Built Within · Hands-On Hospitality
Project Estimate
Division-based construction estimate worksheet
Estimate
Division-based construction estimate worksheet
⌕
35 divisions · 317 sections
| ID | Division / Section | Qty | Unit | Unit Cost | Total | Section Total | Division Total |
|---|---|---|---|---|---|---|---|
| DIV 00 | Procurement and Contracting Requirements13 | $0 | |||||
| Section-00-001 | Bid / Proposal Submitted | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-002 | Contract Executed | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-003 | Bonds Received | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-004 | Insurance Received | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-005 | Notice to Proceed | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-006 | Permit Status | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-007 | Schedule of Values | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-008 | Pay Applications | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-009 | RFIs / Clarifications | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-010 | Change Orders | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-011 | Substantial Completion | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-012 | Final Closeout | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-00-013 | Warranties | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 01 | General Requirements15 | $0 | |||||
| Section-01-001 | Project Summary / Scope | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-002 | Work Restrictions / Site Rules | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-003 | Project Meetings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-004 | Construction Schedule | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-005 | Progress Photos / Documentation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-006 | Submittals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-007 | Quality Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-008 | Temporary Facilities / Utilities | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-009 | Temporary Controls / Safety / Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-010 | Product Delivery / Storage / Handling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-011 | Execution / Cutting / Patching | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-012 | Cleaning / Waste Management | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-013 | Closeout Procedures | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-014 | O&M Manuals / Record Docs | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-01-015 | Demonstration / Training | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 02 | Existing Conditions10 | $0 | |||||
| Section-02-001 | Existing Conditions Assessment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-002 | Surveys / Documentation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-003 | Selective Demolition | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-004 | Site Demolition | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-005 | Structure Demolition | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-006 | Hazardous Material Testing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-007 | Hazardous Material Abatement | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-008 | Asbestos / Lead / Mold Remediation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-009 | Facility Remediation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-02-010 | Existing Utility Locate / Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 03 | Concrete14 | $0 | |||||
| Section-03-001 | Concrete Submittals / Mix Designs | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-002 | Concrete Forming | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-003 | Concrete Reinforcing / Rebar | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-004 | Embeds / Anchor Bolts / Accessories | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-005 | Vapor Retarder / Slab Prep | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-006 | Cast-In-Place Concrete | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-007 | Concrete Placement | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-008 | Concrete Finishing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-009 | Curing / Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-010 | Concrete Joints / Sawcutting | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-011 | Testing / Field Quality Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-012 | Precast Concrete | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-013 | Grouting | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-03-014 | Concrete Cutting / Core Drilling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 04 | Masonry14 | $0 | |||||
| Section-04-001 | Masonry Submittals / Samples | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-002 | Mortar / Grout | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-003 | Masonry Reinforcing / Anchors | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-004 | Masonry Accessories | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-005 | CMU / Concrete Unit Masonry | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-006 | Brick / Clay Unit Masonry | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-007 | Masonry Veneer | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-008 | Flashing / Weeps / Drainage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-009 | Lintels / Bond Beams | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-010 | Control / Expansion Joints | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-011 | Stone Assemblies | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-012 | Cast Stone / Manufactured Stone | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-013 | Masonry Cleaning / Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-04-014 | Masonry Restoration / Repair | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 05 | Metals10 | $0 | |||||
| Section-05-001 | Structural Steel | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-002 | Steel Joists | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-003 | Metal Decking | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-004 | Cold-Formed Metal Framing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-005 | Metal Fabrications | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-006 | Metal Stairs | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-007 | Pipe / Tube Railings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-008 | Gratings / Floor Plates | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-009 | Decorative Metal | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-05-010 | Steel Erection / Field Welding | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 06 | Wood, Plastics, and Composites10 | $0 | |||||
