | Second floor plumbing plan for the project (sheet P1.2).HOLDChain hold
└Scope 08P1.2 [Plumbing] | Reference/coordination for piping within guestrooms to enlarged guestroom plans on sheet P3.1.HOLDChain hold
└Scope 09P1.2 [Plumbing] | SECOND FLOOR PLUMBING PLAN P1.2HOLDChain hold
└Scope 10P1.2 [Plumbing] | REFER TO ENLARGED GUESTROOM PLANS, SHEET P3.1 FOR PIPING WITHIN UNITS. (TYPICAL)HOLDChain hold
└Scope 11P1.3 [Plumbing] | Third floor plumbing plan (sheet P1.3) for the Fairfield Inn project in Tampa, FLHOLDChain hold
└Scope 12P1.3 [Plumbing] | Piping within guestroom units is referenced to Sheet P3.1 (ENLARGED GUESTROOM PLANS)HOLDChain hold
└Scope 13P1.3 [Plumbing] | Locations/labels of plumbing-related items on the third floor (e.g., "Stand pipe")HOLDChain hold
└Scope 14P1.3 [Plumbing] | THIRD FLOOR PLUMBING PLAN P1.3HOLDChain hold
└Scope 15P1.3 [Plumbing] | REFER TO ENLARGED GUESTROOM PLANS, SHEET P3.1 FOR PIPING WITHIN UNITS. (TYPICAL)HOLDChain hold
└Scope 16P1.4 [Plumbing] | Stand pipe locationsHOLDChain hold
└Scope 17P1.4 [Plumbing] | Area of refuge locationsHOLDChain hold
└Scope 18P1.4 [Plumbing] | Ice machine locationHOLDChain hold
└Scope 19P1.4 [Plumbing] | Piping within units to be detailed on sheet P3.1 (enlarged guestroom plans)HOLDChain hold
└Scope 20P1.4 [Plumbing] | FOURTH FLOOR PLUMBING PLAN P1.4HOLDChain hold
└Scope 21P1.4 [Plumbing] | REFER TO ENLARGED GUESTROOM PLANS, SHEET P3.1 FOR PIPING WITHIN UNITS. (TYPICAL)HOLDChain hold
└Scope 22P1.5 [Plumbing] | Plumbing layout for the fifth floor of the Tampa, FL - Fairfield Inn (as shown on P1.5).HOLDChain hold
└Scope 23P1.5 [Plumbing] | Stand pipe(s) shown on plan.HOLDChain hold
└Scope 24P1.5 [Plumbing] | Ice Machine location shown on plan.HOLDChain hold
└Scope 25P1.5 [Plumbing] | Reference to enlarged guestroom piping details on Sheet P3.1 for piping within units (typical).HOLDChain hold
└Scope 26P1.5 [Plumbing] | On-sheet note: REFER TO ENLARGED GUESTROOM PLANS, SHEET P3.1 FOR PIPING WITHIN UNITS. (TYPICAL)HOLDChain hold
└Scope 27P1.6 [Plumbing] | Roof plumbing planHOLDChain hold
└Scope 28P1.6 [Plumbing] | ROOF PLUMBING PLAN P1.6HOLDChain hold
└Scope 29P2.1 [Plumbing] | Piping within guestroom units to be provided on enlarged guestroom plans on sheet P3.1 (as noted)HOLDChain hold
└Scope 30P2.1 [Plumbing] | REFER TO ENLARGED GUESTROOM PLANS, SHEET P3.1 FOR PIPING WITHIN UNITS. (TYPICAL)HOLDChain hold
└Scope 31P3.1 [Plumbing] | Typical guest room units back-to-back plumbing planHOLDChain hold
└Scope 32P3.1 [Plumbing] | TYPICAL GUEST UNITS PLUMBING PLANS P3.1HOLDChain hold
└Scope 33P4.1 [Plumbing] | ENLARGED KITCHEN PLUMBING PLANS P4.1HOLDChain hold
└Scope 34P5.1 [Plumbing] | Coordinate electrical continuation to GFIC and alarm panel per electrical drawings.HOLDChain hold
└Scope 35P5.1 [Plumbing] | REFER TO ELECTRICAL DRAWINGS FOR CONT. TO ALARM PANEL.HOLDChain hold
└Scope 36P5.2 [Plumbing] | Tables for Plumbing - Plastic DWVHOLDChain hold
└Scope 37P5.2 [Plumbing] | Tables for Plumbing - Cast Iron DWVHOLDChain hold
└Scope 38P5.2 [Plumbing] | Tables for Plumbing - Water & Gas (COPPER - STEEL - CPVC - POLYBUTYLENE)HOLDChain hold
└Scope 39P5.2 [Plumbing] | Fire protection general notesHOLDChain hold
└Scope 40P5.2 [Plumbing] | PLUMBING DETAILS P5.2HOLDChain hold
└Scope 41P5.2 [Plumbing] | PENETRATION SCHEDULES NO SCALEHOLDChain hold
Section-22-002Domestic Water PipingChain hold
└Scope 01P2.1 [Plumbing] | Domestic water distribution on first floor as shown on plan P2.1 (graphic piping and fixture locations)HOLDChain hold
└Scope 02P2.1 [Plumbing] | FIRST FLOOR DOMESTIC WATER PLAN P2.1HOLDChain hold
└Scope 03P3.1 [Plumbing] | Typical guest room domestic water plan (single)HOLDChain hold
└Scope 04P4.1 [Plumbing] | Enlarged kitchen domestic water/plumbing plan (sheet P4.1)HOLDChain hold
└Scope 05P5.3 [Plumbing] | Plumbing riser diagrams for domestic waterHOLDChain hold
└Scope 06P5.3 [Plumbing] | TYPICAL RISER DIAGRAMS - DOMESTIC WATERHOLDChain hold
Section-22-003Sanitary Waste / VentChain hold
└Scope 01C-3 [Civil] | Provide sanitary service via private lift station with 2" force main connection to existing sanitary manhole within N 29TH STREET ROW.HOLDChain hold
└Scope 02C-4 [Civil] | Install inlet protection measures to prevent siltation in the drainage systemHOLDChain hold
└Scope 03C-5 [Civil] | CURB INLET SEDIMENT PREVENTION DETAILHOLDChain hold
└Scope 04C-12 [Civil] | Install reduced pressure backflow preventers (1" Wilkins 975 XL; 3" Ames 5000SS; 3"/private as noted)HOLDChain hold
└Scope 05C-12 [Civil] | CORE DRILL EXISTING SANITARY MANHOLE FOR 4" FORCE MAIN CONNECTION, INV 42.05 PROVIDE WATERTIGHT SEAL PER CITY DETAIL SHEET No. 18 (SEE PROFILE, SHEET No. 11)HOLDChain hold
└Scope 06C-12 [Civil] | PRIVATE 3" REDUCED PRESSURE BACKFLOW PREVENTER WITH BYPASS METER, AMES 5000SS (SEE CITY DETAIL, SHEET No. 18)HOLDChain hold
└Scope 07C-14 [Civil] | Deflection and leakage testing of flexible sewer pipe, and manhole air testing per ASTM proceduresHOLDChain hold
└Scope 08C-22 [Civil] | Meter and backflow: M 1.5" IRRIGATION METER; B 1.5" REDUCED PRESSURE BACKFLOW PREVENTERHOLDChain hold
└Scope 09E1.0 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 10E1.1 [Electrical] | Plans and specifications claimed to comply with: 2023 FBC 8TH EDITION (Building, Plumbing, Mechanical), NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 11E1.1 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 12E1.3 [Electrical] | Code compliance statement text (verbatim as shown): 'TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70'HOLDChain hold
└Scope 13E1.4 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 14E1.5 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 15E1.6 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 16E2.1 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 17E2.2 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 18E2.3 [Electrical] | Compliance statement text (verbatim): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 19E2.4 [Electrical] | Text block: 'TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70'HOLDChain hold
└Scope 20E2.5 [Electrical] | Codes/compliance statement (verbatim): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 21E3.1 [Electrical] | Code compliance to: 2023 FBC 8TH EDITION (building, plumbing, mechanical), NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13/13R/13D, 2019 NFPA 72, 2020 NFPA 70 (text as printed on sheet)HOLDChain hold
└Scope 22E3.1 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 23E3.2 [Electrical] | Text on sheet: "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 24E3.4 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 25E3.5 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 26E3.6 [Electrical] | Statement on sheet: "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 27E4.0 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 28E4.2 [Electrical] | Certifying statement as shown: 'TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70'HOLDChain hold
└Scope 29E5.0 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 30E5.1 [Electrical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 31E5.3 [Electrical] | Code compliance statement present: 'TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70'.HOLDChain hold
└Scope 32ID001 [Interior] | 4. ALL WORK SHALL COMPLY WITH APPLICABLE CODES, RULES, REGULATIONS, LAWS, ORDINANCES ETC. AS REQUIRED BY THE PUBLIC AUTHORITIES. IN THE EVENT OF A CONFLICT THE MOST STRINGENT REQUIREMENTS SHALL APPLY.HOLDChain hold
└Scope 33ID508 [Interior] | Equipment / element labels: VENT ABOVE JUICE MACHINEHOLDChain hold
└Scope 34ID512 [Interior] | Waste bin to be provided by owner (WASTE BIN BY OWNER).HOLDChain hold
└Scope 35M1.0 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 36M1.1 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 37M1.2 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 38M1.3 [Mechanical] | Code compliance statement (verbatim): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 39M1.5 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 40M2.0 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 41M2.1 [Mechanical] | Plans and specifications claim to comply with: 2023 FBC 8TH EDITION (Building, Plumbing, Mechanical), NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 42M2.1 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 43M2.2 [Mechanical] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 44P1.0 [Plumbing] | The sheet contains a block of text: 'TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70'HOLDChain hold
└Scope 45P1.1 [Plumbing] | First floor sanitary (plumbing) plan for the specified project (sheet P1.1).HOLDChain hold
└Scope 46P1.1 [Plumbing] | Code/compliance statement (verbatim): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 47P1.2 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 48P1.3 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 49P1.5 [Plumbing] | Code/compliance statement (verbatim excerpt): "TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70"HOLDChain hold
└Scope 50P1.6 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 51P2.1 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 52P3.1 [Plumbing] | Typical guest room sanitary plan (single)HOLDChain hold
└Scope 53P3.1 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 54P4.1 [Plumbing] | Enlarged kitchen sanitary plan (sheet P4.1)HOLDChain hold
└Scope 55P4.1 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 56P4.1 [Plumbing] | ENLARGED KITCHEN SANITARY PLANHOLDChain hold
└Scope 57P5.1 [Plumbing] | Install ZOELLER "OIL GUARD" SYSTEM MODEL 940-0006 to prevent introduction of oil into sanitary system.HOLDChain hold
└Scope 58P5.1 [Plumbing] | ZOELLER "OIL GUARD SYTEM" WITH ZOELLER "OIL GUARD" SYSTEM MODEL 940-0006 SHALL PREVENT INTRODUCTION OF OIL INTO SANITARY SYSTEM.HOLDChain hold
└Scope 59P5.2 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 60P5.3 [Plumbing] | Plumbing riser diagrams for sanitary pipingHOLDChain hold
└Scope 61P5.3 [Plumbing] | TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS ARE COMPLETE AND COMPLY WITH THE 2023 FBC 8TH EDITION FOR BUILDING, PLUMBING, MECHANICAL, AND NEC 2020, 2023 8TH EDITION FLORIDA FIRE PREVENTION CODE, 2019 NFPA 13 13R 13D, 2019 NFPA 72, 2020 NFPA 70HOLDChain hold
└Scope 62P5.3 [Plumbing] | TYPICAL RISER DIAGRAMS - SANITARY PIPINGHOLDChain hold
Section-22-004Storm DrainageChain hold
└Scope 01C-3 [Civil] | Install STORMTECH chamber system under pavement and discharge to existing inlet in N. 30TH STREET ROW.HOLDChain hold
└Scope 02C-7 [Civil] | Installation of StormTech SC-310 chambers (352 units) and associated stone bed and filter fabric per notesHOLDChain hold
└Scope 03C-7 [Civil] | TOTAL INSTALLED STORMTECH SYSTEM VOLUME = 12,164 CFHOLDChain hold
└Scope 04C-8 [Civil] | Stormtech SC-310 (and SC-740) chamber product technical specifications and nominal dimensionsHOLDChain hold
└Scope 05C-8 [Civil] | CHAMBERS SHALL BE STORMTECH SC-740, SC-310 OR APPROVED EQUAL.HOLDChain hold
└Scope 06C-8 [Civil] | CHAMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2418-05, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".HOLDChain hold
└Scope 07C-15 [Civil] | 1/2" pre-molded expansion joint required at each side of all storm inlet structures and at all radius pointsHOLDChain hold
Section-22-005Gas PipingChain hold
└Scope 01P1.0 [Plumbing] | Gas piping notesHOLDChain hold
└Scope 02P1.0 [Plumbing] | Visible schedules/blocks: 'SHOCK ARRESTOR SCHEDULE', 'PLUMBING FIXTURE SPECIFICATIONS AND CONNECTION SCHEDULE', 'PLUMBING LEGEND', 'GAS PIPING NOTES'HOLDChain hold
Section-22-006Plumbing FixturesChain hold
└Scope 01A-008-B | TOILETS STALLS and WATER CLOSETSHOLDChain hold
└Scope 02A-008-B | SHOWER STALLSHOLDChain hold
└Scope 03A-008-B | BATHTUBSHOLDChain hold
└Scope 04A-434 | 13 BATHROOM W/ SHOWER - BACKHOLDChain hold
└Scope 05A-434 | 8 BATHROOM W/ SHOWER - FRONTHOLDChain hold
└Scope 06A-434 | 5 BATHROOM W/ SHOWER - SHOWER DOORHOLDChain hold
└Scope 07A-434 | 12 BATHROOM W/ SHOWER - RIGHTHOLDChain hold
└Scope 08A-434 | 6 BATHROOM W/ SHOWER - LEFTHOLDChain hold
└Scope 09A-434 | 4 BATHROOM FLOOR PLAN W/SHOWERHOLDChain hold
└Scope 10A-434 | 3 3D VIEW - BATHROOM W/SHOWERHOLDChain hold
└Scope 11A-434 | 11 BATHROOM W/TUB BACKHOLDChain hold
└Scope 12A-434 | 7 BATHROOM W/TUB FRONTHOLDChain hold
└Scope 13A-434 | 10 BATHROOM W/TUB RIGHTHOLDChain hold
└Scope 14A-434 | 2 BATHROOM W/TUB LEFTHOLDChain hold