| Section-06-001 | Rough Carpentry | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-002 | Wood Framing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-003 | Sheathing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-004 | Blocking / Backing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-005 | Finish Carpentry | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-006 | Millwork | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-007 | Architectural Woodwork | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-008 | Casework | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-009 | Countertops | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-06-010 | Composite Trim / Panels | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 07 | Thermal and Moisture Protection10 | $0 | |||||
| Section-07-001 | Waterproofing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-002 | Dampproofing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-003 | Thermal Insulation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-004 | Air / Vapor Barriers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-005 | Roofing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-006 | Roof / Wall Panels | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-007 | Flashing / Sheet Metal | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-008 | Roof Accessories | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-009 | Firestopping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-07-010 | Joint Sealants | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 08 | Openings10 | $0 | |||||
| Section-08-001 | Hollow Metal Doors / Frames | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-002 | Wood Doors | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-003 | Specialty Doors | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-004 | Overhead / Coiling Doors | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-005 | Entrances / Storefronts | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-006 | Windows | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-007 | Curtain Wall | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-008 | Door Hardware | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-009 | Glazing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-08-010 | Louvers / Vents | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 09 | Finishes10 | $0 | |||||
| Section-09-001 | Gypsum Board Assemblies | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-09-002 | Tile | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-09-003 | Acoustical Ceilings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-09-004 | Resilient Flooring | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-09-005 | Carpet | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-09-006 | Resinous / Specialty Flooring | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-09-007 | Wall Coverings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-09-008 | Painting | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-09-009 | High-Performance Coatings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-09-010 | Acoustic Treatment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 10 | Specialties9 | $0 | |||||
| Section-10-001 | Visual Display Boards | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-002 | Signage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-003 | Toilet Compartments | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-004 | Lockers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-005 | Fire Extinguishers / Cabinets | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-006 | Toilet / Bath Accessories | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-007 | Wall / Corner Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-008 | Storage Shelving | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-10-009 | Flagpoles | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 11 | Equipment9 | $0 | |||||
| Section-11-001 | Loading Dock Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-002 | Vehicle Service Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-003 | Foodservice Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-004 | Residential Appliances | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-005 | Laundry Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-006 | Waste Handling Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-007 | Athletic / Recreational Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-008 | Laboratory Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-11-009 | Parking Control Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 12 | Furnishings8 | $0 | |||||
| Section-12-001 | Window Treatments | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-002 | Casework | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-003 | Countertops | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-004 | Entry Mats / Grilles | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-005 | Furniture | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-006 | Systems Furniture | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-007 | Fixed Seating | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-12-008 | Site Furnishings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 13 | Special Construction8 | $0 | |||||
| Section-13-001 | Special Facility Components | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-002 | Pools / Fountains | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-003 | Controlled Environment Rooms | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-004 | Vaults / Secure Rooms | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-005 | Pre-Engineered Structures | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-006 | Building Modules | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-007 | Radiation Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-13-008 | Special Instrumentation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 14 | Conveying Equipment7 | $0 | |||||
| Section-14-001 | Elevators | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-002 | Hydraulic Elevators | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-003 | Traction Elevators | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-004 | Escalators / Moving Walks | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-005 | Platform / Wheelchair Lifts | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-006 | Material Lifts | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-14-007 | Conveying Equipment Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 21 | Fire Suppression8 | $0 | |||||
| Section-21-001 | Fire Suppression Submittals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-002 | Sprinkler Systems | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-003 | Wet-Pipe Sprinklers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-004 | Dry / Preaction Sprinklers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-005 | Standpipes | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-006 | Fire Pumps | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-007 | Special Agent Suppression | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-21-008 | Fire Suppression Testing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 22 | Plumbing9 | $0 | |||||
| Section-22-001 | Plumbing Submittals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-22-002 | Domestic Water Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-22-003 | Sanitary Waste / Vent | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-22-004 | Storm Drainage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-22-005 | Gas Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-22-006 | Plumbing Fixtures | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-22-007 | Water Heaters / Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-22-008 | Insulation / Supports | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-22-009 | Testing / Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 23 | Heating, Ventilating, and Air Conditioning9 | $0 | |||||
| Section-23-001 | HVAC Submittals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-002 | HVAC Insulation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-003 | HVAC Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-004 | Ductwork | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-005 | Air Distribution | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-006 | Air Handling Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-007 | Packaged HVAC Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-008 | Controls | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-23-009 | Testing / Adjusting / Balancing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 25 | Integrated Automation8 | $0 | |||||
| Section-25-001 | Automation Network | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-002 | Control / Monitoring Network | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-003 | Local Control Units | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-004 | Automation Software | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-005 | Terminal Devices | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-006 | Facility Controls | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-007 | Control Sequences | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-25-008 | Integrated Automation Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 26 | Electrical10 | $0 | |||||
| Section-26-001 | Electrical Submittals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-26-002 | Grounding / Bonding | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-26-003 | Conduit / Wire / Cable | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-26-004 | Electrical Service | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-26-005 | Switchboards / Panelboards | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-26-006 | Transformers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-26-007 | Wiring Devices | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-26-008 | Lighting | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-26-009 | Emergency Power / Generator | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-26-010 | Electrical Testing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 27 | Communications9 | $0 | |||||
| Section-27-001 | Communications Pathways | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-002 | Structured Cabling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-003 | Equipment Rooms / Racks | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-004 | Backbone Cabling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-005 | Horizontal Cabling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-006 | Data Network Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-007 | Voice Communications | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-008 | Audio-Video Systems | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-27-009 | Communications Testing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 28 | Electronic Safety and Security8 | $0 | |||||
| Section-28-001 | Access Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-002 | Video Surveillance | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-003 | Intrusion Detection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-004 | Security Monitoring | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-005 | Fire Alarm / Detection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-006 | Mass Notification | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-007 | Security Network / Integration | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-28-008 | Security Testing / Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 31 | Earthwork10 | $0 | |||||
| Section-31-001 | Site Clearing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-002 | Rough Grading | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-003 | Excavation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-004 | Trenching | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-005 | Dewatering | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-006 | Fill / Backfill | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-007 | Subgrade Preparation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-008 | Erosion / Sediment Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-009 | Soil Stabilization | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-31-010 | Shoring / Excavation Support | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 32 | Exterior Improvements10 | $0 | |||||
| Section-32-001 | Asphalt Paving | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-002 | Concrete Paving / Walks | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-003 | Curbs / Gutters | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-004 | Pavement Markings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-005 | Fences / Gates | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-006 | Retaining Walls | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-007 | Site Furnishings | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-008 | Irrigation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-009 | Planting / Landscaping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-32-010 | Turf / Seeding | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 33 | Utilities8 | $0 | |||||
| Section-33-001 | Water Utilities | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-002 | Sanitary Sewerage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-003 | Storm Drainage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-004 | Utility Structures | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-005 | Natural Gas Utilities | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-006 | Electrical Site Utilities | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-007 | Communications Site Utilities | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-33-008 | Utility Testing / Tie-Ins | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 34 | Transportation6 | $0 | |||||
| Section-34-001 | Roadways | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-34-002 | Railways / Guideways | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-34-003 | Traffic Signals | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-34-004 | Transportation Signage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-34-005 | Pavement Marking | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-34-006 | Transportation Lighting | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 35 | Waterway and Marine Construction7 | $0 | |||||