└Scope 15A-434 | 9 BATHROOM FLOOR PLAN W/TUBHOLDChain hold
└Scope 16A-434 | 1 3D VIEW - BATHROOM W/TUBHOLDChain hold
└Scope 17A-435 | Accessible bathroom details with transfer shower configurations (right, left, front, back)HOLDChain hold
└Scope 18A-435 | Accessible bathroom details with roll-in shower configurations (right, left, front, back)HOLDChain hold
└Scope 19A-435 | 3D views for transfer shower and roll-in showerHOLDChain hold
└Scope 20A-435A | Accessible bathroom with transfer tub detailHOLDChain hold
└Scope 21A-435A | 3D view of transfer bathtubHOLDChain hold
└Scope 22A-435B | Accessible shower details (upper levels and ground level) as shownHOLDChain hold
└Scope 23A-435B | Standard shower plan and shower corner detailHOLDChain hold
└Scope 24A-435B | Tub surround and tub at non-rated wall detailHOLDChain hold
└Scope 25A-435B | Tub/shower at 1-hour wall detailHOLDChain hold
└Scope 26A-436 | Water closet waste lines to be located in wall chase, not in exterior walls.HOLDChain hold
└Scope 27A-436 | LOCATE FLOOR CLEAN-OUTS IN INCONSPICUOUS LOCATIONS, AND NOT IN GUESTROOMS.HOLDChain hold
└Scope 28E1.0 [Electrical] | Lighting fixture scheduleHOLDChain hold
└Scope 29E2.4 [Electrical] | Plan identifies location labels for rooms, egress elements (stairs), and building equipment/fixtures such as ice machines, VTAC, stand pipe, and area of refuge.HOLDChain hold
└Scope 30E4.1 [Electrical] | Dimensioning of fixture / device locations (dimensions shown such as 12", 36", 104", 46", 60", 18", 35").HOLDChain hold
└Scope 31ID121 [Interior] | Restroom accessories and plumbing fixtures are per the G.C.; refer to brand fixture matrix and design guidelines (note 3).HOLDChain hold
└Scope 32ID121 [Interior] | Purchasing Agent responsible for fixtures shown/tagged; installed by GC (note 15).HOLDChain hold
└Scope 33ID122 [Interior] | Restroom accessories and plumbing fixtures to be provided by G.C.; refer to brand fixture matrix and design guidelines; locations and mounting heights per AOR (note 3).HOLDChain hold
└Scope 34ID123 [Interior] | Restroom accessories and plumbing fixtures are provided by the G.C.; refer to brand fixture matrix and AOR for mounting heights.HOLDChain hold
└Scope 35ID124 [Interior] | Restroom accessories and plumbing fixtures are by G.C.; refer to brand fixture matrix and AOR for locations/mounting heights (per note 3).HOLDChain hold
└Scope 36ID124 [Interior] | NOTE: "RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR."HOLDChain hold
└Scope 37ID125 [Interior] | Restroom accessories and plumbing fixtures are per the G.C.; refer to brand fixture matrix and AOR for location and mounting heights (Note 3).HOLDChain hold
└Scope 38ID125 [Interior] | All non-decorative lighting location and legend per AOR and latest brand standards; fixtures tagged in drawings are per the Purchasing Agent; installed by G.C. (Note 15).HOLDChain hold
└Scope 39ID125 [Interior] | "3. RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR."HOLDChain hold
└Scope 40ID131 [Interior] | RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.HOLDChain hold
└Scope 41ID131 [Interior] | NOTE (COMMON AREAS #3): 'RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.'HOLDChain hold
└Scope 42ID132 [Interior] | 3. RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.HOLDChain hold
└Scope 43ID132 [Interior] | 15. REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C.HOLDChain hold
└Scope 44ID132 [Interior] | Plan references fixture/finish code PG-407 repeatedly: 'PG-407 TYP.' and 'PG-407'.HOLDChain hold
└Scope 45ID133 [Interior] | 3. RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.HOLDChain hold
└Scope 46ID133 [Interior] | 15. REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C.HOLDChain hold
└Scope 47ID200 [Interior] | RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.HOLDChain hold
└Scope 48ID200 [Interior] | REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C.HOLDChain hold
└Scope 49ID400 [Interior] | RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.HOLDChain hold
└Scope 50ID400 [Interior] | REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C.HOLDChain hold
└Scope 51ID400.1 [Interior] | 3. RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.HOLDChain hold
└Scope 52ID400.1 [Interior] | 15. REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C.HOLDChain hold
└Scope 53ID401 [Interior] | 3. RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.HOLDChain hold
└Scope 54ID401 [Interior] | 15. REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C.HOLDChain hold
└Scope 55ID402 [Interior] | RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.HOLDChain hold
└Scope 56ID402 [Interior] | ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C.HOLDChain hold
└Scope 57ID403 [Interior] | Note 3: "RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR."HOLDChain hold
└Scope 58ID403 [Interior] | Note 15: "REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C."HOLDChain hold
└Scope 59ID404 [Interior] | RESTROOM ACCESSORIES AND PLUMBING FIXTURES ARE PER THE G.C. REFER TO THE BRAND FIXTURE MATRIX AND DESIGN GUIDELINES FOR MORE INFORMATION. LOCATION AND MOUNTING HEIGHTS ARE PER THE AOR.HOLDChain hold
└Scope 60ID404 [Interior] | REFER TO AOR'S SET & LATEST BRAND STANDARDS FOR LOCATION AND LEGEND FOR ALL NON-DECORATIVE LIGHTING. ALL FIXTURES THAT ARE TAGGED AND REFERENCED IN THESE DRAWINGS ARE PER THE PURCHASING AGENT. INSTALLED BY THE G.C.HOLDChain hold
└Scope 61ID422 [Interior] | E. FIXTURE PER PLUMBING FIXTURE MATRIX IN DESIGN GUIDE PROJECT MANUAL.HOLDChain hold
└Scope 62ID424 [Interior] | Fixture per plumbing fixture matrix in design guide project manual (Note E).HOLDChain hold
└Scope 63ID431 [Interior] | Note E: 'FIXTURE PER PLUMBING FIXTURE MATRIX IN DESIGN GUIDE PROJECT MANUAL.'HOLDChain hold
└Scope 64ID432 [Interior] | Electrical legend and outlet/fixture locationsHOLDChain hold
└Scope 65ID432 [Interior] | Electrical legend items visible: 'CEILING LT FIXTURE', 'WALL MTD LT FIXTURE', 'TV', 'GFI', 'T RACEWAY & WIRING', 'JUNCTION BOX', 'LIGHT SWITCH', 'TELEPHONE OUTLET', 'TV OUTLET', 'GROUND FAULT INTERRUPTER, DUPLEX RECEPTACLE', 'DUPLEX RECEPTACLE', 'THERMOSTAT', 'MASTER SWITCH', 'DATA DUPLEX', etc.HOLDChain hold
└Scope 66ID440 [Interior] | E. FIXTURE PER PLUMBING FIXTURE MATRIX IN DESIGN GUIDE PROJECT MANUAL.HOLDChain hold
└Scope 67ID441 [Interior] | FIXTURE PER PLUMBING FIXTURE MATRIX IN DESIGN GUIDE PROJECT MANUAL.HOLDChain hold
└Scope 68ID442 [Interior] | ADA restroom layouts (with tub)HOLDChain hold
└Scope 69ID442 [Interior] | ADA restroom layouts (roll-in shower / long)HOLDChain hold
└Scope 70ID501 [Interior] | Provision and installation of J18 LED light fixture in 45 degree channel with lens on all sides of frameHOLDChain hold
└Scope 71ID501 [Interior] | Referenced detail/parts: "J18 LED LIGHT FIXTURE IN 45 DEGREE CHANNEL WITH LENS ON ALL SIDES OF FRAME"HOLDChain hold
└Scope 72ID509 [Interior] | NOTE: CONCEAL WIRING FOR LED FIXTUREHOLDChain hold
└Scope 73P1.0 [Plumbing] | Plumbing fixture specifications and connection schedule (detailed table present)HOLDChain hold
└Scope 74P1.4 [Plumbing] | Fourth floor plumbing plan (layout of plumbing fixtures and related items on the fourth floor)HOLDChain hold
└Scope 75P5.2 [Plumbing] | Penetration schedules for pipe and fixture openings through fire rated floors and wallsHOLDChain hold
Section-22-007Water Heaters / EquipmentChain hold
└Scope 01C-6 [Civil] | Site utilities including PRIVATE LIFT STATION and ELECTRICAL TRANSFORMER PAD locations (shown)HOLDChain hold
└Scope 02C-12 [Civil] | Construct private lift station and connect force main to existing manhole (core drill existing manhole and provide watertight seal per City detail)HOLDChain hold
└Scope 03C-12 [Civil] | Install grease interceptor: 100 GPM SCHIER GB-250 (with inlet/outlet invert elevations provided)HOLDChain hold
└Scope 04C-12.1 [Civil] | Grease trap/interceptor details and installation guidance for GB-250 modelHOLDChain hold
└Scope 05C-12.1 [Civil] | GREASE TRAP DETAILSHOLDChain hold
└Scope 06C-13 [Civil] | Supply one complete ECONO-GP Pre-Fab Lift Station, per design.HOLDChain hold
└Scope 07C-13 [Civil] | Pumps shall be capable of grinding and pumping domestic & commercial sewage.HOLDChain hold
└Scope 08C-13 [Civil] | PUMPS: Submersible grinder pumps shall be HOMA Model GRP.HOLDChain hold
└Scope 09C-13 [Civil] | The pumps shall be installed in the ECONO-GP FRP wetwell utilizing a dual slide rail system.HOLDChain hold
└Scope 10C-22 [Civil] | ALL IRRIGATION EQUIPMENT (PUMP, CONTROLLER, ETC.) SHALL BE PLACED WITHIN FENCED ENCLOSURE.HOLDChain hold
└Scope 11E2.1 [Electrical] | WATER HEATER 007HOLDChain hold
└Scope 12E5.2 [Electrical] | Panel circuits include guest room receptacles (repeated entries), site lighting circuits, heat pump circuits, flagpole lights, BF heater, monument sign, and spares (as listed on schedules).HOLDChain hold
└Scope 13E5.3 [Electrical] | Heat pump branch circuits (labeled M) specified: conductor #12, 3/4" conduit, 20A breakers, 1100 VA per circuit as shown.HOLDChain hold
└Scope 14E5.4 [Electrical] | Mechanical equipment circuits: listed as 'HEAT PUMP' with breaker 20A, conductor '#12', conduit '3/4"'HOLDChain hold
└Scope 15M1.1 [Mechanical] | Water heater identified as 'WATER HEATER 007'HOLDChain hold
└Scope 16M2.0 [Mechanical] | Provide schedules for split system heat pump unitsHOLDChain hold
└Scope 17M2.0 [Mechanical] | SPLIT SYSTEM HEAT PUMP UNIT SCHEDULEHOLDChain hold
└Scope 18P5.1 [Plumbing] | Provide and install ZOELLER PUMP CO. MODEL 161, 115 VOLT, 1/2 HP 60Hz pump.HOLDChain hold
└Scope 19P5.1 [Plumbing] | Provide pump capacity of 93 GALLONS @ 10 FT. HEAD as indicated.HOLDChain hold
└Scope 20P5.1 [Plumbing] | Provide high liquid level pump-on and pump-off levels per drawings.HOLDChain hold
Section-22-008Insulation / SupportsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-22-009Testing / CommissioningChain hold
└Scope 01F1-00 [FIRE-ALARM-SYSTEM] | Testing and commissioning requirements for detectors: canned smoke for smoke detectors, listed heat source for heat detectors, introduction of CO for CO detectors.HOLDChain hold
DIV 23Heating, Ventilating, and Air Conditioning9
Section-23-001HVAC SubmittalsChain hold
└Scope 01M1.0 [Mechanical] | Sheet is the Mechanical Cover Sheet (M1.0) containing HVAC general notes.HOLDChain hold
└Scope 02M1.0 [Mechanical] | HVAC GENERAL NOTES (title present on sheet)HOLDChain hold
└Scope 03M1.1 [Mechanical] | First floor mechanical layout (ducting, equipment locations) as shown on sheet M1.1HOLDChain hold
└Scope 04M1.1 [Mechanical] | MATV notedHOLDChain hold
└Scope 05M1.1 [Mechanical] | Room-by-room mechanical indications for public and guest spaces (room names and room numbers shown on plan)HOLDChain hold
└Scope 06M1.1 [Mechanical] | FIRST FLOOR MECHANICAL PLAN M1.1HOLDChain hold
└Scope 07M1.2 [Mechanical] | Second floor mechanical plan (as indicated by sheet title 'SECOND FLOOR MECHANICAL PLAN')HOLDChain hold
└Scope 08M1.2 [Mechanical] | CAD FILE: (field shown but value not provided in parsed text)HOLDChain hold
└Scope 09M1.2 [Mechanical] | SECOND FLOOR MECHANICAL PLAN M1.2HOLDChain hold
└Scope 10M1.3 [Mechanical] | Third floor mechanical plan (sheet M1.3)HOLDChain hold
└Scope 11M1.3 [Mechanical] | Stand pipe shown/labeled on the planHOLDChain hold
└Scope 12M1.3 [Mechanical] | General mechanical layout for rooms/corridor on third floor (plan-view shown)HOLDChain hold
└Scope 13M1.3 [Mechanical] | Graphic/drawing content: plan view of the third floor mechanical layout (single sheet image)HOLDChain hold
└Scope 14M1.4 [Mechanical] | Fourth floor mechanical planHOLDChain hold
└Scope 15M1.4 [Mechanical] | Stand pipe (labeled on sheet as Stand pipe)HOLDChain hold
└Scope 16M1.4 [Mechanical] | Area of refuge (labeled on sheet as Area of refuge)HOLDChain hold
└Scope 17M1.4 [Mechanical] | Ice Machine (labeled on sheet as Ice Machine)HOLDChain hold
└Scope 18M1.4 [Mechanical] | FOURTH FLOOR MECHANICAL PLAN M1.4HOLDChain hold
└Scope 19M1.5 [Mechanical] | FIFTH FLOOR MECHANICAL PLAN (sheet M1.5)HOLDChain hold
└Scope 20M1.5 [Mechanical] | Stand pipe locationsHOLDChain hold
└Scope 21M1.5 [Mechanical] | Area of refuge locationsHOLDChain hold
└Scope 22M1.5 [Mechanical] | Ice Machine (noted on plan)HOLDChain hold
└Scope 23M1.5 [Mechanical] | FIFTH FLOOR MECHANICAL PLAN M1.5HOLDChain hold
└Scope 24M1.6 [Mechanical] | Mechanical roof plan (roof-mounted mechanical equipment shown)HOLDChain hold