| Section-35-001 | Dredging | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-002 | Shoreline Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-003 | Waterway Bank Protection | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-004 | Marine Construction / Docks | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-005 | Floating Construction | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-006 | Underwater Construction | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-35-007 | Dams / Levees | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 40 | Process Interconnections8 | $0 | |||||
| Section-40-001 | Process Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-002 | Gas / Vapor Process Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-003 | Liquid Process Piping | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-004 | Process Valves | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-005 | Pipe Supports / Sleeves | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-006 | Process Piping Insulation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-007 | Instrumentation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-40-008 | Process Controls | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 41 | Material Processing and Handling Equipment7 | $0 | |||||
| Section-41-001 | Conveyors | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-002 | Cranes / Hoists | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-003 | Lifting Devices | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-004 | Feeders / Batching | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-005 | Storage Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-006 | Manufacturing Lines | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-41-007 | Processing Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 42 | Process Heating, Cooling, and Drying Equipment6 | $0 | |||||
| Section-42-001 | Process Heating Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-42-002 | Process Boilers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-42-003 | Furnaces / Kilns / Ovens | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-42-004 | Process Cooling Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-42-005 | Heat Exchangers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-42-006 | Drying Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 43 | Process Gas and Liquid Handling, Purification, and Storage Equipment7 | $0 | |||||
| Section-43-001 | Gas Handling Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-002 | Compressors / Blowers | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-003 | Liquid Pumps | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-004 | Liquid Handling Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-005 | Filters / Purification | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-006 | Tanks / Storage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-43-007 | Pressurized Vessels | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 44 | Pollution and Waste Control Equipment6 | $0 | |||||
| Section-44-001 | Air Pollution Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-44-002 | Noise / Vibration Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-44-003 | Odor Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-44-004 | Water Pollution Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-44-005 | Solid Waste Control | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-44-006 | Waste Thermal Processing | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 45 | Industry-Specific Manufacturing Equipment7 | $0 | |||||
| Section-45-001 | Oil / Gas Extraction Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-002 | Mining Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-003 | Food Manufacturing Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-004 | Beverage Manufacturing Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-005 | Chemical Manufacturing Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-006 | Metal / Machinery Manufacturing Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-45-007 | Manufacturing Equipment Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 46 | Water and Wastewater Equipment9 | $0 | |||||
| Section-46-001 | Packaged Treatment Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-002 | Screening Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-003 | Grinding / Shredding Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-004 | Oil / Grease Separation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-005 | Chemical Feed Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-006 | Clarifier Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-007 | Aeration / Secondary Treatment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-008 | Filtration / UV Treatment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-46-009 | Residuals / Sludge Handling | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| DIV 48 | Electrical Power Generation8 | $0 | |||||
| Section-48-001 | Generators | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-002 | Solar Power Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-003 | Wind Power Equipment | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-004 | Battery / Energy Storage | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-005 | Inverters / Power Controls | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-006 | Transformers / Voltage Regulation | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-007 | Combined Heat and Power | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
| Section-48-008 | Power Generation Commissioning | $0 | |||||
| └Scope 01 | $0 | ||||||
| └Scope 02 | $0 | ||||||
Schedule Input
Read-only estimate-to-schedule preparation
0 ready scope linesMirrors estimate automatically
| ID | Division / Section | Qty | Unit | Status |
|---|---|---|---|---|
| DIV 00 | Procurement and Contracting Requirements13 | |||
| Section-00-001 | Bid / Proposal Submitted | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-002 | Contract Executed | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-003 | Bonds Received | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-004 | Insurance Received | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-005 | Notice to Proceed | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-006 | Permit Status | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-007 | Schedule of Values | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-008 | Pay Applications | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-009 | RFIs / Clarifications | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-010 | Change Orders | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-011 | Substantial Completion | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-012 | Final Closeout | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-00-013 | Warranties | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 01 | General Requirements15 | |||
| Section-01-001 | Project Summary / Scope | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-002 | Work Restrictions / Site Rules | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-003 | Project Meetings | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-004 | Construction Schedule | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-005 | Progress Photos / Documentation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-006 | Submittals | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-007 | Quality Control | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-008 | Temporary Facilities / Utilities | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-009 | Temporary Controls / Safety / Protection | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-010 | Product Delivery / Storage / Handling | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-011 | Execution / Cutting / Patching | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-012 | Cleaning / Waste Management | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-013 | Closeout Procedures | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-014 | O&M Manuals / Record Docs | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-01-015 | Demonstration / Training | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 02 | Existing Conditions10 | |||
| Section-02-001 | Existing Conditions Assessment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-02-002 | Surveys / Documentation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-02-003 | Selective Demolition | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-02-004 | Site Demolition | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-02-005 | Structure Demolition | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-02-006 | Hazardous Material Testing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-02-007 | Hazardous Material Abatement | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-02-008 | Asbestos / Lead / Mold Remediation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-02-009 | Facility Remediation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-02-010 | Existing Utility Locate / Protection | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 03 | Concrete14 | |||
| Section-03-001 | Concrete Submittals / Mix Designs | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-002 | Concrete Forming | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-003 | Concrete Reinforcing / Rebar | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-004 | Embeds / Anchor Bolts / Accessories | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-005 | Vapor Retarder / Slab Prep | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-006 | Cast-In-Place Concrete | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-007 | Concrete Placement | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-008 | Concrete Finishing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-009 | Curing / Protection | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-010 | Concrete Joints / Sawcutting | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-011 | Testing / Field Quality Control | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-012 | Precast Concrete | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-013 | Grouting | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-03-014 | Concrete Cutting / Core Drilling | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 04 | Masonry14 | |||
| Section-04-001 | Masonry Submittals / Samples | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-002 | Mortar / Grout | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-003 | Masonry Reinforcing / Anchors | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-004 | Masonry Accessories | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-005 | CMU / Concrete Unit Masonry | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-006 | Brick / Clay Unit Masonry | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-007 | Masonry Veneer | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-008 | Flashing / Weeps / Drainage | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-009 | Lintels / Bond Beams | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-010 | Control / Expansion Joints | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-011 | Stone Assemblies | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-012 | Cast Stone / Manufactured Stone | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-013 | Masonry Cleaning / Protection | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-04-014 | Masonry Restoration / Repair | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 05 | Metals10 | |||
| Section-05-001 | Structural Steel | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-05-002 | Steel Joists | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-05-003 | Metal Decking | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-05-004 | Cold-Formed Metal Framing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-05-005 | Metal Fabrications | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-05-006 | Metal Stairs | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-05-007 | Pipe / Tube Railings | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-05-008 | Gratings / Floor Plates | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-05-009 | Decorative Metal | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-05-010 | Steel Erection / Field Welding | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 06 | Wood, Plastics, and Composites10 | |||
| Section-06-001 | Rough Carpentry | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-06-002 | Wood Framing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-06-003 | Sheathing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-06-004 | Blocking / Backing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-06-005 | Finish Carpentry | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-06-006 | Millwork | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-06-007 | Architectural Woodwork | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-06-008 | Casework | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-06-009 | Countertops | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-06-010 | Composite Trim / Panels | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 07 | Thermal and Moisture Protection10 | |||
| Section-07-001 | Waterproofing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-07-002 | Dampproofing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-07-003 | Thermal Insulation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-07-004 | Air / Vapor Barriers | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-07-005 | Roofing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-07-006 | Roof / Wall Panels | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-07-007 | Flashing / Sheet Metal | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-07-008 | Roof Accessories | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-07-009 | Firestopping | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-07-010 | Joint Sealants | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 08 | Openings10 | |||