└Scope 25M1.6 [Mechanical] | Equipment labels present on sheet: "OUTSIDE AIR", "HOOD COIL", "CONDENSER COIL", "SUPPLY AIR"HOLDChain hold
└Scope 26M1.6 [Mechanical] | Visible equipment/labels on sheet: OUTSIDE AIR, HOOD COIL, CONDENSER COIL, SUPPLY AIRHOLDChain hold
└Scope 27M2.0 [Mechanical] | Provide schedules for packaged thru-wall unitsHOLDChain hold
└Scope 28M2.0 [Mechanical] | Provide schedules for mini split cooling unitsHOLDChain hold
└Scope 29M2.0 [Mechanical] | MECHANICAL SCHEDULES M2.0HOLDChain hold
└Scope 30M2.0 [Mechanical] | PACKAGED THRU-WALL UNIT SCHEDULEHOLDChain hold
└Scope 31M2.0 [Mechanical] | MINI SPLIT COOLING UNIT SCHEDULEHOLDChain hold
└Scope 32M2.1 [Mechanical] | Mechanical schedules shown on sheet M2.1HOLDChain hold
└Scope 33M2.1 [Mechanical] | MECHANICAL SCHEDULES M2.1HOLDChain hold
└Scope 34M2.2 [Mechanical] | Make up air unit detailHOLDChain hold
└Scope 35M2.2 [Mechanical] | Access door and panel detailsHOLDChain hold
└Scope 36M2.2 [Mechanical] | Roof discharge/intake detailHOLDChain hold
└Scope 37M2.2 [Mechanical] | General mechanical details (sheet-level)HOLDChain hold
└Scope 38M2.2 [Mechanical] | MECHANICAL DETAILS M2.2HOLDChain hold
Section-23-002HVAC InsulationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-23-003HVAC PipingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-23-004DuctworkChain hold
└Scope 01F7-00 [FIRE-ALARM-SYSTEM] | Field verification of duct detector locations (FIELD TO DETERMINE PATHWAY FOR SLC CIRCUIT BELOW)HOLDChain hold
└Scope 02F7-00 [FIRE-ALARM-SYSTEM] | FIELD TO VERIFY LOCATION OF DUCT DETECTORS (FIELD TO DETERMINE PATHWAY FOR SLC CIRCUIT BELOW)HOLDChain hold
Section-23-005Air DistributionChain hold
└Scope 01A-006 | UL DESIGN INFORMATION (product/design ratings and UL product details)HOLDChain hold
└Scope 02A-112 | Vertical terminal air conditioner (VTAC) locations indicatedHOLDChain hold
└Scope 03A-117 | Provision of screened/secure enclosures for mechanical equipment where required by jurisdictionHOLDChain hold
└Scope 04A-117 | Reference note F: 'PROVIDE SCREENED/SECURE ENCLOSURES FOR MECHANICAL EQUIPMENT WHERE REQUIRED BY LOCAL JURISDICTION.'HOLDChain hold
└Scope 05A-312 | Provide pathway for outdoor air ducts per sheet 910 for guestrooms and corridorsHOLDChain hold
└Scope 06A-312 | Provide pathway for outdoor air ducts as directed on sheet 910, for all guestrooms and guestroom corridorsHOLDChain hold
└Scope 07A-312 | Designer instruction: "DESIGNER TO HOLD MINIMUM CEILING HEIGHTS AS INDICATED, FLOOR TO FLOOR HEIGHTS MAY NEED TO BE ADJUSTED TO ACCOMMODATE DUCTWORK."HOLDChain hold
└Scope 08A-313 | Provide pathway for outdoor air ducts per sheet 910HOLDChain hold
└Scope 09A-313 | PROVIDE PATHWAY FOR OUTDOOR AIR DUCTS AS DIRECTED ON SHEET 910, FOR ALL GUESTROOMS AND GUESTROOM CORRIDORS.HOLDChain hold
└Scope 10A-313 | DESIGNER TO HOLD MINIMUM CEILING HEIGHTS AS INDICATED, FLOOR TO FLOOR HEIGHTS MAY NEED TO BE ADJUSTED TO ACCOMMODATE DUCTWORK.HOLDChain hold
└Scope 11A-314 | Provide pathway for outdoor air ducts as directed on sheet 910 for all guestrooms and guestroom corridors.HOLDChain hold
└Scope 12A-314 | PROVIDE PATHWAY FOR OUTDOOR AIR DUCTS AS DIRECTED ON SHEET 910, FOR ALL GUESTROOMS AND GUESTROOM CORRIDORS.HOLDChain hold
└Scope 13A-436 | Exhaust fan flush mounted in ceiling, typical all public bathrooms.HOLDChain hold
└Scope 14M2.0 [Mechanical] | Provide diffuser schedule and diffuser designationsHOLDChain hold
└Scope 15M2.0 [Mechanical] | DIFFUSER SCHEDULEHOLDChain hold
└Scope 16M2.2 [Mechanical] | Supply air diffuser detailHOLDChain hold
Section-23-006Air Handling EquipmentChain hold
└Scope 01M2.2 [Mechanical] | Ceiling exhaust fan detailHOLDChain hold
└Scope 02M2.2 [Mechanical] | Vertical air handling unit with DX cooling coil detailHOLDChain hold
Section-23-007Packaged HVAC EquipmentChain hold
└Scope 01E2.4 [Electrical] | Labels visible on plan: Area of refuge; Stand pipe; VTAC; Ice Machine; STORAGE 050; STAIR 2.4; STAIR 1.4; CORRIDOR; LINEN 045; Mechanical 046; Elect. 047; CHUTE 049; ICE MACHINE 414 (label present on drawing); multiple room numbers (e.g., 401, 402, 403, 404, 405, 406, 407, 408, 409, 410, 411, 412, 413, 414, 415, 416, 417, 418, 419, 420, 421)HOLDChain hold
└Scope 02E2.5 [Electrical] | Locations and labels for room power devices and equipment such as VTACs, ice machines, electrical room (Elect.), mechanical room, stand pipe and area of refuge are shown on the drawing.HOLDChain hold
└Scope 03E3.4 [Electrical] | Plan-level annotations for area of refuge, stand pipe, VTAC, ice machine, storage, linen, mechanical, electrical, chute, corridor and stairsHOLDChain hold
└Scope 04E3.4 [Electrical] | Plan text includes: Area of refuge, Stand pipe, VTAC, Ice Machine, STORAGE, LINEN, Mechanical, Elect., CORRIDOR, CHUTE, STAIR 1.4, STAIR 2.4HOLDChain hold
└Scope 05E3.5 [Electrical] | VTAC (vinyl through-the-wall air conditioners) labelsHOLDChain hold
└Scope 06E4.1 [Electrical] | Layout and identification of receptacle/lighting circuits for guestroom types labeled on sheet: ACC KING SUITE GUESTROOM, QUEEN/QUEEN SUITE GUESTROOM, KING GUESTROOM.HOLDChain hold
└Scope 07E5.2 [Electrical] | Wire and conduit sizes shown for many circuits (examples: '#12', '3/4"' conduit for guest room receptacles; '#8', '1"' conduit for site lighting).HOLDChain hold
└Scope 08E5.3 [Electrical] | Guest-room branch circuits (receptacles) specified: conductor #12, 3/4" conduit, 20A breakers, 1200 VA per circuit as shown.HOLDChain hold
└Scope 09E5.4 [Electrical] | Guest room receptacle circuits: listed as 'Guest room' with breaker 20A, conductor '#12', conduit '3/4"'HOLDChain hold
└Scope 10E5.4 [Electrical] | L LIGHTING K KITCHEN EQ PROVIDE EQUIPMENT GROUND BUS R RECEPTACLES E EQUIPMENT PROVIDE FEED THRU AND/OR SUB FEED LUGS FOR MULTI-SECTION PANELS M MECH EQUIP O OTHER - CKT. #ITEMHOLDChain hold
└Scope 11ID505 [Interior] | RECEPTACLES INSTALLED IN FACE OF APRON.HOLDChain hold
└Scope 12ID505 [Interior] | RECEPTACLES INSTALLED IN FACE OF APRONHOLDChain hold
└Scope 13ID507 [Interior] | Pop-up receptacle specification: "GLENBEIGH CONTEMPORARY" AS MANUF. BY BYRNE; (2) 15 AMP SIMPLEX RECEPTACLES; FINISH TO BE 'MIDNIGHT BLACK;' HARDWIRED.HOLDChain hold
└Scope 14ID520 [Interior] | Coordinate roller shade, drapery, and PTAC relationships per detail sections.HOLDChain hold
└Scope 15M1.1 [Mechanical] | PTAC units (reference PTAC-1)HOLDChain hold
└Scope 16M1.4 [Mechanical] | VTAC (labeled on sheet as VTAC)HOLDChain hold
└Scope 17M1.5 [Mechanical] | VTAC locations (noted on drawing)HOLDChain hold
└Scope 18M1.5 [Mechanical] | PTAC-1 locations (noted on drawing)HOLDChain hold
└Scope 19P1.4 [Plumbing] | VTAC locationsHOLDChain hold
└Scope 20P1.5 [Plumbing] | VTAC equipment indicated on plan.HOLDChain hold
└Scope 21P1.5 [Plumbing] | On-sheet text: Stand pipe, Area of refuge, Ice Machine, VTAC (as shown on plan)HOLDChain hold
Section-23-008ControlsChain hold
└Scope 01C-13 [Civil] | A heat sensor thermostat shall be attached to the top end of the motor.HOLDChain hold
└Scope 02C-13 [Civil] | Two heat sensor thermostats shall be used on three phase motors.HOLDChain hold
└Scope 03ID422 [Interior] | Q. THERMOSTAT. ALIGN WITH OUTLET BELOW WHERE OCCURS. SEE ELEVATION FOR ADDITIONAL INFORMATION. ALIGN DEVICES VERTICALLY 6" FROM EDGE OF WALL.HOLDChain hold
└Scope 04ID424 [Interior] | Align thermostat with outlet below where occurs; see elevation for additional information; align devices vertically 6" from edge of wall (Note Q).HOLDChain hold
└Scope 05ID440 [Interior] | Q. THERMOSTAT. ALIGN WITH OUTLET BELOW WHERE OCCURS. SEE ELEVATION FOR ADDITIONAL INFORMATION. ALIGN DEVICES VERTICALLY 6" FROM EDGE OF WALL.HOLDChain hold
└Scope 06ID441 [Interior] | THERMOSTAT: ALIGN WITH OUTLET BELOW; ALIGN DEVICES VERTICALLY 6" FROM EDGE OF WALL.HOLDChain hold
Section-23-009Testing / Adjusting / BalancingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 25Integrated Automation8
Section-25-001Automation NetworkReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-25-002Control / Monitoring NetworkReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-25-003Local Control UnitsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-25-004Automation SoftwareReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-25-005Terminal DevicesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-25-006Facility ControlsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-25-007Control SequencesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-25-008Integrated Automation CommissioningReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 26Electrical10
Section-26-001Electrical SubmittalsChain hold
└Scope 01E1.0 [Electrical] | General electrical notesHOLDChain hold
└Scope 02E1.0 [Electrical] | Electrical symbol scheduleHOLDChain hold
└Scope 03E1.0 [Electrical] | Electrical cover sheet for project E1.0HOLDChain hold
└Scope 04E1.2 [Electrical] | Placement/labeling of guest rooms, corridors, stairs, storage, mechanical and electrical rooms as shown on the drawing.HOLDChain hold
└Scope 05E1.2 [Electrical] | Floor plan contains labeled rooms and spaces including (verbatim examples as shown): STORAGE 030, KING SUITE 217, KING SUITE 215, QUEEN QUEEN 213, ACCESSIBLE KING SUITE 211, KING 207, QUEEN QUEEN 220, QUEEN QUEEN 216, QUEEN QUEEN 214, 205 KING, 203 QUEEN QUEEN 201, LINEN 025, QUEEN QUEEN KING KING SUITE 206, KING SUITE 208, QUEEN QUEEN 212, KING SUITE 219, STAIR 1.2 033, STAIR 2.2 032, KING 209, Mechanical 026, Elect. 027, CORRIDOR 028, CHUTE 029, KING SUITE 210, GUEST LAUNDRY 023, KING, QUEEN QUEEN (multiple other room labels appear on the plan)HOLDChain hold
└Scope 06E1.4 [Electrical] | Notes and code compliance statement referencing building and electrical codesHOLDChain hold
└Scope 07E1.5 [Electrical] | Compliance verification statement for codes listed on sheetHOLDChain hold
└Scope 08E2.1 [Electrical] | STORAGEHOLDChain hold
└Scope 09E2.1 [Electrical] | ACCESSIBLEHOLDChain hold
└Scope 10E2.1 [Electrical] | KINGHOLDChain hold
└Scope 11E2.1 [Electrical] | STAIR 2.1HOLDChain hold
└Scope 12E2.1 [Electrical] | 022HOLDChain hold
└Scope 13E2.1 [Electrical] | FOOD PREP 006HOLDChain hold
└Scope 14E2.1 [Electrical] | CONNECT & PRINT 004HOLDChain hold
└Scope 15E2.1 [Electrical] | LOBBY 001HOLDChain hold
└Scope 16E2.1 [Electrical] | REGISTRATION 002HOLDChain hold
└Scope 17E2.1 [Electrical] | WORK 008HOLDChain hold
└Scope 18E2.1 [Electrical] | LAUNDRY 019HOLDChain hold
└Scope 19E2.1 [Electrical] | LINEN 010HOLDChain hold
└Scope 20E2.1 [Electrical] | EXERCISE ROOM 011HOLDChain hold
└Scope 21E2.1 [Electrical] | QUEEN 105HOLDChain hold
└Scope 22E2.1 [Electrical] | EMPLOYEE BREAK ROOM 020HOLDChain hold
└Scope 23E2.1 [Electrical] | CORRIDOR 016HOLDChain hold
└Scope 24E2.1 [Electrical] | OFFICE 007HOLDChain hold
└Scope 25E2.1 [Electrical] | VESTIBULE 000HOLDChain hold
└Scope 26E2.1 [Electrical] | CORRIDOR 017HOLDChain hold
└Scope 27E2.1 [Electrical] | ELEC. ROOM + MATVHOLDChain hold
└Scope 28E2.1 [Electrical] | STAIR 1.1 023HOLDChain hold
└Scope 29E2.1 [Electrical] | BREAKFAST 005HOLDChain hold
└Scope 30E2.1 [Electrical] | Women's 013HOLDChain hold
└Scope 31E2.1 [Electrical] | Men's 012HOLDChain hold
└Scope 32E2.1 [Electrical] | Corridor 014HOLDChain hold
└Scope 33E2.1 [Electrical] | KING KING 103 104HOLDChain hold
└Scope 34E2.1 [Electrical] | MECH 031HOLDChain hold
└Scope 35E2.1 [Electrical] | KING 102HOLDChain hold
└Scope 36E2.1 [Electrical] | KING SUITE 107HOLDChain hold
└Scope 37E2.1 [Electrical] | KING SUITE 108HOLDChain hold
└Scope 38E2.1 [Electrical] | KING 101HOLDChain hold
└Scope 39E2.1 [Electrical] | QUEENHOLDChain hold
└Scope 40E2.1 [Electrical] | FIRST FLOOR POWER PLANHOLDChain hold
└Scope 41E2.1 [Electrical] | GENERAL NOTES:HOLDChain hold
└Scope 42E2.2 [Electrical] | SECOND FLOOR POWER PLANHOLDChain hold
└Scope 43E2.2 [Electrical] | Electrical/power layout for the second floor as shown on sheet E2.2HOLDChain hold
└Scope 44E2.3 [Electrical] | THIRD FLOOR POWER PLANHOLDChain hold
└Scope 45E2.3 [Electrical] | third floor electrical/power layout (as depicted on sheet E2.3)HOLDChain hold
└Scope 46E2.4 [Electrical] | Electrical power layout for the fourth floor of the referenced Fairfield Inn project (as indicated by sheet title).HOLDChain hold
└Scope 47E2.5 [Electrical] | Provide/display power layout for fifth floor of Fairfield Inn (electrical floor plan shown on sheet E2.5).HOLDChain hold
└Scope 48E2.6 [Electrical] | Electrical roof plan (roof electrical layout) as indicated on sheet E2.6HOLDChain hold
└Scope 49E3.1 [Electrical] | Some numeric labels and load/weight markings visible on plan: "75 lbs", "120 lbs 90 lbs", "90 lbs"HOLDChain hold
└Scope 50E3.2 [Electrical] | Device placements and coverage for second-floor guest rooms, corridors, stairs, storage, mechanical, electrical, chute, and guest laundry (labels and room numbers shown on sheet)HOLDChain hold
└Scope 51E3.3 [Electrical] | A "Stand pipe" label is present in the planHOLDChain hold
└Scope 52E3.4 [Electrical] | Coverage of guestrooms and corridor areas on the fourth floor (rooms listed explicitly on drawing: 401-421)HOLDChain hold
└Scope 53E3.4 [Electrical] | Text on plan includes room labels: 401, 402, 403, 404, 405, 406, 407, 408, 409, 410, 411, 412, 413, 414, 415, 416, 417, 418, 419, 420, 421HOLDChain hold
└Scope 54E3.5 [Electrical] | Floor plan annotations showing Areas of refugeHOLDChain hold
└Scope 55E3.5 [Electrical] | Stand pipe locationsHOLDChain hold
└Scope 56E3.5 [Electrical] | Room identification labels and numbers (example: KING SUITE 517, QUEEN QUEEN 513, etc.)HOLDChain hold
└Scope 57E3.5 [Electrical] | Stair identifications (STAIR 1.5, STAIR 2.5)HOLDChain hold
└Scope 58E3.5 [Electrical] | Mechanical and electrical room labels (Mechanical 056, Elect. 057)HOLDChain hold
└Scope 59E3.5 [Electrical] | Ice Machine, Storage, Linen, Corridor, ChuteHOLDChain hold
└Scope 60E4.0 [Electrical] | ELECTRICAL GUESTROOM CONTROLHOLDChain hold
└Scope 61E4.1 [Electrical] | Electrical layout for guestrooms (sheet titled ELECTRICAL GUESTROOM PLANS, E4.1).HOLDChain hold
└Scope 62E4.2 [Electrical] | Electrical layout for guestrooms referenced on sheet E4.2HOLDChain hold
└Scope 63E4.2 [Electrical] | Graphic/layout details for the following guestroom types: KING SUITE GUESTROOM; ACC KING GUESTROOM; ACC QUEEN/QUEEN GUESTROOM; ACC QUEEN SUITE GUESTROOMHOLDChain hold
└Scope 64E4.2 [Electrical] | Note (legible): 'UPDATED DIMENSIONS ACCORDING TO LATEST HOTEL/OWNER CHANGES.'HOLDChain hold
└Scope 65E5.0 [Electrical] | Electrical riser diagram (sheet E5.0)HOLDChain hold
└Scope 66E5.1 [Electrical] | Provide electrical detail drawings and notes as shown on sheet E5.1HOLDChain hold
└Scope 67E5.1 [Electrical] | Area of rescue riser detailHOLDChain hold
└Scope 68E5.1 [Electrical] | Working clearance requirements for electrical equipment per N.E.C. Article 110-26HOLDChain hold
└Scope 69E5.1 [Electrical] | ELECTRICAL DETAILSHOLDChain hold
└Scope 70E5.1 [Electrical] | WORKING CLEARANCE FOR ELECTRICAL EQUIPMENTHOLDChain hold
└Scope 71E5.2 [Electrical] | Breaker sizes shown (predominantly '20A' for listed circuits).HOLDChain hold
└Scope 72E5.3 [Electrical] | Provision of equipment ground bus (note on sheet).HOLDChain hold
└Scope 73E5.3 [Electrical] | Provision of feed-thru and/or sub-feed lugs for multi-section panels (note on sheet).HOLDChain hold
└Scope 74E5.3 [Electrical] | Load connected, sizing and demand calculations shown per panel (connected load (VA), connected ampacity (A), sizing totals, demand totals (VA), demand ampacity (A)).HOLDChain hold
└Scope 75E5.3 [Electrical] | Typical circuit rows: 'Guest room R #12 3/4" 20A 1 1200 A 1200 1 20A 3/4" #12 R Guest room' (repeated multiple times across panels).HOLDChain hold
└Scope 76E5.4 [Electrical] | Provide equipment ground bus per legendHOLDChain hold
└Scope 77E5.4 [Electrical] | Provide feed thru and/or sub feed lugs for multi-section panels per legendHOLDChain hold
└Scope 78E5.4 [Electrical] | Panel loading calculations: connected load (VA) by phase, connected totals, sizing totals, connected ampacity (A), sizing ampacity (A), demand totals and demand ampacityHOLDChain hold
└Scope 79E5.4 [Electrical] | Legend text: "PROVIDE EQUIPMENT GROUND BUS"HOLDChain hold
Section-26-002Grounding / BondingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-26-003Conduit / Wire / CableChain hold
└Scope 01C-5 [Civil] | WIRE MESH SHALL BE HARDWARE CLOTH 23 GAUGE MIN. AND SHALL HAVE 1/4 INCH MESH.HOLDChain hold
└Scope 02C-14 [Civil] | Hydrostatic pressure and leakage testing of potable water pipes per AWWA C600/C605/C603 as applicableHOLDChain hold
└Scope 03C-14 [Civil] | ALL PIPE, PIPE FITTINGS, PIPE JOINT PACKING AND JOINTING MATERIALS, VALVES, FIRE HYDRANTS, AND METERS INSTALLED UNDER THIS PROJECT WILL CONFORM TO APPLICABLE AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARDS.HOLDChain hold
└Scope 04C-22 [Civil] | IRRIGATION SHALL MEET ALL APPLICABLE CURRENT MUNICIPAL, COUNTY, STATE OR FEDERAL CODES, ORDINANCES AND REGULATIONS THAT HAVE JURISDICTION.HOLDChain hold
└Scope 05E5.0 [Electrical] | Feeder diagram (labeled NO SCALE)HOLDChain hold
└Scope 06F1-00 [FIRE-ALARM-SYSTEM] | Provide 3/4" conduit from FACP to telephone backboard for owner-provided central station monitoring.HOLDChain hold
└Scope 07F1-00 [FIRE-ALARM-SYSTEM] | INSTALLATION TO BE DONE IN ACCORDANCE WITH ALL APPLICABLE CITY CODES, NFPA-72 2019 EDITION, NFPA-70 (NEC) 2020 EDITION, FBCB (2023 EDITION), FFPC (8TH EDITION), UNIFORM RULE 69A, RULES AND REGULATIONS OF THE STATE FIRE MARSHAL'S OFFICE, AND FLORIDA STATUTE 633.HOLDChain hold
└Scope 08F15-00 [FIRE-ALARM-SYSTEM] | Wire properties specified: 'B' 16/2 FPLP/R NAC 16 AWG, 2 COND. SOLID COPPER FPLP/R ANALOG UNSHIELDED.HOLDChain hold
└Scope 09F16-00 [FIRE-ALARM-SYSTEM] | Signal and power wiring conductor callouts: '14/2 AWG CABLE', '16/2 AWG CABLE', 'EOL (47K)'HOLDChain hold
└Scope 10F16-00 [FIRE-ALARM-SYSTEM] | Installation note present: 'INSTALLATION TO BE DONE IN ACCORDANCE WITH ALL APPLICABLE CITY CODES, NFPA-72 2019 EDITION, NFPA-70 (NEC) 2020 EDITION, FBCB (2020 EDITION), FFPC (8TH EDITION), UNIFORM RULE 69A, RULES AND REGULATIONS OF THE STATE FIRE MARSHAL'S OFFICE, AND FLORIDA STATUTE 633.'HOLDChain hold
└Scope 11ID001 [Interior] | All work must comply with applicable codes, laws, ordinances; most stringent requirement applies if conflicts exist (Note 4).HOLDChain hold
└Scope 12ID500 [Interior] | Wire management provision: '4" HOLE FOR WIRE MANAGING'HOLDChain hold
└Scope 13ID501 [Interior] | Installation of wood plank ceiling system secured to linear ceiling carriers on hanger wireHOLDChain hold
Section-26-004Electrical ServiceChain hold
└Scope 01C-3 [Civil] | Provide irrigation with an irrigation meter.HOLDChain hold
└Scope 02C-5 [Civil] | FINISHED SIZE, INCLUDING FLAP POCKETS WHERE REQUIRED, SHALL EXTEND A MINIMUM OF 10" AROUND THE PERIMETER TO FACILITATE MAINTENANCE OR REMOVAL.HOLDChain hold
└Scope 03C-12 [Civil] | Install private 8" double detector check assembly with bypass meter (AMES 3000SS)HOLDChain hold
└Scope 04C-16 [Civil] | BOLLARD DETAIL: 8" DIAMETER STEEL PIPE BOLLARD (2 PLACES) (DROP PIN HOLE TYPICAL 4 PLACES)HOLDChain hold
└Scope 05C-18 [Civil] | Above-ground gas meter assembly detailHOLDChain hold
└Scope 06C-22 [Civil] | ALL VALVES SHALL BE INSTALLED IN METER TYPE SIZE BOXES EQUAL TO AMETEK POLY-IRON.HOLDChain hold
└Scope 07C-22 [Civil] | PROVIDE A 6" GRAVEL SUMP AT THE BOTTOM OF ALL METER BOXES AND INSTALL 1/2" TO 1" DIAMETER GRAVEL AT THE BOTTOM OF THE VALVE PIT.HOLDChain hold
└Scope 08P5.1 [Plumbing] | Provide sump pit with recommended size 24" DIAMETER X 36" DEPTH (24"x24"x24" Min.).HOLDChain hold
Section-26-005Switchboards / PanelboardsChain hold
└Scope 01E5.0 [Electrical] | Panelboard schedule (sheet contains a panelboard schedule table)HOLDChain hold
└Scope 02E5.0 [Electrical] | PANELBOARD SCHEDULEHOLDChain hold
└Scope 03E5.2 [Electrical] | PANELBOARD SCHEDULE 2A: CONNECTED LOAD (VA) 16800 16800 14400 48000HOLDChain hold
└Scope 04E5.2 [Electrical] | PANELBOARD SCHEDULE 2A: CONNECTED TOTAL (VA) 78000 44000 SIZING TOTAL (VA) (as printed on sheet)HOLDChain hold
└Scope 05E5.2 [Electrical] | PANELBOARD SCHEDULE 2A: CONNECTED AMPACITY (A) 216.51 122.13 SIZING AMPACITY (A) (as printed on sheet)HOLDChain hold
└Scope 06E5.2 [Electrical] | PANELBOARD SCHEDULE 2A: DEMAND TOTAL (VA) 44000HOLDChain hold
└Scope 07E5.2 [Electrical] | PANELBOARD SCHEDULE 2A: DEMAND AMPACITY (A) 122.13HOLDChain hold
└Scope 08E5.2 [Electrical] | PANELBOARD SCHEDULE 2B: CONNECTED LOAD (VA) 10800 10800 8400 30000HOLDChain hold
└Scope 09E5.3 [Electrical] | Electrical panelboard scheduling and load calculations for multiple panelboards (3A, 4A, 4B, 3B, 4D, 4C, 3D, 3C, 2D).HOLDChain hold
└Scope 10E5.4 [Electrical] | Provide electrical panelboard schedules for panels 5A, 5B, 5C, 5DHOLDChain hold
└Scope 11E5.4 [Electrical] | PANELBOARD SCHEDULE 5BHOLDChain hold
└Scope 12E5.4 [Electrical] | PANELBOARD SCHEDULE 5AHOLDChain hold
└Scope 13E5.4 [Electrical] | PANELBOARD SCHEDULE 5CHOLDChain hold
└Scope 14E5.4 [Electrical] | PANELBOARD SCHEDULE 5DHOLDChain hold
Section-26-006TransformersChain hold
└Scope 01ID509 [Interior] | Remote LED transformer outlet and warm white LED strip with remote driver and transformer; conceal wiringHOLDChain hold
Section-26-007Wiring DevicesChain hold
└Scope 01F2-00 [FIRE-ALARM-SYSTEM] | Field verification requirements: riser location and back-flow/PIV switches prior to install.HOLDChain hold
Section-26-008LightingChain hold
└Scope 01A-570 | Parking lot light fixture detailHOLDChain hold
└Scope 02A-809 | Lighting / ceiling notes include: 'F07 FLUORESCENT LIGHT 4'-0" LONG', 'F09 FLUORESCENT LIGHT FIXTURE 2'X4' RECESSED.', 'R16 RECESSED CAN.'HOLDChain hold
└Scope 03E1.1 [Electrical] | FIRST FLOOR LIGHTING PLANHOLDChain hold
└Scope 04E1.2 [Electrical] | Second floor lighting layout (plan view) for the Fairfield Inn project (sheet E1.2).HOLDChain hold
└Scope 05E1.2 [Electrical] | Notes regarding emergency and exit lighting connection (note text shown on sheet).HOLDChain hold
└Scope 06E1.2 [Electrical] | A note text appears (verbatim as shown): "ALL EMERGENCY AND EXIT LIGHTS SHALL BE CONNECTED TO THE REMOTEST LIGHTING CIRCUIT NEED OF ALL LIGHTING CONTROLS."HOLDChain hold
└Scope 07E1.3 [Electrical] | THIRD FLOOR LIGHTING PLAN (sheet-level scope as titled)HOLDChain hold
└Scope 08E1.3 [Electrical] | Emergency and exit lighting connection requirement as shown: 'ALL EMERGENCY AND EXIT LIGHTS SHALL BE CONNECTED TO THE NEAREST LIGHTING CIRCUIT AHEAD OF ALL LIGHTING CIRCUITS.'HOLDChain hold
└Scope 09E1.3 [Electrical] | Document identifies itself as 'THIRD FLOOR LIGHTING PLAN'HOLDChain hold
└Scope 10E1.3 [Electrical] | Note shown on sheet (verbatim as shown): 'ALL EMERGENCY AND EXIT LIGHTS SHALL BE CONNECTED TO THE NEAREST LIGHTING CIRCUIT AHEAD OF ALL LIGHTING CIRCUITS.'HOLDChain hold
└Scope 11E1.4 [Electrical] | Lighting layout for fourth floor as shown on sheet E1.4HOLDChain hold
└Scope 12E1.4 [Electrical] | Room lighting for individually labeled guestrooms and suites (examples: KING SUITE 417, QUEEN QUEEN 415, etc.)HOLDChain hold
└Scope 13E1.4 [Electrical] | Corridor lighting and service areas (CORRIDOR 048, Mechanical 046, Elect. 047, CHUTE 049, LINEN 045, STORAGE 050)HOLDChain hold
└Scope 14E1.4 [Electrical] | FOURTH FLOOR LIGHTING PLANHOLDChain hold
└Scope 15E1.5 [Electrical] | Lighting layout for fifth floor (FIFTH FLOOR LIGHTING PLAN)HOLDChain hold
└Scope 16E1.5 [Electrical] | Connection requirement for emergency and exit lights: "ALL EMERGENCY AND EXIT LIGHTS SHALL BE CONNECTED TO THE NEAREST LIGHTING CIRCUIT AHEAD OF ALL LIGHTING CONTROLS."HOLDChain hold
└Scope 17E1.5 [Electrical] | FIFTH FLOOR LIGHTING PLANHOLDChain hold
└Scope 18E1.5 [Electrical] | ALL EMERGENCY AND EXIT LIGHTS SHALL BE CONNECTED TO THE NEAREST LIGHTING CIRCUIT AHEAD OF ALL LIGHTING CONTROLS.HOLDChain hold
└Scope 19E1.6 [Electrical] | ROOF LIGHTING PLAN (sheet E1.6)HOLDChain hold
└Scope 20E5.1 [Electrical] | Exterior lighting control detailHOLDChain hold
└Scope 21E5.1 [Electrical] | Detail labels visible on sheet: TELEPHONE RISER DIAGRAM; CATV BOARD RISER DIAGRAM; AREA OF RESCUE RISER; EXTERIOR LIGHTING CONTROL DETAIL; WORKING CLEARANCE FOR ELECTRICAL EQUIPMENTHOLDChain hold
└Scope 22ID124 [Interior] | Refer to AOR's set & latest brand standards for non-decorative lighting locations and legend (per note 15).HOLDChain hold
└Scope 23ID509 [Interior] | Cove lighting and 'L' trim (Fry Reglet DRML-100) and corner molding (Fry Reglet DMCY-1250)HOLDChain hold
Section-26-009Emergency Power / GeneratorChain hold
└Scope 01ID507 [Interior] | Material detail: 1/16" STEEL PLATE LAMINATED TO PLYWOOD BACKER BOARD. SECURE TO WALL FRAMING WITH METAL WALL CLEATS AS REQUIRED (as shown on sheet)HOLDChain hold
└Scope 02ID510 [Interior] | 1/16" STEEL PLATE AT SIDE AND BACK OF HEARTH (GRAY SHADE). STEEL PLATE MOUNTED TO 1/2" PLYWOOD HUNG ON WALLS WITH CLEATS AS REQ'DHOLDChain hold