| Section-08-001 | Hollow Metal Doors / Frames | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-08-002 | Wood Doors | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-08-003 | Specialty Doors | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-08-004 | Overhead / Coiling Doors | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-08-005 | Entrances / Storefronts | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-08-006 | Windows | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-08-007 | Curtain Wall | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-08-008 | Door Hardware | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-08-009 | Glazing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-08-010 | Louvers / Vents | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 09 | Finishes10 | |||
| Section-09-001 | Gypsum Board Assemblies | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-09-002 | Tile | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-09-003 | Acoustical Ceilings | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-09-004 | Resilient Flooring | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-09-005 | Carpet | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-09-006 | Resinous / Specialty Flooring | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-09-007 | Wall Coverings | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-09-008 | Painting | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-09-009 | High-Performance Coatings | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-09-010 | Acoustic Treatment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 10 | Specialties9 | |||
| Section-10-001 | Visual Display Boards | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-10-002 | Signage | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-10-003 | Toilet Compartments | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-10-004 | Lockers | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-10-005 | Fire Extinguishers / Cabinets | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-10-006 | Toilet / Bath Accessories | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-10-007 | Wall / Corner Protection | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-10-008 | Storage Shelving | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-10-009 | Flagpoles | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 11 | Equipment9 | |||
| Section-11-001 | Loading Dock Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-11-002 | Vehicle Service Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-11-003 | Foodservice Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-11-004 | Residential Appliances | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-11-005 | Laundry Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-11-006 | Waste Handling Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-11-007 | Athletic / Recreational Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-11-008 | Laboratory Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-11-009 | Parking Control Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 12 | Furnishings8 | |||
| Section-12-001 | Window Treatments | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-12-002 | Casework | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-12-003 | Countertops | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-12-004 | Entry Mats / Grilles | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-12-005 | Furniture | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-12-006 | Systems Furniture | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-12-007 | Fixed Seating | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-12-008 | Site Furnishings | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 13 | Special Construction8 | |||
| Section-13-001 | Special Facility Components | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-13-002 | Pools / Fountains | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-13-003 | Controlled Environment Rooms | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-13-004 | Vaults / Secure Rooms | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-13-005 | Pre-Engineered Structures | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-13-006 | Building Modules | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-13-007 | Radiation Protection | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-13-008 | Special Instrumentation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 14 | Conveying Equipment7 | |||
| Section-14-001 | Elevators | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-14-002 | Hydraulic Elevators | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-14-003 | Traction Elevators | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-14-004 | Escalators / Moving Walks | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-14-005 | Platform / Wheelchair Lifts | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-14-006 | Material Lifts | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-14-007 | Conveying Equipment Commissioning | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 21 | Fire Suppression8 | |||
| Section-21-001 | Fire Suppression Submittals | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-21-002 | Sprinkler Systems | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-21-003 | Wet-Pipe Sprinklers | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-21-004 | Dry / Preaction Sprinklers | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-21-005 | Standpipes | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-21-006 | Fire Pumps | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-21-007 | Special Agent Suppression | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-21-008 | Fire Suppression Testing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 22 | Plumbing9 | |||
| Section-22-001 | Plumbing Submittals | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-22-002 | Domestic Water Piping | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-22-003 | Sanitary Waste / Vent | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-22-004 | Storm Drainage | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-22-005 | Gas Piping | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-22-006 | Plumbing Fixtures | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-22-007 | Water Heaters / Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-22-008 | Insulation / Supports | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-22-009 | Testing / Commissioning | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 23 | Heating, Ventilating, and Air Conditioning9 | |||
| Section-23-001 | HVAC Submittals | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-23-002 | HVAC Insulation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-23-003 | HVAC Piping | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-23-004 | Ductwork | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-23-005 | Air Distribution | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-23-006 | Air Handling Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-23-007 | Packaged HVAC Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-23-008 | Controls | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-23-009 | Testing / Adjusting / Balancing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 25 | Integrated Automation8 | |||