└Scope 03ID510 [Interior] | WOOD WALL PANEL SYSTEM SECURED TO WALL WITH METAL CLEATS AS REQ'D. VERIFY PANEL THICKNESS.HOLDChain hold
Section-26-010Electrical TestingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 27Communications9
Section-27-001Communications PathwaysReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-27-002Structured CablingChain hold
└Scope 01C-9 [Civil] | VERTICAL DATA: ELEVATIONS SHOWN HEREON ARE BASED ON CITY OF TAMPA BENCH MARK B-1315 ELEVATION = 47.59' BASED ON THE NATIONAL GEODETIC VERTICAL DATUM (N.G.V.D.) SEA LEVEL DATUM OF 1929, PROVIDED BY CITY OF TAMPA - DEPARTMENT OF PUBLIC WORKS.HOLDChain hold
└Scope 02E5.1 [Electrical] | Telephone riser diagram (detail)HOLDChain hold
└Scope 03E5.1 [Electrical] | CATV board riser diagram (detail)HOLDChain hold
└Scope 04E5.2 [Electrical] | Provide electrical panel schedules for panels 2A, 2B, 2C, and SL (panel schedule data shown).HOLDChain hold
└Scope 05M2.0 [Mechanical] | Associated unit notes and equipment data shown in schedulesHOLDChain hold
Section-27-003Equipment Rooms / RacksReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-27-004Backbone CablingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-27-005Horizontal CablingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-27-006Data Network EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-27-007Voice CommunicationsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-27-008Audio-Video SystemsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-27-009Communications TestingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 28Electronic Safety and Security8
Section-28-001Access ControlReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-28-002Video SurveillanceReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-28-003Intrusion DetectionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-28-004Security MonitoringReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-28-005Fire Alarm / DetectionChain hold
└Scope 01A-001 | Separate fire-alarm-system permit required by City of Tampa Fire Marshal.1EAReady
└Scope 02A-002 life-safety requirements | Emergency lighting, exit signs, fire alarm, smoke-detection systems, and panic hardware are all marked YES. Device counts require the referenced discipline plans and remain blank.LSChain hold
└Scope 03A-600 | "WALL MAGNETS TO BE TIED INTO FIRE ALARM SYSTEM"HOLDChain hold
└Scope 04E1.0 [Electrical] | Fire alarm symbol scheduleHOLDChain hold
└Scope 05E3.1 [Electrical] | FIRST FLOOR FIRE ALARM PLAN (sheet E3.1)HOLDChain hold
└Scope 06E3.1 [Electrical] | FIRST FLOOR FIRE ALARM PLANHOLDChain hold
└Scope 07E3.2 [Electrical] | Second-floor fire alarm plan (device/layout) as shown on sheet E3.2HOLDChain hold
└Scope 08E3.3 [Electrical] | Third floor fire alarm plan (sheet E3.3) as the indicated scope for this sheetHOLDChain hold
└Scope 09E3.4 [Electrical] | Fourth Floor fire alarm layout and device locations as shown on floor planHOLDChain hold
└Scope 10E3.5 [Electrical] | FIFTH FLOOR FIRE ALARM PLAN (E3.5)HOLDChain hold
└Scope 11E3.5 [Electrical] | FIFTH FLOOR FIRE ALARM PLANHOLDChain hold
└Scope 12E3.6 [Electrical] | Fire alarm roof plan (sheet title as shown: FIRE ALARM ROOF PLAN)HOLDChain hold
└Scope 13E5.1 [Electrical] | ALL SMOKE DETECTORS SHALL BE LOW FREQUENCY TYPE PER FBC CODEHOLDChain hold
└Scope 14F1-00 [FIRE-ALARM-SYSTEM] | ALL WALL-MOUNTED AUDIBLE & VISUAL SIGNALING APPLIANCES SHALL HAVE THEIR HEIGHTS ABOVE THE FINISHED FLOOR AT 80" TO BOTTOM PER NFPA 72.HOLDChain hold
└Scope 15F1-00 [FIRE-ALARM-SYSTEM] | ALL EQUIPMENT SHALL BE U.L. LISTED.HOLDChain hold
└Scope 16F1-00 [FIRE-ALARM-SYSTEM] | ALL WIRING SHALL BE IN ACCORDANCE WITH THE N.E.C. AND AUTHORITIES HAVING JURISDICTION.HOLDChain hold
└Scope 17F1-00 [FIRE-ALARM-SYSTEM] | ALL JUNCTION BOXES SHALL BE SIZED IN ACCORDANCE WITH THE N.E.C.HOLDChain hold
└Scope 18F2-00 [FIRE-ALARM-SYSTEM] | Fire alarm system layout for 1st floor (device locations and circuit references shown with FP•1•, PS•1•, CM•1•, DM•# tags).HOLDChain hold
└Scope 19F2-00 [FIRE-ALARM-SYSTEM] | Notification appliance candela ratings shown (examples: FP•1•N1•02 15cd, FP•1•N1•03 30cd, FP•1•N1•05 75cd).HOLDChain hold
└Scope 20F2-00 [FIRE-ALARM-SYSTEM] | Device module and control designations (DM•1, DM•2, DM•3, DM•12, ADM, NAC, CM, PS references).HOLDChain hold
└Scope 21F2-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DATE: 2/9/2026HOLDChain hold
└Scope 22F3-00 [FIRE-ALARM-SYSTEM] | Graphical layout of fire alarm devices on the 2nd floor for the Fairfield Inn project.HOLDChain hold
└Scope 23F3-00 [FIRE-ALARM-SYSTEM] | Device tagging and labeling using the project's device tag nomenclature (FP•, PS•, CM•, DM• and PS•1•N2•xx etc.).HOLDChain hold
└Scope 24F3-00 [FIRE-ALARM-SYSTEM] | Identification of end-of-line resistor values and candela ratings for notification appliances (e.g., 15cd, 185cd, EOL 47k, EOL 5.1k, EOL 2.2k).HOLDChain hold
└Scope 25F3-00 [FIRE-ALARM-SYSTEM] | Riser location to be field-verified (note present).HOLDChain hold
└Scope 26F3-00 [FIRE-ALARM-SYSTEM] | Plan submitted for City of Tampa plan approval / code review (permit number provided).HOLDChain hold
└Scope 27F3-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM 2ND FLOOR PLAN (sheet title on drawing)HOLDChain hold
└Scope 28F3-00 [FIRE-ALARM-SYSTEM] | Note on plan: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES"HOLDChain hold
└Scope 29F3-00 [FIRE-ALARM-SYSTEM] | Note on plan: "It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division."HOLDChain hold
└Scope 30F3-00 [FIRE-ALARM-SYSTEM] | Riser note: "FIELD TO VERIFY LOCATION OF RISER (UP/DN) JB"HOLDChain hold
└Scope 31F4-00 [FIRE-ALARM-SYSTEM] | Fire alarm system plan for the 3rd floor of the Fairfield Inn at 9301 N. 29TH STREET, Tampa, FL (as shown on drawing).HOLDChain hold
└Scope 32F4-00 [FIRE-ALARM-SYSTEM] | Document title: FIRE ALARM 3RD FLOOR PLANHOLDChain hold
└Scope 33F4-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DRAWN BY: MSHOLDChain hold
└Scope 34F4-00 [FIRE-ALARM-SYSTEM] | The sheet contains numerous fire alarm device tags and location identifiers (examples preserved in sheetOrSectionReferences)HOLDChain hold
└Scope 35F4-00 [FIRE-ALARM-SYSTEM] | Label on sheet: THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 36F4-00 [FIRE-ALARM-SYSTEM] | Note on sheet: It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division.HOLDChain hold
└Scope 37F4-00 [FIRE-ALARM-SYSTEM] | Note on sheet: The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 38F5-00 [FIRE-ALARM-SYSTEM] | Fire alarm device layout and callouts for the 4th floor of the Fairfield Inn (as shown on the sheet)HOLDChain hold
└Scope 39F5-00 [FIRE-ALARM-SYSTEM] | Includes device labels and circuit references (FP•, PS•, DM•, CM• series shown on plan)HOLDChain hold
└Scope 40F5-00 [FIRE-ALARM-SYSTEM] | Provision to verify riser location in the field (note: FIELD TO VERIFY LOCATION OF RISER (UP/DN))HOLDChain hold
└Scope 41F5-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DRAWN BY: MSHOLDChain hold
└Scope 42F5-00 [FIRE-ALARM-SYSTEM] | Plan approval reference: BLD-26-0522593 2/26/2026HOLDChain hold
└Scope 43F5-00 [FIRE-ALARM-SYSTEM] | Text on sheet: THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMESHOLDChain hold
└Scope 44F5-00 [FIRE-ALARM-SYSTEM] | Text on sheet: It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division.HOLDChain hold
└Scope 45F5-00 [FIRE-ALARM-SYSTEM] | Note on sheet: FIELD TO VERIFY LOCATION OF RISER (UP/DN)HOLDChain hold
└Scope 46F6-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM (as labeled on the sheet)HOLDChain hold
└Scope 47F6-00 [FIRE-ALARM-SYSTEM] | Plans depict device locations and cabling tags for the 5th floor of the Fairfield InnHOLDChain hold
└Scope 48F6-00 [FIRE-ALARM-SYSTEM] | Field verification tasks: "FIELD TO VERIFY LOCATION OF ELEVATOR MODULES"HOLDChain hold
└Scope 49F6-00 [FIRE-ALARM-SYSTEM] | Field verification tasks: "FIELD TO VERIFY LOCATION OF RISER (DN) 1A,3B"HOLDChain hold
└Scope 50F6-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM (heading on sheet)HOLDChain hold
└Scope 51F6-00 [FIRE-ALARM-SYSTEM] | Note on sheet: "THIS SET OF PLANS MUST BE KEPT ON THE JOB AT ALL TIMES"HOLDChain hold
└Scope 52F6-00 [FIRE-ALARM-SYSTEM] | Note on sheet: "It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division."HOLDChain hold
└Scope 53F6-00 [FIRE-ALARM-SYSTEM] | Note on sheet: "The Stamping of this plan shall not be held to permit or approve the violation of any City or State Codes"HOLDChain hold
└Scope 54F6-00 [FIRE-ALARM-SYSTEM] | Note(s) on sheet: "FIELD TO VERIFY LOCATION OF ELEVATOR MODULES" and "FIELD TO VERIFY LOCATION OF RISER (DN) 1A,3B"HOLDChain hold
└Scope 55F7-00 [FIRE-ALARM-SYSTEM] | Fire alarm roof plan (devices on roof shown and referenced)HOLDChain hold
└Scope 56F7-00 [FIRE-ALARM-SYSTEM] | Field verification of weatherproof horn strobe location (FIELD TO DETERMINE NAC CIRCUIT PATHWAY FROM BELOW)HOLDChain hold
└Scope 57F7-00 [FIRE-ALARM-SYSTEM] | Device tags and callouts present (examples: FP•1•L2 .5•D072, FP•1•L2 .5•M029, FP•1•L2 .5•D071, FP•1•L2 .5•M028)HOLDChain hold
└Scope 58F7-00 [FIRE-ALARM-SYSTEM] | FIELD TO VERIFY LOCATION OF WEATHERPROOF HORN STROBE (FIELD TO DETERMINE NAC CIRCUIT PATHWAY FROM BELOW)HOLDChain hold
└Scope 59F7-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DRAWN BY: MSHOLDChain hold
└Scope 60F7-00 [FIRE-ALARM-SYSTEM] | It is unlawful to make changes or alterations without written approval from the City of Tampa Construction Services Division.HOLDChain hold
└Scope 61F7-00 [FIRE-ALARM-SYSTEM] | The Stamping of this plan shall not be held to permit or approve the violation of any City or State CodesHOLDChain hold
└Scope 62F8-00 [FIRE-ALARM-SYSTEM] | Fire alarm NAC riser diagram (NAC wiring and device tagging shown)HOLDChain hold
└Scope 63F8-00 [FIRE-ALARM-SYSTEM] | Fire alarm control panel (FP•1) shown and referencedHOLDChain hold
└Scope 64F8-00 [FIRE-ALARM-SYSTEM] | NAC expander / power supplies (PS•1 and PS•2) referencedHOLDChain hold
└Scope 65F8-00 [FIRE-ALARM-SYSTEM] | Dedicated 120V 20 AMP CIRCUIT for NAC expanders and fire alarm control panelHOLDChain hold
└Scope 66F8-00 [FIRE-ALARM-SYSTEM] | Annunciator (FP•1•ACS•32 / ANN•1) shownHOLDChain hold
└Scope 67F8-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEM DRAWN BY: MSHOLDChain hold
└Scope 68F8-00 [FIRE-ALARM-SYSTEM] | Labels present: 'DEDICATED 120V 20 AMP CIRCUIT HNG NAC EXPANDER POWER SUPPLY PS•2' and 'DEDICATED 120V 20 AMP CIRCUIT HNG FIRE ALARM CONTROL PANEL FP•1'HOLDChain hold
└Scope 69F9-00 [FIRE-ALARM-SYSTEM] | NAC (Notification Appliance Circuit) riser diagram for the fire alarm system as shown on the sheetHOLDChain hold
└Scope 70F9-00 [FIRE-ALARM-SYSTEM] | Graphic layout and circuit/component callouts (component references preserved in sheetOrSectionReferences)HOLDChain hold
└Scope 71F9-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEMHOLDChain hold
└Scope 72F9-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM NAC RISER DIAGRAMHOLDChain hold
└Scope 73F10-00 [FIRE-ALARM-SYSTEM] | Provide/illustrate the fire alarm SLC (signaling line circuit) riser topology for the building (multiple floors) as shown by device loop labels and connectionsHOLDChain hold
└Scope 74F10-00 [FIRE-ALARM-SYSTEM] | Dedicated 120V 20 AMP circuit for fire alarm control panel (text on sheet: 'DEDICATED 120V 20 AMP CIRCUIT HNG FIRE ALARM CONTROL PANEL')HOLDChain hold
└Scope 75F10-00 [FIRE-ALARM-SYSTEM] | Label: FIRE ALARM SLC RISER DIAGRAMHOLDChain hold
└Scope 76F10-00 [FIRE-ALARM-SYSTEM] | Callout: DEDICATED 120V 20 AMP CIRCUIT HNG FIRE ALARM CONTROL PANELHOLDChain hold
└Scope 77F11-00 [FIRE-ALARM-SYSTEM] | Battery calculation (secondary power source requirements) for fire alarm panels and annunciator(s) listed on sheet: FP•1 (NFS2-640), FP•1•ACS•32 ANN•1 (FDU-80), PS•1 (PSN-106B), PS•2 (PSN-106B).HOLDChain hold
└Scope 78F11-00 [FIRE-ALARM-SYSTEM] | Panel FP•1 (NFS2-640) totals: TOTAL STANDBY (A) 0.747; TOTAL ALARM (A) 2.53; REQUIRED STANDBY TIME (HOURS) 24; REQUIRED ALARM TIME (MINUTES) 5.HOLDChain hold
└Scope 79F11-00 [FIRE-ALARM-SYSTEM] | Panel FP•1•ACS•32 ANN•1 (FDU-80) totals: TOTAL STANDBY (A) 0.025; TOTAL ALARM (A) 0.0643; REQUIRED STANDBY TIME (HOURS) 24; REQUIRED ALARM TIME (MINUTES) 5.HOLDChain hold