| Section-25-001 | Automation Network | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-25-002 | Control / Monitoring Network | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-25-003 | Local Control Units | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-25-004 | Automation Software | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-25-005 | Terminal Devices | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-25-006 | Facility Controls | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-25-007 | Control Sequences | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-25-008 | Integrated Automation Commissioning | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 26 | Electrical10 | |||
| Section-26-001 | Electrical Submittals | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-26-002 | Grounding / Bonding | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-26-003 | Conduit / Wire / Cable | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-26-004 | Electrical Service | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-26-005 | Switchboards / Panelboards | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-26-006 | Transformers | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-26-007 | Wiring Devices | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-26-008 | Lighting | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-26-009 | Emergency Power / Generator | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-26-010 | Electrical Testing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 27 | Communications9 | |||
| Section-27-001 | Communications Pathways | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-27-002 | Structured Cabling | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-27-003 | Equipment Rooms / Racks | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-27-004 | Backbone Cabling | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-27-005 | Horizontal Cabling | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-27-006 | Data Network Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-27-007 | Voice Communications | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-27-008 | Audio-Video Systems | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-27-009 | Communications Testing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 28 | Electronic Safety and Security8 | |||
| Section-28-001 | Access Control | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-28-002 | Video Surveillance | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-28-003 | Intrusion Detection | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-28-004 | Security Monitoring | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-28-005 | Fire Alarm / Detection | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-28-006 | Mass Notification | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-28-007 | Security Network / Integration | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-28-008 | Security Testing / Commissioning | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 31 | Earthwork10 | |||
| Section-31-001 | Site Clearing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-31-002 | Rough Grading | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-31-003 | Excavation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-31-004 | Trenching | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-31-005 | Dewatering | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-31-006 | Fill / Backfill | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-31-007 | Subgrade Preparation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-31-008 | Erosion / Sediment Control | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-31-009 | Soil Stabilization | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-31-010 | Shoring / Excavation Support | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 32 | Exterior Improvements10 | |||
| Section-32-001 | Asphalt Paving | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-32-002 | Concrete Paving / Walks | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-32-003 | Curbs / Gutters | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-32-004 | Pavement Markings | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-32-005 | Fences / Gates | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-32-006 | Retaining Walls | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-32-007 | Site Furnishings | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-32-008 | Irrigation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-32-009 | Planting / Landscaping | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-32-010 | Turf / Seeding | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 33 | Utilities8 | |||
| Section-33-001 | Water Utilities | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-33-002 | Sanitary Sewerage | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-33-003 | Storm Drainage | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-33-004 | Utility Structures | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-33-005 | Natural Gas Utilities | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-33-006 | Electrical Site Utilities | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-33-007 | Communications Site Utilities | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-33-008 | Utility Testing / Tie-Ins | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 34 | Transportation6 | |||
| Section-34-001 | Roadways | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-34-002 | Railways / Guideways | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-34-003 | Traffic Signals | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-34-004 | Transportation Signage | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-34-005 | Pavement Marking | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-34-006 | Transportation Lighting | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 35 | Waterway and Marine Construction7 | |||
| Section-35-001 | Dredging | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-35-002 | Shoreline Protection | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-35-003 | Waterway Bank Protection | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-35-004 | Marine Construction / Docks | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-35-005 | Floating Construction | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-35-006 | Underwater Construction | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-35-007 | Dams / Levees | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 40 | Process Interconnections8 | |||