└Scope 80F11-00 [FIRE-ALARM-SYSTEM] | Panel PS•1 (PSN-106B) totals: TOTAL STANDBY (A) 0.1219; TOTAL ALARM (A) 2.84; REQUIRED STANDBY TIME (HOURS) 24; REQUIRED ALARM TIME (MINUTES) 5.HOLDChain hold
└Scope 81F12-00 [FIRE-ALARM-SYSTEM] | Point-to-point voltage drop calculations for fire alarm NAC circuits identified by CM•1, CM•2, CM•3, CM•5, CM•6, CM•8, CM•9, CM•10, CM•12, CM•13HOLDChain hold
└Scope 82F12-00 [FIRE-ALARM-SYSTEM] | Listing of devices on each circuit with part number/description, candela rating, alarm current (A), remaining alarm current (A), distance from previous device (ft), voltage drop from previous, and voltage at deviceHOLDChain hold
└Scope 83F12-00 [FIRE-ALARM-SYSTEM] | Use of a 10.00% additional length multiplier for distance calculations (stated: DISTANCE MEASURED USING DRAWN SEGMENT LENGTHS WITH 10.00 % ADDITIONAL LENGTH)HOLDChain hold
└Scope 84F12-00 [FIRE-ALARM-SYSTEM] | General circuit wiring properties (as shown for many circuits): 'B' 16/2 FPLP/R NAC 16 AWG, 2 COND. SOLID COPPER FPLP/R ANALOG UNSHIELDEDHOLDChain hold
└Scope 85F12-00 [FIRE-ALARM-SYSTEM] | CM•1 devices: CM•1•N1•01 SWLED STROBE, WALL, WHITE 15CD ALARM CURRENT (A): 0.018 REMAINING ALARM CURRENT (A): 0.138 DISTANCE FROM PREVIOUS: 13 VOLTAGE DROP FROM PREVIOUS: 0.02 VOLTAGE AT DEVICE: 20.09; CM•1•N1•02 EOL SWLED STROBE, WALL, WHITE 185CD ALARM CURRENT (A): 0.12 REMAINING ALARM CURRENT (A): 0.12 DISTANCE FROM PREVIOUS: 6 VOLTAGE DROP FROM PREVIOUS: 0.01 VOLTAGE AT DEVICE: 20.08HOLDChain hold
└Scope 86F12-00 [FIRE-ALARM-SYSTEM] | CM•10 devices: CM•10•N1•01 SWLED STROBE, WALL, WHITE 185CD ALARM CURRENT (A): 0.12 REMAINING ALARM CURRENT (A): 0.138 DISTANCE FROM PREVIOUS: 16 VOLTAGE DROP FROM PREVIOUS: 0.02 VOLTAGE AT DEVICE: 18.61; CM•10•N1•02 EOL SWLED STROBE, WALL, WHITE 15CD ALARM CURRENT (A): 0.018 REMAINING ALARM CURRENT (A): 0.018 DISTANCE FROM PREVIOUS: 10 VOLTAGE DROP FROM PREVIOUS: 0 VOLTAGE AT DEVICE: 18.61HOLDChain hold
└Scope 87F12-00 [FIRE-ALARM-SYSTEM] | CM•12 devices: CM•12•N1•01 SWLED STROBE, WALL, WHITE 185CD ALARM CURRENT (A): 0.12 REMAINING ALARM CURRENT (A): 0.138 DISTANCE FROM PREVIOUS: 15 VOLTAGE DROP FROM PREVIOUS: 0.02 VOLTAGE AT DEVICE: 19.83; CM•12•N1•02 EOL SWLED STROBE, WALL, WHITE 15CD ALARM CURRENT (A): 0.018 REMAINING ALARM CURRENT (A): 0.018 DISTANCE FROM PREVIOUS: 11 VOLTAGE DROP FROM PREVIOUS: 0 VOLTAGE AT DEVICE: 19.82HOLDChain hold
└Scope 88F12-00 [FIRE-ALARM-SYSTEM] | CM•13 devices: CM•13•N1•01 SWLED STROBE, WALL, WHITE 185CD ALARM CURRENT (A): 0.12 REMAINING ALARM CURRENT (A): 0.138 DISTANCE FROM PREVIOUS: 20 VOLTAGE DROP FROM PREVIOUS: 0.03 VOLTAGE AT DEVICE: 19.81; CM•13•N1•02 EOL SWLED STROBE, WALL, WHITE 15CD ALARM CURRENT (A): 0.018 REMAINING ALARM CURRENT (A): 0.018 DISTANCE FROM PREVIOUS: 11 VOLTAGE DROP FROM PREVIOUS: 0 VOLTAGE AT DEVICE: 19.81HOLDChain hold
└Scope 89F12-00 [FIRE-ALARM-SYSTEM] | CM•2 devices: CM•2•N1•01 SWLED STROBE, WALL, WHITE 185CD ALARM CURRENT (A): 0.12 REMAINING ALARM CURRENT (A): 0.138 DISTANCE FROM PREVIOUS: 15 VOLTAGE DROP FROM PREVIOUS: 0.02 VOLTAGE AT DEVICE: 18.98; CM•2•N1•02 EOL SWLED STROBE, WALL, WHITE 15CD ALARM CURRENT (A): 0.018 REMAINING ALARM CURRENT (A): 0.018 DISTANCE FROM PREVIOUS: 10 VOLTAGE DROP FROM PREVIOUS: 0 VOLTAGE AT DEVICE: 18.98HOLDChain hold
└Scope 90F13-00 [FIRE-ALARM-SYSTEM] | F13-00-FIRE-ALARM-VOLTAGE-DROPS-Rev.0.pdf: review and carry all shown system requirements, calculations, notes, and references; detailed quantity chain remains pending.HOLDChain hold
└Scope 91F14-00 [FIRE-ALARM-SYSTEM] | ADDRESSABLE LOW-PROFILE PHOTOELECTRIC DETECTOR WITH LOW-FREQUENCY SOUNDER BASE, WHITEHOLDChain hold
└Scope 92F14-00 [FIRE-ALARM-SYSTEM] | PART NO: FSP-951 W/B200S-LF-WHHOLDChain hold
└Scope 93F14-00 [FIRE-ALARM-SYSTEM] | ADDRESSABLE CONTROL MODULE W/ FLASHSCAN, 1 CLASS A OR 1 CLASS BHOLDChain hold
└Scope 94F14-00 [FIRE-ALARM-SYSTEM] | PART NO: FCM-1HOLDChain hold
└Scope 95F14-00 [FIRE-ALARM-SYSTEM] | EOL 5.1K (end-of-line resistor)HOLDChain hold
└Scope 96F15-00 [FIRE-ALARM-SYSTEM] | Voltage drop calculations for multiple fire alarm circuits (notification appliance circuits and control module circuits).HOLDChain hold
└Scope 97F15-00 [FIRE-ALARM-SYSTEM] | End-of-line resistor usage documented: EOL 5.1K on listed circuits.HOLDChain hold
└Scope 98F15-00 [FIRE-ALARM-SYSTEM] | Calculation method formulas for resistance and voltage drop (explicitly shown).HOLDChain hold
└Scope 99F15-00 [FIRE-ALARM-SYSTEM] | Plan approval and code compliance review stamps from City of Tampa Construction Services Division.HOLDChain hold
└Scope 100F16-00 [FIRE-ALARM-SYSTEM] | Device detail illustrations and wiring for Notifier devices (640 Notifier Device Details, FDM-1, FRM-1, FMM-1, FDU-80, FCM-1, FCM-10, ISO-X)HOLDChain hold
└Scope 101F16-00 [FIRE-ALARM-SYSTEM] | Pull Station: NBG-12LX (label shown: 'PULL STATION NBG-12LX 640 Notifier Device Details:')HOLDChain hold
└Scope 102F16-00 [FIRE-ALARM-SYSTEM] | ADA Room Wiring Diagram and specific ADA wiring note: 'FCM-1 TO BE MOUNTED IN A 4S DEEP BOX MOUNTED ABOVE CEILING OF ADA UNIT'HOLDChain hold
└Scope 103F16-00 [FIRE-ALARM-SYSTEM] | Horn/Strobe device constraint: 'P2XLED HORN STROBE OR SXLED STROBE ONLY'HOLDChain hold
└Scope 104F16-00 [FIRE-ALARM-SYSTEM] | Power wiring references to specific panels: 'NFW2-100 Power Wiring to the NFW2-100', 'NFS2-640/NFS-320 Power Wiring to the NFS2-640/NFS-320'HOLDChain hold
└Scope 105F16-00 [FIRE-ALARM-SYSTEM] | Signal Line Circuit (SLC) requirement: '32 VDC MAX. SHIELDED-TWISTED PAIR IS RECOMMENDED'HOLDChain hold
└Scope 106F16-00 [FIRE-ALARM-SYSTEM] | Fault isolation strategy: 'A PAIR OF FAULT ISOLATOR MODULES WILL DISCONNECT A GROUP OF DEVICES IF A SHORT CIRCUIT OCCURS ON THE SIGNALING LINE CIRCUIT WITHIN THAT GROUP.'HOLDChain hold
└Scope 107F16-00 [FIRE-ALARM-SYSTEM] | Plan approval / review stamp: 'City of Tampa CONSTRUCTION SERVICES DIVISION PLAN APPROVAL' and 'REVIEWED FOR CODE COMPLIANCE BLD-26-0522593 2/26/2026'HOLDChain hold
└Scope 108F17-00 [FIRE-ALARM-SYSTEM] | Elevator hoistway smoke detector mounting and locations (diagramed)HOLDChain hold
└Scope 109F17-00 [FIRE-ALARM-SYSTEM] | Elevator machine room smoke detector shownHOLDChain hold
└Scope 110F17-00 [FIRE-ALARM-SYSTEM] | Elevator pit heat detector shown (label: ELEVATOR PIT HEAT DETECTOR)HOLDChain hold
└Scope 111F17-00 [FIRE-ALARM-SYSTEM] | Smoke detector and heat detector shown at hoist way sideHOLDChain hold
└Scope 112F17-00 [FIRE-ALARM-SYSTEM] | Notes and procedures for elevator recall and shunt-trip interface (see text block titled 'ELEVATOR RECALL FOR FIRE FIGHTERS SERVICE AND ELEVATOR SHUNT INSTALLATION...')HOLDChain hold
└Scope 113F17-00 [FIRE-ALARM-SYSTEM] | Primary & Secondary elevator recall interface diagram (label: PRIMARY & SECONDARY ELEVATOR RECALL INTERFACE)HOLDChain hold
└Scope 114F17-00 [FIRE-ALARM-SYSTEM] | Addressable relay and relay module detail (labels: ADDRESSABLE RELAY, RELAY MODULE)HOLDChain hold
└Scope 115F17-00 [FIRE-ALARM-SYSTEM] | Elevator shunt-trip interface diagram (label: ELEVATOR SHUNT-TRIP INTERFACE)HOLDChain hold
└Scope 116F17-00 [FIRE-ALARM-SYSTEM] | Plan approval / review: REVIEWED FOR CODE COMPLIANCE BLD-26-0522593 2/26/2026HOLDChain hold
└Scope 117F18-00 [FIRE-ALARM-SYSTEM] | General Alarm Sequence of Operations (fire alarm logic and outputs)HOLDChain hold
└Scope 118F18-00 [FIRE-ALARM-SYSTEM] | Elevator Wiring Diagram for Notifier System (elevator recall, hat light, shunt trip, monitor modules)HOLDChain hold
└Scope 119F18-00 [FIRE-ALARM-SYSTEM] | Device Mounting Elevation (visual layout of device mounting heights and relationships)HOLDChain hold
└Scope 120F18-00 [FIRE-ALARM-SYSTEM] | FIRE ALARM SYSTEMHOLDChain hold
└Scope 121F18-00 [FIRE-ALARM-SYSTEM] | CONSTRUCTION SERVICES DIVISION PLAN APPROVALHOLDChain hold
└Scope 122F18-00 [FIRE-ALARM-SYSTEM] | General Alarm Sequence of Operations (sheet content header)HOLDChain hold
└Scope 123F18-00 [FIRE-ALARM-SYSTEM] | Elevator Wiring Diagram Notifier System (sheet content header)HOLDChain hold
└Scope 124F18-00 [FIRE-ALARM-SYSTEM] | System Inputs and System Outputs are shown and numbered on the sheet (e.g., "Elevator lobby smoke detector 1st FL", "Elevator mach room/shaft smoke detector", "Shunt Elevator power 1")HOLDChain hold
└Scope 125ID500 [Interior] | Veneer facing on certain components ('303 (VENEER)')HOLDChain hold
Section-28-006Mass NotificationReady
└Scope 01A-001 | Emergency-responder radio enhancement system required.1SYSTEMReady
Section-28-007Security Network / IntegrationReady
Section-28-008Security Testing / CommissioningReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 31Earthwork10
Section-31-001Site ClearingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-31-002Rough GradingChain hold
└Scope 01C-3 [Civil] | Construct an 83-room, 5-story Fairfield Inn & Suites hotel on a 1.351 acre parcel.HOLDChain hold
└Scope 02C-3 [Civil] | All utilities and services installed underground (no overhead utilities).HOLDChain hold
└Scope 03C-3 [Civil] | THE APPLICANT WILL NOT BE REQUIRED TO DEDICATE RIGHT-OF-WAY TO CITY OF TAMPA, OR HILLSBOROUGH COUNTY.HOLDChain hold
└Scope 04C-3 [Civil] | THE KITCHEN WILL BE EQUIPPED WITH ANSUL FIRE SUPPRESSION SYSTEM.HOLDChain hold
└Scope 05C-3 [Civil] | ELECTRICAL UTILITY SERVICE WILL BE PROVIDED BY TAMPA ELECTRIC.HOLDChain hold
└Scope 06C-4 [Civil] | Stabilize soils and provide dust control during earthworkHOLDChain hold
└Scope 07C-5 [Civil] | YARD INLET PROTECTIONHOLDChain hold
└Scope 08C-5 [Civil] | HARDWARE CLOTH INLET PROTECTIONHOLDChain hold
└Scope 09C-5 [Civil] | SLOPE TRACKING DETAILHOLDChain hold
└Scope 10C-5 [Civil] | INSTALL FILTER PRIOR TO BEGINNING CONSTRUCTION.HOLDChain hold
└Scope 11C-6 [Civil] | Building construction of Fairfield Inn & Suites 83 room, 5 story (implied by project title)HOLDChain hold
└Scope 12C-6 [Civil] | Coordination with FDOT for work in FDOT ROW (General Note 2)HOLDChain hold
└Scope 13C-6 [Civil] | Finish floor elevation: 43.30HOLDChain hold
└Scope 14C-7 [Civil] | Installation of exfiltration piping (12" HDPE perforated and solid runs referenced with lengths and slopes in plan view)HOLDChain hold
└Scope 15C-7 [Civil] | Installation of inspection ports (2 total each isolator row) and 12"x12"x12" teesHOLDChain hold
└Scope 16C-7 [Civil] | THE MINIMUM WATER QUALITY TREATMENT VOLUME REQUIRED IS EQUAL TO 3-INCHES OF RUNOFF ...HOLDChain hold
└Scope 17C-7 [Civil] | TREATMENT VOLUME REQUIRED = 11,620 (CF)HOLDChain hold
└Scope 18C-7 [Civil] | TREATMENT VOLUME PROVIDED = 12,164 (CF)HOLDChain hold
└Scope 19C-7 [Civil] | ISOLATOR ROW SC-310 CHAMBERS (40 TOTAL) (178 TOTAL) (134 TOTAL) (counts listed in plan view for different isolator rows)HOLDChain hold
└Scope 20C-8 [Civil] | Connection detail for inspection ports and 4" schedule 40 PVC interfacesHOLDChain hold
└Scope 21C-8 [Civil] | Reference to related NYLOPLAST inline drain components and DWG numbersHOLDChain hold
└Scope 22C-8 [Civil] | Requirements that design engineer must review and approve prior to constructionHOLDChain hold
└Scope 23C-9 [Civil] | Grading and earthwork including removal of muck or muck-like material and backfilling as required; testing per AASHTO T-180 modified Proctor.HOLDChain hold
└Scope 24C-9 [Civil] | ADA-related slope and landing requirements per FACBC (sections called out: Section 502.4 and Section 406).HOLDChain hold
└Scope 25C-9 [Civil] | Stakeout of improvements for construction by digital coordinates or geodetic total station.HOLDChain hold
└Scope 26C-9 [Civil] | FINISH FLOOR ELEVATION 43.30HOLDChain hold
└Scope 27C-9 [Civil] | GENERAL EARTHWORK NOTE 4: SOILS ARE TO BE STABILIZED BY WATER OR OTHER MEANS DURING CONSTRUCTION.HOLDChain hold
└Scope 28C-9 [Civil] | GENERAL EARTHWORK NOTE 5: ONCE AN AREA IS SEEDED OR SODDED, IT MUST BE MAINTAINED TO ALLOW THE GRASS TO GROW.HOLDChain hold
└Scope 29C-10 [Civil] | Elevation and grade callouts including finish floor elevation (EL 43.30) and P.V.I. elevationsHOLDChain hold
└Scope 30C-10 [Civil] | FINISH FLOOR EL 43.30HOLDChain hold
└Scope 31C-10 [Civil] | GRADE 8" BELOW FINISH FLOOR (EL 42.6)HOLDChain hold
└Scope 32C-12 [Civil] | Install firelines: 8" PVC Class 200 (DR 14) fireline and 6" PVC Class 200 fireline to FDCHOLDChain hold
└Scope 33C-12 [Civil] | Install force main (4" green PVC DR 18 and 4" green PVC force main with 36" min cover; additional 24 LF 4" green PVC DR 18 noted)HOLDChain hold
└Scope 34C-12 [Civil] | Directional drilling per City standards (minimum 48" cover, entry/exit angle requirements provided)HOLDChain hold
└Scope 35C-12 [Civil] | PROVIDE WATERTIGHT SEAL PER CITY DETAIL SHEET No. 18HOLDChain hold
└Scope 36C-12.1 [Civil] | Installation special precautions and installation diagramsHOLDChain hold
└Scope 37C-12.1 [Civil] | PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.HOLDChain hold
└Scope 38C-13 [Civil] | SCOPE: NO SUBSTITUTIONS - NO ALTERNATESHOLDChain hold
└Scope 39C-14 [Civil] | Use of restrained joints or thrust blocks for tees, bends, plugs, hydrantsHOLDChain hold
└Scope 40C-14 [Civil] | ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL CONTAIN NO MORE THAN 8.0% LEAD, AND ANY SOLDER OR FLUX USED IN THIS PROJECT WILL CONTAIN NO MORE THAN 0.2% LEAD.HOLDChain hold
└Scope 41C-15 [Civil] | Saw joints per schedule; first saw cut 1/8", second saw cut 1/4" (if required)HOLDChain hold
└Scope 42C-15 [Civil] | Diamond dowel installation: 1/4" x 4.5" DIAMOND DOWEL BY PNA SPACED AT 24" O.C.HOLDChain hold
└Scope 43C-15 [Civil] | Crack control joints at 5' centersHOLDChain hold
└Scope 44C-15 [Civil] | DIAMOND DOWEL 1/4" x 4.5" DIAMOND DOWEL BY PNA SPACED AT 24" O.C. DO NOT GREASE DOWEL. INSTALL PER PNA RECOMMENDATIONHOLDChain hold
└Scope 45C-15 [Civil] | 1/4" SECOND SAW CUT (IF REQUIRED)HOLDChain hold
└Scope 46C-15 [Civil] | SAW JOINTS PER SCHEDULE SAME DAY AS POURHOLDChain hold
└Scope 47C-16 [Civil] | Design and construct walls to meet 2020 Florida Building Code exposure and wind-load requirements as notedHOLDChain hold
└Scope 48C-16 [Civil] | STOP SIGN DETAIL: HIGH INTENSITY R1-1 REFLECTIVE ALUMINUM 36" AT INTERSECTION WITH RIGHT-OF-WAY 30" INTERIORHOLDChain hold
└Scope 49C-16 [Civil] | HANDICAP PARKING SIGN: TOP PORTION OF SIGN SHALL HAVE REFLECTORIZED (ENGINEERING GRADE) BLUE BACKGROUND WITH WHITE REFLECTORIZED LEGEND AND BORDER; BOTTOM PORTION OF SIGN SHALL HAVE REFLECTORIZED (ENGINEERING GRADE) WHITE BACKGROUND WITH BLACK OPAQUE LEGEND AND BORDERHOLDChain hold
└Scope 50C-16 [Civil] | FINE NOTIFICATION SIGN SHALL HAVE A REFLECTORIZED (ENGINEERING GRADE) WHITE BACKGROUND WITH BLACK OPAQUE LEGEND AND BORDERHOLDChain hold
└Scope 51C-16 [Civil] | FINE $250.00 F.S. 318.14 (shown on sign detail)HOLDChain hold
└Scope 52C-18 [Civil] | Standard civil/utility details for the projectHOLDChain hold
└Scope 53C-18 [Civil] | Bollard post detailsHOLDChain hold
└Scope 54C-18 [Civil] | Above-ground double detector check valve assembly detailHOLDChain hold
└Scope 55C-18 [Civil] | New lateral connections detailHOLDChain hold
└Scope 56C-18 [Civil] | Miscellaneous PM detailsHOLDChain hold
└Scope 57C-18 [Civil] | Document or sheet labeled: CITY OF TAMPA STANDARD DETAILSHOLDChain hold
└Scope 58C-18 [Civil] | Text (on face): THIS DRAWING IS THE PROPERTY OF NEWKIRK ENGINEERING ANY USE OR REPRODUCTION IN WHOLE OR PART IS PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF NEWKIRK ENGINEERINGHOLDChain hold
└Scope 59C-19 [Civil] | TWO-LANE AND MULTILANE, WORK ON SHOULDERHOLDChain hold
└Scope 60C-19 [Civil] | TWO-LANE, TWO-WAY WORK WITHIN THE TRAVEL WAYHOLDChain hold
└Scope 61C-19 [Civil] | SPECIAL CONDITIONSHOLDChain hold
└Scope 62C-19 [Civil] | TEMPORARY RAILROAD CROSSING BUFFER SPACE EXTENSIONHOLDChain hold
└Scope 63C-19 [Civil] | TEMPORARY LANE SHIFT TO SHOULDER WHEN WORK AREA ENCROACHES ON THE CENTERLINEHOLDChain hold
└Scope 64C-19 [Civil] | FDOT standard-plan captions visible: 'FY 2021-22 STANDARD PLANS' and sheet identifiers '102-602' and '102-603'HOLDChain hold
└Scope 65C-19 [Civil] | Visible plan detail captions: 'TWO-LANE AND MULTILANE, WORK ON SHOULDER', 'TWO-LANE, TWO-WAY WORK WITHIN THE TRAVEL WAY', 'SPECIAL CONDITIONS'HOLDChain hold
└Scope 66C-19 [Civil] | Examples of detail labels visible: 'TEMPORARY RAILROAD CROSSING BUFFER SPACE EXTENSION', 'TEMPORARY LANE SHIFT TO SHOULDER WHEN WORK AREA ENCROACHES ON THE CENTERLINE'HOLDChain hold
└Scope 67C-20 [Civil] | THIS DRAWING IS THE PROPERTY OF NEWKIRK ENGINEERING ANY USE OR REPRODUCTION IN WHOLE OR PART IS PROHIBITED WITHOUT THE EXPRESSED WRITTEN CONSENT OF NEWKIRK ENGINEERING COPYRIGHT 2013 ALL RIGHTS RESERVEDHOLDChain hold
└Scope 68C-20 [Civil] | FY 2021-22 STANDARD PLANSHOLDChain hold
└Scope 69C-21 [Civil] | 2. ALL MULCH SHALL BE ALL NATURAL WOOD (NO CYPRESS).HOLDChain hold
└Scope 70C-21 [Civil] | 9. NO SUBSTITUTIONS OR CHANGES OF ANY KIND WILL BE ALLOWED AT THE TIME OF BIDDING SO AS TO PROVIDE FOR FAIR COMPARISON.HOLDChain hold
└Scope 71C-21 [Civil] | 12. ALL BUILDING MATERIALS AND LABOR SHALL CONFORM TO THE SOUTHERN BUILDING CODE AND ALSO TO ALL LOCAL CODES THAT HAVE JURISDICTION.HOLDChain hold
└Scope 72C-21 [Civil] | 22. ALL PLANT MATERIAL SHALL BE GUARANTEED ONE YEAR AFTER ACCEPTANCE BY OWNER.HOLDChain hold
└Scope 73C-21 [Civil] | 28. FOR ALL NEW DEVELOPMENT, OR REDEVELOPMENT OF EXISTING PROPERTY, THE APPLICANT SHALL BE REQUIRED TO REMOVE ALL INVASIVE NONNATIVE PLANT SPECIES FROM THE PROPERTY PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY.HOLDChain hold
└Scope 74C-21 [Civil] | PLANT LIST - GROUND COVER: DT 95, MC 94, ZI 235HOLDChain hold
└Scope 75C-21 [Civil] | ALL MULCH SHALL BE ALL NATURAL WOOD (NO CYPRESS).HOLDChain hold
└Scope 76C-22 [Civil] | INSTALL SLEEVE PIPING WHERE SHOWN ON THE DRAWINGS AT THE PROPER DEPTH.HOLDChain hold
└Scope 77C-22 [Civil] | ALL SLEEVE PIPE SHALL BE SCHEDULE 40 PVC PIPE INSTALLED A MINIMUM OF 20" BELOW FINISHED PAVING GRADES.HOLDChain hold
└Scope 78C-22 [Civil] | ALL SLEEVES WHEN PLACED IN FIELD ARE TO BE LOCATED BY A METAL PIPE AT EACH END AND LOCATED FROM TWO STATIONARY POINTS BY TAPE MEASUREMENTS.HOLDChain hold
└Scope 79C-22 [Civil] | ALL PIPE SHALL BE INSTALLED A MINIMUM OF 20" BELOW GRADE.HOLDChain hold
└Scope 80C-22 [Civil] | ALL PIPE EXPOSED ABOVE GRADE AND TO VIEW SHALL BE SCHEDULE 40 GALVANIZED STEEL PIPE OF THE NOTED SIZE.HOLDChain hold
└Scope 81C-22 [Civil] | ALL PIPE 1/2" TO 2 1/2" IN SIZE SHALL BE PRESSURE RATED 160 PVC (EXCEPT MAIN).HOLDChain hold
└Scope 82C-22 [Civil] | ALL FITTINGS SHALL BE SCHEDULE 40 PVC.HOLDChain hold
└Scope 83C-22 [Civil] | Finish floor elevation 43.30HOLDChain hold
└Scope 84C-23 [Civil] | Palm Batten system and installation detailHOLDChain hold
└Scope 85C-23 [Civil] | SAUCER - 3" DEEP (appears in multi-trunk and other details)HOLDChain hold
Section-31-003ExcavationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-31-004TrenchingChain hold
└Scope 01C-22 [Civil] | ALL TRENCHING SHALL BE KEPT OUT OF THE DRIP LINE AREA OF ALL EXISTING TREES. USE RADIAL LINES OR TUNNELING WHEN NECESSARY TO ENCROACH INTO THE DRIP LINE AREA OF TREES.HOLDChain hold
Section-31-005DewateringChain hold
└Scope 01C-5 [Civil] | TYPICAL DEWATERING DISCHARGE DETAILHOLDChain hold
Section-31-006Fill / BackfillChain hold
└Scope 01C-9 [Civil] | Prohibition on temporary fill stockpiling in lifts greater than six feet.HOLDChain hold
Section-31-007Subgrade PreparationChain hold
└Scope 01A-002 | Provide termite treatment per FBC Section 1816. Treatment limits/area are not defined on this sheet; quantity remains blank.SFChain hold
Section-31-008Erosion / Sediment ControlChain hold
└Scope 01C-4 [Civil] | Install proposed silt fence (see detail, sheet No. 5)HOLDChain hold
└Scope 02C-4 [Civil] | PROPOSED SILT FENCE (SEE DETAIL, SHEET No. 5)HOLDChain hold
└Scope 03C-5 [Civil] | SEDIMENT FENCE DETAILHOLDChain hold
└Scope 04C-5 [Civil] | TEMPORARY SEDIMENT POND DETAILHOLDChain hold
└Scope 05C-5 [Civil] | SEDIMENT CONTROL STONE SHALL BE 3/4" WASHED STONE.HOLDChain hold
└Scope 06C-9 [Civil] | Soil stabilization during construction to reduce erosion.HOLDChain hold
Section-31-009Soil StabilizationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-31-010Shoring / Excavation SupportReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 32Exterior Improvements10
Section-32-001Asphalt PavingChain hold
└Scope 01C-1A [Civil] | Existing site features indicated (broken asphalt, retention pond, asphalt parking)HOLDChain hold
└Scope 02C-4 [Civil] | Asphalt pavement removal (13,414 SF total)HOLDChain hold
└Scope 03C-4 [Civil] | Saw cut and remove 13,716± SF asphalt pavement (alternate/as-annotated line)HOLDChain hold
└Scope 04C-4 [Civil] | Open cut asphalt pavement as required for 4" force main connection (see Utility Plan, Sheet No. 12)HOLDChain hold
└Scope 05C-6 [Civil] | ASPHALT PAVEMENT (typical): 1.5" SP-9.5 WITH TACK COAT PER FDOT SPECIFICATIONSHOLDChain hold
└Scope 06C-10 [Civil] | Asphalt pavement and overlay dimensions and locationsHOLDChain hold
└Scope 07C-12 [Civil] | Roadway restoration per corresponding jurisdictions latest standards and City detail (mill & overlay where asphalt open cuts are within City R/W)HOLDChain hold
└Scope 08C-15 [Civil] | Imprinted asphalt to be installed with 1/4" max imprint depth and specified thermoplastic edge markingsHOLDChain hold
Section-32-002Concrete Paving / WalksChain hold
└Scope 01A-570 | Sidewalk detailHOLDChain hold
└Scope 02C-3 [Civil] | 4 HANDICAP PARKING SPACES ARE PROVIDED WITH A SIDEWALK CONNECTION TO THE 9301 N 29TH STREET RIGHT-OF-WAY.HOLDChain hold
└Scope 03C-4 [Civil] | Saw cut and remove various sidewalks and curbs (examples: 168±LF sidewalk, 47±LF sidewalk, 40 LF Type 'F' curb, 73 LF drop curb, 41 LF Type 'F' curb)HOLDChain hold
└Scope 04C-9 [Civil] | Sidewalk and curb/curb ramp construction per typical details (including saw cut and match existing pavement with butt joint and transition to thickened edge sidewalk).HOLDChain hold
└Scope 05C-10 [Civil] | Site cross-sections for building, sidewalks, curb, pavement and landscapingHOLDChain hold
└Scope 06C-10 [Civil] | Handicap parking and sidewalk crossing configurationHOLDChain hold
└Scope 07C-15 [Civil] | Place 1/2" expansion joints at maximum 50' o.c. for sidewalksHOLDChain hold
└Scope 08C-20 [Civil] | Sidewalk closure (standard plan)HOLDChain hold
Section-32-003Curbs / GuttersChain hold
└Scope 01C-5 [Civil] | CURB INLET PROTECTION (WITH AND WITHOUT GRATE)HOLDChain hold
└Scope 02C-5 [Civil] | FOR CURB INLET PROTECTION AN ADDITIONAL 18" OF FABRIC IS WRAPPED AROUND THE WOOD AND SECURED WITH STAPLES. THE WOOD SHALL NOT BLOCK THE ENTIRE HEIGHT OF THE CURB BOX OPENING.HOLDChain hold
└Scope 03C-15 [Civil] | 1/2" pre-molded expansion joint required every 500' for curbs; construction joint required every 10' maximum (4' minimum)HOLDChain hold
└Scope 04C-15 [Civil] | Expansion joint material must cover entire cross section of curbHOLDChain hold
└Scope 05C-22 [Civil] | WHEN INSTALLING IRRIGATION PIPING IN ISLAND AND OTHER NARROW PLANTING AREAS RUN PIPING CLOSE TO CURB AND NOT DOWN THE MIDDLE OF THE PLANTING AREA.HOLDChain hold
Section-32-004Pavement MarkingsChain hold
└Scope 01C-6 [Civil] | Paving and pavement marking shown for parking and drives (as detailed in PAVING LEGEND and PAVEMENT MARKING NOTES)HOLDChain hold
Section-32-005Fences / GatesChain hold
└Scope 01C-1A [Civil] | Fence line shown: '6' CHAIN LINK FENCE'HOLDChain hold
└Scope 02C-4 [Civil] | Remove chain link fence along 29th Street right-of-wayHOLDChain hold
└Scope 03C-16 [Civil] | Provide/construct corrugated metal gate with drop pin holes and locking mechanism as detailedHOLDChain hold
└Scope 04P5.1 [Plumbing] | GATE VALVE UNION STAINLESS STEELHOLDChain hold
Section-32-006Retaining WallsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-32-007Site FurnishingsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-32-008IrrigationChain hold
└Scope 01C-21 [Civil] | 10. EXISTING IRRIGATION SYSTEM SHALL BE REVAMPED TO PROVIDE 100% COVERAGE.HOLDChain hold
└Scope 02C-22 [Civil] | LOCATE ALL VALVES AND OTHER IRRIGATION EQUIPMENT IN PLANT BED AREAS WITHIN THE PROJECT LIMITS FOR CONCEALMENT PURPOSES.HOLDChain hold
└Scope 03C-22 [Civil] | PURPLE IRRIGATION EQUIPMENT MUST BE USED FOR ALL IRRIGATION IF REUSE WATER IS BEING USED.HOLDChain hold
└Scope 04C-22 [Civil] | IRRIGATION LINES ARE SHOWN DIAGRAMMATICALLY AND ARE INTENDED TO SHOW DISTRIBUTION ZONES ONLY. ALL VALVES SHALL BE LOCATED WITHIN PLANTING AREAS (NOT WITHIN PAVEMENT). LINES LOCATED UNDER PAVEMENT SHALL BE KEPT TO A MINIMUM AND ALL PIPING UNDER PAVED AREAS SHALL BE SLEEVED.HOLDChain hold
└Scope 05C-22 [Civil] | NO SIGNIFICANT IRRIGATION OVERTHROW SHALL BE ALLOWED ONTO IMPERVIOUS SURFACES.HOLDChain hold
└Scope 06C-22 [Civil] | IRRIGATION PLAN scale: 1" = 20'HOLDChain hold
└Scope 07C-22 [Civil] | Controller specified: RACHIO 16 ZONE IRO (SMART IRRIGATION) OR EQUALHOLDChain hold
└Scope 08C-22 [Civil] | 1-1/2" LOOPED IRRIGATION MAIN (MUST BE SCH 40 PIPE) is shownHOLDChain hold
└Scope 09C-22 [Civil] | Plan note: 25% OF IRRIGATION IS LOW VOLUMEHOLDChain hold
└Scope 10C-23 [Civil] | Irrigation techline/center feed layout and Netafim detailHOLDChain hold