| Section-40-001 | Process Piping | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-40-002 | Gas / Vapor Process Piping | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-40-003 | Liquid Process Piping | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-40-004 | Process Valves | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-40-005 | Pipe Supports / Sleeves | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-40-006 | Process Piping Insulation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-40-007 | Instrumentation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-40-008 | Process Controls | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 41 | Material Processing and Handling Equipment7 | |||
| Section-41-001 | Conveyors | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-41-002 | Cranes / Hoists | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-41-003 | Lifting Devices | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-41-004 | Feeders / Batching | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-41-005 | Storage Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-41-006 | Manufacturing Lines | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-41-007 | Processing Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 42 | Process Heating, Cooling, and Drying Equipment6 | |||
| Section-42-001 | Process Heating Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-42-002 | Process Boilers | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-42-003 | Furnaces / Kilns / Ovens | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-42-004 | Process Cooling Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-42-005 | Heat Exchangers | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-42-006 | Drying Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 43 | Process Gas and Liquid Handling, Purification, and Storage Equipment7 | |||
| Section-43-001 | Gas Handling Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-43-002 | Compressors / Blowers | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-43-003 | Liquid Pumps | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-43-004 | Liquid Handling Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-43-005 | Filters / Purification | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-43-006 | Tanks / Storage | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-43-007 | Pressurized Vessels | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 44 | Pollution and Waste Control Equipment6 | |||
| Section-44-001 | Air Pollution Control | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-44-002 | Noise / Vibration Control | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-44-003 | Odor Control | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-44-004 | Water Pollution Control | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-44-005 | Solid Waste Control | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-44-006 | Waste Thermal Processing | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 45 | Industry-Specific Manufacturing Equipment7 | |||
| Section-45-001 | Oil / Gas Extraction Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-45-002 | Mining Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-45-003 | Food Manufacturing Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-45-004 | Beverage Manufacturing Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-45-005 | Chemical Manufacturing Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-45-006 | Metal / Machinery Manufacturing Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-45-007 | Manufacturing Equipment Commissioning | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 46 | Water and Wastewater Equipment9 | |||
| Section-46-001 | Packaged Treatment Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-46-002 | Screening Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-46-003 | Grinding / Shredding Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-46-004 | Oil / Grease Separation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-46-005 | Chemical Feed Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-46-006 | Clarifier Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-46-007 | Aeration / Secondary Treatment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-46-008 | Filtration / UV Treatment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-46-009 | Residuals / Sludge Handling | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| DIV 48 | Electrical Power Generation8 | |||
| Section-48-001 | Generators | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-48-002 | Solar Power Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-48-003 | Wind Power Equipment | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-48-004 | Battery / Energy Storage | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-48-005 | Inverters / Power Controls | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-48-006 | Transformers / Voltage Regulation | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-48-007 | Combined Heat and Power | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
| Section-48-008 | Power Generation Commissioning | Ready | ||
| └Scope 01 | Enter scope description | 0 | LS | Needs description |
| └Scope 02 | Enter scope description | 0 | LS | Needs description |
Proposal Builder
Build polished proposals from your estimate

CONSTRUCTION PROPOSAL
New Hotel Development
City, State
Prepared August 15, 2026Project Understanding
BASK Development proposes to provide the construction services represented by the selected estimate divisions, sections, and detailed scope lines for this project.
Scope Summary
The proposal scope is generated directly from the project estimate. Additions or deletions made in the estimate will update this proposal before final issue.
Cost by Division
DIV 00 — Procurement and Contracting Requirements$0
DIV 01 — General Requirements$0
DIV 02 — Existing Conditions$0
DIV 03 — Concrete$0
DIV 04 — Masonry$0
DIV 05 — Metals$0
DIV 06 — Wood, Plastics, and Composites$0
DIV 07 — Thermal and Moisture Protection$0
DIV 08 — Openings$0
DIV 09 — Finishes$0
DIV 10 — Specialties$0
DIV 11 — Equipment$0
DIV 12 — Furnishings$0
DIV 13 — Special Construction$0
DIV 14 — Conveying Equipment$0
DIV 21 — Fire Suppression$0
DIV 22 — Plumbing$0
DIV 23 — Heating, Ventilating, and Air Conditioning$0
DIV 25 — Integrated Automation$0
DIV 26 — Electrical$0
DIV 27 — Communications$0
DIV 28 — Electronic Safety and Security$0
DIV 31 — Earthwork$0
DIV 32 — Exterior Improvements$0
DIV 33 — Utilities$0
DIV 34 — Transportation$0
DIV 35 — Waterway and Marine Construction$0
DIV 40 — Process Interconnections$0
DIV 41 — Material Processing and Handling Equipment$0
DIV 42 — Process Heating, Cooling, and Drying Equipment$0
DIV 43 — Process Gas and Liquid Handling, Purification, and Storage Equipment$0
DIV 44 — Pollution and Waste Control Equipment$0
DIV 45 — Industry-Specific Manufacturing Equipment$0
DIV 46 — Water and Wastewater Equipment$0
DIV 48 — Electrical Power Generation$0
Proposal Summary
- Direct Construction Cost
- $0
- Markup
- 5.0% · $0
- Proposal Total
- $0
Clarifications & Notes
Project assumptions, exclusions, alternates, and clarifications will be included here before the proposal is issued.
Acceptance
Accepted by: ______________________________
Date: ____________________________________
Direct construction cost$0
$0
Total estimate$0