└Scope 11C-23 [Civil] | Document title: LANDSCAPE AND IRRIGATION DETAILSHOLDChain hold
Section-32-009Planting / LandscapingChain hold
└Scope 01C-1A [Civil] | Relationships to adjacent public streets: 29th STREET NORTH and 30th STREET NORTHHOLDChain hold
└Scope 02C-3 [Civil] | Provide two (2) right-in and right-out driveway connections on N 30TH STREET.HOLDChain hold
└Scope 03C-3 [Civil] | Connect potable water to a 12" water main within the N. 30TH STREET ROW.HOLDChain hold
└Scope 04C-3 [Civil] | SITE ACCESS WILL BE PROVIDED TWO (2) RIGHT-IN AND RIGHT-OUT DRIVEWAY CONNECTION ON N 30TH STREET.HOLDChain hold
└Scope 05C-4 [Civil] | Tree removal (typical 20 places) and tree protection barriers (typical 23 places)HOLDChain hold
└Scope 06C-5 [Civil] | TREE PROTECTION BARRIERHOLDChain hold
└Scope 07C-6 [Civil] | Landscape/restore disturbed right-of-way areas with BAHIA SOD (General Note 7)HOLDChain hold
└Scope 08C-9 [Civil] | Seeding/sodding and maintenance until grass establishes; planting/grass/mulch of all non-paved areas.HOLDChain hold
└Scope 09C-10 [Civil] | 4' LANDSCAPE AREAHOLDChain hold
└Scope 10C-17 [Civil] | Civil Engineering, Transportation, CEI & Landscape ArchitectureHOLDChain hold
└Scope 11C-20 [Civil] | Civil Engineering, Transportation, CEI & Landscape Architecture 1230 North US1, Suite 3 Ormond Beach, Florida 32174 Phone (386) 872-7794 www.Newkirk-Engineering.com C.A. # 30209 L.C. # 26000584HOLDChain hold
└Scope 12C-21 [Civil] | 1. ALL PLANT MATERIAL SHALL CONFORM TO THE STANDARDS FOR FLORIDA #1 OR BETTER AS DESCRIBED IN THE CURRENT "GRADES AND STANDARDS FOR NURSERY PLANTS", STATE OF FLORIDA, DEPARTMENT OF AGRICULTURE, TALLAHASSEE, OR THEIR EQUAL AS DETERMINED BY THE LANDSCAPE ARCHITECT.HOLDChain hold
└Scope 13C-21 [Civil] | 16. ANY EXISTING TREES CREDITED TOWARDS REQUIRED BUFFERS OR LANDSCAPE REQUIREMENTS REMOVED FOR ANY REASON SHALL BE REPLACED WITH TREES MEETING CITY APPROVAL WITH REGARDS TO SPECIES AND SIZE.HOLDChain hold
└Scope 14C-21 [Civil] | 18. ALL SHADE TREES AND SINGLE TRUNK UNDERSTORY TREES SHALL BE STAKED USING ARBORGUY STAKING SYSTEM FOR SINGLE STEM TREE AND ALL MULTI-TRUNK UNDERSTORY TREES SHALL BE STAKED WITH ARBORGUY MULTI-TRUNK SYSTEM.HOLDChain hold
└Scope 15C-21 [Civil] | PLANT LIST - TREES: AR 4, CC 9, IN 6, JV 3, LI 11, LIG 3, MGB 7, SP 17, TD 4HOLDChain hold
└Scope 16C-21 [Civil] | PLANT LIST - SHRUBS: IVS 35, LJF 46, POM 104, PR 6, PS 28, RI 24, ROSA 50, VW 375, VS 25HOLDChain hold
└Scope 17C-21 [Civil] | PLANT LIST TOTAL 1181 (64 trees + 693 shrubs + 424 ground cover)HOLDChain hold
└Scope 18C-22 [Civil] | CHECK PRESSURE AND GPM OF WATER SUPPLY BEFORE BEGINNING JOB AND REPORT FINDINGS TO LANDSCAPE ARCHITECT. LANDSCAPE ARCHITECT WILL MAKE ANY ADJUSTMENT NECESSARY TO MAKE SYSTEM WORK AT ITS BEST.HOLDChain hold
└Scope 19C-23 [Civil] | Island planting detailHOLDChain hold
└Scope 20C-23 [Civil] | Tree planting detailHOLDChain hold
└Scope 21C-23 [Civil] | Palm tree planting detailHOLDChain hold
└Scope 22C-23 [Civil] | Shrub planting detailHOLDChain hold
└Scope 23C-23 [Civil] | Multi-trunk planting detailHOLDChain hold
└Scope 24C-23 [Civil] | Tree anchoring/guying details (Tree Frog PRO/BIO systems)HOLDChain hold
└Scope 25C-23 [Civil] | General planting/soil/mulch/fertilizer notesHOLDChain hold
└Scope 26C-23 [Civil] | Landscape Architect: RICHARD L. POORE, L.A. # LA533HOLDChain hold
└Scope 27C-23 [Civil] | PLANTING PIT IS TO BE 1.5 TIMES THE ROOT BALL / also 'PLANT PIT TWICE SIZE OF ROOTBALL' appears in other detailsHOLDChain hold
└Scope 28ENERGY-1 [Energy-Calculations] | Two (2) right-in and right-out driveway connections on N 30TH STREETHOLDChain hold
└Scope 29ENERGY-1 [Energy-Calculations] | SITE ACCESS WILL BE PROVIDED TWO (2) RIGHT-IN AND RIGHT-OUT DRIVEWAY CONNECTIONS ON N 30TH STREET.HOLDChain hold
Section-32-010Turf / SeedingChain hold
└Scope 01C-5 [Civil] | TEMPORARY SEEDING SPECIFICATION AND MULCHINGHOLDChain hold
└Scope 02C-21 [Civil] | 3. SOD SPECIFIED AS ST. AUGUSTINE "FLORITAM" SHALL BE 95% WEED-FREE. SOD SPECIFIED AS BAHIA SHALL BE 85% WEED-FREE. ALL SOD SHALL BE INSTALLED WITH TIGHT JOINTS, ROLLED AND FERTILIZED.HOLDChain hold
└Scope 03C-21 [Civil] | SOD SPECIFIED AS ST. AUGUSTINE "FLORITAM" SHALL BE 95% WEED-FREE. SOD SPECIFIED AS BAHIA SHALL BE 85% WEED-FREE. ALL SOD SHALL BE INSTALLED WITH TIGHT JOINTS, ROLLED AND FERTILIZED.HOLDChain hold
DIV 33Utilities8
Section-33-001Water UtilitiesChain hold
└Scope 01C-12 [Civil] | Install 4" PVC (DR 18) water service to building (36" min. cover)HOLDChain hold
└Scope 02C-12 [Civil] | Perform wet taps to existing 8" DIP water main (various tap sizes referenced: 8"x8" MJ saddle, 8"x4" tapping sleeve, 8"x2" double strap tapping saddle)HOLDChain hold
└Scope 03C-12 [Civil] | WET TAP EXISTING 8" DIP WATER MAIN WITH 8"x8" MJ SADDLE, VALVE AND VALVE BOX FOR FIRE SERVICE. SEE CITY DETAIL, SHEET No. 18HOLDChain hold
└Scope 04C-12 [Civil] | WET TAP EXISTING 8" WATER MAIN WITH 8"x4" TAPPING SLEEVE, VALVE AND VALVE BOX FOR POTABLE WATER SERVICE. SEE CITY DETAIL 6.01A, SHEET No. 18HOLDChain hold
└Scope 05C-14 [Civil] | Installation of potable water mains and appurtenances to AWWA standardsHOLDChain hold
Section-33-002Sanitary SewerageReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-33-003Storm DrainageReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-33-004Utility StructuresChain hold
└Scope 01C-12 [Civil] | Provide traffic-bearing adjustments for manhole tops and cleanoutsHOLDChain hold
└Scope 02C-18 [Civil] | Force main connection to existing manhole detailHOLDChain hold
Section-33-005Natural Gas UtilitiesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-33-006Electrical Site UtilitiesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-33-007Communications Site UtilitiesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-33-008Utility Testing / Tie-InsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 34Transportation6
Section-34-001RoadwaysReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-34-002Railways / GuidewaysReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-34-003Traffic SignalsChain hold
└Scope 01C-4 [Civil] | Provide traffic control measures and MOT plan; maintain driveways in-serviceHOLDChain hold
└Scope 02C-19 [Civil] | MAINTENANCE OF TRAFFICHOLDChain hold
└Scope 03C-20 [Civil] | Maintenance of TrafficHOLDChain hold
└Scope 04C-20 [Civil] | Multilane roadway lane closures (standard plan)HOLDChain hold
Section-34-004Transportation SignageReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-34-005Pavement MarkingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-34-006Transportation LightingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 35Waterway and Marine Construction7
Section-35-001DredgingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-35-002Shoreline ProtectionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-35-003Waterway Bank ProtectionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-35-004Marine Construction / DocksReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-35-005Floating ConstructionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-35-006Underwater ConstructionReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-35-007Dams / LeveesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 40Process Interconnections8
Section-40-001Process PipingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-40-002Gas / Vapor Process PipingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-40-003Liquid Process PipingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-40-004Process ValvesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-40-005Pipe Supports / SleevesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-40-006Process Piping InsulationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-40-007InstrumentationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-40-008Process ControlsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 41Material Processing and Handling Equipment7
Section-41-001ConveyorsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-41-002Cranes / HoistsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-41-003Lifting DevicesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-41-004Feeders / BatchingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-41-005Storage EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-41-006Manufacturing LinesReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-41-007Processing EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 42Process Heating, Cooling, and Drying Equipment6
Section-42-001Process Heating EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-42-002Process BoilersReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-42-003Furnaces / Kilns / OvensReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-42-004Process Cooling EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-42-005Heat ExchangersReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-42-006Drying EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 43Process Gas and Liquid Handling, Purification, and Storage Equipment7
Section-43-001Gas Handling EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-43-002Compressors / BlowersReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-43-003Liquid PumpsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-43-004Liquid Handling EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-43-005Filters / PurificationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-43-006Tanks / StorageReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-43-007Pressurized VesselsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 44Pollution and Waste Control Equipment6
Section-44-001Air Pollution ControlReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-44-002Noise / Vibration ControlReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-44-003Odor ControlReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-44-004Water Pollution ControlReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-44-005Solid Waste ControlReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-44-006Waste Thermal ProcessingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 45Industry-Specific Manufacturing Equipment7
Section-45-001Oil / Gas Extraction EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-45-002Mining EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-45-003Food Manufacturing EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-45-004Beverage Manufacturing EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-45-005Chemical Manufacturing EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-45-006Metal / Machinery Manufacturing EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-45-007Manufacturing Equipment CommissioningReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 46Water and Wastewater Equipment9
Section-46-001Packaged Treatment EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-46-002Screening EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-46-003Grinding / Shredding EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-46-004Oil / Grease SeparationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-46-005Chemical Feed EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-46-006Clarifier EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-46-007Aeration / Secondary TreatmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-46-008Filtration / UV TreatmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-46-009Residuals / Sludge HandlingReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
DIV 48Electrical Power Generation8
Section-48-001GeneratorsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-48-002Solar Power EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-48-003Wind Power EquipmentReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-48-004Battery / Energy StorageReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-48-005Inverters / Power ControlsReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-48-006Transformers / Voltage RegulationReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-48-007Combined Heat and PowerReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Section-48-008Power Generation CommissioningReady
└Scope 01Enter scope descriptionLSNeeds description
└Scope 02Enter scope descriptionLSNeeds description
Direct construction cost$0
$0
Total estimate$0